2026-10-13 - Planning Board
Summary
Based on auto-generated captions; names and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk; the 19-minute recess from 1:37:11 to 1:56:12 and other stretches with no meeting speech are not counted):
- Tuesday, October 13, 2026, Jersey City Planning Board.
- The recording starts at the call to order and runs about 3 hours 44 minutes; adjourned after the resolutions.
- Six members were present at the start and Councilwoman Little joined during the second item, making seven voters.
- Every vote was unanimous.
- Commissioners are named only by surname in the captions (Vice Chair Wick, Commissioners Kaplan, Stamato, Conway and Patel, and the Chair).
Black heritage sites historic preservation element
2:08-9:06
- Maggie O'Neal presented a master plan re-examination adding 43 Black heritage sites from a citywide survey to the historic preservation element and inventory.
- No public comment; motion finding it consistent with the master plan and recommending City Council adoption carried 6-0.
Four-unit building in the Heights (Case P2026-000077)
9:41-34:19
- Minor site plan for a four-story, four-unit as-of-right building; vinyl siding replaced by fiber cement at the board's request.
- Approved 7-0 with staff conditions; Councilwoman Little voted.
Four-unit rehab with parking variance (Case P2025-0270)
34:22-59:53
- Two-family rehab and addition to four units; questions on a shared driveway, removed garage and a bio-retention basin.
- Staff found an un-noticed parking variance (4.8 spaces required); carried to a date uncertain for renotice.
Ocean Avenue South mixed-use building (Case P2025-0160)
9:08-9:35, 59:57-1:37:09
- First called early but moved back while the applicant's planner was delayed.
- Five stories, 40 units, one affordable, 8 garage spaces; two side-yard and building-depth variances.
- Approved 7-0 with added conditions on trash chute, siding, side fencing, bump-outs, a flashing beacon and a loading zone request.
Powerhouse Arts 35-story tower site plan amendment (Case P2026-0126)
1:56:22-2:07:03
- Unit count cut from 633 to 613 and height raised two feet to 342 feet, under the 350-foot limit; parking unchanged. Approved 7-0.
Fifth Street minor subdivision (Case P2026-000099)
2:07:17-2:36:38
- Subdivision restoring two 12.5 by 50 foot lots after a tax assessor consolidation; board counsel recused, applicant consented.
- A neighbor raised flooding and drainage; the board said only the subdivision was before it. Approved 7-0.
Morris Canal mixed-use building (Case P2026-000063)
2:37:30-3:38:44
- Five stories, 96 units (10 affordable), 25 parking spaces, 10-foot easement walkway along the light rail line; one variance for a second residential sign.
- Four conditions added: forestry permits, fence, loading space inquiry, crosswalks. A nearby resident objected to crowding and parking. Approved 7-0.
Summit Avenue preliminary site plan (Case P2025-0169)
3:39:41-3:41:52
- Carried to October 27 after talks with the administration; time to act waived through October 28; no further notice.
Other business
- Roll call, sunshine notice and swearing in of staff (the opening minutes); one case (item 10, P2024-0106) adjourned to a date uncertain at the applicant's request.
- Near the end the board memorialized about five resolutions (a corrective resolution, extensions of two approvals, a signage deviation and a site plan approval); captions garble the case details. Approved 7-0 and adjourned.
- Staff presenting included Ward (city planning) and Maggie O'Neal.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:00Um, schedule meeting today is Tuesday,
00:02October 13th, with a start time at 5:38
00:07p.m. Can we all stand for the pledge of
00:08the allegiance?
00:11>> Ice
00:12to the flag of the United States of
00:15America and to the republic for which it
00:17stands, one nation under God,
00:20indivisible, liberty and justice for
00:22all.
00:28Can we have the sunshine announcement,
00:32Ben?
00:33>> Yeah, me again. Uh, good evening
00:36everyone. Today is Tuesday, October 13,
00:392026. This is a Jersey City Planning
00:41Board meeting with a scheduled 5:30 p.m.
00:44start time. In accordance with the open
00:46public meetings act, notice of this
00:48meeting has been posted with the city
00:50clerk on the city bulletin uh and on the
00:53city website on October 9th, 2026. Uh
00:57this meeting was also posted on the
00:58Jersey City Division of City Planning
01:00web page and all distribution materials
01:03uh made available to the board were
01:05published and made available to the
01:07public.
01:08>> Thank you. Can we have the roll call,
01:09please?
01:11>> Uh Vice Chair Wick
01:12>> here. Commissioner Kaplan
01:14>> here.
01:15>> Commissioner Stamato
01:16>> here.
01:17>> Commissioner Conway
01:18>> here.
01:18>> Commissioner Patel
01:19>> here.
01:20>> And Madam Chair Gongadan
01:21>> here.
01:22>> We have six commissioners. We have a
01:23quorum.
01:24>> Thank you.
01:24>> Let's just mark the sunshine B1.
01:27>> B1. Okay.
01:28>> Thanks. Can we swear into staff, please?
01:33>> I see Matt, Maggie, Ben, do you guys any
01:35testimony tonight? It's going to be the
01:36truth, the whole truth, and nothing but
01:37the truth.
01:38>> Yes.
01:38>> Thank you,
01:40>> Ben. Any correspondence? Uh yes, we have
01:43one adjournment. Uh case P2024
01:48uh-0106
01:50item 10 on the agenda at uh 120 Theodore
01:54Conrad Drive has requested to adjourn to
01:57a date uncertain and they will renote
01:59us.
02:00>> Thank you.
02:08>> Okay. At this time, I would like to call
02:09KP2026-0147
02:12review and discussion of the master plan
02:14re-examination of the historic
02:16preservation element to revise and add
02:19properties identified in the historic
02:21inventory inventory of black heritage
02:24building and sites to the historic
02:27resource inventory. Formal action may be
02:29taken.
02:31>> Good evening, commissioners. For those
02:33of you who I have not met, my name is
02:34Maggie O'Neal. I am the principal
02:36historic preservation specialist for the
02:38city. Um I am here tonight to present a
02:41master plan re-exam report for your
02:43consideration and hopefully adoption.
02:45The purpose of this re-exam report is to
02:48adopt the historic resource inventory.
02:50I'm sorry, the historic inventory of
02:52black heritage buildings and sites into
02:54the historic preservation element of the
02:56master plan. The city adopted a new
02:58historic preservation element in 2023.
03:01One of the recommendations in that
03:03master plan report was to conduct a
03:05survey of African-American history
03:07within Jersey City and then to identify
03:10sites related to African-American
03:11history and adopt them into the master
03:13plan. In late 2024, we engaged Hunter
03:16Research to study African-American
03:18history in Jersey City. Hunter Research
03:20is a firm that has performed similar
03:22surveys for other municipalities. They
03:24have extensive experience in preparing
03:26broad history surveys like this. They
03:29have a vast knowledge of Jersey City and
03:30we have an excellent working
03:31relationship with them. So we thought
03:33that they were the best firm to execute
03:34this work. [snorts] The uh Hunter
03:37Research presented a methodology to us
03:39um which is outlined extensively in the
03:41report um but at its base um it utilized
03:45a similar methodology to a 2011 study of
03:48African-American history in Trenton. And
03:50their goal was to compile a larger
03:52narrative of black history in Jersey
03:54City and then use that narrative to tie
03:57specific events and sites and people to
04:00actual pieces of land and buildings.
04:03This approach was especially important
04:05to us as the type of preservation our
04:07office typically completes is tied to
04:09blocks and lots. Jersey City's HPC is
04:12primarily a land usebased commission.
04:14Um, so this approach really aligns with
04:16our ordinance and makes it easier for us
04:18to actually execute preservation of
04:20these sites. City planning staff
04:22provided Hunter with some starting
04:23points, some known sites. Um, but we
04:25really, um, set them loose and connected
04:27them to many members of the community
04:29that they could speak to to further
04:30their research. Um, and after many years
04:33of work, the end result is the report
04:35that's in front of you this evening with
04:3743 specific sites identified. Um, as I
04:40said, Hunter worked with many community
04:42groups, but most extensively with Neil
04:44Brunson of the Afroamerican Historical
04:46and Cultural Society Museum, Charles
04:48Mayor of the Jersey City NAACP, and
04:51Jillian Sergeant Allen of Radical
04:53Solutions. They also worked um and
04:55reviewed prior documentation work such
04:57as Mayor uh Glenn Cunningham's Hidden
05:00Footprints and Martin Pierce and Deborah
05:02Haristen's Histories of Black Jersey
05:04City 19 uh sorry, 1630 to present.
05:07Before I go any further in talking about
05:09the report, um I want to mention that
05:12everyone who has worked on this report
05:14and reviewed this report is all in
05:16agreement that this report is a starting
05:18point, not an ending point. Um the hope
05:21is that this report is the basis to
05:24continue to do even more research.
05:26Hunter themselves wrote on page 10 of
05:28the report that historians are just be
05:30to quote them, "Historians are just
05:32beginning to scratch the surface of this
05:33theme and that future efforts are likely
05:35to refine or revise some of this
05:37report's findings as well as identify
05:40additional locations of potential
05:41significance. The report itself is an
05:44extensive narrative context um and
05:46individual surveys which are about four
05:48to five page pages per identified site
05:51and the tables provided in the staff
05:53report are broken into extent buildings
05:55so still standing sites um and
05:57demolished sites. The first
06:00recommendation in the report itself is
06:02to adopt the 43 identified sites into
06:04the historic preservation element of the
06:06master plan and um in the historic
06:09resource inventory. Um as outlined in
06:12the staff report, we will revise
06:13appendic appendex A of the element to
06:16include the report as a completed
06:17history survey and as a reference and
06:20then we will also add the sites
06:21individually into the survey in uh in
06:24the survey in the historic resource
06:26inventory. Um our historic resource
06:28inventory as it stands is identified by
06:31individual address. So some of the sites
06:34that are mentioned in this report and
06:36identified have are actually pre already
06:38in our historic resource inventory by
06:40address. Um we won't be duplicating
06:42them. What we do is um in that inventory
06:44we have a section for how they are
06:46identified and what their context is. We
06:48will be adding the black heritage site
06:50survey as additional context to those
06:52identified sites. So we will not have
06:54duplicates. it'll more just be adding to
06:56the context of those. We also have an
06:58entire section of the inventory for
07:00demolished buildings. So, the identified
07:03demolished buildings will be added to
07:04that list as well. Um, and the Historic
07:06Preservation Re Commission reviewed the
07:09report and staff's recommendations at
07:11its September meeting and recommended it
07:13for adoption.
07:15If you all have any questions about the
07:18information in front of you, I'm more
07:19than happy to answer them.
07:22>> Thank you, Maggie. Madam Chair, I think
07:24we should mark the notice. I note that
07:26the notices were sent to the various uh
07:30neighboring [clears throat]
07:31municipalities
07:32as well as to the county and was
07:34published in accordance with the law.
07:37So, we're going to mark those as B1 for
07:39purpose of the record.
07:41>> Thank you, councelor.
07:44>> Is there any board comments? I I just
07:46wanted to note that, you know, having
07:48read the report, having an opportunity
07:49ahead of this meeting, I thought it was
07:50very enlightening about a lot of the
07:52rich history um within the city that I
07:54personally was not fully aware of and
07:56and knowledgeable. And I I think it's
07:58important and excited to have the black
08:01history of the city highlighted and
08:02preserved.
08:05>> Any other board comments?
08:07I'd like to open for the public. Is
08:09there anyone from the public?
08:11>> I see no one from the public. I'd like
08:12to close the public portion. Second.
08:15>> Public is closed.
08:20>> Staff recommends approval.
08:21>> Okay,
08:22>> great.
08:23>> I'd like I'd like to entertain a motion.
08:26>> I'd like to make a motion to recommend
08:29um Oops, sorry. I'd like to make a
08:31motion finding the revision to the
08:32historic preservation element is
08:34consistent with the master plan and
08:36recommending city council take formal
08:37action to adopt the revision to the
08:40historic preservation element. Second
08:42it.
08:43>> Vice Chair Wick
08:44>> I.
08:45>> Commissioner Kaplan
08:46>> I.
08:46>> Commissioner Stamato
08:48>> I.
08:48>> Commissioner Conway
08:49>> I.
08:50>> Commissioner Patel.
08:51>> Hi.
08:51>> And Madam Chair Congadan.
08:53>> Maggie. Thank you so much to you and
08:55your staff and to everyone from the
08:57community that was involved in this
08:58study. Um it is very much needed here in
09:02Jersey City. My vote is I.
09:04>> Motion carries. All in favor.
09:05>> Thank you all.
09:06>> Thank you. Thank you.
09:08>> I'd like to call KPB2025-0160.
09:12Address is 89 Ocean Avenue.
09:15>> Mr. Lean, is there a preliminary and
09:18major and final major site plan with C
09:21variances?
09:22>> My planner is
09:24>> My planner is stuck in traffic. She's
09:26apparently five minutes away. Um I would
09:29request the board take the application
09:31right behind me and when she gets here
09:33we can proceed if that's acceptable.
09:35>> Sure.
09:35>> Okay.
09:38Okay,
09:41I'd like to move on to case 2026-000077.
09:46Address is 34 Leelaw Avenue. It's a
09:49minor site plan.
10:02>> Okay. after.
10:04>> Good evening. I'm Jonno appearing for
10:06the applicant.
10:08>> I have one witness with me today
10:11and um that's Martin Marino, our
10:14architect, but it is a notice case. So,
10:17we're going to submit the notice.
10:31I just want to note for the record um
10:33Councilwoman Little is in attendance.
10:38>> Well, this is a pretty straightforward
10:40application. Um it's a for a four-story
10:43building with four dwelling units
10:46located on 34 L Avenue which is in the
10:48height section of Jersey City. And I
10:50have my architect
10:52>> is the microphone on. Is the microphone
10:55on? Perfect.
10:58>> So, Madam Chairman, received the
10:59affidavit of publication proof of
11:01mailing with respect to the application
11:05P2026-000077.
11:08It does appear to be an order. We're
11:10going to mark it as A1 for purpose of
11:11the record.
11:12>> Thank you.
11:13>> Are you in?
11:16>> Okay. I'm going to swear in Jeffrey
11:18Lewis and Mareno is going to present.
11:22>> Thank you.
11:25Yes, I do.
11:27>> Jeffrey Lewis, J EF R Y L E W I S.
11:30>> Mr. Lewis, is your license current and
11:32in good standing?
11:33>> It is.
11:34>> Okay.
11:34>> And uh Martin is the project manager for
11:36this project. He's been working on it
11:37from day one. Not an architect yet, but
11:39he's in the process of taking his tests.
11:41And we're thankful that you're going to
11:43maybe let him present since he Thank
11:46you.
11:56Where is he?
12:34Thank you, Matt.
12:34>> Thank you.
12:40Got you.
13:07It's great when the technology works.
13:11I don't think that's
13:23[snorts]
13:25>> swear to this witness, please.
13:28>> The whole truth.
13:30>> I do.
13:32>> Martin Moreno. M A R T I N M O R E N O.
13:38>> Okay. Martin, can you share your screen?
13:40Uh, yeah. I'm waiting for it to connect.
13:43>> Mr. Marino, can you speak into the
13:44microphone, please?
13:45>> I'm sorry. Yes, of course. Councilwoman.
13:48>> Hello. Check. Check. Just waiting for
13:50this to connect.
13:55>> I think this is why Mr. Lean deferred.
13:57He knew the technology.
14:06>> All right. So far so good.
14:10>> Okay. Well, good evening everyone. Uh my
14:12name is Martin Moreno speaking on behalf
14:13of Tila Porto Architect PC. Here to
14:16present a project at 34 Law Avenue. As
14:19uh Mr. Okonnell said at the beginning of
14:21his statement, we are proposing an NASA
14:23frighttory 4-unit building located
14:25approximately smack dab between uh
14:28Palisade Avenue and its opposing uh
14:31street. The surveyor, I'm sorry, the
14:34site engineer is not here at the moment.
14:36I do have her drawing so I can propose I
14:39can show the site plan if you guys need
14:40me to but for now I'm just going going
14:42to go ahead and uh present the
14:44architecturals. So to start off on the
14:46cover page we are showing uh the design
14:48of our building as mentioned it's
14:50completely as of right we are proposing
14:53a sard setback of 3.2 ft for both egress
14:56purposes and lighting and ventilation
14:58purposes as well. Um moving on to the
15:03um just floor plans.
15:09So the first floor building we are
15:11showing two entrances. The entrance that
15:12is up here on the left hand side looking
15:14straight on from the street is at grade
15:16level that is meant to enter the unit
15:19one which is an ADA compliant unit. The
15:22other entrance which goes up to the
15:24second floor is raised and it's meant to
15:26match the neighboring building um per
15:29code I'm sorry per zoning requirements.
15:32So each unit that we are proposing here
15:34is going to be three bedroomedroom and
15:37um two baths for both the first I'm
15:40sorry three bedrooms two and a half
15:42baths for both the first and the second
15:44floor unit. Uh you enter on the first
15:47floor as I mentioned to unit one uh to
15:50an open living dining area, kitchen and
15:52then all your bedrooms oriented towards
15:54the back. We also have access for the
15:57building utilities such as the sprinkler
15:59which is accessed from the sideyard. Um
16:01and for the um upstairs entrance, you're
16:05entering from down here as I mentioned
16:08uh going up to the second floor level,
16:10landing right about here and entering
16:12into your second unit which is located
16:13on the second floor. Once you enter, to
16:16your left, you have an open uh living
16:18dining area as well as a kitchen. And
16:20similar to downstairs, all your bedrooms
16:23um are oriented towards the back of the
16:25building. Moving on to the third and
16:27fourth floor, we are proposing uh a nice
16:31feature here. We're doing a duplex unit
16:33for both the third and fourth floor
16:34units. Uh we are orient we are locating
16:38two units um as I mentioned as a duplex.
16:42One is going to be towards the front of
16:43the building. The other one is going to
16:45be towards the back of the building. So,
16:47as you enter um on the here's the
16:50landing that you're going to end up on
16:53as you're going up. So, if I just
16:54quickly go back, you're going to go up
16:56the stairs. Second floor landing to unit
16:59two. You continue going up. It dumps you
17:02off right here on the third floor
17:03landing. This one takes you into duplex.
17:07Uh that's towards the front of the
17:08building. And this entrance takes you
17:10towards the duplex that's towards the
17:11back of the building. Uh the duplex is
17:14towards the front of the building that
17:15we are locating. We are putting two
17:18bedrooms down there taking um pretty
17:21much taking advantage of the extra space
17:22that we have that resulted as that
17:25resulted in in regards to the landing
17:27being here which more with more space
17:29towards the front. We are putting two
17:31bedrooms towards the front kitchen and
17:33living dining area as as well as a Jack
17:36and Jill bathroom for both the lower
17:39level bedrooms to share. Um and a half
17:41bathroom as well. The back duplex we're
17:44just proposing on this level a the
17:47common living area as well as the
17:48kitchen and a half bath. Um given that
17:52we are essentially utilizing the front
17:55portion of the third and fourth floor
17:57for one of the duplexes, we decide to
18:00propose a sort of double height space
18:02like a bit of an atrium. Um so on the
18:04fourth floor, once you go up to the
18:06fourth level of the front duplex, the
18:09level in the front is going to be open.
18:12So it gives it a nice little feature. It
18:14allows for the big double height windows
18:15that you saw in the rendering, which I
18:17will show once again. and um just a nice
18:21like feature to the heights area which
18:23has a lot of more um scale modern uh
18:27units. So on the second level of the
18:30front duplex we have our master on we
18:32have our master bedroom with an on suite
18:35and a secondary living area. So for the
18:39for the third floor portion we have the
18:41dining and for the top level we have the
18:43living area. towards the back of the
18:46duplex. We are putting all of our
18:48bedroom spaces. So, we have all the
18:50bedrooms oriented towards the back. Um,
18:53with just sort of no double height space
18:56here, just a very standard uh nice
18:58duplex. As I mentioned, all units are
19:01three-bedroom, 2 and a half bath, each
19:03with their own washer dryer um and
19:07u mechanical space. the both the top
19:11duplexes will have access to a roof
19:13terrace. So both stairs will continue to
19:16go up and dump you off at the roof
19:19terrace here. Uh each So again, the
19:22front terrace located towards the front,
19:25the back unit terrace located towards
19:27the back. Just some more um deck
19:29details. Scrolling down to the
19:32elevations.
19:34Uh during our site analysis, we took
19:36some photo photog um we took some
19:38photographs of the neighboring
19:39buildings, the neighboring streets. We
19:41found, as you can see in the photos down
19:43here towards the left, that there's a
19:44very strong accent of beige, whether
19:47it's panels, bricks, whatever it may be.
19:49Um that was pretty common throughout
19:52this stretch of Leilaw Avenue that our
19:54um that our project is at. So, we
19:56decided to incorporate a incorporate a
19:59bridge uh a beige brick accent and just
20:03to kind of give it a little bit of a
20:05modern flare, so to speak, a little bit
20:06of aesthetics, we went with a vertical
20:08wood panning for the bumpout.
20:11These are the double height windows that
20:13I was referencing. Um, taking advantage
20:15of the fact that the duplex is located
20:17towards the front with the open space
20:19towards the bottom. It allows us for a
20:21nice big windows in the in the front
20:23facade design. This here is the rear
20:25elevation. Again, um larger windows
20:29allow a lot of light in. So, when we did
20:32our sun study, we noticed that the
20:35morning sun really hits the back of the
20:37building straight on, which allows for a
20:39lot of building, which allows for a lot
20:40of natural light to come in. Our side
20:43elevations are well as well. This is the
20:45side that's open with the rear yard with
20:47the sidey yard setback for our windows.
20:51This is the side going to be attached to
20:53our neighbor. And then I also just have
20:56some few extra things. Now, this is
20:59going to be exhibit um because we didn't
21:02get a chance to upload this.
21:05Excuse me. But this is just an animation
21:07to show the context of the building and
21:09how it sort of works with the existing
21:12streetscape.
21:13>> So, council, we're going to mark it as
21:15A2 for purpose of the record and
21:16obviously we'll upload it after the
21:18hearing.
21:20Um, I'm not sure if it's showing.
21:24>> Oh, there you go. Okay,
21:30>> it's loading.
21:32>> Your computer disconnected again.
21:35>> I don't think so.
21:47>> Oh, hold on a second. What' you do,
21:50Jeff?
21:52>> Give it a second.
21:57It's not
22:00right. Hold on. Let me try starting it
22:01over.
22:16Could
22:19you do the same? Just
22:21>> sure.
22:40>> No.
22:43>> All right. Um,
22:44>> it's okay. posted.
22:46>> Can you see the renderings? I have
22:48renderings up as well.
22:50>> We don't see your screen right now.
22:53>> Can you go back to the drawing? Will it
22:55come back up?
22:55>> Sure. Let me double check.
23:13I got the P PDFs up.
23:20>> All right.
23:24>> I would check if it's displaying your
23:27You have your
23:29>> I'm sorry.
23:30>> You have your display mode on.
23:32>> Windows key and P at the same time.
23:34Windows NP
23:40says PC screen duplicate extend second
23:43screen only
23:44>> duplicate
23:45>> duplicate.
23:46>> Yes, please
24:00change.
24:02>> Uhhuh.
24:04Um, okay. Well, unfortunately I can't
24:07share the animation with everyone, but
24:09um I'll just quickly
24:13if you like to see it, I can do a quick
24:14walk. I can come across and just show a
24:16quick uh video.
24:22So,
24:24just really showing the just showing the
24:27building in context with the street how
24:30it lies in with the existing
24:32streetscape.
24:33This is more of a panoramic view going
24:35across the street in the oneway
24:36direction going that way. Um,
24:42again, just showing that featuring the
24:43double height space, how you can put
24:45furniture, lights, whatever may be down
24:48there. There's more of a sidewalk view,
24:50more lower level, walking down in the
24:51opposite direction. Once again, seeing
24:53how the building fits in its existing
24:55streetscape.
24:57just sort of panning coming around
25:02and then just going back to the original
25:05rendering that we had with a more front
25:08straight-on street view of the project.
25:13>> Can we um can you just go over the um
25:17sighting? What material is being used?
25:19>> Sure.
25:20>> The materials you mean councilwoman?
25:21Sure.
25:22>> Yes.
25:22>> Yes. Specifically for the rear and then
25:24the side for the neighbors.
25:27The vinyl. We are proposing vinyl on the
25:29sides on the side rears and on the side
25:33elevations and on the rear. On the front
25:35we are proposing a fiber cement panel
25:37that has a bit of a wood finish. That is
25:39the material that we are proposing for
25:41excuse me for the bumpout. The darker
25:44dark gray paneling that's in the
25:46background is also a fiber cement siding
25:49with a dark gray finish and the um beige
25:52brick. And then the vinyl siding
25:54strictly to the side elevation and the
25:56rear elevation.
25:57>> So this board here does uh does not like
26:02vinyl siding.
26:03>> Well, we can replace the vinyl with
26:05fiber cement match a similar color if
26:08that's preferred.
26:09>> That is preferred.
26:10>> Sure, councilman. Of course.
26:13>> Thank you.
26:13>> I want you to know that Mr. Lewis set
26:15you up with that.
26:16>> I'm sorry, sir.
26:17>> Mr. Lewis totally set you up with that.
26:25Now he knows. All right.
26:38Oh.
26:43Um, I'll
26:45briefly I don't know if that'll work.
26:49>> Oh, there we go.
26:52Success.
26:52>> Success.
26:54>> Is there any fire escape?
26:56>> Fire escape?
26:57>> Yes.
26:57>> Um, no. Uh, council, this is uh
27:00sprinkler building with a single means
27:02of eress.
27:03>> Okay.
27:03>> Mhm.
27:04>> Thank you. Any board comments?
27:06>> Just
27:07>> and I'm sorry. Lastly, just two things.
27:09just uh once again some interior
27:10renderings to showcase the um double
27:14height space with what we hope is going
27:16to be nice journal square views from
27:18both the fourth floor that's here on the
27:21left goes up to the roof terrace. Um,
27:23this is the living area with the open
27:24space down to below. And then the dining
27:28area. Once again, what we hope is going
27:30to have some nice general square views
27:32um with double height space. You know,
27:35just kind of a nice little feature that
27:36we were able to take advantage of by
27:38having the duplex um oriented towards
27:40the front of the building.
27:42>> Okay. We're going to mark this A3 and A4
27:46upper living room area and the dining
27:49room area. council, you'll submit those
27:52tomorrow.
27:52>> That's enough to say a plan you want to
27:53go over.
27:56>> That's our presentation. I think we, you
27:58know, if you have any questions for my
28:00>> Sure.
