2026-09-29 - Planning Board

Summary

  • Opening: six commissioners present, quorum confirmed; staff were sworn in.
  • 381 Route 440 (P2026-0133): one-year extension of the preliminary site plan for a retail pad in the parking lot of the new Target on Route 440. Target construction is complete and the owner is meeting prospective tenants. Approved, 6-0, with the original conditions.
  • 535 Manmud Street (as transcribed): one-year extension to August 23, 2027 for a 246-unit mixed-use building in the Newport area, citing economic conditions. Approved, 6-0.
  • 292 Van Horn Street Site Plan: a four-story residential building, continued from September 8 on a landscaping variance. The architect described planters, grass pavers, a green roof and a right-of-way planting bed; the applicant said full compliance would cost required parking. Speakers opposed it, alleging risks to older neighboring homes, parking and traffic strain, flooding and loss of neighborhood character. Approved 5-1 with staff conditions; a commissioner floated a pre-construction community meeting condition and then withdrew it.
  • Certified artist review: the applicant was found to meet the certified artist criteria and approved, 6-0.
  • Let's Move JC Mobility Element: a transportation planner presented the citywide mobility plan, built on outreach to over 4,000 participants, seven "big moves" and small-area plans for Journal Square and the West Side. Andy Kaplan recused because his department led the plan. The board found it consistent with the master plan and recommended it to the City Council; one speaker supported it.
  • Scatter Site Study Area 6 Redevelopment Determination: staff found seven vacant or blighted properties qualify as an area in need of redevelopment, specifically a condemnation redevelopment area. Representatives of three owners said they were actively renovating or developing; board counsel said the board's role is to apply the statutory criteria and recommend to the governing body. The board voted 6-0 to recommend the determination to the City Council.
  • 26 Bright Street (P2025-0255): a four-story, four-unit infill building in the Van Vorst Historic District with a 3'11" height variance driven by flood elevation. The design was mirrored after neighbors' concerns and adjacent residents said they supported the latest plans. Approved with five in favor and one abstention.
  • 300 Central Avenue (P2024-0198): rehabilitation of a three-story building with two added stories, 16 residential units and ground-floor commercial, no variances. Approved, 6-0, with staff conditions.
  • 146 Academy Street (P2025-0161): a four-story, 13-unit building with setback, Palisades overlay and height variances; revised plans added a trash chute and street access to the cellar. Approved, 6-0, on the September 29 plans with staff conditions.
  • Summit Avenue preliminary site plan (Case P2025-0169): carried to a later meeting at the applicant's request, with notice preserved.
  • 33 Division Street Mixed-Use Building: an eight-story, 115-unit mixed-use building across from Enos Jones Park, using the redevelopment plan bonus with a $1.68 million park contribution; variances for curb cut width, upper-floor setback, height and building design. An adjacent resident asked for a screened construction fence and the applicant agreed. Approved, 6-0, with conditions including a payment schedule for the contribution before permits.
  • Resolutions: thirteen memorializing resolutions passed on one 6-0 roll call, including the resolution recommending the Hudson County Plaza redevelopment area designation as a non-condemnation redevelopment area.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:006 with a start time of 5:40. Can we all

00:04stand for the pledge of the allegiance?

00:07>> Ice

00:09to the flag of the United States of

00:11America and to the republic for which it

00:14stands, one nation under God,

00:17indivisible, liberty and justice for

00:19all.

00:22>> Kim, can I have the sunshine

00:23announcement?

00:24>> Yes, madam chair. Good evening everyone.

00:26Today's Tuesday, September 29th, in the

00:28year 2026, this is a Jersey City

00:30Planning Board meeting with the

00:31scheduled 5:30 p.m. start time. And in

00:34accordance with the Open Public Meeting

00:35Act, notice of this meeting has been

00:37posted with the city clerk, on the city

00:38bulletin, and on the city website on

00:40September 24th of this year. This

00:42meeting was also posted on the Jersey

00:44City Division of City Planning web page,

00:46and all distribution materials made

00:47available to the board were published

00:49and made available to the public.

00:51>> Thank you. Um, roll call, please.

00:54>> Yes. Acting Vice Chair Patel,

00:57>> I here.

00:58>> Commissioner Conaway

01:00>> here.

01:01>> Commissioner Stamato

01:02>> I here.

01:03>> Commissioner Capers

01:04>> here.

01:05>> Commissioner Kaplan

01:06>> present.

01:06>> And Madam Chair Gangadin

01:08>> here.

01:08>> All right. We have six commissioners

01:10present. We have a quorum.

01:11>> Thank you. Can we ask correspondence?

01:14>> Yes. Um,

01:16we have no correspondence um for the

01:20first time in a while, but I am going to

01:21say that we've marked into evidence the

01:23sunshine announcement as B1.

01:26>> Okay. Thank you. Can we swear in staff,

01:28please?

01:28>> Yes.

01:31>> Let's see. Matt, Ben, Joe, Cam, do you

01:33guys find any testimony you get tonight?

01:34The whole truth and nothing but the

01:35truth.

01:36>> Yes.

01:38>> All right. That concludes uh staff

01:41opening.

01:42>> Thank you.

01:47I'd like to call case P2026-0133.

01:52It's a one-year site plan extension 381

01:56Route 440.

02:00>> Mr. Le,

02:01>> good evening commissioners. Uh for the

02:04record, Tom Lean of Connell Foley. This

02:06is an extension request. I know that

02:08notice is not required. However, I did

02:10provide it and post it on the portal. I

02:12would just like to uh provide a copy to

02:14your council.

02:15>> Sounds like

02:28you council. Madame [clears throat]

02:30Chair, council is correct. Notice is not

02:31required on this particular extension.

02:33However, since council went through the

02:36trouble of providing the notice,

02:38we're going to mark it as A1 for purpose

02:40of the record. Thank you.

02:42>> Thank you. Uh the extension before you

02:44this evening was for a preliminary site

02:47plan approval we requested from the

02:48board uh which received approval back in

02:50October of 2023. Uh this was the site of

02:54a bank drive-thru facility that is

02:56located in the same parking lot as where

02:58the new Target building has been

03:00constructed out on 440. Uh the bank uh

03:03is no longer there. Uh my client who

03:06owns the property has carved out a space

03:08for a retail pad. Uh we came before the

03:11board and just asked them to approve

03:14um a preliminary site plan to uh keep

03:16that use on the site there. Um we're

03:19just asking it to extend it now that the

03:20target has been completed. My client is

03:22meeting with a number of uh possible

03:25tenants to occupy that space. They'll

03:27have to come back and do the final site

03:29plan approval and ask you for signage or

03:30anything of that uh of that nature.

03:34>> Is that your testimony?

03:36>> That's it.

03:36>> Thank you. Any board comments?

03:39No madam.

03:40>> Sure.

03:44>> Sento, is that normal

03:48>> for the extension?

03:49>> Yes, it's satisfactory uh under the

03:52legal standard as to why they have not

03:54been able to perfect the application at

03:58this point, but I think council's

04:00justification is clear and obvious.

04:03>> Thank you. I would like to open for

04:04public. Is there anyone from the public

04:06who would like to comment on this uh

04:08matter?

04:10>> Madam chair, there is no one in the

04:12public. I'd like to close to the public

04:14portion.

04:14>> Second.

04:16>> Thank you. Okay.

04:18>> Planning staff would just ask that the

04:19applicant's attorney agree to uh add the

04:23conditions from the original approval to

04:25the resolution on this extension. So

04:27that's case P23-072.

04:30And if those conditions are acceptable,

04:32planning staff will recommend approval.

04:33those conditions are acceptable to my

04:34client. Obviously, if somebody comes

04:36back in with a final site plan, they'll

04:38deal with with staff uh if there are any

04:40additional comments that need to be

04:41added to that final approval.

04:42>> Okay.

04:44>> Okay.

04:45>> I'd like to entertain a motion.

04:48>> I'd like to make a motion to approve the

04:50case uh number P2026-0133

04:55as presented to the board this evening.

04:58>> Second.

05:00A motion to approve. Acting Vice Chair

05:02Patel,

05:03>> I.

05:04>> Commissioner Conaway,

05:05>> I.

05:06>> Commissioner Stamato,

05:07>> I.

05:07>> Commissioner Capers,

05:08>> I.

05:09>> Commissioner Kaplan,

05:10>> I.

05:10>> And Madam Chair Gungarden,

05:11>> I.

05:12>> All right. Motion carries. All in favor

05:13with conditions.

05:14>> Thank you everyone.

05:15>> Thank you.

05:16>> I'd like to call KP206-01000.

05:20It's a one-year site plan extension.

05:22Address is 535 Manmud Street.