28:01>> Please feel free.
28:02>> And we're good with the stipulation on
28:04the Hardy plank around the entire
28:05building.
28:06>> Correct. Yes.
28:07>> Okay.
28:08>> Madam Chair, just one quick question.
28:10Did you say the first floor unit was the
28:11ADA?
28:12>> Yes, that's going to be on the street
28:14level.
28:15>> Gotcha. Well, I thought I saw in the
28:16plans, was there is there a step up or
28:17an elevation change for that?
28:18>> There is a step up. It's hard to see
28:20here, sir, because uh but the the
28:23entrance to the first floor unit is
28:24going to be on the left. The step the
28:27raised um entrance is going to be on the
28:28right. That is meant to match our
28:30neighbor per the zoning ordinance. So,
28:32the quote unquote common entrance that's
28:35going to be accessible um on the right,
28:37which I'm sorry, not not ADA accessible,
28:39but the one that you access on the
28:41right, that's the one that takes you to
28:42the second and the third floor. So the
28:43the ADA level the first floor unit, the
28:47ADA unit is going to be level with the
28:49ground.
28:49>> Yes, that's the left hand entrance.
28:51>> That's the one that's level with great.
28:53Correct.
28:53>> Thanks.
28:54>> Mhm.
28:55>> Any other board comments?
28:57>> I just have one more thing. Sure.
28:58>> Can you go over that left side again?
29:00>> So basically that's accessible for AD.
29:03>> Yes, it's on ground level because that
29:05lower level unit has to be ADX
29:07accessible.
29:08Mhm.
29:08>> And then the one that's raised on the
29:10right, that's the main entrance that's
29:12going to take to the second and third
29:13floor.
29:14>> Mhm.
29:18>> Uh not on on this on this building. No,
29:21because we're going to be sprinkler and
29:23we're going to be um the main point of
29:25egress is from the third floor.
29:27>> On the ground floor level,
29:29>> I'm sorry.
29:29>> The entrance there.
29:31>> Well, the ground level, that one has
29:32their means of egress from both windows
29:34and doors. that's on the level of
29:35discharge. But by doing this duplex
29:38feature and keeping the the main
29:40entrance to the to both the duplexes on
29:42the third floor, we we have the
29:43exception of just doing one means of
29:45egress as long as it's sprinklered.
29:48>> Andy,
29:48>> um could you just uh point out the refu
29:50room and kind of how the trash is going
29:52to be handled?
29:53>> Um actually, I can go to the site plan.
29:55So, one second.
30:00Um,
30:02let me
30:03>> I think that's in China.
30:14[clears throat]
30:15So, our engineer also got caught in
30:17traffic. Um, but just to quickly go over
30:19her site plan, the refuge room is going
30:21to be located towards the back of the
30:23building and it's going to be uh
30:25screened off. So, that's where the uh
30:28refuge collection is going to be. And
30:29then it's just up to the tenants to
30:31wheel it out to the front of the street
30:32for collection.
30:34>> So is that indoors or outdoors? Where
30:36>> outdoors? It's going to be outdoors.
30:37Correct. So this this is our site plan.
30:40Um as mentioned, we're providing a
30:42setback on the side for both egress and
30:44lighting and natural air. And the refuge
30:48um waistband is going to be located
30:49towards the back of the building. So,
30:51actually, now that I have this up, this
30:54um the backyard is going to be split
30:56into an uh into an exterior space for
31:00both the first floor and the second
31:01floor units. So, the third floor and the
31:04fourth floor duplexes, they have their
31:05exterior space upstairs on the roof deck
31:08and the first and the second floor are
31:10going to have their space to in the
31:12backyard. It's going to be split for
31:13both of them. So, then that way pretty
31:15much every single unit gets some sort of
31:16outdoor amenity space.
31:18>> Question for you, getting back to
31:21uh my fellow commissioner over here when
31:23he brought up about the garbage that'll
31:25be taken out what towards the front.
31:27>> Yes sir.
31:28>> Okay. And that's both for that'll be
31:30both for uh garbage and recycling.
31:33>> Yes.
31:34>> City collection.
31:34>> Yes sir. So it's going to be the quote
31:36[clears throat] waste and recycle
31:39collection area and everything's going
31:40to be wheeled out. So this sideyard um
31:43this sideyard here is going to be a
31:44common sideyard. It's going to be
31:46accessible by everyone u in the
31:48building. And then the private the
31:51private backyard terraces are um are
31:54fenced off.
31:57>> Okay.
31:58>> And how would folk folks would need to I
32:00guess exit the front door of the
32:02building and then walk it back around.
32:03>> Yeah, pretty much take your refugees
32:05back there. It's going to be handled by
32:06the tendants. That's the idea.
32:07>> Okay.
32:08>> Mhm. C
32:09>> could you elaborate a little bit on how
32:10the terrace um backyards work and how
32:13the second floor and first floor each
32:14access?
32:15>> Yeah. So again, so the first floor has
32:16the
32:18first floor has the um the quote unquote
32:21advantage. They can just walk straight
32:22out to the backyard. As far as the
32:24second floor unit, they're pretty much
32:26going going to have to walk downstairs
32:27and then go around towards the back if
32:30they want to access their their backyard
32:32space. But the plan is to have um a
32:35space reserved for the second floor
32:36unit. That way it has exterior space.
32:39>> And the maintenance of both of those
32:41spaces would be
32:42>> that will be up to the um to the
32:44tenants. Yeah.
32:47>> Okay. Thank you.
32:49>> Thank you.
32:52>> Thank you, Mr.
32:55>> At this time, I would like to open for
32:56the public. Is there anyone from the
32:57public?
32:58>> See no one from the public. I'd like to
33:00close the public portion.
33:01>> Second.
33:03>> Public is closed.
33:05>> Yeah. And I'm going to be presenting on
33:06this item today. This was reviewed by
33:08Sophia Pereira. Um I also reviewed the
33:11plans and uh application materials in
33:13prepare preparation for this evening. Uh
33:17a memo was dated uh was prepared and
33:20dated October 9th, 2026. Uh there are um
33:25there are seven standard conditions in
33:28addition to the one that the the
33:29commissioners put on the record with
33:31regards to the change from vinyl to
33:33fiber cement. Um this application is
33:37relatively straightforward. It's also
33:39utilizing the new RC3 zone that was
33:42applied to this uh area as a result of
33:44the latest master plan element. Staff
33:47recommends approval.
33:48>> Thank you. At this time, I would like to
33:50entertain a motion.
33:51>> I'd like to make a motion to approve KP
33:542026-0077
33:56as presented to the board with all staff
33:58recommendations and conditions.
33:59>> Second,
34:02>> Vice Chair Wick,
34:03>> I.
34:03>> Commissioner Kaplan,
34:04>> I. Uh, Commissioner, Council Person
34:07Little,
34:08>> I,
34:08>> Commissioner Stamato,
34:10>> I.
34:10>> Commissioner Conway,
34:11>> I.
34:12>> Commissioner Patel,
34:13>> I.
34:14>> And Madam Chair Gongadan,
34:15>> I.
34:15>> Motion carries. All in favor?
34:17>> Thank you.
34:17>> Thank you.
34:18>> And just for the record, we agree with
34:19all the conditions.
34:20>> Thank you, Mr. Connelly, as you're here.
34:22We're going to call in your other case.
34:24Id like to call in case P2025-0270,
34:29preliminarian final major site plan.
34:32Address is 35 Wegman Parkway.
34:55Gino Okonnell appearing for the
34:57applicant for 35 W Parkway and this is a
35:00notice case.
35:07>> Thank you councel.
35:16Madam Chair, receive the affidavit of
35:18publication proof of mailing with
35:19respect to the application P2025-0270.
35:25Does appear to be in order. We're going
35:26to mark it as A1 for purpose of the
35:28record.
35:30>> Thank you.
35:32>> So, this application is for a rehab of
35:34an existing two family building on
35:37Wegman Parkway and to make four units.
35:40And like the last application, these are
35:42all four bedroomedroom units. I know
35:44there's been a der of threebedroom and
35:46fourbedroom units in the city. So these
35:48are units that a family could reside in.
35:51And my witness tonight is Jeffrey Lewis.
35:53And
35:55Jeff is here.
36:21might download faster if you come to the
36:23podium.
36:26[laughter]
36:27>> Absolutely.
36:48See, Mr. O'Connell, no good deed goes
36:50unpunished.
36:51>> I know.
36:57I thought as I get older I'd get better,
36:59but doesn't seem so. [laughter]
37:02>> I blame Mr. Lewis, not you, Mr.
37:04Okonnell.
37:06>> It is my fault this time. I'll take it.
37:21>> Is it loading, Mr. Lewis?
37:29I blame your internet too a little bit.
37:32>> Completely blame the internet. It should
37:34be downloaded already.
37:40>> We all know the internet doesn't really
37:42work.
37:49>> We'll just sit here.
37:53No,
37:57>> I'm good.
38:04>> Let's see if you can plug it in and
38:05project it.
38:08>> You're just tempting fate, Santa.
38:09>> Okay. I apologize, everyone.
38:14>> Yes, sir.
38:16>> Thank you.
38:21>> Okay.
38:23So, I'm here to present 35 Wegman
38:25Parkway. Um, I'm sorry. Is Mike here,
38:31[laughter]
38:34>> site engineer?
38:37>> Mark. Geez. Mark, are you gonna do the
38:39site stuff?
38:41>> He should be going first.
38:43[sighs]
38:44You
38:44>> want me to go first?
38:45>> Yeah, I think you should go first with
38:46the site.
38:47>> Really? Know how to build?
38:48>> Really? I'm sorry.
38:56Give me a second. I just closed it.
39:13Okay.
39:17It's on this side.
39:28All righty.
39:32>> I don't see anything there. There we go.
39:34Here we go.
39:37>> Yes, I do.
39:39>> Mark Chisvet. C H I S V T. And my
39:44license is still current and in good
39:46standing.
39:46>> Thank you. You're qualified. You may
39:47proceed. All right. So, this is the site
39:50plan I'm I'm showing you right now. Um,
39:53Wegman Parkway is at the top of the
39:55screen on this. Um, you can see that the
39:59And I'll zoom in a little bit to help
40:02visualize. And I hope my battery didn't
40:04go on this. Um, oh no.
40:10Maybe I won't zoom in. Um,
40:15here we go.
40:18That's better.
40:22>> Okay. So, the the the left portion of
40:25the building is the existing structure
40:28and it will be uh there will be an
40:30addition vertically on that and then
40:32there is an addition to the right of
40:34that which is the rectangle that says
40:35proposed addition. Um there is a
40:41garage on the neighboring property with
40:43a party wall and there's an additional
40:45garage and you can see on the existing
40:48conditions plan that is on the you know
40:51subject property that will be demolished
40:53up to the party wall. Um there is a
40:57shared driveway between the two lots and
41:00that will remain in active and in fact
41:03it it's going to be re that the half
41:05that's on the subject property will be
41:07resurfaced with new concrete. So so the
41:10neighbor will still have access from
41:12that driveway into their garage. Um the
41:15the area where there was originally a
41:18garage will be a lawn with with one
41:21shade tree being planted in that area.
41:24And in addition in that rear yard, we
41:26will be proposing a bio retention area.
41:29Um we move down to the um grading plan
41:33and you can see that a little bit better
41:35here. The tree is not shown on this plan
41:37but the grading is. So the roof runoff
41:40from the proposed building and the
41:41existing building will be directed into
41:44this bio retention area. When that bio
41:46retention area overflows, pipe will
41:49carry around the side of the building
41:50and that pipe will then merge in with
41:53the existing sanitary line that's
41:55already carrying sanitary flow from the
41:57existing building and that will remain
41:59in service. But instead of it being a
42:01combined pipe, um it will carry only
42:03sanitary flow until they get beyond the
42:05curb and then is the typical MUA
42:09requirement. The sanitary and the storm
42:11join beyond the curb line. Um, so the
42:15connection, uh, there will not be, uh,
42:17the need to actually cut a new
42:20connection into the, uh, storm sore
42:23that's in the street. It's an 18-in
42:24vitrified clay pipe, and there is a
42:27concern with always the MUA always has
42:30concerns with cutting the the clay pipe
42:33because they tend to they tend to break
42:35very easily. They're very brittle. So,
42:36this this uh eliminates the need to u
42:40cut into the existing main. Um there
42:43will be a new uh water service. There's
42:47an existing water service that'll stay
42:48active, but that would become domestic
42:50only. And a new service will um actually
42:55um I'm sorry, I misspoke. The existing
42:58service will be abandoned. It will be
43:00cut and abandoned in accordance with MUA
43:02requirements. a new combined water
43:04service 6- in um which will also carry
43:08fire suppression will be constructed uh
43:10next next to where the original uh fire
43:13service was located. Um I apologize for
43:16jumping back and forth between plans,
43:18but I'm going to go back to the site
43:20plan. As you can see, uh we are prop in
43:24the sidewalk area will be reconstructed.
43:26We are proposing two new street trees uh
43:30along that frontage that that would
43:32comply with the required tree plant
43:34street tree ordinance for the for uh um
43:38number of trees per frontage. And um in
43:42addition to the new tree tree in the
43:43rear um and then I'm just going to move
43:47down to the lighting plan. We are
43:49proposing a wall-mounted lighting
43:51fixture in the front of the existing
43:52building. um that light that that
43:55fixture has been sized so that it will
43:58project out to the to the curb line and
44:01provide the one foot candle minimum
44:02that's required for municipal cur for
44:05municipal sidewalk areas. Um and u there
44:10will be um some landscaping I saw on the
44:13site plan. Sorry, I went the wrong way.
44:15Back to the site plan. Um the rear will
44:18be lawn with the bio retention uh area
44:21and then there's lawn along the side of
44:24the building on the on the easterly side
44:26and uh planting areas and in between the
44:30right ofway line and the fronts of the
44:32buildings.
44:35Um the this project is a u a minor
44:39development under your storm water
44:40ordinance. Um and um the requirement
44:45that the calculations are shown on on
44:47the drawing uh C5 which is the grading
44:50and drainage plan um because of the uh
44:54additional uh impervious area uh is less
44:58than 5,000 square ft. So that put but
45:00more than 1,000. So that puts us in the
45:02minor development category. Uh minor
45:05development category has a sort of
45:07simplified calculation. It requires a
45:106.6 6 gallons of storage retention for
45:14every square foot of additional
45:16impervious and and so that that
45:18calculation came to uh 1536 gallons or
45:22205 cubic feet. We are proposing a
45:26combination of the bio retention and
45:28some green roof. Uh the green roof in in
45:31combin in combination with the by
45:34retention volume will provide a total
45:37retention of 232
45:39cubic feet. So that is 27 cubic feet
45:42beyond what's required by the ordinance
45:44and so this is in compliance with the
45:46stormwood ordinance for minor
45:47development.
45:49Unless you have any questions that's
45:51>> Yeah, I have a question madam chair. Um,
45:54explain the the bile retention uh pond
45:58or whatever you want to call it.
45:59>> Okay.
46:00>> Go over that with me again. And then the
46:01other thing is the driveway. I'm just
46:03curious about the driveway.
46:04>> Okay. Sure.
46:05>> Let's start with this.
46:06>> So, the bio retention pond, it's it's an
46:08excavated pond into the into the rear
46:10yard. It's not going to be very deep.
46:12It's going to be about um a little more
46:15than 18 inches in depth.
46:16>> Okay. Um, and the idea there is that it
46:20gives an opportunity for rainwater to to
46:23penetrate back into the ground a little
46:25bit, but when it when it fills up to a
46:27certain height, there is a there's an
46:29inlet, but instead of the inlet being at
46:31the sur at the bottom surface of the of
46:34the bio retention, it's it's a few
46:36inches higher. And so there's the
46:38storage below that grate. Once the water
46:40level reaches that grate, it overflows
46:42into the two foot by two foot catch
46:44basin and then flows out through gravity
46:46pipe in a conventional manner.
46:48>> On that grate, where you have some type
46:49of filtration uh type of filter or
46:52whatever due to the fact that between
46:54the there's a lawn back there also.
46:56>> It is lawn. Yes.
46:57>> Okay. So, so that we don't get any uh uh
47:03mud or dirt or whatever going into that
47:05pipe because it's all going into the
47:07sewer. Correct.
47:07>> It is. It is going into Yes,
47:09>> we can have something just to cover that
47:10cover to let the water through but not
47:12the
47:12>> Well, it'll have a conventional grate
47:14like a like a typical inlet would have.
47:17Um any any sediment that would would go
47:20into the pond would would settle to the
47:22bottom of that pond.
47:23>> So, it wouldn't it wouldn't go.
47:25>> I'm just thinking it's a heavy raintorm.
47:27>> You know how everything gets kicked
47:29around and you usually get a lot of
47:30solid material. I would just like to see
47:32something that would protect that from
47:34happening. allow the water to go
47:36through, but nothing any type of solids
47:38or cut grass or what have you.
47:42>> Yeah. Generally
47:44something like a trash rack or some kind
47:46like that, but that would not really
47:47stop any kind of sediment that would go
47:49in there. Um the thing with if we put a
47:52filter fabric across the top of it, uh
47:54they they have they require a lot of
47:56maintenance. They would have to be
47:58cleaned out
48:00regularly. and and if you if they get
48:03clogged up then this thing would
48:05overflow onto the neighbors property. It
48:07wouldn't
48:07>> Yeah, we just can't afford to have that
48:08type of material going into the sewers
48:10because we're running into a problem as
48:12you already know in the city of Jersey
48:13City with our source system between you
48:16know solid material going through.
48:18>> So this is not a traditional seepage
48:21pit. This is exposed on the top. Yes,
48:24it's going to be landscaped. It'll it'll
48:26be it would be no different than runoff
48:28from of lawn going out into the gutter.
48:31It's the same. It's the same. It's
48:33>> all right. So, you're telling me and
48:34most of it is roof solids going into
48:36this.
48:36>> What's that?
48:37>> There's not going to be any type of
48:38solids going into this.
48:40>> There shouldn't be because it's it's
48:42mostly well roof runoff really. Um
48:44there's a little bit of lawn as you can
48:46see the rear yard, but mo most of it is
48:48roof runoff and that's that's generally
48:50considered clean. In fact, um, if you
48:53had a if this was a major development,
48:55you wouldn't even be treating roof
48:56runoff because it's considered clean.
48:58>> Yeah,
49:00>> I I understand what you're saying. I My
49:03concern is that's all
49:04>> my concern is that if it does clog up,
49:08yeah, that the owner can go out there
49:10and clean it, but he's not going to do
49:11that till the next day. In the
49:13meanwhile, there is no there's no place
49:15for that water to go otherwise. And
49:18>> all right. Can you go to the driveway
49:20again? Explain that to me. That's
49:22>> Yeah, the driveway is actually split
49:25right down the middle. I see
49:27>> the property line spans. So So only 5 ft
49:31of that, as you can see, the building on
49:33this side bumps out a little bit. So at
49:35its narrowest point, the property is
49:37only 5 feet from the from the building
49:40edge. Um, but there's about 10 ft total
49:43within that driveway to to the adjacent
49:45building. and both both owners utilized
49:49that driveway in the past because they
49:52both had garage doors. So, um our
49:56proposal, as you can see, I'm going to
49:58pan just a little bit so you can see at
50:00the street line, there is an existing
50:02planter uh that we are respecting and
50:05not not going to touch. That's going to
50:06remain the a new curb cut and a new
50:09driveway apron is going to be
50:10constructed at at the street. um
50:14twothirds of it or so is on the subject
50:16property side and about a third of that
50:18is is on the neighbor's side. And then
50:21once you get past that um and you can
50:23see the the concrete hatching is might
50:25be a little misleading. The other side
50:27of that property line is already
50:29concrete.
50:30>> Um would you but we're going to replace
50:32the concrete on the subject side.
50:35>> Is that a shared driveway? So basically
50:37you can handle one one car is going to
50:39back be in front of the other car or in
50:41back of the other car or whatever
50:42>> which is exactly how it operates now.
50:44>> They'll have to work the neighbors will
50:46have to work that out.
50:47>> Yeah. And I don't know they've been
50:49doing that for years. It's been this
50:50way. So I'm not sure how that
50:51arrangement is. I'm not even sure if
50:53there's an actual easement for that or
50:54not.
50:55>> There is there is
50:56>> there is an easement.
50:57>> So there's a recorded easement with
50:59respect to the driveway.
51:01>> She has drive. Now, is
51:05your client as the developer of the
51:07subject parcel going to have access to
51:11that driveway?
51:12>> Both both of the owners on either side
51:15of the driveway have access,
51:16>> but you're removing the garage that the
51:18driveway goes to
51:20>> on your property.
51:21>> You're calling it a garage, but it's
51:23smaller than an actual garage. It's more
51:26like a a storage area.
51:30I mean, I'm looking at the picture in
51:31the staff report and it looks like a
51:34looks like a garage.
51:35>> Mr. Connor, can you speak into the mic,
51:36please?
51:38>> Looks like it's got two garage doors,
51:44but you're removing your half of that
51:46because that's on your property and
51:49you're removing it. I understand you
51:50have to grant the neighbor the access,
51:52>> of course. But
51:56I guess the question is it's an existing
51:58easement.
52:01Where are your people going down the
52:03driveway if there's no garage to go to?
52:06They're going to park there.
52:07>> Well, they can park on It doesn't have
52:10they don't have to park in a garage.
52:11They can park on the on the uh
52:15in the rear rear yard area.
52:18>> Well,
52:21it's proposed now. There's no no parking
52:23space provided in the rear yard. It's
52:25going to be long.
52:26>> So, how are they then getting back out
52:28if they're going in head first to the
52:32driveway and then
52:34>> they would have to back out. That's what
52:35they're doing now cuz there's no place
52:37to turn around.
52:38>> I see.
52:39>> I hope they like each other.
52:47>> And how many
52:54So, Madam Chair, if you look at the
52:56photographs in the staff report as
52:59testified to
53:01on the existing condition, it appears to
53:04be a
53:07twocar garage with a garage on the
53:12subject property and a garage on the
53:15neighboring property detached in the
53:18rear of the structures.
53:20The proposal would be to remove
53:23uh the garage on the subject property,
53:26leaving the garage on the neighboring
53:28property.
53:30If there's an easement and everybody has
53:32the right to access the garage, they
53:36have the right to access the garage.
53:39That that's an established right.
53:43I don't know what more to say about it
53:45other than that
53:47the concerns are are valid.
53:49>> We're certainly not going to restrict
53:50the neighbor from using his garage. He
53:52has he has an easement for the shared
53:54driveway.
53:59>> Understood.
54:03>> I think the concern is kind of just the
54:05practical nature of the neighbor
54:07accessing that garage. if member
54:09residents of of this site were to park
54:12in the driveway or vice versa. Um, in
54:15terms of playing the Jenga game of of
54:17getting one vehicle out if there's, you
54:20know, now this is going into a be a four
54:22unit, you know, with families, right?
54:24Multiple bedrooms per unit. So, if they
54:26all have vehicles, you know, what would
54:28the coordination be between
54:31both properties and then the units
54:33within this property in terms of
54:35utilization of that shared driveway?
54:37include
54:44>> speaking to you some type of
54:46>> sorry
54:48possibly have them get into some kind of
54:53>> they have an agreement in place.
54:55>> Okay.
54:55>> So according to council there's an
54:57easement in place that gives them both
54:59access. It exists. Uh parking
55:03requirement. Is that an issue? that
55:06>> I don't think there's a parking
55:07requirement.
55:09>> I could make a suggestion that where we
55:11have the grass and the tree,
55:13>> we could put pavers there and so that a
55:15car could park in that area and it would
55:19be just the same as
55:22of uh he would have access to his rear
55:25yard and he could park the car in the
55:28same area where the garage was.
55:32>> All right. So, I don't think that solves
55:34I I'm not sure what the
55:37>> concern is. I understand the practical
55:39aspect of the fact that we've got
55:40neighboring properties using a shared
55:42driveway. That's what exists today.
55:44>> Correct.
55:44>> But going forward, we're increasing the
55:47number of units.
55:48So,
55:51the concern becomes, are you increasing
55:53the number of vehicles? The reality is
55:57there's no parking requirement. Mr.
55:59Jordan,
56:01>> we are looking into it. We actually
56:02believe there might be cuz the the lot
56:05width at 52 ft and change. So, we're
56:09just confirming.
56:12>> You know, I didn't realize if I could
56:14say something. I didn't realize.
56:17[snorts]
56:18>> Yes, you can.
56:22>> Go ahead.
56:23>> Oh, god. Yeah. All right.
56:26And you might
56:26>> I'm looking at this right now and I'm
56:28seeing part of a garage. I'm not seeing
56:30the whole detail. But when I saw it on
56:32the on the photo, then you I can
56:35understand how it's working.
56:37>> But like it was also brought up, you
56:39have other residents living here. So,
56:41you know, you're going to have to drive
56:42I guess they're going to have you're
56:43going to have a parking attendant there
56:45getting the cars in and out.
56:48>> I mean, how many units are go how many
56:49people are going to be living here? I
56:50mean,
56:51>> parking is required.
56:54>> That would change. We're going from two
56:56to four on the subject site.
56:57>> Okay. So, they're going to be parking
56:58their cars there. I guess they're going
56:59to have to work that out.
57:02>> So, there is a parking requirement due
57:04to the lot width being above 50 ft. Uh
57:07it is a ratio of.3 spaces per bedroom.
57:11So, in this case, that would be a uh
57:14required parking count of 4.8 spaces,
57:18meaning there would be a variance with
57:20the current plans as shown.
57:25So that was a variance not previously
57:28listed.
57:29>> Correct.
57:30>> So does it need to be renoticed?
57:33>> We can review their notice but uh and
57:35hand it back to the council to answer
57:37that question.
57:38>> So clearly was not noticed. Came up
57:41during the hearing. Mr. Okonnell, I
57:44don't know where we're parking vehicles,
57:47how many vehicles we're parking. This is
57:50something that
57:52you want to I have the staff report uh
57:55that was dated 92826 and the staff
57:58report says there's no off- streetet
58:00parking space will be provided. It
58:02doesn't say there was any variances
58:05>> but we've just identified a variance Mr.
58:08Okonnell.
58:11>> Well, of course I didn't I didn't notice
58:12for variance. I understand
58:21>> during your presentation
58:24a variance now is required.
58:27>> So then we'll have to withdraw the
58:30application and renotice.
58:31>> Correct.
58:32>> We're going to carry the application and
58:35renotice. know this
58:39>> and
58:44>> Mr. Okonnell, you may not need a
58:46variance if you can park the cars on
58:50site. Right.
58:51>> Right. So,
58:54the requirement based on the number of
58:56bedrooms is 4.8.