05:28>> Good evening, Madame Chair and members

05:30of the board. My name is Ronald Shaian.

05:32I'm an attorney with Schuman Hanland and

05:35we represented the applicant in this

05:38matter uh at the original application

05:41and subsequent to that application there

05:43were two extensions, the last of which

05:47was to expire in August of 2026.

05:51And for the reasons that we have set

05:53forth in our explanatory letter and the

05:57economic conditions that currently

05:59exist, uh, our client is asking that we

06:03receive another one-year uh, extension

06:06until August 23rd of 2027.

06:16This was a 246 unit resident multi- uh

06:20use building uh in the Newport

06:22development area.

06:28>> Thank you councel.

06:31>> Any board comments?

06:34>> No.

06:36>> I would like to open for the public. Is

06:38there anyone from the public?

06:40>> Madam Chair, there's no one in the

06:41public. Do you like to close the public

06:43portion of it?

06:44>> Second it.

06:46>> Public list closed. Um, so you're acting

06:49for Sophia.

06:50>> Okay.

06:51>> Yes, madam chair. Okay. Um, planning

06:53staff would ask um that you agree to all

06:56the conditions that were previously

06:57placed on your resolution for case

06:59P22-030.

07:02And if those conditions are acceptable,

07:04planning staff recommends approval.

07:06>> Yes, we will.

07:07>> Okay.

07:07>> I'd like to entertain a motion.

07:10I would like to make a motion to approve

07:12the case as presented in the board. Case

07:15number P2026

07:20>> 01

07:220.

07:24>> Second it.

07:25>> On a motion to approve with conditions.

07:27Acting Vice Chair Patel

07:29>> I.

07:30>> Commissioner Conaway

07:31>> I.

07:32>> Commissioner Stamato

07:33>> I.

07:34>> Commissioner Capers

07:35>> I.

07:36>> Commissioner Kaplan

07:37>> I. and madam chair Gangadin

07:39>> I

07:39>> motion carries all in favor with

07:41conditions thank you thank you very much

07:43>> I'd like to call case 2025-0138

07:47is a preliminary and final major site

07:49plan with C variance address is 292 van

07:53horn this matter was um heard on

07:57September 8th and testimony was taken

08:00the following commissioners were present

08:01at that meeting

08:04uh commissioner capers commissioner

08:05Kaplan commissioner Conaway Okay,

08:07Commissioners Stamato and um acting vice

08:11chair Patel and myself.

08:17>> Good evening.

08:18>> Good evening. Thank you, Madam Chair,

08:19and uh good evening, board and councel.

08:21Uh I'm Jim Burke. I'm filling in for the

08:23eminent Steven Joseph who's on vacation.

08:26Uh and uh as you recite it, um it's a uh

08:31project in a redevelopment zone and

08:32there was one issue involving

08:34landscaping and a variance. Uh so this

08:37is the second hearing and uh the

08:40applicant was asked to come back to

08:41address that one issue. So to my left,

08:44where is he?

08:45>> Where's Russell?

08:47[laughter]

08:48>> You disappeared.

08:49>> Uh to my left is the architect. Uh I'll

08:53remind him he's still under oath and

08:56then he will walk through uh the issue

08:59involving the landscaping. You know,

09:01before uh I came here tonight, I did go

09:03down to the site and I saw what what the

09:05issue was involving the the easement in

09:07the back. Uh and that's the uh issue

09:10that is being presented as far as the

09:12inability to provide uh the landscaping

09:15according to the ordinance.

09:17>> All right, let me grab the cord.

09:20>> So, council, as I understand it, the

09:22plans have been revised. There's been

09:24some additional measures put forth. So I

09:28am sure

09:30>> Russell is going to testify to the

09:32revisions to the plan and walk us

09:34through that.

09:35>> Council that's correct. Um several pages

09:38in the plans were changed. Um and uh

09:41>> you just speak into the mic because I

09:43know there are members of the public

09:44that are interested.

09:45>> This one

09:46>> if you turn it on it goes live.

09:51>> Okay. Is that on? Okay. Yes. That's

09:54that's correct. council. There were

09:56several pages in the plans which are

09:58changed in order to try to ameliate uh

10:01the issue involving the landscaping.

10:04>> Thank you.

10:08>> All right.

10:10>> Russell, is your license still current

10:11and standing? Thank you. You're

10:13qualified.

10:14>> Um as you can I guess this is is a

10:17sharing yet or not?