59:00>> Correct. Yes.
59:05All right. So, you're going to carry
59:07>> carry it to
59:08>> and we'll see.
59:09>> That's a new date that we can carry to
59:11>> Well, he has to notice. So, we're going
59:13to carry it.
59:15And if there's going to be a revision to
59:17the plan, you'll submit a revision. And
59:20if not, then you're just going to notice
59:22for a parking variance.
59:26I don't know how you're going to
59:27calculate what you got versus what you
59:29need.
59:29>> Okay. Well, of course, we'll reook at it
59:31and, you know, thanks for your time and
59:33once we have a chance to review it.
59:35>> Carry it to a date uncertain.
59:36>> We we we recommend Oh, that's fine, too.
59:39But we recommend if we're going to carry
59:41it to a date certain that it be November
59:4210th. But they're going to have to
59:44renotice anyways.
59:44>> They have to renotice. That's the
59:46purpose of the adjournment,
59:47>> right? So date uncertain.
59:50>> Yeah.
59:50>> Okay.
59:52>> Thank you, Mr. Ok.
59:53>> Thank you.
59:57>> Okay. I'd like to call KP2025-0160
1:00:01preliminary and final major site plan
1:00:03with C with variances. Address is 89
1:00:06Ocean Avenue. Mr. Lean.
1:00:13Good evening, commissioners. For the
1:00:14record, Tom Lean from Connell Foley. Uh,
1:00:17this is a notice case. I did upload my
1:00:19affidavit to the portal. However, I will
1:00:21provide my originals to your council.
1:00:24>> Thank you.
1:00:36Madam Chairman, receive the affidavit
1:00:38notice proof of publication with respect
1:00:39to the application 85 to 89 Ocean A and
1:00:43110 C view A. Does appear to be the
1:00:46original of the notice that was uploaded
1:00:48to the portal. We're going to mark it as
1:00:50A1 for purpose of the record.
1:00:51>> Thank you.
1:00:53>> Thank you, council. Uh the application
1:00:55before you is for a project in the Ocean
1:00:57Avenue South redevelopment plan area. It
1:01:01is a fivetory
1:01:03building containing uh 40 uh residential
1:01:05units with ground floor commercial and
1:01:08eight parking spaces. Uh there is a
1:01:10requirement under the redevelopment plan
1:01:12that all units above the fourth floor,
1:01:14excuse me, 5% of all units above the
1:01:17fourth floor in a building be
1:01:18affordable. The calculation here results
1:01:20in one affordable unit. Uh we are asking
1:01:24for two variances. Uh we do have uh some
1:01:27issues with the sideyards of the
1:01:28building that are created by uh some
1:01:30existing uh lot conditions. We also have
1:01:33a rear yard variance we're seeking uh
1:01:35related to the depth of the building
1:01:37from each of the roadways. Uh I do have
1:01:40uh three witnesses this evening. I'm
1:01:42going to start with uh Daphne Galvin who
1:01:45is my civil engineer.
1:01:46>> Thank you.
1:01:55>> [cough and clears throat]
1:02:14>> I do.
1:02:16>> Daffhany Galvin. D A P H N E G A L V I
1:02:21N.
1:02:22>> Miss Galvin, is your license current and
1:02:23in good standing?
1:02:24>> Yes.
1:02:25>> Thank you. You may proceed. Great. Uh so
1:02:28I'm going to start by utilizing as a
1:02:30display our grading drainage and utility
1:02:32plan which is sheet five of 12 of the
1:02:35site plans that were submitted to the
1:02:36board. It's dated June 6, 2025, revised
1:02:39through September 17th, 2025. Uh on the
1:02:43plan, North is generally up where the
1:02:45arrow is. Ocean Avenue runs uh along the
1:02:48bottom of the sheet in an east west
1:02:50direction and See Avenue is along the
1:02:52left side of the sheet running in a
1:02:54north south direction. property is known
1:02:56as block 29301,
1:02:59lots 20.01 and 22 through 25. It's
1:03:03located on the northerly side of Ocean
1:03:05Avenue with a street address of 85 to 89
1:03:08Ocean Avenue. It's a generally
1:03:10rectangular shaped property containing
1:03:12about 2/10en of an acre. It's located in
1:03:15zone one neighborhood mixeduse zone of
1:03:17the Ocean Avenue South redevelopment
1:03:19plan. Ocean Avenue is a two-way roadway
1:03:23with parking on both sides. C View
1:03:25Avenue is a one-way roadway headed south
1:03:28with parking on both sides. The
1:03:30surrounding area is a mix of uh mix of
1:03:33uses including residential, commercial,
1:03:35and educational.
1:03:37With respect to what's on the site in
1:03:39the existing condition, the site's
1:03:40vacant. There is a an old gravel parking
1:03:43lot in the northerly portion of the site
1:03:45that used to service the previous
1:03:47mixeduse development. The rest of the
1:03:49site is lawn area and in general the
1:03:51property drains uh towards the
1:03:53intersection of ocean and sea view.
1:03:58Access to the site is provided with an
1:04:00existing driveway along C view near the
1:04:02northerly end of the property in this
1:04:04location here. There's also a second
1:04:06driveway along Ocean Avenue near the
1:04:08southeasterly corner. The proximity of
1:04:11the adjacent buildings to the site
1:04:13creates some setback issues along a
1:04:15northerly property line. This is the
1:04:17northerly property line. The windows of
1:04:20the adjacent dwelling are about 1.8 ft
1:04:22from the property line. And then also
1:04:24along the easterly property line in this
1:04:27area right here, the existing dwell or
1:04:29the adjacent dwelling encroaches the
1:04:31subject property by about 610 of a foot.
1:04:34These conditions impact the required
1:04:36building setbacks and will be discussed
1:04:38further by the architect and the
1:04:40planner.
1:04:41Continuing along with to discuss what's
1:04:43proposed. Project proposes to remove the
1:04:46gravel parking area and construct a new
1:04:47five-story building that will contain 40
1:04:50residential units, commercial space and
1:04:53garage with a garage access along se
1:04:55View near the existing driveway. The
1:04:57second existing driveway along Ocean
1:04:59will be eliminated.
1:05:01The building proposes parking for eight
1:05:03vehicles. There are no minimum parking
1:05:05requirements. Uh the curb cut for the
1:05:08garage access is 10 ft wide and then it
1:05:11widens once it gets inside the building
1:05:13to allow for access to the parking
1:05:14spaces. Uh loading is not required for
1:05:17the project. The proposed building
1:05:19covers the majority of the site. There
1:05:21are some small gravel areas on the
1:05:23northeast corner and then along the
1:05:24northerly property line. Uh the project
1:05:27is classified as a major development
1:05:29with respect to the city storm water
1:05:30ordinance and it will address those
1:05:32ordinance requirements as well as the
1:05:34JCMUA reg rules and regulations. Storm
1:05:37water controls include a 2588
1:05:41square foot green roof and an
1:05:43underground detention system located
1:05:44within the garage or located below the
1:05:46parking garage. Discharge will be to the
1:05:48existing combined sewer in C view. Um
1:05:53utilities all new utilities are proposed
1:05:54for the site. water, sewer, gas,
1:05:56electric, telecom. Um, all new services
1:05:59will be provided. Preliminary locations
1:06:01are shown on the plans and will be
1:06:03coordinated with the utility companies
1:06:05along with the JCMUA.
1:06:08Going to go to one other sheet here. I'm
1:06:10going to go to sheet six for the
1:06:12landscaping and lighting.
1:06:14Um, we have um three street trees
1:06:17proposed. Two along Ocean, one along
1:06:20Seeview. Um they'll be planted in
1:06:22accordance with the J Jersey City
1:06:24forestry standards. The standards would
1:06:26require a total of seven trees based on
1:06:28the length of the streets. One tree for
1:06:31every 25 ft. Um so such that seven trees
1:06:34would be required. The applicant will
1:06:36make a monetary contribution um in lie
1:06:39of the additional four trees. Also at
1:06:41the request of forestry, we're going to
1:06:43update the tree species that were
1:06:45proposed along ocean.
1:06:48Uh with respect to lighting, we are
1:06:51going to add one light fixture along se
1:06:53View to supplement the existing lighting
1:06:55in that area. Um and no additional
1:06:58lighting is required along ocean. The
1:06:59lighting levels are adequate along
1:07:01ocean. Um we have four uh review
1:07:05letters. Uh we have the city division of
1:07:08planning dated November 25th of 2025.
1:07:11There's no site plan revisions required
1:07:13for that letter. Uh we also have the
1:07:15division of transportation planning
1:07:17letter dated December 2nd of 2025. We
1:07:20will address those outstanding comments.
1:07:22We have the division of forestry
1:07:24comments which I me mentioned before uh
1:07:26with respect to changing the species of
1:07:28the trees along ocean. So we'll take
1:07:29care of that. And there was also a JCMUA
1:07:32letter issued July 15th of 2026 and we
1:07:36will address those outstanding comments.
1:07:40>> Uh just one question. And uh there is a
1:07:42comment in the uh transportation letter
1:07:45uh asking us to pursue a loading zone
1:07:49with the uh with the city. Uh that is
1:07:51something that we can work with planning
1:07:53staff if planning staff feels that's
1:07:55appropriate. Um and we can accommodate
1:07:58that. Correct.
1:07:58>> Correct.
1:07:59>> Okay. I have no further questions.
1:08:07>> But I don't know if you have somebody
1:08:08else coming. Yeah, it'd be better if our
1:08:10architecture.
1:08:11>> All right, no [clears throat] problem.
1:08:12>> Yeah,
1:08:12>> quick quick question. Uh, the
1:08:14transportation memo also, I guess,
1:08:15references um corner bumpouts. Is that
1:08:18something that you'd be amendable to
1:08:20adding?
1:08:20>> Yes.
1:08:21>> Um, and it also references a request to
1:08:23install an a rectangular rapid flashing
1:08:25beacon.
1:08:26>> Yes.
1:08:28>> Thank you.
1:08:28>> That was easy. [laughter]
1:08:30>> Yes, it was.
1:08:31>> One quick question.
1:08:32>> Is there a reason behind the decrease in
1:08:34the street trees versus what is
1:08:36required? Yeah. In general, what happens
1:08:38is because of all the various um
1:08:40constraints associated with utilities
1:08:42and driveways, we just can't squeeze
1:08:45them in.
1:08:45>> Got it.
1:08:46>> So, we get in as many as we can and then
1:08:47we then we offer the payment in lie of
1:08:49the other trees.
1:08:50>> Okay. Thank you.
1:08:55>> Good.
1:08:55>> All right.
1:09:07Uh, my next witness is my architect,
1:09:08Jeff Lewis.
1:09:20>> Okay. And I am still under oath.
1:09:23>> And your license still current?
1:09:24>> Yes, ma'am.
1:09:25>> Thank you. My person.
1:09:26>> And if I could just add, the streets are
1:09:28usually more difficult at these corner
1:09:29lots because there's so much stuff at
1:09:31the corners with all the street lights
1:09:32and stop signs and everything. I just
1:09:33the clearances that they need make it
1:09:35very difficult.
1:09:37Okay. Uh with that 89 Ocean Avenue,
1:09:40we're proposing a fivestory mixeduse
1:09:42building. Uh on the ground floor, we
1:09:45have two commercial spaces. Uh one of
1:09:46them is 1354 ft. The other is 690 as
1:09:50well as uh eight parking spaces in the
1:09:52garage. Uh on the four floors above, we
1:09:55have 40 total apartments. There's one
1:09:57three-bedroom apartment, three
1:09:59two-bedrooms, 24 one-bedrooms, and 12
1:10:02studio apartments. Uh, I do want to
1:10:04briefly touch on the variances. Uh,
1:10:06Daffh needs to discuss them a little
1:10:07bit. These are some of those variances
1:10:09that it actually wasn't possible for us
1:10:11to comply with. So, the ordinance says
1:10:14we have to have a zero foot sideyard
1:10:16setback for the first 10 ft of the lot.
1:10:19That's impossible on uh the Ocean Avenue
1:10:22side because the building that is next
1:10:24to us is actually built 6 in on our
1:10:26property. So, we can't have a zero foot
1:10:29setback because there's a building there
1:10:30already. We're built up right against
1:10:32that building, but that's a 6-in
1:10:34setback. So, we're not complying with
1:10:35that sideyard. The other sideyard, we do
1:10:38have uh the building that's closer and
1:10:40we are um respecting those windows. Uh
1:10:42but there's also a second reason for
1:10:44that and that's the uh the rear yard
1:10:47setback requirement which says you can't
1:10:49be more than 95 ft away from any street
1:10:52frontage. So we're providing 95 ft
1:10:55setbacks each way and when you get to so
1:10:5895t setback from Ocean Avenue is
1:11:01actually this 2.33 ft. So the rear yard
1:11:04setback says we need a 2.33 foot setback
1:11:06here and then the sideyard setback says
1:11:08we need zero foot. So we can't do both.
1:11:10So, we decided to do the one that's a
1:11:12little more um conservative, give the
1:11:152.33 ft and give some more space uh for
1:11:18the building next to us. It's kind of a
1:11:21setback that wasn't thinking about
1:11:23corner lots as much. It makes more sense
1:11:24on an interior lot than a corner lot. Uh
1:11:27that being said, let me jump into the
1:11:29the ground floor here. We don't have a
1:11:30basement or a cellar here. Uh at the top
1:11:33of the building, uh we do have that
1:11:3410-ft uh garage door as well as a
1:11:38regular door into the garage. Uh there
1:11:40are eight parking spaces in the garage,
1:11:41including uh one handicap space. Uh we
1:11:45will of course also have the pedestrian
1:11:46warning system at the garage door. It is
1:11:49right at the um sidewalk uh frontage.
1:11:53Um we have bicycle storage for 20 bikes.
1:11:56This is covered in the garage. Uh off
1:11:59the garage, we also have access to our
1:12:01sprinkler room, our meter rooms, as well
1:12:03as the trash and recycling room. Uh the
1:12:05trash recycling room is also accessed
1:12:07from the lobby over here. Um the front
1:12:11lobby is accessed from Ocean Avenue.
1:12:15It's a large open space with access to
1:12:17uh stair number one as well as the
1:12:19elevator. Uh we also have a second
1:12:21staircase. I apologize. We also have a
1:12:24second staircase which provides access
1:12:26directly outside as a emergency egress.
1:12:29Uh and then we have those two commercial
1:12:30spaces. The smaller one is to the right
1:12:32here and then the larger one is right at
1:12:34the corner of Ocean and C view.
1:12:39Uh moving on to the second floor. Uh
1:12:42this is our typical floor plan. It's the
1:12:43same for the second, third, and fourth
1:12:45floor. And then there's just one minor
1:12:46change on the fifth floor. Uh all the
1:12:48apartments in the building are ADA
1:12:49adaptable. They all have washerd dryers
1:12:51in the units. We're using uh PAX for
1:12:53heat and air conditioning. Each floor
1:12:55has uh three studios, six onebedrooms,
1:12:58and then for the second, third, and
1:13:00fourth floor, one two-bedroom apartment.
1:13:03Uh we do have this large window well cut
1:13:06out here. This is above the parking
1:13:07area. It's also notable that this is uh
1:13:10cut out in the section that is closest
1:13:12to uh that existing building next to us,
1:13:14which is right here. So, we are trying
1:13:16to uh give them as much light as air as
1:13:18we can. There's also a second window
1:13:21well next to the other building on the
1:13:23right here. Um, and that's just because
1:13:25there are two windows here that are
1:13:26actually small bathroom windows. So,
1:13:28these aren't egress windows. These
1:13:29aren't bedroom windows. There's some
1:13:31small uh bathroom windows, but we're
1:13:33still providing a window well there to
1:13:34give them the light and air that they
1:13:36would need as well.
1:13:38Um,
1:13:40I might as well deal with the trash
1:13:41right now.
1:13:43>> Could I just ask what's
1:13:44>> We do not have a trash shoot, but we do
1:13:46have room for a trash shoot, and we will
1:13:48add a trash shoot. Before you move
1:13:50sheets, could I just ask you about
1:13:52what's going on on the roof in the
1:13:53courtyard?
1:13:54>> It's open.
1:13:55>> It's open.
1:13:56>> This is open.
1:13:57>> Okay.
1:13:58>> So, it would provide some ventilation
1:13:59for the garage as well.
1:14:02>> Yeah. We're not using it as a outdoor
1:14:04space.
1:14:05>> And this will be done privately. This
1:14:07will be private collection
1:14:08>> for the trash.
1:14:09>> Yes. For both trash and recycling.
1:14:11>> Yes.
1:14:11>> Yes.
1:14:12>> Okay. Great.
1:14:12>> And there's drains in the parking garage
1:14:14then?
1:14:15>> Yes. They would be pitched and drained.
1:14:17Yes.
1:14:17>> Okay.
1:14:19Uh this is the fifth floor plan. Again,
1:14:22there's just one small difference. It's
1:14:24this back apartment here, which was
1:14:26changed from a two-bedroom to a
1:14:27threebedroom on this floor. I think
1:14:28that's what we needed to have.
1:14:30>> Mr. Lewis, as you're at it, the
1:14:32affordable units, where is the location
1:14:34and um is it a one-bedroom, two-bedroom?
1:14:36>> What is the affordable unit? I'm
1:14:38actually not sure.
1:14:38>> It is a moderate unit um because we only
1:14:41have the one. So, that complies with
1:14:43U-Hack. And yes, it is the three-bedroom
1:14:44unit that's required. Yes. And the
1:14:47buildout is all the same
1:14:48>> that it will use the same materials,
1:14:51same fixtures, same everything as the
1:14:53market rate units.
1:14:54>> Okay.
1:14:56>> Okay. Yeah. So that's why we have a
1:14:57three-bedroom here because that's the
1:14:59affordable unit on the top floor.
1:15:02Moving on to the roof deck. Uh this is
1:15:04accessed by both stairs as well as the
1:15:06elevator. We have a 440T amenity space
1:15:10which has its own ADA bathroom and then
1:15:12access to uh the outdoor roof deck. The
1:15:16roof deck is 1,550
1:15:18ft and it's located along Ocean Avenue.
1:15:21Most of the rest of the roof is used for
1:15:23green roof trays. It's actually 3,528
1:15:26square ft. So, there's a lot of green
1:15:27roof here, more than twice as much as we
1:15:29have roof deck area. And then we do have
1:15:32some condensers in the central area
1:15:34here. Those are just for the hallways
1:15:35and for the commercial areas. And
1:15:37they're screened with uh corrugated
1:15:40metal screening that you can see images
1:15:42of down at the bottom here.
1:15:46Uh moving on to the building elevations.
1:15:48This is looking at uh the building from
1:15:51Ocean Avenue. To the right here is that
1:15:53existing building next to us. Uh our
1:15:55main finish that we're using. Uh you can
1:15:57see it is a modern building. Uh we have
1:15:59a couple mostly using fiber cement
1:16:01siding and a couple different finishes
1:16:02in color to give it some variety and
1:16:04depth. Uh so the main finish I would say
1:16:07is a cedar siding. We're using that at
1:16:10the ground floor as well as the infill
1:16:12for all the upper floor in between the
1:16:14windows here.
1:16:16Uh the second finish that we're using is
1:16:17a kind is a medium uh gray cement color.
1:16:21We're using that for the sign band
1:16:22between the first and second floor for
1:16:24the corners at the top of the building
1:16:26as well as uh along the side here as the
1:16:28main finish. And then the third uh
1:16:31finish that we have is a dark gray fiber
1:16:34spent siding which is used as accents
1:16:37between the windows. You can see them
1:16:38here uh vertically as well as here where
1:16:41we don't have PEX. Um at the bottom we
1:16:44have black storefront doors. Uh we have
1:16:47black aluminum frame windows with
1:16:48matching black PTA grills.
1:16:52Uh moving on to C view avenue. This is
1:16:54wrapping around and these all these
1:16:55finishes are literally wrapping around.
1:16:57We do have a rendering that'll show that
1:16:59a little better. Um the only thing
1:17:02different on this side that we have
1:17:04added is the door and the garage door
1:17:06which are located here. And both of them
1:17:08are solid and would be painted to match
1:17:10the same color of the cedar siding.
1:17:15This is the uh left side elevation.
1:17:18Uh what you can see is we are wrapping
1:17:21uh those uh fiberment panels around all
1:17:24the way back to where the um where the
1:17:27courtyard the upper level courtyard
1:17:28starts which is right here.
1:17:31Um, after that
1:17:35we have here's what I'm going to make
1:17:37our second change.
1:17:38>> Yep, I saw that.
1:17:39>> Cuz we have light gray fiber cement
1:17:41panels at the base of the building
1:17:42>> and then a darker gray what was
1:17:44previously vinyl siding, but we will
1:17:47provide fiber cement siding at the upper
1:17:49levels. Uh, this is on the side. We'll
1:17:52use those same finishes on the rear and
1:17:54the right side as well. Um, and then the
1:17:56bulkheads. Are we doing vinyl on the
1:17:59bulkheads? Is that okay? So we fi white
1:18:02white fiber cement siding on the
1:18:03bulkheads as well.
1:18:04>> Perfect.
1:18:06>> Uh this is just the interior courtyard
1:18:08and again this was vinyl. We will change
1:18:10this to fiber cement siding.
1:18:13Then here we're looking at the right
1:18:15side of the building. This is the
1:18:16existing building. We're wrapping uh
1:18:19that front fiber cement uh panels around
1:18:22about 15 ft or so. And then behind that,
1:18:25again, we'll have the same finishes as
1:18:26the right side with a light gray fiber
1:18:28cement siding at the base and a darker
1:18:30gray fiber cement siding on the upper
1:18:33levels.
1:18:36And then, as I mentioned, we do have
1:18:37this rendering which shows kind of the
1:18:39corner, how the elevation wraps around
1:18:43uh that corner there.
1:18:45Um, and with that, I can answer any
1:18:47questions.
1:18:47>> I have a question.
1:18:48>> Yes.
1:18:49>> You mentioned cedar.
1:18:51>> Yes. You're talking actual cedar.
1:18:53>> No, no, no. It's fiber cement. It's
1:18:54imitation cedar.
1:18:55>> Okay, good. Yeah, I was going to make a
1:18:56suggestion. What's it going to cost for
1:18:58cedar? Your mouse mouse.
1:18:59>> Yeah. No, it's fiberment.
1:19:01>> Okay, great. Thank you.
1:19:02>> Is there a a loading zone?
1:19:05>> There is not a loading zone. Um
1:19:09>> I I can Yeah, that that was I had
1:19:10brought that up during um Miss Galvin's
1:19:12testimony. There is a comment in the
1:19:14transportation comments for us to pursue
1:19:16a loading zone. That obviously can only
1:19:18be approved by the city council. So, we
1:19:21will work with city planning. We can
1:19:22have that as a condition of approval,
1:19:24but at the end of the day, that that is
1:19:26up to the city council to approve that.
1:19:28>> Okay.
1:19:31>> Could you provide some testimony on the
1:19:33bike parking and how that whether that's
1:19:36enclosed and how that would operate?
1:19:38>> Sure. I mean, technically the garage is
1:19:41open in the back, but it is covered.
1:19:45So, just getting back to the ground
1:19:48floor.
1:19:50So, it's in the back area here. You can
1:19:52see it's open to the back. Uh, but
1:19:56again, it's it's it's enclosed. It's
1:19:58gated, so it could be locked up and
1:20:00secured. However, and it's covered, so
1:20:03there's a roof above it. However, it's
1:20:05open to the back. So, there are multiple
1:20:07ways for you to get out with your bike.
1:20:08If you needed to use the side uh
1:20:10walkway, you could. Or you would just,
1:20:11you know, use the garage door or the
1:20:13regular door. So, you have a couple
1:20:15different ways out. And what are the
1:20:17devices in inside the bike room to affix
1:20:19your bike to?
1:20:20>> Oh, these are just going to be standard
1:20:21bike racks. We have a lot of room here.
1:20:24>> Okay, gotcha. It's not anything fancy.
1:20:26>> Yeah, we don't have any hanging or
1:20:27anything. It's we have enough room to
1:20:28just do regular bike racks. Make it nice
1:20:29and easy.
1:20:30>> Great. Um, could you speak a little bit?
1:20:32I know you mentioned kind of the rear
1:20:34yard versus sideyard set back, but what
1:20:36is the space um along C view between
1:20:39your building and the neighbor and
1:20:40what's going to be in that space?
1:20:42>> This space here, it's really just a a
1:20:45walkway. It's just going to be I'm not
1:20:46sure if we're doing a gravel finish or a
1:20:48or a concrete finish, but it's really
1:20:50just going to be unused space on our end
1:20:53really.
1:20:53>> And what's the width?
1:20:54>> It's 2.3 ft. So, it's two two two feet 4
1:20:58in.
1:20:59>> I might be wide, but that's pretty
1:21:01narrow for a walkway,
1:21:02>> right? It's it's not a legal walkway.
1:21:04It's not It's not a legal means of
1:21:06egress. Um,
1:21:09but it it was used we were combining
1:21:11that with the separation between us and
1:21:13our the building between us to give them
1:21:15actually like I think four feet they
1:21:17have between
1:21:18>> is that going to be secured
1:21:21>> street? I I um Daphne that's more of a
1:21:24site plan issue. I'm not sure what we
1:21:26did for fencing there. I don't think we
1:21:27have any fencing on the sides.
1:21:30>> There's no fencing proposed right now.
1:21:35So I I guess my question maybe more more
1:21:37broadly is what's the intention in terms
1:21:39of maintaining that space? It would be
1:21:41on your property and ensuring that you
1:21:44know unwanted uses not by your residents
1:21:47but by others in terms of security and
1:21:50and otherwise.
1:21:51>> Um
1:21:52>> Mr. Lewis, I don't know how you could
1:21:54answer that question. You're an
1:21:55architect, are you not?
1:21:56>> I am an architect. Thank you.
1:21:58>> Okay.
1:21:58>> Council, obviously the applicant is
1:22:00responsible to maintain and provide safe
1:22:03correct. We're always responsible to
1:22:04maintain our property. I think your
1:22:06question more goes to can anybody enter
1:22:09or exit it? Is is it secure? Is is that
1:22:12correct?
1:22:12>> That's correct.
1:22:13>> Okay. Um I mean we are dealing with some
1:22:16constraints as we talked about with with
1:22:18trying to respect the light and air of
1:22:20the neighboring property. Um, I think it
1:22:23would be very difficult to gate that
1:22:26small area in
1:22:28um without turning it into
1:22:32a very kind of scary narrow long way
1:22:35there. Um, you know, it's something that
1:22:38we can try to work with staff to
1:22:40address. Uh, or we can put um some form
1:22:44of fencing on the on the on the lot line
1:22:47with a with a gate when it gets to the
1:22:48street level. Uh, I mean, I'm I'm open
1:22:50to suggestions from the board or staff.
1:22:52>> Commissioner, what's the concern that
1:22:53somebody's going to come on the property
1:22:55and
1:22:57go into the bat? I'm just
1:22:59>> I I just I mean, two feet void at street
1:23:01level in between properties. Could it be
1:23:04a collection of litter and trash or, you
1:23:06know?
1:23:06>> So, I don't think it's really two feet
1:23:08at the front property line based on the
1:23:12way the neighboring building.
1:23:15Is it two feet between you and the
1:23:17neighbor?
1:23:18Well, it with within our property, it's
1:23:212 feet 4 in.
1:23:23>> The neighbor the neighbor has a sideyard
1:23:25separating us their building from ours.
1:23:27>> How far is that?
1:23:28>> Their building's on an angle,
1:23:30>> right?
1:23:30>> It's 1.8 ft at the closest and probably
1:23:32at the street it's about 8 or 9 ft.
1:23:34>> I see.
1:23:34>> And then it pies back to that point
1:23:36which is where that 2T
1:23:38>> 4 in is measured.
1:23:40>> Correct.
1:23:41>> That's correct.
1:23:42>> Well, yes.
1:23:44What we could do, there is an existing
1:23:46fence running on their property. We
1:23:49could match that fence, just bring it
1:23:51right tie that back to our building so
1:23:54that people wouldn't be able to get to
1:23:55there from the street. The only access
1:23:57would be from our property in the back.
1:24:00>> That's better.
1:24:01>> That makes sense. That's good. Thank
1:24:02you.
1:24:03>> We can agree to that as conditional.
1:24:04>> Yeah.
1:24:05>> Okay.
1:24:06>> Any other board comments for
1:24:07>> Yeah. I have one more in reference to
1:24:09the garage area. Can you go over that?
1:24:11>> Sure. Uh, what exactly do you
1:24:14>> Well, I'm I'm interested in possibly
1:24:15having something warning people that a
1:24:17car is coming out or going.
1:24:19>> Oh, yeah. Yeah, we're going to do the
1:24:20pedestrian warning system. There'll be
1:24:21there'll be a light and a noise right
1:24:22here that when the garage door opens.
1:24:24>> I'm fine.
1:24:25>> Thank you, Mr. Lewis.
1:24:26>> You're welcome.
1:24:28>> Your next witness.
1:24:29>> Yes. And my final witness is Carolyn
1:24:31Worcell, who is my planner.
1:24:33>> Thank you. And council, if I'm
1:24:34understanding it, the variances being
1:24:36sought are because you're providing
1:24:41>> sideyard on the one side where you're
1:24:43not allowed to have a sideyard setback,
1:24:46but then on the other side, because
1:24:47their building encroaches,
1:24:50you're claiming you have a negative
1:24:51sideyard.
1:24:52>> That's correct. For the sideyards, we
1:24:54also have an issue with the building
1:24:56depth. There is a requirement that u all
1:24:59buildings with parking be are only
1:25:01allowed to be 95 feet from the street.
1:25:03Above that, it's 70 feet from the
1:25:05street. So that's that's the other
1:25:07variance relief that we're requesting.
1:25:16>> The whole truth.
1:25:17>> I do.
1:25:19>> Carolyn Worst W.
1:25:22>> Carolyn, is your license current and in
1:25:24good standing?
1:25:24>> Yes, it is this evening.
1:25:25>> Thank you. you're qualified.
1:25:27>> Thank you. Good evening, board. Um so
1:25:29yes, so we're here for a couple of uh
1:25:30bulk variances, C variances. Um so the
1:25:35first one again um relates to that
1:25:37sideyard setback. Um again, as was uh
1:25:41has been discussed uh specifically uh
1:25:45we're looking at these really as sort of
1:25:46um
1:25:48sort of hardship criteria. So the first
1:25:50one is going to be that C view avenue.
1:25:52So that's going to be the one up here at
1:25:54the top of our page. Um and again, so
1:25:58that one um is we have um a two 2.2 foot
1:26:04or 2.2 foot setback from the side
1:26:06property line. Um and that was as as
1:26:08discussed for a couple of reasons. One
1:26:10is to provide um the necessary
1:26:12clearances and light and air to the
1:26:13adjacent property at that point where
1:26:16their building is the closest to ours
1:26:18and we have a a lot line or a window
1:26:19that's close to us. Um so we need to
1:26:21provide the setback necessary for that
1:26:23window but also because um there is
1:26:26language in the the plan that talks
1:26:28about building depth and you can't have
1:26:30a building depth greater than 95 ft from
1:26:33uh a right of way. So when we looked at
1:26:36um this ground floor uh from Ocean
1:26:39Avenue, if you go back the 95 ft uh that
1:26:43gets you the building line at the the
1:26:45far side. So, um there's a little bit of
1:26:47a conflict between the two requirements
1:26:49and regulations within the redevelopment
1:26:51plan as to um what has to sort of happen
1:26:54with that sideyard setback. And um as
1:26:56was said, we we chose to create the open
1:26:59space, not put a building there. And so,
1:27:01we're requesting the variance because
1:27:04we're not and the requirement is that we
1:27:06have a zero foot sideyard setback at the
1:27:09first 100 or first 10 ft. So, we're
1:27:12asking to create more open space versus
1:27:14less open spaces. I normally have to
1:27:17make a judge a justification for
1:27:20um the second one again relates to um
1:27:24this uh property line here again where
1:27:27we are required to have zero foot
1:27:30sideyard setback um along uh along a
1:27:35side a side lot line. um the adjacent
1:27:37property does have a building that uh
1:27:41encroaches into our property. So, we are
1:27:42going to be meeting it right up along
1:27:44their property. And so, we're meeting
1:27:46the intent here, which is that you are
1:27:48sort of um building to building and not
1:27:50creating those spaces between buildings.
1:27:52So, we're meeting the intent, but we're
1:27:54not fully compliant with the letter of
1:27:56the ordinance. Um, so I would look at
1:27:58both of these as hardship criteria just
1:28:00given the uh the conditions and the way
1:28:03that the site has um has the push and
1:28:06pull of of where we uh can and cannot
1:28:08provide uh building uh for those two
1:28:12variances.
1:28:15The uh second variance or or rather I
1:28:17guess it's the deviation um is for the
1:28:19maximum building depth on upper floors
1:28:21without parking.
1:28:23Um so um
1:28:29again we are um there's a a requirement
1:28:33that we can only provide a maximum of 70
1:28:35ft building depth from a right of way.
1:28:38So, uh, when we sort of look at this on
1:28:40a corner property, again, we sort of
1:28:41take from, uh, one, uh, property line,
1:28:45we'd go back 70 ft. We'd go from the
1:28:47other property line, we go back 70 ft,
1:28:49and you sort of create an L-shape here.
1:28:51Um, with this building, um, because of
1:28:54some of the unusual configurations and
1:28:56and the way the lot, uh, fell and and
1:28:59some of the other conditions on the
1:29:00adjacent properties, we've created
1:29:03instead of having the setback, creating
1:29:05sort of the space here at the rear
1:29:07portion of the lot, um, we've done it so
1:29:09that we're actually creating an open
1:29:11space here where we are closest to this
1:29:14adjacent neighbor, um, where they are
1:29:16closest to us. Um, so we are providing a
1:29:19it's a 33 and a half by 25 ft um sort of
1:29:23courtyard at those upper floors. Um, and
1:29:25it's it's not going to be open space in
1:29:27use, but it's just sort of open like a
1:29:30very large open um air and light well um
1:29:34that's going to be along that property
1:29:36line. So again, we're providing the
1:29:38light and air to this adjacent uh
1:29:40property through that courtyard. Um and
1:29:44then um
1:29:48here on um along Ocean Avenue, we are
1:29:53providing light and air well again to
1:29:54the adjacent uh property where there is
1:29:57um a uh a light well. So again, we're
1:29:59providing the necessary light and air
1:30:01there. Um
1:30:04when we sort of look at what the intent
1:30:06of the ordinance is to providing these
1:30:10uh building depths, um the intent is to
1:30:13sort of create uh it's similar to a rear
1:30:16yard setback. Um and that it's intended
1:30:18to provide that light and air towards
1:30:20the rear of the property. Um, and I
1:30:23think that what we've tried to do here
1:30:25with this this uh development is to
1:30:28respond to some of the sort of unusual
1:30:31configurations of this block um to
1:30:34provide light and air to the adjacent
1:30:35properties and to the adjacent
1:30:37structures. Um
1:30:40so again um with this property here we
1:30:42we are providing the light and air um
1:30:44where there are adjacent windows. And
1:30:46then again here uh when we looked at and
1:30:49evaluated how the adjacent property or
1:30:52how our building was going to impact
1:30:54this property um the substantial um
1:30:59amount of the the light impacts they're
1:31:01coming from the building that's located
1:31:03within this area uh where you are
1:31:06permitted um the additional uh square
1:31:09footage and less of the impact is coming
1:31:12here because if this is north we don't
1:31:15cast shadows directly to the south of
1:31:17us. So, we're getting less of our shadow
1:31:19impact um on this adjacent property from
1:31:21this portion of the building. And the
1:31:23majority of the light and sha uh shadow
1:31:26impact is coming from this portion of
1:31:28the building um which has that
1:31:30conforming sideyard setback of zero
1:31:32feet.
1:31:34So we think that um overall um the the
1:31:37project um provides adequate light and
1:31:40air um through the various setbacks that
1:31:42have been provided. Um and that again
1:31:45overall the the the project uh the
1:31:48benefits of the project outweigh the uh
1:31:50the negatives of having that um
1:31:53additional or having requesting the
1:31:56deviation for the building depth.
1:31:59Um I think overall the project advances
1:32:01the municipal land use law um you know
1:32:05it's providing an appropriate mixed use
1:32:08um consistent with um the uh
1:32:12redevelopment plan. Um it's providing uh
1:32:15density consistent with the
1:32:16redevelopment plan um as well as having
1:32:19that additional um affordable unit um in
1:32:22accordance with the the uh provisions.
1:32:26Um we're providing a more desirable
1:32:28visual environment through this overall
1:32:30development. Um you know this is uh this
1:32:33is right now a fairly rough corner. Um
1:32:36there's uh you know it's vacant um and
1:32:41this is going to be providing new
1:32:42mixeduse retail at the corner. Um it's
1:32:46going to really sort of activate what is
1:32:48right now a block that is um
1:32:52uh vacant and a corner that is vacant.
1:32:55Um, we're going to be adding, you know,
1:32:57new, uh, sidewalks, new street trees.
1:32:59We're removing a curb cut on Ocean
1:33:01Avenue. Um, so again, it's going to make
1:33:03for a better, um, uh, condition along
1:33:05Ocean Avenue. Um, so I do think that
1:33:09that advances a more desirable visual
1:33:11environment.
1:33:13Uh, I don't see this resulting
1:33:14substantial detriment to the general
1:33:16welfare. Again, it's a 40 unit uh,
1:33:18mixeduse residential development on a
1:33:20vacant site. uh that's really in
1:33:22accordance with what the um the
1:33:25redevelopment plan is looking for. Um
1:33:28and it is consistent with the intent and
1:33:31objectives of the redevelopment plan. Um
1:33:34it is reestablishing Ocean Avenue South
1:33:37as a neighborhood commercial corridor
1:33:38and neighborhood destination. Uh it's
1:33:41removal and rehabilitation um of vacated
1:33:45uh and uh deteriorated and obsolete
1:33:47structures and lots. creation of new
1:33:49employment, housing um for the just
1:33:52residents of Jersey City and um
1:33:56really sort of uh coordinating uh uh
1:34:00consistent attack on blighted,
1:34:02dilapidated and obsolete structures in
1:34:03the area. So again, I think this is
1:34:05going to be um a really uh key project
1:34:08on a corner um of this block and I think
1:34:11overall it advances the objectives of
1:34:13the Jersey City master plan to continue
1:34:15to enhance residential neighborhoods um
1:34:18create balanced housing uh for future
1:34:20residents.
1:34:22>> Thank you.
1:34:23>> And so that is uh my testimony unless
1:34:26anyone has questions.
1:34:27>> Thank you. Any board comments?
1:34:29>> No.
1:34:30>> Thank you, Mrs.
1:34:34Uh that's my presentation. Just a couple
1:34:36things to put on the record. There is a
1:34:37community notice requirement in this
1:34:39redevelopment plan. We did meet that. Uh
1:34:41we did I did upload an affidavit to that
1:34:43effect to the portal. Um and finally, I
1:34:47am receipt of the November 25th, 2025
1:34:51um report from planning staff with the
1:34:53and I've reviewed the conditions
1:34:55therein. They are acceptable. We are
1:34:57also adding the three additional
1:34:58conditions related to the trash chute uh
1:35:01related to the removal of the vinyl
1:35:03siding and replacement with fiber cement
1:35:05paneling and uh fencing on the side of
1:35:08the property uh where the pathway is.
1:35:11>> Thank you.
1:35:12>> Thank you,
1:35:13>> Madam Chair. I believe there's also two
1:35:15additional uh one for the bumpout, one
1:35:17for the rectangular rabbit flashing
1:35:18beacon.
1:35:19>> Yes, there's a comment in the plans to
1:35:21comply with conditions of the letters
1:35:23which we will accept. Yes.
1:35:24>> Perfect. Thank you.
1:35:26At this time, I would like to open for
1:35:28the public. Is there anyone from the
1:35:29public?
1:35:30>> See no one from the public. I'd like to
1:35:32close the public portion.
1:35:33>> Second.
1:35:35>> Public is closed. Matt, is that you?
1:35:37>> Yeah, this is in the Ocean Avenue South
1:35:39redevelopment plan. Uh Cameron Black was
1:35:42the primary uh reviewer on this. Uh I
1:35:47reviewed the plans in preparation for
1:35:49tonight's meeting. Uh the application
1:35:51does not trigger the ICO although it
1:35:54does have some variance floor gained
1:35:57through the request for variance um more
1:36:00specifically the rear yard variance uh
1:36:03but it does not exceed the 5,000 square
1:36:06ft. Um however they are still providing
1:36:10a one affordable unit pursuant to the
1:36:12redevelopment plan. Um
1:36:16they've gone through the uh the
1:36:19variances that they're seeking uh the
1:36:21proofs
1:36:23um and
1:36:25the project overall is meeting the goals
1:36:27and objective of the redevelopment plan.
1:36:29Um we recognize the three conditions
1:36:32that were put on the record in in
1:36:33addition to those recommended by staff.
1:36:36Staff recommends approval.
1:36:37>> Thank you. I'd like to entertain a
1:36:39motion. I'd like to make a motion to
1:36:40approve case P2025-0160
1:36:44as presented to the board this evening
1:36:46with all staff recommendations and
1:36:47conditions.
1:36:48>> Second.
1:36:50>> Vice Chair Wick
1:36:52>> I.
1:36:52>> Commissioner Kaplan
1:36:53>> I.
1:36:54>> Commissioner Council person Little
1:36:55>> I.
1:36:56>> Commissioner Stamato
1:36:57>> I.
1:36:58>> Commissioner Conaway
1:36:59>> I.
1:36:59>> Commissioner Patel
1:37:00>> I.
1:37:01>> And Madam Chair Gongadan.
1:37:03>> Yeah I think the variance requested is
1:37:05uh very minimal. Um my vote is I.
1:37:08>> Motion carries. It's all in favor.
1:37:09>> Thank you.
1:37:11>> We'll take a 10 minutes break.
1:37:48What?
1:37:51New man. New
1:37:54place.
1:38:13It's something.
1:38:15>> It's something
1:38:22bad. I'm so bad at the accounting. So
1:38:24bad,
1:38:26>> right? You have so
1:38:30Yeah, for me it doesn't matter.
1:38:39>> Oh wow.
1:38:40>> Yeah. No, they take it easy on us.
1:38:45>> I don't think I'll get anybody.
1:38:50>> Oh, okay. I was say if I got
1:38:53[laughter] no paperwork for anything be
1:38:55a disaster. Just start making up numbers
1:38:57like I do. You know, when I pay my
1:38:59taxes, they want to make sure.
1:39:02>> Sure.
1:39:04>> It seems to be in vogue lately.
1:39:06>> Not just attorneys, everybody buy the
1:39:09Lakers insurance money. It's fine.
1:39:11>> Needs to be a certain amount of money,
1:39:13right? Like you're going to do it. You
1:39:15need
1:39:15>> You should have some money, right?
1:39:19>> Some of it should be yours. Some of the
1:39:20money should be yours.
1:39:21>> A little bit.
1:39:23>> That's what happens now. They just they
1:39:25buy and they like just put a bunch
1:39:27of debt on each team. So now it's like
1:39:29seems to pay off. Maybe they did that to
1:39:30Manchester United. Like they're still
1:39:32paying off.
1:39:34>> Why buy with your own money when you
1:39:36could buy with the team? Like literally
1:39:38buy with their crazy
1:39:42own.
1:39:44>> Why not?
1:39:45>> Where's your office?
1:39:48That's right.
1:39:51>> You just take the train.
1:39:58Okay,
1:40:04>> that's easy enough.
1:40:05>> Yeah.
1:40:10>> All right, I got a second.
1:40:12>> Yeah, you do or not.
1:40:40Friday.
1:40:47They're
1:41:17missing.
1:41:23No, no,
1:41:45she
1:42:44Yeah.
1:42:56I checked.
1:43:04>> Yeah.
1:43:35You're
1:43:40>> Oh, yeah.
1:44:24Okay.
1:45:00Yeah,
1:45:07that's
1:45:22What's a good
1:46:46Have a good night.
1:46:59Charles
1:47:14everything
1:47:32And then
1:47:43you have no responsibility.
1:47:45I guess
1:48:00they made it over.
1:48:20All right.
1:49:00That's right.
1:49:48So employer
1:49:54>> Oh yeah.
1:50:21This is just this is just
1:50:48I would argue
1:51:07that
1:51:18I like the fact that they were kind of
1:51:19like short projects, you know,
1:51:31>> right? But that's always the catch like
1:51:33what makes a story.
1:51:34>> Yeah, I know.
1:51:36>> See, like I thought like a black
1:51:37heritage thing. Get some nice pretty
1:51:39pictures.
1:51:41>> She didn't have any pretty pictures.
1:51:45>> Can I make a screen of pretty
1:52:24I bought my house.
1:53:01Yeah.
1:53:51David Cyberstein.
1:54:15All right. Come on.
1:54:35Oh gosh.
1:54:39>> HDMI.
1:54:40>> Yeah.
1:54:42>> Mic is hot.
1:54:45>> It's okay. HDMI.
1:54:50What is that?
1:54:58>> Oh, you're charging. You're charging up
1:54:59the charger.
1:55:01>> Oh, that's pretty cool.
1:55:06>> Oh, okay. Cool.
1:55:11>> Okie do.
1:55:32Don't we have to go back to something?
1:55:33No, I guess not. Right.
1:55:36Done.
1:55:38We got this one to do, right? 13
1:55:42>> 107 Morgan Street.
1:55:53Santa,
1:55:59>> I can work anywhere in the room.
1:56:12But I'd like to call the meeting back to
1:56:13order. When you're sitting,
1:56:18>> you're our security blanket, Santa.
1:56:21>> I'd like to call the meeting back to
1:56:22order. I'd like to call KP2026-0126.
1:56:27It's a site plan amendment. Address is
1:56:30107 Morgan Street. Mr. Le.
1:56:33>> Uh, yes. Again, for the record, Tom Lean
1:56:35of Connell Foley. Uh, this is a notice
1:56:37application. I did post my affidavit uh
1:56:39on the portal, but we'll provide same to
1:56:41council.
1:56:54Thank you, council. I may receive the
1:56:55affidavit of publication proof of
1:56:56mailing. It does appear to be the
1:56:58original of the document that was
1:57:00uploaded to the portal. I did have the
1:57:03opportunity to review it. It does appear
1:57:05to be in order. Mark, it is A1 for the
1:57:07record.
1:57:08>> Thank you. Uh the application before you
1:57:10this evening is an amendment to a
1:57:12project that was approved uh by the
1:57:14board uh back in 2025. Uh it is a
1:57:1835story tower that is located within the
1:57:21powerhouse arts uh redevelopment plan
1:57:24area. Uh overall the project has 633
1:57:28dwelling units, 210 parking spaces, uh
1:57:3118,000 square ft of ground floor retail
1:57:33area, and there's also an open arcade uh
1:57:36that will be publicly accessible. Um the
1:57:39project is currently under construction.
1:57:42Um the uh applicant is the designated
1:57:44redeveloper for the property. Um the
1:57:48amendments that we're asking for this
1:57:50evening are essentially uh to decrease
1:57:52the total unit count. We're changing
1:57:54around some of the units to make them a
1:57:56little bit larger uh based on market
1:57:59conditions. Um, additionally, uh, once
1:58:01we commenced um, construction drawings,
1:58:03we realized that we had a little bit of
1:58:06height to play with as far as the
1:58:07building. We are still within the
1:58:10permitted height of the uh, the
1:58:12redevelopment plan. Um, we are not
1:58:14asking for a deviation for that height.
1:58:16It's simply to make some of the u floor
1:58:18to ceiling heights in the building a
1:58:20little bit better and also to
1:58:21accommodate uh some of the um
1:58:23mechanicals that are on the roof. Um I
1:58:26only have uh one w uh witness this
1:58:29evening. It's my architect and I am
1:58:31going to have him present. Uh if we can
1:58:34get this up on the screen. Okay,
1:58:41>> Mr. Lean, we're going to be looking at
1:58:42the actual changes that are
1:58:44>> That's correct. What you have before you
1:58:46is a sidebyside comparison of the
1:58:49building as approved and what is
1:58:51proposed. Uh the areas that are
1:58:53different will be marked and bubbled in
1:58:55red.
1:58:55>> Thank you.
1:58:55>> Thank you.
1:59:01>> I do.
1:59:03>> Uh yes. Paul Albano ALB an o
1:59:07>> Mr. Albano. Is your license current and
1:59:09in good standing?
1:59:10>> Yes it is.
1:59:10>> Okay. You're qualified. You may proceed.
1:59:12>> Okay. Thank you for for having me today.
1:59:15Um, as Mr. Lean stated, we are looking
1:59:18to uh receive two amendments that have
1:59:22been um proposed. Uh, one of them is a
1:59:24reduction in unit count and the other
1:59:26one is a building height. So, I'll walk
1:59:27you through and we could look at the
1:59:30both of those changes. Um, the unit
1:59:34count really changes from the 12th to
1:59:36the 31st floor. What we did was looking
1:59:39at the units as they were arranged, we
1:59:41uh revised a four bedroomedroom unit and
1:59:44reduced it. Um we excuse me we we
1:59:47revised four zero bedroomedroom units
1:59:49into three units. So we took a net loss
1:59:52of six units for floors 12 to um 17. And
1:59:56we did similar on floors 18 to 31 where
1:59:59we took um a revised onebedroom
2:00:03and onebedroom plus and we combined it
2:00:06to make a threebedroom. So we lost an
2:00:07additional 14 units. So for a total loss
2:00:10of 20 units. So our unit count went from
2:00:13633 units down to 613 units. And I'll
2:00:17walk you through those those changes
2:00:19now. So
2:00:22um on the 12th through 17th floor, we
2:00:26highlighted the area where there were
2:00:28the studio apartments. You can see they
2:00:30were highlighted in in red as I'm
2:00:32highlighting here. So there was um
2:00:36studio apartments there. What we did in
2:00:39the sideby-side analysis is show that
2:00:41the difference in the four studios turns
2:00:43into the three units netting one unit
2:00:45per floor for six floors is minus six.
2:00:49That happens on 12 to 17. Going to the
2:00:51upper floors
2:00:54which are 18 to 31. Um we also revised
2:00:58that corner unit and as a as a
2:01:02comparison you'll see it went from uh
2:01:05two units to a single unit netting a
2:01:08loss of one unit per floor for 14 floors
2:01:11and that's the total of 20. Where the
2:01:14height comes in is where after we
2:01:17started doing the construction documents
2:01:19and after we were working with the
2:01:21mechanical engineers, we realized that
2:01:23we were having a tough time getting
2:01:24mechanical offsets at the upper floors.
2:01:27So, being that we had some height, like
2:01:29Mr. stated, "We took an additional
2:01:32approach to to take one foot on the 33rd
2:01:35floor and one foot on the 34th floor,
2:01:38raising the building height from 340 ft
2:01:41as approved to 342 feet. Uh, still
2:01:45within the 350 ft height limitation. So,
2:01:48it really just was a matter of
2:01:51coordination with the trades and seeing
2:01:53where we needed the height. Uh and
2:01:55therefore that raised everything above
2:01:5833 to feet including the bulkhead which
2:02:00is in the permitted height for a
2:02:02bulkhead which is 30 feet but we wound
2:02:05up raising that to um a to 26 ft. Um and
2:02:11it really just came from coordination
2:02:13and the effort with the design team. Um
2:02:16so it's a net reduction. Just to state
2:02:18one thing that I didn't state although
2:02:20we have a variance for the parking
2:02:22count. We did not change the parking
2:02:24count. So although the units went down
2:02:2620 um 20 units, the parking count
2:02:28remains the same.
2:02:31>> Number of parking spaces.
2:02:32>> The number of parking spaces remain the
2:02:33same. The the factor changes obviously,
2:02:36>> right?
2:02:37>> Mr. B, is the overall height that I'm
2:02:41looking at on the agenda 362 ft to 364?
2:02:46>> That's correct.
2:02:47>> Okay. So it's not 340.
2:02:50>> Well, that's to the bulkhead. It's 342
2:02:52to the measuring to the building height.
2:02:56So here is the building.
2:03:09Measuring the building to the roof is
2:03:11the 342 which is
2:03:17measured from the 12 foot elevation mark
2:03:21which is uh designed flood elevation
2:03:25to 354. So if you subtracted two that's
2:03:30sorry
2:03:33354.
2:03:36Yeah, the proposed 342. Did did was
2:03:39there something different in there?
2:03:40>> Uh my notice just calls out that 350 is
2:03:43the max permitted height. I I I don't
2:03:45know if there's a mistake in the but
2:03:47that it might be referencing what is the
2:03:49to the bulkhead and that's exempted from
2:03:51our calculation on height per the
2:03:52ordinance.
2:03:53>> Okay.
2:03:55>> Yeah. If you if I look at this again, it
2:03:56looks like it was measured 364
2:03:59feet minus
2:04:04to 12 ft. [clears throat]
2:04:06>> Right. So, you increased it 2 feet, but
2:04:08it was to elevation 364
2:04:12>> from elevation 362.