10:19>> We can see it.

10:21>> Oh, I'm sorry. [laughter]

10:23>> That's okay. Thanks, Cameron.

10:29All right, so originally we had uh 12%

10:33uh landscaping um and we're acquired 50%

10:36of the residual leftover land that we're

10:38not using for the building or the

10:40parking or anything else as

10:44um for the uh for the landscaping. So

10:47the uh building itself we we are

10:49required 525 square feet. Um it's uh

10:53that's how much we're required for our

10:55landscaping. We didn't quite get there,

10:57but we got uh on our property itself, we

11:01got down to uh 200 235.66

11:06square ft, which brings us to a 22.4

11:09of our required landscape. We did that

11:11by adding a couple extra plant beds in

11:13the back um adjacent to the access aisle

11:16over here and also on the other side of

11:18the the parking area. We reduced the

11:20parking um width. We got we got bring

11:22them down to 86 as opposed to nine. And

11:25we reduced the uh the handicap down

11:29because we're you know we're still

11:30allowed to get the eight and the five

11:32space that we're allowed to use for our

11:34handicap access and our handicap

11:36parking. I also came up with another

11:37idea along the way. Um and uh we talked

11:41about using these uh grass pavers in the

11:44back where you have these in um pavers

11:46that are filled with grass at the

11:48parking area only. in this actually

11:49where you're parking in the cars and

11:51I'll show you that in a in a moment and

11:54that part that space alone was 450 ft

11:57and at 40% of it which is what they're

11:59saying on the uh information that is the

12:03grass section brings us to 180 ft and we

12:06also did add in a planting bed in the

12:10right in the rightway 5 feet by um uh

12:15let's say 5t by 25 and that bring me

12:18another 125 5 ft in gross. I said option

12:21option with everything. We actually

12:24brought our um our number although we're

12:26not all on our property to 540.66

12:31square ft which put us to the 51.5%

12:36which was like what we're presenting is

12:38what I by code I could only get to 22%.

12:42By the residual lectures that we're

12:44doing, we're actually getting to the 50

12:4751.5 even though the the planting beds

12:51technically the the fi the extra 5 foot

12:54planting bed by 125 is not on our

12:57property. It's actually in the city

12:58right away and we need a franchise

13:01agreement for that. If we come down here

13:03further to um sheet I get to it

13:09further down

13:13if we get to sheet uh it's called ASP

13:16for I was actually showing the detail of

13:18that that planting idea in the parking

13:21lot just it's actually just in the

13:23parking stall area where you have these

13:25like grass inlaid pavers that we can put

13:29in that you know add some more

13:30landscaping even though it's really not.

13:33But it does bring into the fact that it

13:36is extra landscaping. Our biggest

13:37problem is we can't get our our land to

13:41work out because in the back of the

13:43building there's a drive on our property

13:46part of the easement and that is a 11

13:49foot by 30 um 35 ft space 385

13:54square ft. 36.7%

13:58of our residual leftover landscaped area

14:01is actually used for that dry vial. So

14:03we're already starting off at a negative

14:05385 square ft. And out of the the 10,000

14:10I mean out of the uh,50 square feet that

14:13I need to come up with and we're

14:15required also by this plan by the design

14:20and the and the ordinance. We required

14:22to have those three those three parking

14:24spaces in the rear according to the

14:26zoning ordinance. So I don't know. It's

14:27really hard to get to the numbers if I

14:30either going to ask for a variance for

14:31parking and do the landscaping or ask

14:34for a variance for landscaping because

14:36I'd have the parking.

14:37>> So, Mr. Bonder, you had testified at the

14:39previous hearing that [clears throat]

14:42the reduction of the footprint of the

14:44building would actually not help in

14:46terms of the landscape ratio because

14:48obviously as the building gets smaller,

14:51the amount of square footage needed for

14:53landscaping in the rear continues to go

14:56up and that it's an impossible

14:58calculation.

14:58>> Yeah, I started working on that really

15:00hard. I realized the building would have

15:02to get to like under 40% of the lot and

15:04we're allowed to 70% of the building

15:06coverage and we would be under 40 just

15:08to possibly get to to the landscaping to

15:11work. So I mean that brings a building

15:12down smaller than the existing condition

15:14we have exist today. and you were just

15:18testifying, but I'd like you to finish

15:20the thought in terms of in order to get

15:22the landscaping to comply,

15:25the required parking spaces that would

15:28need to be removed would be one parking

15:31space or two parking.