2:04:15>> From 362,
2:04:16>> but of course, you have to measure from
2:04:18the flood elevation.
2:04:19>> Elevation, right,
2:04:20>> for the actual height of the building.
2:04:22>> Exactly.
2:04:23>> Thank you.
2:04:25So, Madam Chair, this is pretty standard
2:04:27in terms of after an approval happens
2:04:30and we're going through the construction
2:04:34drawings and we're starting to put the
2:04:37meat on the bone in terms of what is
2:04:40happening with the project in in real
2:04:43life and time that there are certain
2:04:45changes and modifications to make the
2:04:47project uh better. The mechanicals
2:04:51obviously is a a significant thing. If
2:04:53they need more room, those types of
2:04:56things make a lot of sense when they're
2:04:58actually designing out those those
2:05:00systems in totality, dealing with the
2:05:01trades as was testified to. This is the
2:05:05way the process is supposed to work.
2:05:07They're supposed to recognize it, come
2:05:09back before the board, amend the site
2:05:11plan, and then continue with the
2:05:14project. So, um, this is the the system
2:05:18working the way it's supposed to work as
2:05:20opposed to we've built the building and
2:05:21now we need the relief. Uh, this is how
2:05:25it should be. So,
2:05:26>> and noticed that
2:05:29>> I said we do appreciate that.
2:05:32>> Any board comments?
2:05:33>> Just one question. Um, are there any
2:05:35affordable units uh in the building
2:05:37under the prior approval?
2:05:38>> Uh, there are no affordable units. It's
2:05:40not a requirement under the
2:05:40redevelopment plan.
2:05:41>> Okay. Thank you.
2:05:44Thank you, Mr. Albano.
2:05:46>> Thank you. I have no further witnesses.
2:05:48>> Thank you.
2:05:49>> Thank you.
2:05:49>> I'd like to open for the public. Is
2:05:51there anyone from the public?
2:05:53>> See no one from the public. I'd like to
2:05:54close the public portion.
2:05:56>> Second.
2:05:57>> Public is closed.
2:05:59>> I'll take it. Yeah.
2:06:01>> Uh so I reviewed this application in
2:06:04preparation uh for tonight. Uh the
2:06:08review planner was Sophia Pereira. She
2:06:10prepared a memo dated October 9th, 2024.
2:06:14Um there are existing conditions part of
2:06:17the prior approval that said two
2:06:20additional conditions are recommended
2:06:22that their expert witness uh their
2:06:25testimony of their expert witness be
2:06:26binding and that uh and regarding
2:06:29utility meters, does the applicant
2:06:31comply agree to
2:06:32>> I've reviewed I've reviewed the memo and
2:06:34we agree to the conditions therein.
2:06:35>> Staff recommends approval.
2:06:37>> Thank you. I'd like to entertain a
2:06:38motion. I'd [clears throat] like to make
2:06:39a motion to approve case P206-0126
2:06:43as presented to the board this evening
2:06:45with all existing staff conditions.
2:06:48>> Second.
2:06:49>> Vice Chair Wick
2:06:50>> I.
2:06:51>> Commissioner Kaplan
2:06:52>> I.
2:06:52>> Commissioner Council person Little
2:06:54>> I.
2:06:55>> Commissioner Stamato
2:06:56>> I.
2:06:56>> Commissioner Conaway
2:06:58>> I.
2:06:58>> Commissioner Patel I.
2:06:59>> And Madam Chair Congadan I.
2:07:01>> Motion carries. All in favor.
2:07:03>> Thank you.
2:07:03>> Thank you very much everyone. Have a
2:07:04good Thank you.
2:07:17I'd like to call KP2026-000099.
2:07:21It's a minor subdivision. Address is
2:07:24364th Street.
2:07:26>> Mr. Joseph,
2:07:29>> Madam Chair, I have to recuse. I do have
2:07:30a conflict on this matter. So, I'll step
2:07:32away from the deis. Obviously, if the
2:07:35board is uncomfortable proceeding
2:07:36without me, uh we can carry the matter
2:07:39and we will get a another attorney to
2:07:42handle the matter while there is a
2:07:44conflict. Of course, Madame Chair, the
2:07:47board has handled matters in my abs and
2:07:50it's uh and has been comfortable moving
2:07:53forward with the applicant agreeing, but
2:07:56I leave that to the board to make that
2:07:57decision.
2:07:58>> The board is very comfortable.
2:08:00>> The applicant consents for the record.
2:08:04Uh, good evening everyone. Stephen
2:08:06Joseph S. Joseph Law LLC for the
2:08:09applicant. Um,
2:08:11>> this is a little bit of a strange
2:08:13situation. So, my uh my client, the
2:08:16developer, owns two parcels side by
2:08:20side, undersized lots. We had obtained
2:08:23zoning board approval to construct the
2:08:25single family home with variances on
2:08:28each one of these two parcels. In
2:08:30between getting the approval at the
2:08:32zoning board and the resolution being
2:08:34formally adopted, the uh lots were
2:08:36automatically consolidated by the tax
2:08:39assessor, creating one lot, which
2:08:41prevented us from pulling permits to
2:08:43build the two separate buildings because
2:08:45they would then be two buildings on on a
2:08:47single lot, which is not permitted. So,
2:08:51what we're trying to do this evening is
2:08:54get a subdivision to put the property
2:08:56back exactly how it was before uh the
2:09:00lots were consolidated so we can get our
2:09:03permits approved and build the two
2:09:06single family structures that were
2:09:08approved by the zoning board. So, 364
2:09:12Fifth Street, it's located near the
2:09:14corner of Brunswick and Fifth Street.
2:09:16It's in the RC3 zone. We're subdividing
2:09:19the lot. It's currently 1,250 square
2:09:23feet. It's going to turn into two 625
2:09:26square foot lots uh 12 a.5 by 50 each
2:09:30unders sized. We need a handful of
2:09:32variances for each of these lots. Uh lot
2:09:35area lot width building coverage, lot
2:09:37coverage, rear yard setback. A lot of
2:09:39these the coverage variances are going
2:09:42to go away very quickly. There's a demo
2:09:45per permit that was pulled. The existing
2:09:48improvements on the site are coming down
2:09:50Monday and my client's prepared to move
2:09:52forward with their permit application
2:09:54for the approvals um that I previously
2:09:57mentioned. We have surveyor here this
2:09:59evening. We have a planner to testify
2:10:01about the variances. Let's get Michael
2:10:04Sworn in. He'll walk you through the
2:10:06survey, explain what's going on, and
2:10:07then we'll have some testimony about the
2:10:09variances.
2:10:10>> Okay. Thank you.
2:10:10>> Right before that, do you want to
2:10:12>> Yes. I'm sorry. This is also a notice
2:10:14application. Council's not here. I did
2:10:16turn my notices in uh to Ben. We could
2:10:18mark those as A1.
2:10:21>> Thank you very much.
2:10:22>> Thank you.
2:10:22>> Thank you.
2:10:29>> I do.
2:10:31>> Uh Michael Nicholski.
2:10:35M I C H A L. Last name N I C Z E W S K
2:10:42I. Michael, is your license current and
2:10:45in good standing?
2:10:46>> Yes.
2:10:47>> Okay, you're qualified.
2:10:49>> Thank you. All right, let's get uh your
2:10:52computer plugged in here.
2:10:56>> It's plugged in. I don't know if it'll
2:10:59take a just a minute.
2:11:07There we go. All right, Michael. So,
2:11:11explain the current condition of the
2:11:13site, explain what we want to do to the
2:11:15property, and if you could just
2:11:18list the variances that we're seeking
2:11:20that are associated with the subdivision
2:11:22as well. But let's start with the
2:11:24current conditions.
2:11:25>> Sure. This is 364 uh
2:11:29street.
2:11:30>> Uh it's currently occupied by a
2:11:35uh two and a half story frame house. Uh
2:11:37it is attached to another uh two and a
2:11:41half story frame house separated by a
2:11:43driveway. Uh
2:11:46it's neighboring a two twotory masonry
2:11:49house separated by a driveway and it um
2:11:53to the rear there's a community garden.
2:11:56Uh there are a few uh encroachments or
2:12:02the visible party wall uh between the
2:12:05two neighboring attached homes is across
2:12:08the lot line by
2:12:11uh 4T
2:12:15and 8 ft respectively. Uh that's the
2:12:18visible outside seam. Uh the neighboring
2:12:22house to the
2:12:24to the west uh is on the property line.
2:12:28Uh
2:12:29>> and Michael, the give us the dimensions
2:12:32of the of the current consolidated lot.
2:12:35>> Yeah, the the lot as it stands now is 25
2:12:38by 50.
2:12:42>> Great.
2:12:43Um and we're proposing to
2:12:46>> uh we're proposing to bring it back to
2:12:48how it was. uh a 50 foot a 12 and a half
2:12:54by 50 foot lot and a 12 and a half by 50
2:12:57foot lot.
2:12:58>> Right. And the the adjacent parcels are
2:13:00of similar size to what we're proposing.
2:13:04>> Yeah.
2:13:04>> Great. Um if you could go into the
2:13:07zoning table and just uh briefly mention
2:13:11the variances that we're we're seeking
2:13:13for each of the new lots.
2:13:16Uh, no variance on residential. Uh, a
2:13:19variance for the minimum lot size, a
2:13:23variance for minimum lot width, uh, a
2:13:27variance for the maximum lot coverage.
2:13:31I think that's it, right?
2:13:32>> The building coverage
2:13:35>> and and the rear yard setback,
2:13:38right? But as previously stated, uh,
2:13:40those are all going to get cleared up
2:13:42once the building gets demolished.
2:13:44All right.
2:13:45Are there questions for Michael about
2:13:48the actual survey? I think this piece of
2:13:51it relatively straightforward. There'll
2:13:53probably be more questions for Carolyn.
2:13:56>> So, as is the lot size currently,
2:14:00is that 25 by 50 or 12 by 50?
2:14:04>> It's 25 by 50.
2:14:06>> Okay.
2:14:12It used to be 12 1.5 by 50.
2:14:15>> It's Say that again.
2:14:17>> It used to be two 12 and 1/2 by 50 lots.
2:14:20>> So, you're combining both lots. They
2:14:22>> no it used to be two 1250 lots uh and
2:14:26then they were consolidated uh after uh
2:14:29the mortgage was paid
2:14:31>> and then now we're applying for uh them
2:14:34to be subdivided.
2:14:35>> Subdivide again
2:14:36>> to be returned to their state
2:14:38>> to 12 by 50.
2:14:40>> Yes.
2:14:41>> Okay.
2:14:42>> Uh yeah to two 12 by 50s.
2:14:45>> Any board comments?
2:14:49>> No. Thank you. Thank you. Should I leave
2:14:52this or
2:14:53>> you can leave it there? Carolyn's going
2:14:55to offer some testimony about the
2:14:57variances.
2:15:01>> I do.
2:15:03>> Thank you, Carolyn. You may proceed.
2:15:05>> Thank you. Um, so we're here again um as
2:15:08was stated because we're sort of in an
2:15:10unusual situation which is there were
2:15:12two uh existing lots. they were combined
2:15:16um as was I guess sort of the standard
2:15:18practice by the tax assessor's office
2:15:21without understanding that there had
2:15:23been approvals for two new buildings on
2:15:26these properties. So we're essentially
2:15:28trying to return this lot to the state
2:15:31that it was in previously. Um so
2:15:35essentially uh there are a couple of
2:15:37variances that are associated with this.
2:15:40Um and some of them are related to
2:15:43what's currently on the site and some
2:15:45are related to the subdivision. So I'm
2:15:47going to focus on the first two which
2:15:48are related to the subdivision. So each
2:15:50of these uh lots are going to require uh
2:15:53variances for minimum lot area and for
2:15:55minimum lot width. Um so again the zone
2:15:59standard is for a 25 by 100. Um these
2:16:02were both 12 and a half by 50. Um and
2:16:08while that is undized uh for the um R1
2:16:12district um they it's not uncommon along
2:16:15this block frontage uh to see that type
2:16:19of development. Um there are existing uh
2:16:2212 and a half by um 50 lots um on lots
2:16:2628 through 35 on the same block
2:16:29frontage. Um let's see. Can is there?
2:16:33Oops.
2:16:36No, it doesn't show. Okay.
2:16:39Um, but if we were to look at a a tax
2:16:42map, you would see them further down the
2:16:43block that this is a common condition.
2:16:45And if you look elsewhere in the
2:16:47historic uh districts throughout
2:16:48downtown Jersey City, this is not an
2:16:51uncommon thing to find are these smaller
2:16:53lots. um they do allow for the smaller
2:16:56townhouse um developments that that we
2:16:58see has historically uh developed in
2:17:00these areas. Um so again, so that what
2:17:03we're essentially seeking to do is to um
2:17:07restore the the the lot separation that
2:17:10was there so that the approved plans for
2:17:13the two town houses can be developed. Um
2:17:16and all the variance associated with
2:17:18those approved plans have already been
2:17:21granted by the zoning board. Um there
2:17:24are a couple other um bulk variances
2:17:26that are associated with this again
2:17:28because we do have an existing building
2:17:30that extends across the property line
2:17:32and we have you know a driveway with you
2:17:34know impervious coverages. So um there
2:17:37are several other bulk standards um
2:17:40associated with this that we are going
2:17:42to request relief. Um so the first one
2:17:45is proposed lot A which is where the
2:17:47driveway is. Uh we do have a maximum
2:17:49coverage uh where there's approximately
2:17:5286 and a half%
2:17:54uh on lot A in terms of coverage where
2:17:5680 is the maximum permitted. As stated
2:17:59previously, all of that um coverage is
2:18:02slated to be removed um as part of the
2:18:04demolition.
2:18:06on proposed lot B which is the building
2:18:08that has the majority of the existing
2:18:10structure. Um
2:18:14there is uh
2:18:1781.5%
2:18:19um building coverage where 70% is
2:18:22permitted. Um again that structure is
2:18:25proposed to be removed. Um there's a
2:18:27maximum lot coverage of 100% on lot B
2:18:29where 80% is uh the maximum permitted.
2:18:33Again, we we are proposing to re be
2:18:35removing um those improvements that
2:18:37exist on the lot. Um
2:18:41there are also, I believe, a couple of
2:18:43setback variances
2:18:46uh that are existing non-conforming
2:18:47conditions for the most part. Um but
2:18:50again, these are all items that will be
2:18:53um removed uh and demolished as part of
2:18:56the approved site plan application for
2:18:59the properties.
2:19:02uh in looking at uh a you know I believe
2:19:06this this uh project advances the
2:19:08municipal land use law um it's promoting
2:19:11appropriate population density and
2:19:12concentration
2:19:14um it's that is uh consistent with the
2:19:17overall character and scale of this
2:19:19neighborhood consistent with purpose E.
2:19:21Um, it's promoting desirable visual
2:19:23environment consistent with purpose I um
2:19:25by allowing for the two uh the two new
2:19:30uh residential developments uh to
2:19:32proceed um as approved by the zoning
2:19:34board. And it would also remove that
2:19:36asphalt driveway and um parking area
2:19:39which again is would not be permitted on
2:19:41the lot even at 25 ft wide. Um
2:19:45and so that that will be removed as part
2:19:47of the application. Um
2:19:52and then I think uh there I don't see
2:19:53this resulting in a substantial
2:19:55detriment to the general welfare. Um
2:19:57again it's proposing to restore previous
2:20:00uh lots uh that existed for decades
2:20:02prior to the recent lot consolidation um
2:20:05and consistent with the existing
2:20:07character of the surrounding
2:20:07neighborhood in scale. Um, it's
2:20:10consistent with the purpose of the RC3
2:20:12district
2:20:14uh to protect the historically low-rise
2:20:16nature of the neighborhood with an uh uh
2:20:20and allow for an appropriate uh infill
2:20:22development. It's great uh
2:20:27um that would allow for inappropriate
2:20:29infill development. Um
2:20:32I don't see this resulting in a
2:20:33substantial impairment to the intent and
2:20:35purpose of zone plan of the zoning
2:20:36ordinance. Um, you know, again, it's
2:20:38consistent with the RC3, um, goals of,
2:20:42you know, allowing that protecting the
2:20:44historic character. Um, and it advances
2:20:47the goal of the Jersey City master plan,
2:20:49uh, to provide unique, attractive, and
2:20:51high quality, uh, residential areas. So,
2:20:54I think overall the variances can be
2:20:56granted in that both the positive and
2:20:57the negative criteria have been met.
2:21:00If anyone has any questions, I'm happy
2:21:02to answer them. [clears throat]
2:21:05Any more?
2:21:06>> Um, being that you're doing 100% lot
2:21:09coverage, would there be any concern on
2:21:12uh drainage runoff?
2:21:13>> So, right now the lots are close to 100%
2:21:16lot coverage. The the plan is to remove
2:21:19all the existing improvements and that
2:21:21there would be um future development
2:21:23that already went through an approval
2:21:25process at the zoning board. Um, and all
2:21:28of the necessary approvals were granted
2:21:30by that board. There's a stormwater
2:21:32detention system that's proposed as part
2:21:34of each of those approvals.
2:21:37>> Okay. And that would just tie right into
2:21:39the you're not doing like any access
2:21:42runoff drainage. It's just something
2:21:43that ties right into the current system,
2:21:45the subsystem.
2:21:47>> Yeah. I I mean, we don't have the
2:21:48architect here that worked on those
2:21:49those other approvals, but there was a
2:21:52system contemplated as part of part of
2:21:54each of those.
2:21:55>> Thank you for your clarification.
2:22:00I'm, you know, if I could jump in, I
2:22:03just try to get an understanding. What
2:22:04are you doing with this?
2:22:06>> You're going from one size, which is a
2:22:08larger size, down to a smaller size.
2:22:11>> So, what what's the plan? What's the
2:22:12final plan for this property?
2:22:14>> So, the plan, which is already approved,
2:22:15is two fourstory single family homes on
2:22:18on each of these lots. Um,
2:22:22like we tried to explain before, these
2:22:24were two separate properties exactly as
2:22:27as we're proposing for decades. The
2:22:30applicant paid off his mortgage in
2:22:32preparation to start doing construction.
2:22:35The tax assessor got got a notice of
2:22:38that, consolidated the two lots
2:22:40together.
2:22:42We didn't find that out until we went to
2:22:44go pull permits and we weren't able to
2:22:46pull permits because the lots were
2:22:48consolidated together.
2:22:50>> So, we're trying to separate the lots
2:22:51again so we could act on on the
2:22:53approvals that we got from the the
2:22:54zoning board last year.
2:22:57>> Okay.
2:23:00>> The approval that was um granted by the
2:23:02zoning board, is it based on
2:23:04[clears throat] 25 by 50 or 12 by 50?
2:23:07>> 12 1.5 by 50. So yeah, we we're we're
2:23:10trying to and we we have to put the lots
2:23:13back exactly the way they were where
2:23:15those approvals aren't valid. The lots
2:23:18have to be the same as they were when we
2:23:19got the approvals.
2:23:24>> And what is proposed to be built?
2:23:26>> Single family.
2:23:27>> Single family on each lot.
2:23:29>> Four stories.
2:23:30>> Four stories each
2:23:31>> which is permitted in the in the zone to
2:23:33RC3 zone.
2:23:36Matt, do you want to comment on this?
2:23:38>> This is all checks out and I know this
2:23:41very well.
2:23:42>> That's why I referred to you there.
2:23:44>> Um, it has been a long go longstanding
2:23:48ongoing application. In fact, even the
2:23:50neighbor at 366 has a zoning board
2:23:53approval. So, these potentially three
2:23:57row of three properties would all
2:24:00undergo uh new additions or new
2:24:03construction. Um
2:24:06the uh the reason why they were before
2:24:08the zoning board is because they're not
2:24:11minor site plans but have variances
2:24:13because of the undersized nature of
2:24:14these lots. Um but as testified to that
2:24:18is uh that's a
2:24:22established condition on this block of
2:24:24fifth street especially on this side of
2:24:26the block.
2:24:27Um
2:24:30does that answer your question? So Matt,
2:24:32were you saying it's normal for this
2:24:34area or for this street or whatever?
2:24:37>> Yeah, absolutely. Construction. So from
2:24:3933 338 to 344 Fifth Street and then at
2:24:44366
2:24:46uh Fifth Street right next to this
2:24:48property. Um there is this this this 50
2:24:52foot depth by 12 and a half
2:24:55>> feet wide. [clears throat]
2:24:56>> Correct.
2:24:59Is the property attached?
2:25:01>> Correct.
2:25:03>> Is it attached to another building or
2:25:05detached?
2:25:06>> It's proposed to be attached with the
2:25:07new structures.
2:25:09>> The two 12 12 and a half 12 and a half
2:25:11will be attached
2:25:12>> to to each other and to the the
2:25:15properties that are on
2:25:16>> both sides.
2:25:17>> Correct.
2:25:17>> Gotcha.
2:25:18>> All right.
2:25:19>> Townhouse style.
2:25:20>> Get a better picture.
2:25:22>> Okay.
2:25:23>> So, just to confirm, we're not here to
2:25:25vet those development plans. were
2:25:27cheered here to talk about the
2:25:28subdivision.
2:25:29>> Correct.
2:25:29>> Correct.
2:25:30>> Okay. Sounds like
2:25:30>> I just want to have a better
2:25:31understanding.
2:25:33>> Of course. It it sounds like you guys
2:25:35got all your approvals through the
2:25:36proper process and then entered some
2:25:37sort of Kafka like um circle that
2:25:41brought you back before us.
2:25:42>> We we had the option of filing for a tax
2:25:44appeal or or to come before this board
2:25:47and and we'd much prefer to be in front
2:25:49of you, I think, than than spending time
2:25:51with the tax appeal.
2:25:52>> Okay. Got it. Is there any other board
2:25:55comments? No. Thank you, Mr.
2:25:59>> Thank you. That concludes our direct
2:26:00testimony.
2:26:01>> Thank you. At this time, I would like to
2:26:03open for the public. Is there anyone
2:26:04from the public? Come on up.
2:26:12>> Swear me in. Sure. Which hand? Right
2:26:14hand.
2:26:17>> Yes.
2:26:19>> Amy Vickers. Amy. Amy Vickers. A m y v i
2:26:24c k ers 3615th street.
2:26:28>> Amy, you had three minutes.
2:26:30>> Okay, I will try to speak fast.
2:26:34Um, so first things first, uh, thank you
2:26:36all for hearing me. This is my first
2:26:38time doing anything like this, so I'm
2:26:39not quite sure about the protocols. Um,
2:26:43I live across the street from this
2:26:46proposed property. I'm also a new
2:26:47homeowner in Jersey City. Um the
2:26:52the I have a couple of concerns about
2:26:55the lot and even some of the facts that
2:26:57have been discussed tonight. So just to
2:26:59give you guys an impression um and again
2:27:02I will try to speak quickly. This is a
2:27:05twostory single family home. I think
2:27:08it's single family currently and it has
2:27:10a driveway and so if you look at the
2:27:13city tax maps it is two lots. Um, it's
2:27:17gone like I don't know when exactly that
2:27:20was created, but there's one house and a
2:27:23driveway on the lot with the embankment
2:27:25behind it. There's new construction
2:27:28um, uh, renovation on another twostory
2:27:32that's currently being made a fourstory.
2:27:35Um the concerns that we have uh across
2:27:39the street have largely to do with the
2:27:42complexion of the block as well as flood
2:27:46um uh flooding and drainage that are
2:27:49kind of happening within the
2:27:50neighborhood. Um so this isn't actually
2:27:53that common on the block. Um less than
2:27:5630% of the units on the block are 12 and
2:28:00a half uh wide. The majority are 14 and
2:28:05a half are or up on that north side of
2:28:08the block. There's a set all the way
2:28:11towards um Mammoth. It's Fifth Street
2:28:13between Brunswick and Mammoth. And
2:28:15there's a set of those lots that are the
2:28:17smaller ones. Uh the majority of the
2:28:20block are not actually um that that
2:28:23narrow. Um, in terms of the coverage and
2:28:28runoff, as I understand it, I I wasn't
2:28:32able to find engineering plans on the
2:28:34portal, but we did look at the
2:28:36architectural plans, and there's um
2:28:40there's like 16 uh 600 cubic foot
2:28:46retention uh water retention that seems
2:28:49to be planned for runoff. um which seems
2:28:53to be like very minimal for like that
2:28:57would accommodate like I'm not a
2:28:59certified engineer but I've done the
2:29:02math and I've done a bunch of research
2:29:04because I didn't want to come here
2:29:05foolishly um and that would be enough to
2:29:07accommodate a small storm but certainly
2:29:09nothing major and these are homes that
2:29:13typically take on a lot of water like
2:29:15I've reported neighbors that have sump
2:29:17pumps getting drained into the street
2:29:21during heavy storms storms because these
2:29:23homes across the embankment are taking
2:29:25on that much water. Um, and this is a
2:29:28flood zone like AE, right, which I know
2:29:32from my own insurance, it's a difficult
2:29:34area from a flood perspective. Is that
2:29:36my time limit?
2:29:38>> Okay.
2:29:39>> Um, so do I have can I just finish like
2:29:4230 seconds? Sure. Is that okay?
2:29:44>> That's okay. Um, so I know that you guys
2:29:48are just about um saying whether or not
2:29:52the lot should exist.
2:29:55If the lots are going to exist, my
2:29:58request would just be that adequate
2:29:59provisions be made for the drainage and
2:30:04the maintenance of the water and the
2:30:06sewer, you know, systems within that
2:30:09neighborhood. Um there are a couple of
2:30:11other like challenges that we run into
2:30:15um in terms of parking uh construction
2:30:19on an already really tight block and
2:30:22power lines. I don't think I have enough
2:30:24time to address those, but the flooding
2:30:26is the main issue and the water
2:30:28drainage.
2:30:28>> Thank you. Understood. But this is just
2:30:30a minor subdivision of the lots right
2:30:32now. They would have to come back with a
2:30:34full application when it's that time.
2:30:38>> Yeah. So, we we have the approvals
2:30:40already from the zoning board, right?
2:30:42And that's that's not being presented to
2:30:44this board this evening.
2:30:45>> Um I I will say with regard to the
2:30:48drainage system, you have to multiply it
2:30:49by two because there's two lots. So,
2:30:51it's if it is the 600 cubic foot, I
2:30:54don't know if it is, but there's two
2:30:56lots. So, it's that system times two for
2:30:58each of the 625 square foot lots. Um not
2:31:02just one, but
2:31:04>> Okay.
2:31:05Is there anyone else from the public who
2:31:07would like to comment on this
2:31:09application?
2:31:11>> I see no one else from the public. I'd
2:31:12like to close the public portion.
2:31:14>> Second.
2:31:16>> Public is closed. Matt, that
2:31:18[clears throat] gives us your summary
2:31:20there.
2:31:21>> Yeah, I think uh what I would just like
2:31:23to add is um
2:31:26there's two lots proposed here. They're
2:31:28identified on the subdivision plat as
2:31:30lot A and lot B. Presumably those would
2:31:33be uh should the board make a motion to
2:31:36approve the subdivision
2:31:38364 Fifth Street and 364 and a half
2:31:43Fifth Street that should be confirmed
2:31:45with the tax assessor and updated prior
2:31:48to uh sign off on a subdivision plat.
2:31:53Are you in receipt of the memo dated
2:31:55October 9th?
2:31:56>> I I am the applicant accepts all those
2:31:58conditions. Um we we did get the lot
2:32:00numbers and the addresses from the tax
2:32:02assessor after we noticed so we'll we
2:32:04will update the the plat with that
2:32:07information.
2:32:07>> Okay. Regarding the the comment put on
2:32:10the the comments put on the record uh
2:32:12from the neighbor Miss Vickers. Uh I do
2:32:15want to remind that this is uh this
2:32:18would facilitate the those two approvals
2:32:20to move forward which will be improving
2:32:23uh the imperousness of of the area by
2:32:27also installing storm water detention.
2:32:30Um
2:32:31this application
2:32:34uh this application that was before the
2:32:36zoning board is a result of the zoning
2:32:38that was put in place which I believe is
2:32:40RC3.
2:32:42Um
2:32:46I I appreciate uh a new neighbor coming
2:32:49out to these meetings and appreciate
2:32:50your comments. Uh this application
2:32:53though it's in keeping with the pattern
2:32:56of development of of its of its neighbor
2:32:58at 366 as well as some down the down the
2:33:01street. The master plan does emphasize
2:33:05uh that lot width is more important uh
2:33:10from a character defining uh uh sense
2:33:14than uh perhaps uh lot depth. And this
2:33:18is a move to establish a row of three
2:33:21lots that used to exist at 12 12. Staff
2:33:25recommends approval.
2:33:27>> I'd like to entertain a motion.
2:33:28[clears throat]
2:33:28>> Um I just I just have a question. So, so
2:33:31we are just voting on the subdivision.
2:33:34Um, so we're not, you know, able to take
2:33:36into account from a legal perspective
2:33:38the the storm water concerns and as as
2:33:41Matt said, um, this will make the lot
2:33:45more pvious than it is now. Um so so
2:33:49that should be a positive thing. But um
2:33:53you know given given that we're not
2:33:56voting on that in planning board if um
2:33:58constituents do have concerns what is
2:34:00what is the available um you know place
2:34:04for them to voice them?
2:34:07>> Matt, would you like to answer that? uh
2:34:09I would have to reach out to the JCMUA
2:34:11which is the the agency that is uh
2:34:16charged with uh with storm water uh
2:34:21management in the city. So I think if uh
2:34:24I haven't gotten that specific question
2:34:26before, but if I had to, I would have I
2:34:28would recommend they reach out to JCMUA
2:34:30and I would need to find uh the correct
2:34:32contact to pass along um about kind of
2:34:36constituent inquiries. Okay. Thank you.
2:34:39>> Okay.
2:34:40>> Just to clarify though, because
2:34:42[clears throat] the other development
2:34:44applications are already approved by the
2:34:45zoning board, there's not another public
2:34:46forum to discuss them. Correct. Because
2:34:48the approval's been granted.
2:34:49>> That's correct.
2:34:50>> That's correct.
2:34:50>> Just wanted that.
2:34:52>> Thank you.
2:34:53>> I'd like to entertain a motion.
2:34:56>> I'd like to make a motion to approve
2:34:58case P2026-000099
2:35:02as presented to the board this evening.
2:35:04>> Second it.
2:35:06>> Vice Chair Wick.
2:35:08Yeah. Uh, thank you for coming out and,
2:35:10um, all heard and understood. I think
2:35:13when I'm focusing on the subdivision of
2:35:16the law as proposed to the the planning
2:35:19board, I I will vote I.
2:35:22>> Commissioner Kaplan.
2:35:24>> Yeah, I agree. I appreciate coming out
2:35:26speaking. You did great. Um, but I do
2:35:28think as it relates to the specific
2:35:29question before us about the
2:35:31subdivision, it's restoring a previous
2:35:33condition that existed. Um and I don't
2:35:37see any detriment to the variances
2:35:39sought. So I I vote I.
2:35:41>> Commissioner Council person Little.
2:35:43>> Um voting on the subdivision. I
2:35:47>> Commissioner Stamato.
2:35:49>> I'm voting on the subdivision. I
2:35:51>> Commissioner Conaway.
2:35:53>> Same. Voting on the subdivision. I
2:35:56>> Commissioner Patel.
2:35:57>> Same voting subdivision. I
2:35:59>> And Madam Chair Congadan.
2:36:01>> Yes. So um as as you explained to us
2:36:04Matt, it's very common within the um
2:36:07area as well and based on the variances
2:36:10in the subdivision. Um it all falls
2:36:14within the other property line as well.
2:36:17Um what I would suggest if you the
2:36:21developer can work together with the
2:36:22neighbors and be good neighbors at the
2:36:24same time. Um, no one wants to see
2:36:27what's happening currently with the
2:36:29flooding issue and so working with the
2:36:31neighbors would be would we would
2:36:33appreciate that as well.
2:36:35>> My vote is I.
2:36:36>> Motion carries. All in favor?
2:36:38>> Thank you all. Have a good night.
2:36:40>> You too.
2:36:42>> Um, let's get back our attorney.
2:36:56Andy,
2:36:59>> did you find him?
2:37:03>> Here he comes. Here he comes, Andy.
2:37:09>> We thought we lost you.
2:37:14[laughter]
2:37:15>> Looking for you,
2:37:16>> but also we're very proud that we did it
2:37:18without you.
2:37:21>> [laughter]
2:37:30>> At this time I would like to call KPB
2:37:322026-000063
2:37:35preliminary and final major site plan
2:37:37with C varianc's address is 176 H
2:37:41holiday street Mr. Wine.
2:37:43>> Yes. Good evening, Madame Chair,
2:37:45commissioners. For the record, Benjamin
2:37:46Wine of Prime Tube Balmi on behalf of
2:37:48the applicant Pacific Luxury
2:37:50Condominiums LLC. Uh for the record, um
2:37:54actually I'll start by uh indicating
2:37:56that this is a notice case and I have
2:37:58prepared the notice. I'll hand that over
2:38:00to council.
2:38:01>> Thank you, council.
2:38:22Madam Chairman, receive the affidavit of
2:38:24publication proof of mailing with
2:38:25respect to the application. It does
2:38:27appear to be in order. We are going to
2:38:28mark it as A1 for purpose of the record.
2:38:31>> Thank you.
2:38:32>> Thank you, councel. So, the property uh
2:38:34in question and before you here this
2:38:36evening is located at we've got several
2:38:38addresses, but primarily 213 Pacific
2:38:40Avenue on one side and 176 Halliday on
2:38:43the other side. This is a through lot in
2:38:45an interesting configuration. Um and uh
2:38:48and so we'll proceed with our our
2:38:49testimony here this evening and show you
2:38:51the plans as to what we ultimately
2:38:53propose. Just by way of a little bit of
2:38:55background and some overview, we are
2:38:57here seeking approval for preliminary
2:38:59and final major site plan approval
2:39:01within the mixeduse a subd district of
2:39:04the Morris Canal redevelopment plan
2:39:06area. Um we do have an almost fully
2:39:09conforming application uh for you this
2:39:11evening which I I give a lot of credit.
2:39:13This is a plan that has been in place in
2:39:14Morris Canal for um a couple of decades
2:39:17at this point and only now is there a
2:39:19plan being put forward to actually
2:39:20realize the concept. and we fully
2:39:22conform with all of the regulations of
2:39:24the redevelopment plan with the
2:39:26exception of signage. It's kind of an
2:39:28interesting one, but the redevelopment
2:39:29plan specifically calls for one
2:39:32residential sign for the building. Since
2:39:34I mentioned in my opening that we have
2:39:36frontage on Pacific and on Hall, we feel
2:39:39it's uh mostly it's most appropriate and
2:39:41safe to have an address uh listed on
2:39:44both frontages. And that's that's the
2:39:45only deviation we have from the
2:39:47redevelopment plan. We're otherwise
2:39:48entirely an as of right application. Our
2:39:51proposal is for a five-story mixeduse
2:39:54development that will consist of four
2:39:56stories of residential development above
2:39:58a ground floor with approximately 1,800
2:40:00square ft of commercial space as well as
2:40:0225 parking spaces. Within the
2:40:04residential portion of the program,
2:40:07there are proposed 96 residential units,
2:40:1010 of which will be affordable housing
2:40:11units. So just over 10% approximately
2:40:1411.8% I believe are affordable housing.
2:40:18uh again compliant with the
2:40:19redevelopment plan as well as the ICO.
2:40:22Um there is a good mix of units as
2:40:24you'll see from our project architect
2:40:26and uh since we are in the Morris Canal
2:40:28redevelopment plan, there is a
2:40:29requirement for a community outreach
2:40:31component. We did uh check that box. We
2:40:33did reach out a couple of times to
2:40:35Morris Canal um by email. We actually
2:40:37even sent them a set of plans as well by
2:40:40mail and um and we did upload an
2:40:42affidavit to that effect to the portal
2:40:44as well. Just to preempt a couple of the
2:40:46questions we know we're going to get. Uh
2:40:48there is no vinyl siding associated with
2:40:50this application whatsoever. Um there
2:40:53are railings to the bases of the
2:40:55balconies and the roof deck. There are
2:40:57trash shoots on all floors. And finally,
2:41:00the affordable housing units will be
2:41:02constructed with the exact same fit and
2:41:04finish uh as the market rate units in
2:41:06the development. So I think I can
2:41:07probably rest at this point.
2:41:10[laughter] I have to leave you one
2:41:12question to ask, right? Yes, it is
2:41:14assume it is assumed. It will likely be
2:41:15private collection. We'll coordinate it
2:41:17obviously with DPW and uh and and
2:41:20depending on ultimately
2:41:20>> it'll be with both recycling and garden.
2:41:23>> Correct. Whatever DPW recommends, we're
2:41:24we're not going to stand in their way.
2:41:26>> Um so with that, I do have two witnesses
2:41:29I intend to call this evening. I have a
2:41:30third in the wings. um our project
2:41:32architect Kieran Kelly of MVMK
2:41:35architecture will present the
2:41:36[clears throat] overall plan and our
2:41:38professional planner Carolyn will speak
2:41:39to that one uh deviation we have with
2:41:41respect to the signage on both frontages
2:41:44and if there are any engineering
2:41:45questions that come up I do have our
2:41:47civil engineer Brian Labiscin from
2:41:49Dresnner Robin who is present to answer
2:41:50any questions you may have with that
2:41:52madam chair unless you have any
2:41:54questions of me I'm happy to proceed
2:41:55>> sure you can proceed
2:41:57>> okay that I'll call up Kieran
2:42:00>> hello everybody Hello.
2:42:14>> Yes.
2:42:17>> I do.
2:42:19>> Uh, Kieran Kelly. C I A R A N K E L L Y.
2:42:23>> Mr. Kelly, is your license current and
2:42:25in good standing?
2:42:26>> It is.
2:42:26>> Okay. You're qualified. Proceed.
2:42:28>> Thank you. Okay. So, forgive me. I might
2:42:31repeat a lot of the things Ben just said
2:42:32because that was quite a very it was a
2:42:34great opener. Um but let me walk you
2:42:36through the building and of course if
2:42:38you have questions uh you know by all
2:42:40means feel free. So uh brief summary
2:42:43once again
2:42:44>> real quickly we're not seeing this on
2:42:45our screens.
2:42:47>> I don't know
2:42:49>> behind you click view large. Oh
2:42:53>> there you go.
2:42:55>> Okay there it is. Thanks.
2:42:58>> you have a separate file for the
2:42:59presentation or is that this?
2:43:00>> This is the presentation. So we actually
2:43:02is a good uh point. So the presentation
2:43:05I'm about to give perhaps we should mark
2:43:07it as an exhibit because it is the
2:43:09content of the original submitted
2:43:10drawings but for ease of presentation.
2:43:12I've colorized some of the drawings uh
2:43:14and I've moved some of the information.
2:43:15I've also removed some of the sheets
2:43:17which typically you know just
2:43:20>> So we're going to mark it as A2. Does it
2:43:22tell us how many sheets it is?
2:43:25>> It's 18 sheets.
2:43:27title or date?
2:43:29>> Uh, today's date.
2:43:31>> Very good.
2:43:33>> And Kieran to just confirm that it
2:43:35everything we're going to see here pulls
2:43:36from the plans that were submitted and
2:43:38on the portal at least 10 days ago. Is
2:43:40that correct?
2:43:40>> Correct.
2:43:41>> Okay. So, it's just a demonstrative
2:43:42presentation.
2:43:43>> Correct.
2:43:44>> And for purposes of record, we will
2:43:46identify it as the 18 sheet titled 213
2:43:51Pacific A. and we'll date it as of
2:43:54today, October 13, 2026. A2.
2:43:57>> Thank you.
2:43:58>> Okay, I'm going to enter as a slideshow.
2:44:00So, occasionally it might automatically
2:44:02update, so forgive me if it does. Um,
2:44:04I'm going to start by describing the
2:44:06site to you. So, it's an interesting
2:44:08site. It's irregular in shape. It's kind
2:44:10of like a skewed Lshaped site. Uh but
2:44:13what's perhaps most interesting about it
2:44:14is that even though it's in the middle
2:44:16of the block, uh it actually has three
2:44:18frontages because this block, block
2:44:201990, is split down the middle
2:44:22diagonally by the uh New Jersey Transit
2:44:25light rail line. So we have uh about uh
2:44:29108 foot frontage uh on the west side,
2:44:31which is Holiday Street, and then we
2:44:33have 228 uh feet of frontage on the
2:44:35light rail to the south, and then we
2:44:37have 123 uh feet of frontage on Pacific
2:44:40Avenue. Um so the lot size is 24,261
2:44:46square feet which is just over half an
2:44:48acre. Um and currently there is in this
2:44:51photograph which admittedly is taken
2:44:53about a year ago there was uh an
2:44:55assemblage of of three distinct
2:44:57one-story masonry structures which in
2:44:59the interim uh two of them are partially
2:45:02or completely demolished at this point
2:45:04but uh the original set included uh
2:45:08sheet Z19 which was site photographs at
2:45:10the time when the set was originally um
2:45:12submitted. So to bring it up to date, I
2:45:15visited the site yesterday uh and I took
2:45:17pictures uh of the current condition. So
2:45:20let me just talk you through the site
2:45:21context and the the the surrounding
2:45:23buildings. Top left corner are the
2:45:25buildings directly adjacent to the
2:45:27property on Pacific which are threetory
2:45:29residential buildings and opposite them
2:45:32opposite on Pacific are newer new more
2:45:34recently built but again threetory uh
2:45:37residential town homes. Um directly
2:45:39below them are the uh residential
2:45:42buildings which currently exist on
2:45:44holiday. So again it's a collection of
2:45:46two and threetory residential buildings.
2:45:48The building in the center to middle is
2:45:50our adjacent neighbor uh on the holiday
2:45:52side. And then uh top right is the
2:45:56existing there's a different context
2:45:58across the light rail. Uh immediately
2:46:00you enter into a semi-industrial
2:46:02commercial zone and you have a
2:46:03four-story industrial building uh
2:46:05directly across the light rail. And then
2:46:07bottom right corner is the current
2:46:08condition of our site which as you can
2:46:10see uh those one-story masonry
2:46:12structures have uh at some point been
2:46:14demolished. So there's a series or
2:46:16there's a collection of rubble as well
2:46:18as kind of broken concrete slab on grade
2:46:20and the rest of the property is kind of
2:46:22semi overgrown uh just a derelic site.
2:46:25So the property sits as was described it
2:46:28sits within the Mars Canal uh
2:46:30redevelopment plan area specifically in
2:46:32mixeduse A. So the what you know it's
2:46:35it's a nice thing and I think you
2:46:36touched on it Ben often times uh you
2:46:39know the buildings that are presented as
2:46:41redevelopment buildings are uh you know
2:46:44kind of designed with planning staff and
2:46:46then the redevelopment plan is kind of
2:46:48tailored around the resultant building.
2:46:50Uh in this case the redevelopment plan
2:46:52was developed many many years ago and
2:46:54sometimes when you have an irregular log
2:46:55like this it can be difficult to
2:46:57consolidate the two. Um but actually I
2:47:00think it's a testament to the planning
2:47:01staff because it worked really really
2:47:03well. So, we're proposing a fivestory as
2:47:05of right uh building, four residential
2:47:07floors uh over uh the first floor of the
2:47:10podium, which is parking, uh residential
2:47:12uses, and retail. Uh we conform to all
2:47:15of the setbacks. Um and so with that, I
2:47:18think I'll walk you through the first
2:47:19floor plan.
2:47:22So, this is a colorized version of the
2:47:24first floor plan, which is in your set.
2:47:26Um in order to speed things up tonight,
2:47:28Ben suggested that I also touch on some
2:47:30of the civil aspects of the application.
2:47:32So I will do that and then if you have
2:47:34more questions our civil engineer is
2:47:35here but just to describe it to you
2:47:38briefly and orientate it. Uh so across
2:47:40the bottom of the sheet uh running
2:47:42horizontally are the light rail tracks
2:47:44and then on the right hand side of the
2:47:46sheet uh running you know they're
2:47:48slightly skewed but you have Pacific
2:47:50Avenue and all the way over to the left
2:47:51you have Holiday. So again you see that
2:47:54uh L-shaped uh site that I described.
2:47:57One of the requirements of the
2:47:59redevelopment plan uh for this specific
2:48:01site was that we provide a 10-ft setback
2:48:05uh along the frontage for the light rail
2:48:07so that we could create a landscape uh
2:48:09public access walkway. So, a sidewalk
2:48:11essentially. So, we have uh provided
2:48:14that 10-ft setback. Now, it's worth
2:48:16noting that the southern edge of that
2:48:19the the light rail you're not on the
2:48:20tracks. There's an additional 20 ft or
2:48:2225 ft or so to the tracks themselves. So
2:48:25as it's in closest condition, the
2:48:27building's about 30 ft from the tracks.
2:48:30Um in addition to that, if you if say if
2:48:34we continue around counterclockwise onto
2:48:36the Holiday Street, we're providing a
2:48:395-ft setback from the property line, a
2:48:405ft front yard setback. And the
2:48:42requirement there is that we meet the
2:48:44predominant prevailing setback on the
2:48:46block. Um so uh the the buildings uh
2:48:49further up along the street are at 5ft
2:48:51setback. As we then continue around the
2:48:54property where we have a sideyard
2:48:56setback to that neighbor, uh we have a
2:48:58five foot setback which provides an
2:49:01access an exterior access walkway uh two
2:49:05or 15 ft uh what is what we're calling a
2:49:08rear yard setback condition. Um, now
2:49:11because we're a through lot, I guess
2:49:12it's questionable whether we even
2:49:14require a rear yacht, a rear yard, but
2:49:17because we're backing onto the rear
2:49:18yards of other properties, we provided
2:49:20the required 15t setback at that
2:49:22location. And in that location, we're
2:49:24providing a landscaped outdoor common
2:49:26area. Now, all of those conditions where
2:49:29we're adjoining neighboring properties,
2:49:30we're providing a sixoot high privacy
2:49:32fence. Um, when we continue around, we
2:49:36come to I guess what would be the
2:49:37northern property edge. We have a zero
2:49:39lot line condition there. Uh and I
2:49:41believe we have a zero lot the neighbor
2:49:43is also at zero lot line. And then we
2:49:45continue on to Pacific where we have a
2:49:48zero front yard where zero is required.
2:49:50So in terms of our building footprint
2:49:52and our setbacks, we meet all of the
2:49:54required setbacks. Um I'm just going to
2:49:56grab a water.
2:49:59So the uh building footprint uh occupies
2:50:0480.19%
2:50:06building coverage on the lot. The
2:50:07impervious coverage is 94.6 I believe.
2:50:11Uh both of which are uh permitted under
2:50:14the requirements of the redevelopment
2:50:15plan. So let me talk you uh through the
2:50:18building a little bit. The first thing
2:50:20I'd like to point out is uh the yellow I
2:50:22guess triangular shaped element at the
2:50:24corner. That is the main residential
2:50:25lobby and it's of course intentionally
2:50:27placed at that corner condition, the
2:50:29corner of Pacific and the light rail. Um
2:50:32that uh residential lobby is 2300 square
2:50:35ft. It includes a package room, uh, you
2:50:38know, uh, mail rooms and access to the
2:50:40double elevator bank which serves all
2:50:42floors. It also gives you direct access
2:50:45to that landscape rear yard space I
2:50:47discussed, but also there's a corridor
2:50:49here that branches off to what I'll
2:50:52probably it's an orange color. That's a
2:50:54firstf floor residential amenity space.
2:50:57So there's 2207 square ft there, which
2:51:00would be made up of a lounge room, a
2:51:02fitness suite, and also a golf
2:51:03simulator. to the blue fronting on to
2:51:06Pacific we have an 18,800 square foot
2:51:08retail space and then behind that in
2:51:10white are some of our service or backup
2:51:12spaces. So we have a required
2:51:13transformer room for example electrical
2:51:15rooms as well as secondary egress for
2:51:18our residential units above uh out to
2:51:20the street. So uh on the other side of
2:51:23the lobby the majority of the remainder
2:51:26of the footprint is taken up by our
2:51:27parking garage. So uh there is a parking
2:51:31requirement. Uh any lot over 60 ft wide
2:51:33is required to have parking because of
2:51:36the nature of the breakdown of unit
2:51:38types. Our parking requirement here is
2:51:40actually only three spaces. Uh but we're
2:51:43providing 25 spaces. So we have 25
2:51:45spaces within a parking garage that is
2:51:48access from Holiday. The access being
2:51:50from Holiday because the plan requires
2:51:52it to be from the lesser of the streets.
2:51:55It's a two-way 23 foot wide drive vial.
2:51:58Uh spec the spaces are obviously
2:51:59arranged either side of that drive vial.
2:52:02Um we also have bike parking of course.
2:52:04Uh we're required to have 0.5 for our
2:52:07residential count. We have 96
2:52:09residential units. We're providing 49
2:52:11bike parking spaces. Now the bike
2:52:13parking spaces are um kind of placed
2:52:15around the garage. Um all have been
2:52:18vetted by the uh planning staff. uh all
2:52:21are protected of course by ballards to
2:52:23make them safe and accessible. The
2:52:25majority of them are uh vertically
2:52:27stacked bike racks. So they're
2:52:29wall-mounted. The bikes are attached to
2:52:32their individual racks and then there
2:52:34are lockable. So each one of them has a
2:52:35lock. And then also at one location we
2:52:38have floor mounted racks. So they're for
2:52:40perhaps if people just found it easier
2:52:42to access them. But also for heavier uh
2:52:45uh you know scooters or what have you,
2:52:46they can they can use those. So we meet
2:52:48the bike parking requirement.
2:52:50To the top left of the parking garage is
2:52:52a 704 square foot secondary lobby. And
2:52:55so that relates I guess to the signage
2:52:58uh variance which I'll discuss later.
2:53:00But because we have the two street
2:53:02frontages, we wanted the ability for
2:53:04people to access the building from uh
2:53:06the holiday side and we didn't want it
2:53:08to be through an exit door or kind of a
2:53:10secondary entrance. So we created a
2:53:11separate lobby and it also helps to
2:53:13activate that street frontage. In terms
2:53:15of an active first floor, we're required
2:53:18to have 25% of this floor be active use.
2:53:21Uh we are at I believe just over 29%. So
2:53:24again, we meet that requirement. Um
2:53:27street trees. I now is a good time to
2:53:29talk about these civil uh items. So
2:53:31we're providing six uh street trees,
2:53:34three on both streets. Uh there is a
2:53:36requirement for eight, I believe, but
2:53:38we're going to make a finan financial
2:53:39contribution for the other two. And
2:53:41again, the reason for that is because of
2:53:43just limited access along the sidewalks.
2:53:45When you take into account of sight
2:53:47triangle from the garage entryway
2:53:49utilities being proposed, uh we're
2:53:51providing uh six trees. Um it's it's
2:53:56okay. So, I'm going to read from here.
2:53:58Excuse me. Um so, we are providing new
2:54:01curbs and sidewalks across both street
2:54:03frontages. We're going to mill and pave
2:54:06both streets. We have uh new underground
2:54:09utilities. All utilities will be
2:54:10underground. Uh the storm water, the
2:54:13sanitary and the gas will be on Holiday
2:54:14Street. The water, the electric, and the
2:54:16telecom will be on Pacific. Um because
2:54:19it's a major development, greater than
2:54:2010,000 square ft. We are providing storm
2:54:23water detention and there's a tank
2:54:24proposed under the garage slab and
2:54:27that's in addition to an extensive green
2:54:29roof, which I'll talk about in a minute,
2:54:31which of course also helps mitigate the
2:54:33uh the storm water runoff. Um I
2:54:36described the the six street trees. And
2:54:38then the other thing just relating to
2:54:40civil is we are proposing five new uh
2:54:43New Jersey signature street lights. We
2:54:45have three of them on Pacific and two of
2:54:47them on holiday. So with that I'll move
2:54:49up to the building or or up through the
2:54:51building rather.
2:54:53So this is a typical residential floor
2:54:55plan.
2:54:58Floors through or two through five are
2:55:01all the same. Um it's a pretty standard
2:55:04residential configuration you're all
2:55:06familiar with. It's a double- loaded
2:55:07corridor. We have in the center of the
2:55:09building at the hinge point, we have two
2:55:11fully ADA compliant stretcher compliant
2:55:13elevators which serve a a corridor which
2:55:16runs in both directions. Two egress
2:55:19stairs at either end. Either side of
2:55:21that corridor, we have arranged 24
2:55:23resident residential units per floor. So
2:55:26on four floors, that's 96 units in
2:55:28total. Just to give you a breakdown, 16
2:55:31of those units are studios and on
2:55:33average they are 455 square ft and they
2:55:36make up 16.7% of the total. 44 of the
2:55:40units are one-bedroom units at 660 ft on
2:55:43average and they make up 45.8%.