15:32>> We would probably have to take two

15:33parking spaces away just to get that to

15:35comply.

15:36>> And then you'd be deficient in parking,

15:38but you could comply with the landscape

15:40requirements.

15:40>> Correct. Either have one variant for

15:42landscape or one for parking. I know the

15:44neighborhood requested as much parking

15:46as I could get at one point.

15:53So, I mean, we did try to work on as

15:55many things. We also did add another

15:58like 200 ft of green roofing to bring us

16:00to a grand total of 778

16:03square ft of green roofing. And by doing

16:06all these extra changes, we actually

16:08changed our G for our flood information,

16:11our flood numbers from like just around

16:1330 to now 44. So our number jumped by

16:17almost 14 in terms of a G, which is a

16:20significant number in terms of like

16:22helping out for flood mitigation.

16:26>> Does that conclude your testimony?

16:28>> That's that'll do it.

16:30>> Okay. Any board comments?

16:32Just a quick question, Madam Chair, for

16:34the um for what you're proposing for the

16:36planting bed in the public right of way?

16:38>> Yes.

16:38>> Um is the maintenance of that going to

16:40be by the property owner?

16:41>> That's by the property owner. All

16:43anything you do in the rightway is on us

16:46and adjacent to our our site. The

16:50there's actually um adjacent to our site

16:54on both sides. They already are using

16:56the uh right away on the neighboring

16:58properties. So, we're not encroaching

16:59any further out than they are. We're

17:01just taking 5T of it, which still leaves

17:03us with a almost a 6ft

17:05um 6T sidewalk in front of the planting

17:09in front of the tree street beds, which

17:11means we have actually a uh almost an

17:1311t um sidewalk including the street

17:17street trees.

17:18>> Thank you.

17:20>> Any other board comments?

17:22Thank you.

17:24At this time, I would like to open for

17:26the public. Is there anyone from the

17:27public?

17:31Okay, come on up. One at a time.

17:34>> Um, these are for questions, not

17:37comments.

17:38>> Public comments.

17:39>> Comments. Oh, comments. Okay.

17:40>> Every Okay.

17:42>> Do you have another witness?

17:43>> No.

17:45>> How you doing?

17:46>> Okay.

17:46>> Yes.

17:48>> Tonight is going to be the truth, the

17:49whole truth, and nothing but the truth.

17:50>> Yes. For the record, can you spell your

17:51name and give us your home address,

17:52please?

17:52>> My name is uh Juan Davila, spelled J u

17:55D- A V I L A. And uh my home address is

17:58353 Holiday Street and 355 Holiday

18:01Street. I'm literally right behind the

18:04project that's gonna place. You have

18:06three minutes.

18:07>> Yes. So

18:09I'm here to represent myself and also my

18:11my my parents that can't be here.

18:12They're 85. They can't walk. So okay,

18:15this project um this specific project

18:17directly impacts my family in the

18:19neighborhood. We all come home for

18:21decades. My par my parents have owned

18:23our home over 30 years and have been

18:25living here. I've been living next door

18:27to them for seven years with my wife and

18:28my kids, my five kids. My parents have

18:31put literally a blood, sweat, and tears

18:32into this home and to maintain this

18:34property, investing our community in the

18:36building, a life in this home. Like many

18:39long-term residents, they have anchored

18:43the this neighborhood through its

18:44changes and their voices deserve to be

18:46projected against development that

18:48threaten the character and the stability

18:49of our block.

18:51Number one,

18:54property taxes. It often raises the the

18:56total property value of this area which

18:58can increase individual property

19:00assessments and that would directly

19:02affect what we will have to pay yearly

19:04and monthly. Number two, traffic and

19:07safety. Our local roads cannot handle

19:09more cars, especially huge construction

19:12trucks. It's going to affect our parking

19:15lot by not being able to enter or exit.

19:17And that's a tremendous inconvenience

19:20for everyone that needs access to their

19:22parking spaces in case of any emergency.

19:24We need to be able to get in and out.

19:27With ongoing construction, we will not

19:29be able to do so. Also, it's going to

19:31directly impact everyone that has to be

19:33that has to come from work and that has

19:36to drop and pick up their kids from

19:37school. For example, on the corner of

19:40Pacific and Johnston, there's a similar

19:41project that's going on at this point

19:43that's taking place literally as we

19:44speak. They're having all the issues

19:47that I'm listing plus more. Um,

19:51I'm sorry.