2:55:4824 of the units are one bed plus dens at
2:55:50850 ft uh on average and that
2:55:53constitutes 25% of the total number. 11
2:55:56of them are two bed units at 981 square
2:55:59ft which is 11.5 uh% of the total. And
2:56:02finally, we have one three-bedroom unit
2:56:05uh and that measures uh 1,044 ft and
2:56:08it's essentially 1% of the of the total.
2:56:11Now, as was mentioned again previously,
2:56:13we are providing 10 affordable units.
2:56:15So, the breakdown of the affordable
2:56:17units uh so we can put it on the record
2:56:19is four studios, five one beds and one
2:56:21three bed. So, that one three bed unit
2:56:23is an affordable unit.
2:56:26And Kieran, just to y uh stop you in
2:56:29quick correction before you go on. Um
2:56:31you mentioned all the floor plans are
2:56:32the same. Just to confirm, the second
2:56:33floor actually has the three-bedroom
2:56:35unit in place of a two bedroom.
2:56:37>> Correct. Correct. Thank you. Thank you.
2:56:38Yes. So, uh you'll see the unit which is
2:56:41kind of floating out there by itself.
2:56:42That's the three-bedroom unit that
2:56:43occurs at the second floor. Above that,
2:56:46it's the corner unit. Above that, that
2:56:48is a uh two-bedroom unit. So, you know,
2:56:51same number of uh units per floor, same
2:56:53demising wall locations on every floor,
2:56:55but that one unit is a three bed on the
2:56:57second floor and a twobedroom above.
2:57:01Okay.
2:57:03Uh just one last thing on the typical
2:57:05residential floor, but it relates to the
2:57:07entire building. There are uh there's a
2:57:10trash shoot. There's a trash shoot on
2:57:11all floors which serves a uh trash and
2:57:14refuge storage and compactor room on the
2:57:16first floor. The room has been sized
2:57:18based on the New Jersey standards for
2:57:20what would be required for a residential
2:57:22building of this size. And I'll just
2:57:24jump back because I do want to touch on
2:57:26it. I know trash is always a very
2:57:27important question. The trash room is
2:57:29the gray room next to the corner lobby
2:57:32and there's two doors in it. One door
2:57:33opens directly to the garage which then
2:57:36can lead to Holiday Street or the other
2:57:38one opens directly to the exterior on
2:57:40the 10-ft setback right at the Pacific
2:57:42end. So building maintenance staff will
2:57:45have an option uh and it'll be
2:57:46determined I guess how trash uh pickup
2:57:49will be orchestrated but they have the
2:57:51option of going either way to either
2:57:52street
2:57:53>> question
2:57:56>> the blue the blue that's the retail
2:58:00>> yet to be determined yet to be
2:58:02determined I don't honestly know
2:58:06>> commissioner it would be one of the uses
2:58:08that are permitted in the redevelopment
2:58:10plan
2:58:12>> so Now we'll go to the roof plan. Uh the
2:58:14vast majority of the roof plan as you
2:58:16can see is is the green color. So that's
2:58:17extensive green roof. Um the orange area
2:58:21is a uh 1797
2:58:24square foot uh common amenity lounge. Um
2:58:28so that combined with the uh the
2:58:31elevator access corridor next to it um
2:58:34makes up no more than 10% of the overall
2:58:36roof coverage. So that's again within
2:58:38what we're permitted. And that space
2:58:40opens out onto a 3580 square foot uh
2:58:44roof terrace. Um and then the remainder
2:58:47of the roof are just the mechanicals.
2:58:48Those mechanicals are roof mounted
2:58:50condensers for the units below. All
2:58:52visually screened and acoustically
2:58:54screened from all sides.
2:58:58So then to touch briefly on the look of
2:59:00the building and the aesthetics um you
2:59:03can see it here there you know because
2:59:05the uh irregular and extensive I guess
2:59:08linear frontage of the property uh we're
2:59:11proposing that this facade treatment be
2:59:14repeated on all sides so we don't have
2:59:17backs of the building where we're trying
2:59:18to value engineer it. Uh this is the
2:59:21look at a building as you can pretty
2:59:22much see it from all directions and I'll
2:59:23give you some views but this is the the
2:59:25view standing across the light rail on
2:59:28the Pacific side looking at the corner
2:59:30of the building. So at the bottom of
2:59:31this is the main residential entry
2:59:33lobby. Uh I should mention I I forgot to
2:59:36mention it but both lobbies have uh 3
2:59:39foot6 projecting canopies above their
2:59:41entryways. Um so in terms of materials
2:59:45the I would say the primary material is
2:59:47the beige brick. Uh so you'll see that
2:59:50used repeatedly up to the fifth floor
2:59:52level. And then we changed the material
2:59:55to a combination of two types of fiber
2:59:57cement board. One is a horizontal lap
3:00:00sighting cement board in a mist gray.
3:00:03And then we have a darker uh black uh
3:00:06fiber cement panel um which which works
3:00:09with that. And then everything is kind
3:00:11of accented with this uh cedar lab
3:00:13sighting. So it's interesting one of the
3:00:15other uh projects earlier talked about
3:00:16the same material. So, it's a fiber
3:00:19cement board, but it has a cedar green
3:00:21and a cedar color. And it actually has a
3:00:22really good characteristic that um there
3:00:25there's not repetition. So, you don't
3:00:27see a repeating pattern the way that
3:00:28sometimes you do. So, it looks very
3:00:30natural and it's very good in terms of
3:00:32durability. So, we're proposing the same
3:00:34material.
3:00:34>> I'm familiar with what you're talking
3:00:35about. I think you got a beautiful
3:00:37building and um I'm glad to see that
3:00:40you're getting away from the vinyl
3:00:42siding and putting that type of material
3:00:44in. Yeah,
3:00:45>> it's beautiful building.
3:00:46>> Thank you. Go ahead.
3:00:47>> So then no, no, anytime you want to jump
3:00:50in and say it's beautiful, please go
3:00:51ahead. [laughter]
3:00:52>> Um the only other material then to talk
3:00:54about is the floating cornises. And so
3:00:58that's a a an aluminum um sighting. So
3:01:01it's a metal wrap and then that's
3:01:02replicated on the balcony edges. Now
3:01:05just to talk about the balconies
3:01:06briefly, you know, when the clients
3:01:08originally came to us, they really
3:01:09wanted a lot of outdoor space for the
3:01:11residents of the building, private
3:01:13outdoor spaces. Um, and so 60 60 of the
3:01:16units, so the majority of our overall
3:01:19unit count, they have these private
3:01:20balconies. The redevelopment plan
3:01:22doesn't permit them to stick all the way
3:01:24out of the building. So where we're
3:01:26limited by our frontage, those are
3:01:28recess balconies. They're 60 square ft
3:01:30each. Uh, where we front onto the the
3:01:33light rail and we have that 10-ft
3:01:34setback, which permits us to project, we
3:01:37project 18 in uh as is stipulated by the
3:01:40redevelopment plan. So, you'll notice
3:01:42the balconies are quite a big feature on
3:01:43the facade. The street facing facades
3:01:46all have glass uh railings, but they
3:01:48have an aluminum rounded cap handrail on
3:01:51top. Note that it's rounded. You can't
3:01:53put a glass on top of it. And those
3:01:55railings also come all the way down to
3:01:57uh the walking surface. So, there's no
3:01:59ability for something to slide out
3:02:00underneath. uh on the other sides the uh
3:02:03rear of the building where you are set
3:02:05back from the perimeter uh it is a
3:02:08picket type railing which I'll show you
3:02:10on the next image.
3:02:12So this is the other view taken from
3:02:14Holiday. Uh you can see the beautiful
3:02:17historic home to the left. We have uh a
3:02:20set book setback there where we're
3:02:21proposing planting and to reconstruct
3:02:24the existing uh privacy fence but also
3:02:27there's a sign significant amount of
3:02:28planting on the property on that
3:02:30property line which I kind of I haven't
3:02:33shown to a full extent here because you
3:02:34wouldn't have seen our building. Um but
3:02:36again you can see the the repetition of
3:02:39the facade materials the way it wraps
3:02:40around the building on all sides. You
3:02:42can just see here on the left hand side
3:02:44where our building returns from the
3:02:46street the way we transition from the
3:02:47glass railings to the black picket
3:02:49railings. Uh just to talk briefly about
3:02:52the signage variance. So again we're
3:02:53requesting one variance and that's for
3:02:55signage. Uh the redevelopment plan I
3:02:57guess envisions one frontage, one street
3:03:00frontage, one sign. Uh we have two. So
3:03:02we're proposing minimal signs in in both
3:03:05cases. I'm going to go to a drawing to
3:03:07help you see this. So, this is uh the
3:03:10building frontage on Pacific. And just
3:03:13down at the bottom here, uh you'll see
3:03:15there's two signs. They're kind of
3:03:17wall-mounted, and all they are just
3:03:18lettering. And the detail is up here
3:03:20above. Uh the retail will have one
3:03:23retail sign. It's just says whatever the
3:03:26future name of the retail occupant will
3:03:28be. It's wall-mounted. It's less than 8
3:03:30square ft. Uh over here at the lobby
3:03:33entrance, again, we've said 213 because
3:03:36we've always thought of this project 213
3:03:38Pacific, but depending on what the
3:03:39eventual address will be, those numbers
3:03:42will be used for the signage at that
3:03:43location. So that's the one side. And
3:03:46then on the other side, because we have
3:03:47that separate secondary lobby entrance,
3:03:50we have the same sign wall mounted at
3:03:52that location. Again, just letters
3:03:54mounted on the wall, less than eight
3:03:56square feet. So that's the extent of the
3:03:58variance that we're requesting.
3:04:01Um and and that's really that's really
3:04:03it. The rest of them are just a lot of
3:04:05facade drawings to show the extensive
3:04:07facade. Um that ends my direct
3:04:10testimony. If anyone has questions, I'm
3:04:11more than happy to do
3:04:13>> Mr. Kelly, if I may. Um in regards to
3:04:16the affordable units, I know the number.
3:04:19Are the buildout the same?
3:04:21>> Absolutely.
3:04:22>> And the location?
3:04:23>> Yes. And I have indicated on the plan.
3:04:25I'm happy to go back if you wish.
3:04:26>> Sure.
3:04:27>> Yeah. And as you do that, I I was meant
3:04:29to put this in my opening, but I was
3:04:31going to put it in my closing and now
3:04:32I'll put it in now. We received actually
3:04:34our Division of Affordable Housing
3:04:35approval today of all the units that Mr.
3:04:37Kelly will show you exactly where they
3:04:39are. The division has specifically seen
3:04:42those exact units and those exact unit
3:04:44numbers and has approved them as of
3:04:46today.
3:04:46>> Okay. Can we take a look?
3:04:48>> Yeah, sure. So, the plan is it on your
3:04:49screen?
3:04:50>> Yes.
3:04:50>> Okay. So, the the ones which are
3:04:52highlighted in yellow are the affordable
3:04:54units. And so again, just to touch on
3:04:56the one which is floating by itself,
3:04:58that's a three-bedroom affordable unit
3:04:59which is at the second floor. So one
3:05:02more time to summarize, 10 in total,
3:05:04four studios, five one beds, and one
3:05:06threebedroom.
3:05:07>> And Kieran, they're not all at the same
3:05:09foot. This is one floor.
3:05:10>> This is one floor, but this is a typical
3:05:11floor. So they're not all on the second
3:05:14floor. They're evenly spread out and
3:05:16they're stacked.
3:05:17>> Okay. Um if we can go back to the um
3:05:22trees.
3:05:23>> Yes. on the site.
3:05:24>> Is there is there any way to have the
3:05:25shade trees along the walkway next to
3:05:27the light rail?
3:05:29>> Um,
3:05:31so I I didn't design the street trees
3:05:34because it's in the perview of the civil
3:05:35engineer whom you may wish to speak
3:05:37with, but 10 ft is a narrow amount of
3:05:40space in which to, you know, have a have
3:05:41a tree of any maturity, I would say. Um,
3:05:45>> yeah.
3:05:45>> What's your thoughts, Sento?
3:05:47>> Well, council, if I understood
3:05:49correctly,
3:05:51where's the property line? cuz I believe
3:05:53that walkway goes there's another 20 ft
3:05:56to the light rail.
3:05:57>> Yeah. So, so this lower red dash line,
3:06:00if you can see my cursor, is the
3:06:01property line. Our building is set back
3:06:0510 ft from that here. And then all this
3:06:08space below is NJ Transit property.
3:06:11>> Right. And I'll I'll just indicate as
3:06:13well, it's going to remain our pro
3:06:15everything between the two red hash
3:06:17lines is our property, but it's uh the
3:06:19redevelopment requires that we grant an
3:06:21easement to the city of Jersey City for
3:06:23that 10 ft. Um it actually doesn't
3:06:25require that we particularly landscape
3:06:27or hardscape it with any particular um
3:06:30attention or material. We have shown
3:06:33what we anticipate the city would like
3:06:34to see in that space and obviously have
3:06:36offered to plant all those plantings and
3:06:38do so. But that easement area will be
3:06:40granted and I'm happy to share with
3:06:42council a draft of that easement once I
3:06:44prepare it. And it will be ultimately up
3:06:46to the city to somewhat decide and
3:06:48regulate um how that space is
3:06:51constructed so to speak with the with
3:06:53the vision that it would be a walkway.
3:06:55That's the intent and purpose. Um so it
3:06:57is an easement granted to the city but
3:06:59that is the extent of our property line.
3:07:01So, council, my question was, where is
3:07:04the property line for purposes of
3:07:05planting street trees? What's going on
3:07:07the property line? Is there a fence to
3:07:09prevent anything from going into the
3:07:12light rail or it's it's going to be
3:07:14natural vegetation over there?
3:07:16>> So, if I may answer, yeah, it's it's
3:07:19natural uh vegetation. There's a linear
3:07:22planting strip as you can see, right,
3:07:23>> with with low-level shrubbery. So,
3:07:26that's the deterrent. I don't think that
3:07:27we had planned a a fence
3:07:31So, council, I think as a condition to
3:07:34the chairwoman's point,
3:07:37I think if you could discuss with
3:07:40transit the planting of some shade trees
3:07:44in that area. I think anytime we have an
3:07:46opportunity to plant shade trees in the
3:07:49city, that's that's a benefit to
3:07:52everybody. So, I can appreciate that you
3:07:54can't fit the shade tree with the pit
3:07:56within that 10-ft easement, but if maybe
3:07:59we can discuss that with transit, I
3:08:02think that absolutely and also it's a
3:08:04it's more of a safety there as well for
3:08:08anyone who has small children running
3:08:09around in the vicinity area as well. So,
3:08:12>> yeah. So, I think the best way to to
3:08:13address that is exactly council, as you
3:08:15said, is to discuss it with transit. I'm
3:08:17not sure if since we haven't approached
3:08:19them yet, I'm not sure what they will
3:08:21and will not allow within certain
3:08:22distances of their tracks. Um but that
3:08:25we have no issue with with approaching
3:08:27them with that suggestion. Again,
3:08:28assuming that's also what uh city
3:08:30planning and the city itself would like
3:08:31to see there given that it will be an
3:08:33easement um for you know for them to
3:08:36ultimately um you know propose what's
3:08:38there. That said, and I should stipulate
3:08:40this as well, it will be for us to
3:08:42maintain. So even though it is an
3:08:43easement for the benefit of the city to
3:08:45to create this walkway that's envisioned
3:08:47um maintenance of that area will be on
3:08:50the building owner.
3:08:51>> Okay something I'm just surprised that
3:08:55uh transit wouldn't put up some kind of
3:08:57a fence or have you put up some kind of
3:08:59a fence as a barrier for you know you
3:09:02hit kids. I mean somebody coming across
3:09:04chase looking for their ball and all of
3:09:06a sudden they're train. That's item one.
3:09:08Item two. It's surprising that um you
3:09:12guys didn't even think about approaching
3:09:14them in reference for I guess you're
3:09:16going to but making this a stop for your
3:09:19residents to utilize the light rail
3:09:22which would be a total home run. Got a
3:09:24beautiful building. You got great
3:09:25access. I am happy with the trash door
3:09:28being on the side of the tracks rather
3:09:30than run through the building having
3:09:32that go right out to Pacific. I think
3:09:34that would be perfect. But anyway,
3:09:36that's just my comments.
3:09:37>> Yeah. Yeah, it's a it's a good point.
3:09:39You can certainly ask the question.
3:09:42>> Sure. They would love a light rail
3:09:44station right in front of the building.
3:09:45>> Absolutely. So, it's a plus.
3:09:47>> I
3:09:49can imagine.
3:09:50>> That in front of my house as well.
3:09:52[laughter]
3:09:52>> What the hell? It'd be perfect.
3:09:54>> I believe there is considerations of a
3:09:55light rail station there as part of the
3:09:57um redevelopment plan to the south of
3:09:59the tracks there, but
3:10:01>> there is.
3:10:02>> I don't know exactly where, but
3:10:03somewhere along the stretch.
3:10:04>> That push, guys.
3:10:05>> Sure.
3:10:07Very good.
3:10:08>> Any board comments for Mr. Kelly?
3:10:10>> Concerns?
3:10:11>> Yeah. Uh, could you just speak to um,
3:10:13and forgive me if this is for someone
3:10:14else, um, but I know there's some mature
3:10:17street trees along Holiday Street. Are
3:10:19you looking to retain those or relocate
3:10:20those or replace them?
3:10:23I believe that there are mature trees
3:10:25that we are looking to maintain and and
3:10:27keep but I I didn't I I don't want to
3:10:31speak in too much detail about the
3:10:32street trees because I wasn't really
3:10:34involved with the you know with the
3:10:35discussions but I know from the civil
3:10:37engineering plants there are existing
3:10:38trees which we are planning to retain.
3:10:41>> Gotcha. I'd be curious to understand
3:10:43which ones are retained and which ones
3:10:45are new plantings
3:10:47whether it's you or other
3:10:49>> if you'd like us to call up the
3:10:50engineer. I think it is in our
3:10:51demolition plan which was in the actual
3:10:53set of plans. I can I can have Mr.
3:10:55Labiskin answer that directly if you
3:10:57would like a question that answered.
3:11:00>> I don't see why not, but I'll defer to
3:11:02Madam Chair.
3:11:02>> No, I would like your questions to be
3:11:04answered. Absolutely. So,
3:11:05>> sure.
3:11:06>> We want to call them.
3:11:06>> Any other questions for Mr. Kelly before
3:11:08we let Mr. Kelly go?
3:11:10>> No. Okay. Thank you, Mr. Kelly.
3:11:12[clears throat]
3:11:13All right. So, my pleasure. Thank you.
3:11:15>> Or did Brian go? There he is.
3:11:23testimony tonight. The truth, the whole
3:11:25truth, nothing truth.
3:11:26>> I do.
3:11:28>> Brian Libiskin. L I E B S K I N D.
3:11:32>> Brian, is your license current and in
3:11:34good standing?
3:11:34>> It is.
3:11:35>> Thank you. You're qualified.
3:11:36>> Thank you.
3:11:37>> Proceed.
3:11:38>> So, Brian, you heard the question from
3:11:39Commissioner Kaplan. If you can please
3:11:41address the street trees.
3:11:43>> Uh, yes. And and the rendering that's on
3:11:45the screen um prepared um for Mr. Kelly
3:11:48actually, you know, depicts the the
3:11:51difference between the um existing
3:11:53trees. Um so there's one um directly
3:11:56adjacent to our our curb cut on Holiday
3:11:59Street. Um so, you know, we are
3:12:02providing a 5x10 tree pit around that
3:12:04existing tree. Um and then um slightly,
3:12:07you know, off um you know, our frontage
3:12:10on on Pacific, you know, is um another
3:12:13existing tree that would be maintained.
3:12:15So um in in total we have you know six
3:12:18trees um uh you know that are are
3:12:20counted towards um you know the eight
3:12:22that are required. Um I now that I'm
3:12:25being sworn in I can I uh regarding the
3:12:28u you know planting along the tracks
3:12:30when we we have reached out to transit
3:12:33uh and have you know initial review with
3:12:36with them have also uh talked about you
3:12:39know general requirements for spacing u
3:12:42between the tracks and planting the
3:12:44their general rules is 25 ft. Um so it
3:12:47is sort of you know around that uh that
3:12:50threshold. Um even the the one tree um
3:12:53on the the you know southwest end of of
3:12:56Pacific we're we're showing it I you
3:12:58know airing on the side of um you know
3:13:00of more trees um you know but the
3:13:03expectation is you the the planting you
3:13:06know along the that light rail corridor
3:13:07probably you know would would not be per
3:13:09permitted uh by uh NJ Transit. Um but
3:13:13again we we're you know open to that um
3:13:15that conversation and um and then also
3:13:18would would not know there is an
3:13:19existing chain link fence that runs
3:13:21along that um you know the the transit
3:13:25property um so that would be you know
3:13:27maintained um you as part of the
3:13:29>> Is that your fence or their fence? No, I
3:13:32mean it's uh if I can maybe zoom in,
3:13:34it's it shows on
3:13:38um on the
3:13:38>> It shows inbound to the property line or
3:13:41outbound to the property line?
3:13:43>> Yes, it's it slightly off our property.
3:13:46Um so I mean we have no intention of um
3:13:49>> But is it your fence or is it their
3:13:51fence?
3:13:51>> It's it's on the the transit property.
3:13:54>> Yeah,
3:13:54>> that doesn't answer the question.
3:13:56>> Well, I mean legally it it belongs to
3:13:58transit if it's on their property.
3:14:01It's It's not something we installed.
3:14:02>> Is it yes or it's no?
3:14:04>> So, it's it's for all intents and
3:14:06purposes, it belongs to them.
3:14:09>> So, you're going to have a meeting with
3:14:10transit, correct?
3:14:11>> We'll have to.
3:14:12>> So, bring that issue up with transit and
3:14:14then get back to our planning staff.
3:14:16>> You're not going to put up a nice fence
3:14:17on your property line.
3:14:18>> What a shame.
3:14:20>> On that side, again, we can we'll have
3:14:22that conversation with them. So, we're
3:14:23happy to include that as
3:14:25>> I assume it's not their fence, but I
3:14:30mean, I'd be interested to go out and
3:14:31look, but
3:14:33>> put it this way. I think when whoever
3:14:35pull maybe a permit wasn't pulled to put
3:14:36up that fence, and then therefore
3:14:38there's I don't know the answer, but
3:14:39assuming a permit was pulled, a permit
3:14:41can only be pulled by the property owner
3:14:43to put a fence on. So, if a permit was
3:14:45pulled, it would have been by NJ
3:14:46Transit. If it was not, I guess Matt,
3:14:48you could be correct. It could be our
3:14:50fence just installed off our property
3:14:51line. So then we'll make it a condition.
3:14:54If it turns out that it is your fence,
3:14:56you'll get rid of the ugly chain link
3:14:57fence and make it a nice fence. Sure.
3:15:01>> Again, or whatever
3:15:04says we can put there
3:15:07>> within x distance of their tracks.
3:15:09>> Correct.
3:15:09>> Correct.
3:15:10>> Yes.
3:15:12>> So you'd upgrade the fence and whatever
3:15:14>> again to whatever
3:15:16>> whatever that means.
3:15:16>> Whatever. We're going to put the
3:15:18condition in to help you convince
3:15:20transit
3:15:21>> that they should do this on this site.
3:15:24>> Now, you guys keep saying six trees.
3:15:27>> I'm counting seven.
3:15:28>> Seven.
3:15:29>> The the seventh that's that's slightly
3:15:31off is not accredited towards the
3:15:35>> on Pacific.
3:15:36>> One on the top right is beyond the
3:15:38property line, right?
3:15:39>> And I mistakenly colored it in.
3:15:42>> Okay.
3:15:42>> Which means it'll be there.
3:15:44>> It is there
3:15:45>> and it's going to stay there. It's that
3:15:47is definitely off our property. That is
3:15:50>> But it's not on your property.
3:15:52>> As long as it stays
3:15:53>> counted towards the
3:15:55>> Okay.
3:15:56>> Okay. I'll call it six and a half.
3:16:00[laughter]
3:16:00>> Half in here and half there.
3:16:02>> Looks more like six and three/4.
3:16:06>> Um,
3:16:07>> okay.
3:16:08>> Question. And forgive me. I'm not sure
3:16:10who I should ask this to if it's you,
3:16:11Brian, or or the architect, but um
3:16:13you're showing the 5ft setback beyond on
3:16:16the north the top side of this drawing
3:16:19that is that going to be gated walkway
3:16:22or is that you know to it looks like it
3:16:25goes into that amenity space rear yard.
3:16:28>> Uh yes, that's a good question. It's
3:16:29something that um was discussed earlier.
3:16:32I think yes the the intent will be you
3:16:33know there'll be a
3:16:35>> um you know a panic button bar gate um
3:16:40you know for for rest out of that the
3:16:42private amenity space
3:16:46thank you [snorts]
3:16:48>> um go ahead
3:16:50>> sorry can you speak to what uh bike rack
3:16:52or bike maybe it's for the architect but
3:16:56what is um what what's going to be for
3:16:59bike parking inside the garage sort of
3:17:01>> better Karen.
3:17:02>> Yeah, I might I might go to a different
3:17:05exhibit
3:17:07or rather just to the actual drawing.
3:17:14>> Can we go through this already? Can we
3:17:17go through this?
3:17:19>> Council, while he's looking that up over
3:17:21the garage, vehicles coming in or coming
3:17:24out, there'll be a light up above there
3:17:25to basically as an indication that the
3:17:27garage is a pedestrian warning device.
3:17:30Absolutely. Perfect.
3:17:31>> Yes.
3:17:31>> Thank you.
3:17:32>> So, regarding the bike parking, I'll
3:17:34just uh show you this sheet. Uh first of
3:17:37all, there are two types of bike rack
3:17:38proposed. The majority of them are the
3:17:40bike rack which you see on the left hand
3:17:41side, which is a vertical um it can be
3:17:44freestanding, but in our case, it'll be
3:17:46a wall-mounted bike rack. So, the bike
3:17:48the bikes are brought in, they're stood
3:17:50vertically, they're hung on a hook, and
3:17:51then they're locked in position. Um it's
3:17:54the best in terms of uh the efficiency
3:17:56of space. So we can get as many bikes or
3:17:59far more bikes to fit in those space.
3:18:00But then we are also providing a
3:18:03different type which is this which is a
3:18:04floor mounted type bike rack. Um so
3:18:07again there's a I believe we have three
3:18:10of those so people could use them and
3:18:12just wheel their bike into position or
3:18:14if somebody wanted to chain a scooter
3:18:16they could do so. But in terms of the
3:18:18location on the floor plan, um the bike
3:18:22racks are kind of spaced evenly
3:18:24throughout the floor in the garage.