19:53Uh, our streets is even smaller than

19:56theirs. That's right on Johnston

19:57Pacific. If you stand on the entrance of

20:00their parking lot, you see nails, broken

20:02wood, mud, cement, tools, construction

20:04trucks. I even saw a gasoline tank right

20:08um on right next to the generator.

20:11Um, this is taking place right now in

20:14the parking lot where their kids play,

20:16where they're where the cars are driving

20:18through whenever it's not blocked. This

20:20is not a safe environment for no one,

20:22especially kids.

20:24Um, it's also causing damage to

20:26everyone's vehicles. This project is

20:28going to, if this project gets approved,

20:29our neighborhood is going to suffer the

20:31same circumstances.

20:33Also, neighborhood character. The size

20:35and style of this project clashes with

20:38our existing homes. Picture a colorless

20:40building in between our beautiful

20:42colorful homes is going to affect our

20:44mental health. Not only is the

20:46construction going to be nosy and

20:48disruptive, it's also going to be

20:49painful to see our building where there

20:51once was a beautiful home that our

20:53friends lived in.

20:55Also, property values. It's going to be

20:57a constant clash with the new people

20:59that's going to try and move there. Most

21:02or all might not agree with our cultural

21:04differences, lifestyle, habits,

21:05different expectations for noise, and

21:07can lead to social friction.

21:09>> Your time is up.

21:11>> Sorry,

21:11>> your time is up. I just have one more

21:13thing is is going to conclude

21:14everything. Can I just have one more?

21:16>> Okay.

21:17>> Okay. In conclusion, we might we are all

21:20a tight community. We all grew up

21:21together. We all were kids when we when

21:23our parents has purchased these homes

21:24and now we have kids of our own. And we

21:26would like and love to raise our kids

21:29together. And this is threatened with

21:31this property with this proposal of this

21:33project because that building is a harsh

21:34reality of our future of not being able

21:38to live in our neighborhood city that

21:40was that we were born and raised in.

21:41Thank you. Thank you.

21:42>> Thank you for your time.

21:43>> Thank you. Is there any other speaker?

21:46>> Please comfort.

22:02>> Yes.

22:04>> M A R I E C E L E S C I N. My name is

22:08Marie Celestein. Um, I'm the daughter of

22:12also Marie Celelesen. That's the owner

22:13of 290 Venhorn Street. I'm sorry. Um, my

22:18mother will be right next to

22:22the house that's being built right now.

22:24>> Good evening, Marie. You have three

22:25minutes.

22:26>> Um, I have pictures. I don't know if you

22:28will be able to see it. Um, I hope

22:31that's not part of my three minutes.

22:43Um, I don't know. It's on my phone.

22:46>> Did you print them, ma'am?

22:47>> No, I did not print them. I did. I

22:49thought I, you know, I saw technology. I

22:51thought he was going to be able to see

22:53it. So,

22:54>> I

22:55don't know how we would share those. Is

22:57that possible?

22:59>> Uh, the dongle can

23:05import.

23:55Um, I don't know if everybody could see

23:57the first picture. The first picture is

23:59the picture of my mother's house.

24:01>> Okay, hold on, ma'am.

24:01>> Well, okay.

24:03>> Do you have any idea how many pictures

24:05you have?

24:06>> There's not a lot. There's one.

24:11>> Ma'am, when did you take these pictures?

24:13>> Today.

24:14>> Okay. And they depict

24:19>> what it is right now.

24:20>> What? What is right now?

24:21>> Like, yeah.

24:22>> The subject property.

24:23>> Yeah, the subject property.

24:25>> Okay. So, um,

24:26>> ma'am, we're gonna mark it as 01 for the

24:29record.

24:30>> And then I am gonna ask that you email

24:33those to the staff tomorrow.

24:37>> Okay.

24:38>> Okay.

24:39>> Okay. So, the first um picture is the

24:42picture of my mother's house. My mother

24:44had lifted.

24:44>> And can we put that on the screen?

24:47>> It is.

24:50>> Okay.