3:18:29Just trying to find the first floor
3:18:31plan. Excuse me.
3:18:33Maybe page seven. There we go. So, uh we
3:18:37have we have a a ver a
3:18:41bank of bike parking here and then also
3:18:44directly adjacent to it here. We also
3:18:47have a a long bank of wall-mounted
3:18:49spaces here and a long bank of
3:18:51wall-mounted spaces there. And the three
3:18:53floor mounted spaces are here at that
3:18:56location right there.
3:18:58>> Thank you. Could could you just confirm
3:19:00for the hanging device? Um are you able
3:19:02to individually lock the bike to not
3:19:05just hang it but a fix like a security
3:19:07lock for
3:19:08>> Yeah, you can do it either way. You can
3:19:09affix your own lock between the bike and
3:19:11the hook or the it actually has a a
3:19:14latch which can if if the landlord
3:19:17provides a key it can be locked.
3:19:19>> Perfect. Thank you.
3:19:24>> Um is there any consideration for a
3:19:27loading zone in front of the lobby um to
3:19:29work in conjunction with the city on?
3:19:33>> So I will say that we have no objection
3:19:35to that. It's obviously not a
3:19:36requirement for the redevelopment plan,
3:19:38but we have no objection. We if that's
3:19:40what the city would like, it would
3:19:42likely be located along Pacific Avenue
3:19:44as our curb cut is on Holiday. Um,
3:19:47again, no objection on our front and and
3:19:50you know, again, I would just caveat
3:19:52that with I'm not sure at this point if
3:19:54NJ Transit might also have some comments
3:19:57about uh loading areas, you know, within
3:20:00proximity of their rail line, especially
3:20:02because obviously that that's that's
3:20:05directly where you would cross over the
3:20:07rail line. Um, but again, we have no
3:20:09objection to it. It's just not something
3:20:11that we outright considered as it wasn't
3:20:13required.
3:20:14>> Gotcha. My my only piece on that is I
3:20:16know you're providing more parking than
3:20:18is required, but there's still a large
3:20:19number of units that will be utilizing
3:20:21transit, bicycles, andor Ubers, or other
3:20:25means to get around. So, a loading zone
3:20:27or a place to have those transactions,
3:20:29those curbside transactions may be
3:20:30beneficial as opposed to double parking
3:20:33and and blocking the street um to load
3:20:35or unload your residents.
3:20:38>> But of course, that would need to be
3:20:39worked out with
3:20:41the city,
3:20:42>> right? Right. So, I would say we could
3:20:43certainly as a condition inquire about
3:20:45loading um with both the city and uh and
3:20:49uh transit.
3:20:50>> Perfect. And then one last question I
3:20:53guess regarding that easement and that
3:20:54that walkway. Um is there and maybe this
3:20:58should be best directed towards staff.
3:20:59Is there a vision or or a concept where
3:21:03this walkway would extend beyond this
3:21:05where, you know, I see a pedestrian kind
3:21:08of being funneled into Pacific and
3:21:11Holiday Midblock um parallel to the
3:21:14light rail tracks without really kind of
3:21:15an easy crosswalk. The nearest
3:21:17crosswalks to cross Holiday or Pacific
3:21:19is is a little bit far.
3:21:22So, the plan does have a vision for a
3:21:26trail that
3:21:27uh continues along the light rail tracks
3:21:31um parallel to the tracks. But the
3:21:35district's requirements don't other than
3:21:38this particular project don't really
3:21:41codify how that's going to happen or
3:21:43where.
3:21:44Um,
3:21:46now this particular link is is helpful
3:21:49because it connects into Bram Hall and
3:21:52then over on Holiday can connect over
3:21:54into Forest Street which will eventually
3:21:58uh continue all the way to Garfield
3:22:00Avenue uh across the street from the
3:22:03station. So this is a critical
3:22:05connection but there really isn't a
3:22:07detailed uh vision for how or standards
3:22:11for how this is going to happen. Uh it
3:22:13also take uh an immense amount of
3:22:16coordination with transit because unlike
3:22:20this location, other segments would have
3:22:23to be within their rightway that 30 that
3:22:2630 foot or 25 ft as been testified to by
3:22:29uh Mr. Kelly. Um,
3:22:34and I know that the station was
3:22:35mentioned earlier, but in past meetings
3:22:39with them, speaking about this location,
3:22:42um, they've given all sorts of reasons
3:22:44why they can't put a station at this
3:22:45location. Um, so creating this path is
3:22:48very crucial in trying to get, uh, a
3:22:51better connection in uh, from this
3:22:53location to Garfield Avenue light
3:22:55station.
3:22:56>> Thanks, Matt. My my only thinking and I
3:22:58don't know that I have the right answer
3:22:59here, but you know if it would be
3:23:02beneficial or or desirable or important
3:23:04to provide a crosswalk at either end of
3:23:06this segment of the trail. Um, for
3:23:09example, if someone is on Holiday Street
3:23:10on the opposite end or on Pacific on the
3:23:12opposite end, there may be a desire line
3:23:15for pedestrians to kind of cross
3:23:17midblock here.
3:23:20Um, but I also understand that gets
3:23:22complicated because there's light rail
3:23:23crossing gates there and and it's not a
3:23:26straightforward
3:23:27um
3:23:29crosswalk.
3:23:30>> Yeah, I'm um
3:23:33not entirely sure how that would work.
3:23:35Um
3:23:37I'm sure there's devices to do that and
3:23:39facilitate that. Um it might need a
3:23:42special permit from uh DOT or NJ Transit
3:23:48um being right next to light rail
3:23:50tracks.
3:23:51>> Would the applicant be open to that
3:23:52conversation? Understanding there's
3:23:54complications with transit and others.
3:23:56>> Again, anything that you'd like, we're
3:23:58happy to engage with them on. Um I I
3:24:01just, you know, can't promise you what
3:24:02the result will be of course, but if you
3:24:04wanted to where specifically
3:24:06commissioner were you looking for? So I
3:24:08I think what would be beneficial to
3:24:10align with this walkway would be ADA
3:24:12ramps and crosswalks across both Pacific
3:24:14and Holiday to the other side of the
3:24:16street to provide public access to this
3:24:19this walkway.
3:24:20>> Got it. Across so from our site across
3:24:23the other frontage AC got it under both
3:24:25sides. Okay.
3:24:26>> Um
3:24:27conditional on transit and everyone
3:24:30else.
3:24:31>> So you want it on the transit side? No,
3:24:34I I to be able to cross Pacific Avenue.
3:24:37So, if you're to to go from this walkway
3:24:40to keep going straight across the
3:24:42street, I think people will be doing
3:24:43that.
3:24:44>> Yeah. I mean, again, we have no problem
3:24:46requesting that of them and also
3:24:48obviously the city and division of
3:24:49transportation as to what they think on
3:24:51that issue as well.
3:24:52>> Of course.
3:24:53>> Yeah.
3:24:57>> All right.
3:24:58>> Okay. Any other board comments at this
3:25:00time?
3:25:01>> Okay. Okay. So, with that, I'll call my
3:25:02next and final witness, Carolyn
3:25:03Worstelle, to speak to the deviation for
3:25:05the two-sided two sides of residential
3:25:08signage.
3:25:11>> Let's just focus on the sign.
3:25:14>> Sure.
3:25:15>> Yeah, just Yeah, definitely.
3:25:18>> Good evening.
3:25:19>> Good evening.
3:25:20>> Uh, so I'm I'm here. I'm still under
3:25:23oath. License is still in good standing.
3:25:25Um it's always a pleasure to go before
3:25:27the board when I have a fairly simple uh
3:25:31application before me. Um so yes, so
3:25:34we're here I'm here tonight only for the
3:25:37one sign. Um
3:25:41so
3:25:43essentially the project is proposing two
3:25:44residential signs um where only one is
3:25:47permitted. Um, so the redevelopment plan
3:25:51requires properties located within the
3:25:53mixeduse a district to refer to the
3:25:56neighborhood commercial the NC district
3:25:58signage standards in the LDO.
3:26:01Um, the NC district standards only
3:26:04permit one side per per residential
3:26:07building.
3:26:09So it doesn't, you know, allow us to
3:26:11have a second sign even in a situation
3:26:13where we have two frontages or we're on
3:26:15a corner or anything like that. Just one
3:26:16sign. Um there is however language
3:26:19within the redevelopment plan that
3:26:20states that a maximum of one side per
3:26:22occupant per street frontage shall be
3:26:24allowed. Um so we are before you asking
3:26:27for the one sign because the NC district
3:26:30signage standards don't allow us to
3:26:32second sign even though there's language
3:26:34in the redevelopment plan which
3:26:35indicates that we should be allowed to
3:26:37have that second sign. Um, so we're
3:26:39going to be um, you know, look at this
3:26:42conservatively and just ask for the
3:26:44permission to have the variance from the
3:26:46NC district signage standards. Um,
3:26:48again, we do have two primary facads,
3:26:51one on Pacific, one on Holiday Street
3:26:53with two residential lobbies. We think
3:26:56that it is a better planning alternative
3:26:58to make sure that both of those lobbies
3:27:00are signed for um, the ease and and uh,
3:27:04wayfinding for everyone. Um,
3:27:07you know, again, I I think overall the
3:27:11project, you know, obviously advances
3:27:12municipal land use law. It's an
3:27:13appropriate use consistent with purpose
3:27:15A. It's in a mixeduse development um
3:27:18that is specifically uh envisioned
3:27:20within the redevelopment plan. Um, we're
3:27:22obviously providing um conforming
3:27:24setbacks. We're providing adequate
3:27:26light, air, and open space consistent
3:27:27with purpose C. Um and then obviously
3:27:29it's a vastly uh more desirable visual
3:27:32environment consistent with purpose I uh
3:27:34with the substantial improvements both
3:27:36to the property and the the surrounding
3:27:38um right ofways. Um I don't see
3:27:41obviously a substantial detriment to
3:27:43this uh variance. It's it is just for
3:27:45the one sign. Um and again uh I don't
3:27:48see res a substantial impairment to the
3:27:50intent and purpose of zone plan or
3:27:51zoning ordinance. Um so I think overall
3:27:54the project or the variance could be
3:27:55granted and both the positive and
3:27:57negative variant uh criteria have been
3:27:58met.
3:27:59>> Thank you Carolyn.
3:28:00>> Thank you.
3:28:01>> Any more comments?
3:28:04>> No.
3:28:04>> Thank you.
3:28:05>> So madam chair that would conclude my
3:28:07direct presentation. Uh obviously if
3:28:09there's any reason to sum up at the end
3:28:10or respond to any comments I will do so.
3:28:12>> Okay. At this time I would like to open
3:28:14for the public. Is there anyone from the
3:28:16public who would like to comment on this
3:28:18application?
3:28:30testimony tonight is going to be the
3:28:31truth. The whole truth and nothing but
3:28:32the truth.
3:28:32>> Yes.
3:28:33>> For the record, can you explain your
3:28:34name and give us your home address,
3:28:35please?
3:28:35>> Yes. Mary Web Miller, M I L L E R. Home
3:28:39address 255 Pacific Avenue.
3:28:42>> Mary, you have three minutes. Good
3:28:45evening.
3:28:47>> Good evening.
3:28:503 minutes and I've sat here for I don't
3:28:53know how many hours and to hear what
3:28:56will happen to my neighborhood.
3:28:58I own the house at 177 Holly Street and
3:29:02I live at 255 Pacific Avenue
3:29:05and to hear that now where the trees
3:29:09were is going to be 50 residents or
3:29:12however many that's in that building and
3:29:15I don't know the role specifically. It
3:29:18seems that you're governed by what
3:29:20redevelopment tells you and you go
3:29:24through the uh uh the dot the eyes and
3:29:28force the tees to make sure everybody's
3:29:30doing what they should do but tell me
3:29:32where someone should speak for the
3:29:34people to go from a residential
3:29:36neighborhood. There was nothing nothing
3:29:39down there but uh two buildings that
3:29:42were not being utilized. And when they
3:29:44were utilized in a bunch of garages that
3:29:47have 50 people on that corner the in
3:29:50front of the house at 170 my house at
3:29:53177 Holiday Street that faces 176. The
3:29:57history of those houses were that large
3:29:58red house that you saw belonged to the
3:30:00McConnell fuel oil company and the one
3:30:02family houses on the other side were
3:30:04built by McConnell for his workers.
3:30:06those all residential homes and no
3:30:10consideration to the people who have
3:30:12lived there for generations what their
3:30:14homes just to drop in this project.
3:30:19I don't have anything else to say. It's
3:30:21your responsibility and for me it's just
3:30:24the fact that the home that was bought I
3:30:28can't go home and park tonight. I'll go
3:30:29three blocks to find a parking space.
3:30:32And to think that 50 more uh uh
3:30:36addresses will be added is just
3:30:38unbelievable.
3:30:40And and if it was just this one project,
3:30:43it would be something else. But all
3:30:46night I've sat here in the last three
3:30:47times I've come here, all I've heard is
3:30:50people uh apply for even the two little
3:30:53lots on I forgot what street it was to
3:30:56join the lots and on Fifth Street and
3:30:59make just build build. You can't leave
3:31:02the city. I tried to go to Newark. It
3:31:04took me an almost an hour.
3:31:07I tried crossing uh 440. You can't leave
3:31:10the city. You can't drive.
3:31:13and it just goes on and on and no
3:31:16consideration for uh the quality of
3:31:18life. Once that building is built, then
3:31:21the neighborhood is gone.
3:31:24But you do your job and thank you for
3:31:26listening.
3:31:26>> Thank you.
3:31:30>> Anyone else from the public
3:31:33council? Could you make a few comments
3:31:34in reference to what she had said?
3:31:38>> Sure. I mean, you know, explain about
3:31:40the law and everything else that we're
3:31:42governed by.
3:31:45So I think the member of the public
3:31:49understands that
3:31:51this body is in charge of development in
3:31:55the city. That's that's what your charge
3:31:58is. This is permitted at this site. Uh
3:32:04and you're required to follow what's
3:32:07required within the development plan for
3:32:11the site. So if anybody comes here, they
3:32:14are going to hear people coming before
3:32:16the board with development projects.
3:32:19That's what we do. This isn't the
3:32:20municipal court where you would show up
3:32:22because you got a parking ticket.
3:32:24>> You're here because you're trying to
3:32:26develop property in the city under this
3:32:29board's jurisdiction.
3:32:30>> So every other Tuesday, we are here
3:32:33going through the agendas.
3:32:37I would advise the board that this is
3:32:40what is envisioned for this site.
3:32:43The only deviation is the second sign on
3:32:46the second entrance since the property
3:32:49has two street frontages.
3:32:53That's the only thing that is not on all
3:32:57fours with what's required under the
3:33:00redevelopment plan. So, uh, all of you
3:33:04are seasoned enough and have been doing
3:33:06this long enough that you you understand
3:33:08the ask, you understand what the plan
3:33:10requires and you understand the nature
3:33:13of the project. So, uh, I think the
3:33:15questions and and what the board looked
3:33:17at and wanted to make sure was gotten
3:33:20right,
3:33:21>> right,
3:33:22>> uh, you know, is is what matters and
3:33:24what this board's supposed to be doing.
3:33:26And just so everybody understands, this
3:33:29board doesn't create the rules. The
3:33:32rules get created in city hall. This
3:33:35board plays with the rules. And we're
3:33:39not allowed to to color outside the
3:33:41lines. We're here calling balls and
3:33:43strikes. That's that's the charge of
3:33:45this board. So, uh I think you guys do a
3:33:49great job of doing that. And I would
3:33:52urge everybody whatever issues you know
3:33:54or legislation you don't like this body
3:33:58doesn't legislate.
3:34:00>> It's not what we do.
3:34:12Thank you, ma'am.
3:34:13>> Thank you for coming.
3:34:13>> There's no one else from the public. Uh
3:34:16>> I see no else. So, no one else from the
3:34:18public. I'd like to close the public
3:34:19portion.
3:34:20>> Second.
3:34:21>> Public is closed.
3:34:22>> Ben,
3:34:24>> uh yes, uh staff agrees with the
3:34:26testimony provided by the applicant and
3:34:29uh the planner, Miss Worstelle. Um, I
3:34:31would add that the uh plan as provided
3:34:35does advance some of the redevelopment
3:34:37plan goals um such as providing
3:34:40opportunities for the growth of
3:34:41neighborhood level retail um in the form
3:34:44of the uh retail square footage they're
3:34:46adding. Um there's also a goal of
3:34:49creating opportunities for the
3:34:51development of additional park areas. I
3:34:53feel like the easement is in the spirit
3:34:55of that. Um, so staff recommends
3:34:59approval provided that the applicant
3:35:02agree to the conditions in the staff
3:35:03memo dated uh October 6th, 2026 with I
3:35:08believe four additional conditions if I
3:35:10was counting right. Um, one condition to
3:35:14obtain forestry permits prior to zoning
3:35:16permit. That's something that Mr. Wine
3:35:18and I discussed prior to this meeting.
3:35:21um the fence condition, the loading
3:35:23space condition, and then the uh
3:35:26crosswalk condition. Um so if the
3:35:29applicant agrees to all of those
3:35:30conditions, uh staff recommends
3:35:32approval.
3:35:33>> As set forth on the record, yes, we do.
3:35:35>> Um Mr. Vine, um you know, it did not
3:35:38escape my attention that there's a lot
3:35:40of really beautiful historic buildings
3:35:42around this. Um, and I was just
3:35:44wondering if you could speak on the
3:35:46record briefly about, you know, what
3:35:48what measures you tend you intend to
3:35:50your client intends to take to make sure
3:35:51you're being a good neighbor during the
3:35:53construction process. Uh, especially
3:35:55considering the age of some of these
3:35:56neighboring buildings.
3:35:57>> Sure. It's it's a great question and you
3:35:59know, I could give I will give the
3:36:01standard answer, but I will also enhance
3:36:02that. So the standard answer is
3:36:04obviously we're governed by the
3:36:05demolition ordinance and demolition
3:36:07requirements um which require safety and
3:36:09stabilization of neighboring properties
3:36:11and buildings and all that. That is the
3:36:13standard answer and I would hope that
3:36:15every developer in the city whether
3:36:16they're before this board or or filing
3:36:18for permits only would follow that. I
3:36:20think what's what's different here is
3:36:22typically you see applications that have
3:36:25minimal or no setbacks at all from
3:36:28property lines. You often see attached
3:36:29buildings. You saw several of them
3:36:30tonight. This is, as you heard from Mr.
3:36:33Kelly, in addition to the enhanced
3:36:35setback. So, sideyards here have the
3:36:36requirement of even 5T, which again is
3:36:39on the larger side for most most zones
3:36:42throughout the city. Typically, they're
3:36:43they're between zero and three. So, that
3:36:45enhanced sideyard is going to help that
3:36:47coupled with the fact that on the one
3:36:49side that we were actually concerned
3:36:51might even be a considered a rear yard,
3:36:53we went to 15 ft um because it directly
3:36:56abuts a neighboring property's rear yard
3:36:58as well. And so, we took that extra
3:37:00conservative step. So, this project I
3:37:01think in and of itself and how it's been
3:37:03designed is particularly curated to take
3:37:06into account um some of those
3:37:08enhancements. And just beyond that, I
3:37:09would just say again when you're dealing
3:37:11with historic properties, what I said to
3:37:14start kind of the standard answer and
3:37:15the demolition requirements, you
3:37:17actually do organically have to take
3:37:19extra protective measures because some
3:37:21of those structures may not be as stable
3:37:23as something that is uh is more, you
3:37:25know, newly constructed.
3:37:28>> All right. Thank you so much.
3:37:31At this time, I would like to entertain
3:37:33a motion.
3:37:34>> I'd like to make a motion to approve KP
3:37:362026-0063
3:37:38as presented to the board with all staff
3:37:40recommendations and conditions.
3:37:42>> Second,
3:37:44>> Vice Chair Wick.
3:37:45>> I think it's a gorgeous building. Um I
3:37:48think in a lot of categories you guys
3:37:49went beyond the standard. So, I'm going
3:37:51to vote I.
3:37:52>> Commissioner Kaplan.
3:37:53>> Yeah, I concur. Great building, great
3:37:56plan. um and aligns with the vision for
3:37:58the neighborhood in the redevelopment
3:38:00plan. So with that I vote I
3:38:02>> Commissioner Council person Little
3:38:04>> I.
3:38:05>> Uh Commissioner Stamato.
3:38:07>> Great job. Your team did an excellent
3:38:09job. I vote I
3:38:10>> Commissioner Conway.
3:38:11>> I also think you guys did a great job.
3:38:13You guys went above and beyond what was
3:38:16you know listed. So I
3:38:18>> Commissioner Patel
3:38:19>> very nice I
3:38:20>> and Madam Chair Congadan. Yeah, I just
3:38:22want to touch um I'm happy to see the
3:38:24affordable housing in particularly in
3:38:27that neighborhood there. Um this is a
3:38:29changing for that neighborhood. Change
3:38:32is always good. Um and it's much of a
3:38:35growth within that area, especially that
3:38:38the light rail is right there. Um
3:38:40beautifully designed. So my vote is eye.
3:38:43>> Motion carries. All in favor?
3:38:44>> Congratulations.
3:38:46>> Thank you. Have a good night.
3:38:47>> Thank you.
3:38:48>> Mike, you want to take a 10?
3:38:50We'll be quick.
3:38:56>> One more.
3:39:00>> I don't think it's council.
3:39:03>> Do you want us to take a break or do you
3:39:05want to get
3:39:12>> Yeah, I don't see any of his witnesses.
3:39:13So,
3:39:14>> I learned from the last time I didn't
3:39:16want to speak before I came to the mic.
3:39:18Um, I I don't
3:39:20>> state your name for the record, council.
3:39:22>> Good evening, commissioners. Gerard
3:39:24Pizzill from GOVA Burns on behalf of the
3:39:26Applicane 500 Summit Avenue Owner LLC.
3:39:29>> Well, Madame Chair, I think it's only
3:39:31right that we call the case and
3:39:34>> Okay.
3:39:35>> allow councel to make his comments.
3:39:38>> Sure.
3:39:38>> Agree with you.
3:39:39>> At this time, I would like to call case
3:39:41speed 2025-0169.
3:39:43It's a preliminary and major site plan.
3:39:46address is 506 Summit Avenue. Um the
3:39:51attorney is Cheryl Pazello,
3:39:54>> council, it's a preliminary,
3:39:55>> correct? Preliminary only, not final. Uh
3:39:58so just preliminary only. Uh good
3:40:00evening, chair, madam chair,
3:40:02commissioners, Gerard Pizzillo, uh on
3:40:04behalf of the applicant. Um as you have
3:40:07seen, this is an application that's been
3:40:09carried a number of times. Uh I think
3:40:12probably eight. Uh I think we were first
3:40:14on the agenda in April. Uh we did appear
3:40:17last week or two weeks ago. Uh we almost
3:40:20got there. Uh we were one off. Uh and
3:40:23then we you know we're towards the
3:40:25bottom again this time. Uh we've had a
3:40:29number of conversations for a number of
3:40:31months with a number of stakeholders.
3:40:34Um one of the reasons why we've
3:40:36continued to carry is to allow those
3:40:39conversations to happen. Uh they did
3:40:42happen some sporadically.
3:40:45Um
3:40:47but I think there was conversations
3:40:48earlier this afternoon
3:40:51uh between my client and members of the
3:40:53administration. Uh and I think there was
3:40:56an agreement uh that we would agree to
3:40:58carry tonight to a date certain of
3:41:01October 27th. uh we would agree to uh
3:41:06consent to wave the time to act to that
3:41:09period of time. Uh and I would just put
3:41:12that on the record and just ask if we
3:41:14can you accommodate the or at least
3:41:17schedule this for the date certain of
3:41:1910:27
3:41:21>> with that you know with those consents.
3:41:24>> So council we're going to do that then
3:41:26we are going to carry this matter to
3:41:29October 27th. It will be listed on that
3:41:32agenda uh with the understanding that
3:41:35the applicant has waved the time on
3:41:37which this board has to act until
3:41:39October 28 since the meeting is October
3:41:4327th.
3:41:44>> That's correct.
3:41:46And there will be no further notice for
3:41:48this matter. Thank you council.
3:41:51>> Thank you. Thank you all. Have a great
3:41:52night. Appreciate it.
3:41:54>> Will work.
3:41:58At this time I would like to have the
3:42:00resolution memoralization of resolution.
3:42:03>> Yes. Uh corrective resolution of the
3:42:06planning board of the city of Jersey
3:42:08City applicant team Walker Incorporated
3:42:10for preliminary and final major site
3:42:13plan approval 373 through 379 Communa
3:42:17Avenue case number P2024-0206.
3:42:22Resolution the planning board of the
3:42:24city of Jersey City extending
3:42:25preliminary and final major site plan
3:42:27approval submitted by Newport Associates
3:42:30Development Company 535 Monmouth Street
3:42:33aka 354 10th Street block 6902 lot 27
3:42:38and that's case number P2026-10
3:42:420. Applicant Harborside unit A, urban
3:42:46renewal LLC for minor site plan approval
3:42:48with C deviation signage 200 Green
3:42:51Street, Jersey City, New Jersey, block
3:42:5411603,
3:42:55lot 31.03. And that's case number
3:42:58P2026-0018.
3:43:02Applicant Rohei NGA Sha for preliminary
3:43:05and final major site plan approval. 300
3:43:07Central Avenue, Jersey City, New Jersey,
3:43:10block 3801, lot 26. And that's case
3:43:13number P2024-0198.
3:43:17Resolution planning board of the city of
3:43:18Jersey City approving approving an
3:43:20extension of preliminary major site plan
3:43:22approval with a variance. Applicant is
3:43:25PAL Maul's Venture for extension of
3:43:29preliminary site plan approval with a C
3:43:31variance 381 route 440 block 26102
3:43:36lot 3. And that's case number
3:43:37P2026-0133.
3:43:44Second roll call, please.
3:43:46>> Vice Chair Wick,
3:43:47>> I.
3:43:48>> Commissioner Kaplan,
3:43:48>> I.
3:43:49>> Commissioner Council person Little,
3:43:50>> I.
3:43:51>> Commissioner Stamato,
3:43:52>> I.
3:43:52>> Commissioner Conway,
3:43:54>> I.
3:43:54>> Commissioner Patel,
3:43:55>> I.
3:43:55>> And Madam Chair Congadan, I
3:43:57>> motion carries. All in favor?
3:43:58>> Thank you. Any other board business to
3:44:00discuss?
3:44:02>> If not, motion to journ.
3:44:03>> So move.
3:44:04>> Second.
3:44:06>> Thank you. Thank you.
3:44:10The agenda.