24:51>> My mother's house. Um my mother um got

24:55this house over 30 years ago. As you

24:57could see, this was like a uh for

25:00lowincome family house. These houses are

25:03not structured like the um same as the

25:06foundation as what it is today. These

25:09houses were bought on trailers. So, if

25:12you can see the side of the of the

25:16house,

25:17um the way that it is built, they

25:20literally put the house on top of like

25:24brick, not bricks. So, not bricks, but

25:27like a wall. All the all the plumbings

25:29are right underneath the house. If this

25:32construction is going on, the I feel

25:34that is going to impact my mother's

25:36house. My mother's 80 years old. she

25:38cannot afford for her to have um her her

25:44foundation be cracked. Also, I see that

25:47he's saying that he's going to be

25:49building three three um parking space.

25:53We already fighting this um with the

25:57school being right across from from our

26:01where we are is right across um in the

26:04driveway and also on the side is the

26:06city's pool. So during the school year

26:09we have the parking for the for the

26:11teachers and also the parents and also

26:14during the um summer v summer summertime

26:17we have the whole entire city that's

26:19also parking in our neighborhood which

26:22we don't mind because we are a

26:23community. And then also this the house

26:26that he's he's um he's trying to build

26:30is also um we are a family. This is not

26:34a for-profit organization or and stuff

26:38like that. I have my grandchild that

26:40live right next door to this and I do

26:43not want one of the one of the um houses

26:46or like for um what do you call that or

26:49Airbnb. We don't know who's coming in

26:51and out of this house. This is what we

26:54fight for and this is what we the city

26:56gave us an opportunity for us to grow

26:58our kids. Now, I feel like they are

27:01trying to take it away from us. They're

27:03trying to take that and try to push us

27:06away. A lot of people in the

27:08neighborhood are saying that they are

27:09afraid. The developers are coming in.

27:12They are taking houses that were next to

27:15them. They don't know who is going to

27:18live. I talked to people that was on

27:20Pacific Avenue. This lady said, "I don't

27:23if they they don't even know who's going

27:25to be living on on the big building that

27:28they are building now. The the

27:30neighborhoods in the community are

27:32scared. Why are we Why are the houses

27:35that was given to us by the by the city

27:38is being taken away? We are forced by

27:41developers right now to to to at least

27:44sell our house or let the foundation be

27:46cracked and and be gone."

27:48>> I'm sorry your time is up. Thank you so

27:49much.

27:53Is there anyone else from the public?

28:10>> Yes, I do.

28:13>> Franny Saledo. F R A N Y S A L C E D O

28:18and it's 300 Van Horn Street. Well, 300

28:21and 302 Van Street. Um,

28:24>> Freddy, you have three minutes.

28:25>> Thank you. Like Gabby and Celestine, my

28:29mom, my parents bought this this home 35

28:33years ago. Exa. Exactly. We just turned

28:3535 years.

28:36Um, not only was I raised and we were

28:39all able to play, but now my mom is

28:42helping me raise my four-year-old who

28:45plays with my cousin who lives next door

28:48and they ride their scooters together,

28:50bikes, the kids play. Even with the

28:53people that just moved in, they don't

28:55know them, but they're playing with the

28:56kids. It's home to us. It may not be

29:00home for I'm sorry, I'm emotional. It's

29:03It's not home for them, but this is our

29:06home.

29:08My uncle

29:10raised his kids and my parents raised us

29:13and we were all together, literally next

29:15door to each other. And now our kids are

29:17playing together. God forbid my son is

29:20playing with his scooter to go to

29:21swimming class to the school and

29:24something happens to him because these

29:26people want to take our community away.

29:30does not only the school traffic during

29:32the school year, which we already adapt

29:33to that, but on top of that, the pool

29:36traffic. So when school ends, it's the

29:38pool. Then now the lofts behind 22

29:41school, they don't get they street park.

29:45Two, three years ago, we used to find

29:46parking like this in our block. Now we

29:49can't.

29:50But it's a growing community and we like

29:53it. But we love our families. Our

29:56families, they raised us there. We want

29:58to raise our kids there. I would love to

30:00keep this home in my family just like my

30:03parents did for us. Now, next door to me

30:05is my older brother with his two kids.

30:09It's just our legacy. Like, this city is

30:12our home. It's your home, too.

30:16We don't want the developers just to

30:17come and take our land and our family

30:20traditions away from us because God

30:23forbid what? I won't be able to see my

30:25cousin, my little cousin play with my

30:28son. My son is going to 22 school.

30:33So now with all the disruptions taking

30:35him to school, I got to be careful. God

30:37forbid something falls on him.

30:40Like they're just taking our community

30:41away from us. Just like Celestine said,

30:44this was for lowincome family, but now

30:46we build a bond. We've been there 35

30:49years. That's all. Thank you.

30:51>> Thank you.

30:54>> [applause]

30:55>> Is there anyone else from the public?

31:06>> Hello.

31:07>> How are you?

31:11>> Yes, it is. Yes, it is.

31:12>> Spell your name and give us your home

31:13address, please.

31:14>> Yes. My name is Terrain Filillmore.

31:15That's T E R A I N. Last name Filmore. F

31:19I L M R E. And um I lived at 142144

31:24Maple Street. My family um been here for

31:27the entire time. Um I actually

31:29>> You have three minutes.

31:30>> Yes. Thank you. Um so I grew up in this

31:32neighborhood and when we first um were

31:34here, this neighborhood actually was one

31:36of the most dangerous neighborhoods in

31:37Jersey City. So as we saw things change

31:40in the neighborhood with certain things

31:41like Lafayette projects and we saw the

31:43development of that and the development

31:46in that is much better now. The the

31:48neighborhood is a lot um safer now. We

31:50had to go through a lot um to to have

31:52like like they said to have this

31:53community withstand and be a family

31:56community. I'm talking about some a lot

31:57of things happened in this neighborhood.

31:59Now that the neighborhood is much better

32:01and safer, why are we now building

32:04trying to take away the community that

32:06we um took so long to build as well as

32:09like like she stated, these houses were

32:12were um you know delivered on a truck um

32:15sorry a flat bed. So, they cannot

32:17withstand this type of construction. It

32:20could make um the house unstable and

32:22make cracks. So, eventually you would

32:24have to sell. And there's also a 95/5

32:27rule. So, if you do sell, there's an

32:29issue is that you're not going to get um

32:31a large percent of your money back. I

32:33believe it is true cuz I read several

32:34articles on that and people were

32:35complaining about that. So, as well as a

32:38property tax like there was in years

32:40that the property tax actually doubled

32:42and this is allegedly a lowincome family

32:45um a community. So, how can we withstand

32:47all these changes? Things are changing

32:49rapidly. And you have to also consider

32:51that this is a school zone. So, there's

32:53several children um 365 days a year,

32:56they're back in the school. Um they're

32:58playing um you know, in the park, you

33:00know, so to have that construction is is

33:02highly dangerous for children and

33:04elderly as well. You know, this

33:06community is there for a purpose um for

33:09the city and it's now finally a safer

33:11environment. And um I just think that

33:14it's an issue as well as it's a high

33:17flood zone area and I believe that all

33:20this construction is causing problems.

33:22The other day um the lights are

33:23flickering like back and forth. I have

33:25no idea why. That's never really

33:27happened and there's just things that

33:29are happening that we just want to see.

33:32As well as that property is way too

33:34close to the other properties. Um it's

33:37just way too close. like he said, he has

33:39to do a lot of compliance just to make

33:41it fit. But it doesn't fit. Why don't

33:44you have that property and a open lot

33:47that's already open? You know, we have

33:49this community. It doesn't even match.

33:50Like he said, it doesn't match what

33:52these are low, you know, they're

33:54two-story homes. Now you're building

33:55this large property in the area that it

33:58just doesn't fit. It It doesn't even

33:59look right. And half the other

34:01condominiums are half. They're not even

34:04full. So, I just don't I just don't

34:06understand it. And that's just that's

34:08just just what I have to say.

34:10>> Thank you.

34:11>> Thank you.

34:14>> Is there anyone else from the public?

34:16>> Come forth, please.

34:25>> Okay.

34:25>> Okay.

34:29>> Yes.

34:32>> Can you speak into the mic? Sorry, I'm

34:33small. Um, my name is Marley Mangro. M A

34:36R L Y N. Um, last name is M O N E G R O

34:39and I live at 296 298 Van Horn Street.

34:43>> Marilyn, you have three minutes.

34:44>> Okay. I also have one picture that I

34:46would just like to show. I don't know

34:48how that would

35:22Okay.

35:22>> So, ma'am, before you start, did you

35:25take this photograph?

35:26>> Yes.

35:27>> When did you take this photograph?

35:28>> Um, earlier today. And it obviously

35:31depicts what is shown in the photograph

35:33as of earlier today.

35:35>> Yes, correct.

35:35>> And what is it that it depicts?

35:37>> Um, so I just want to show you how close

35:40the um properties are on the left side.

35:43That would be um my property and the

35:45property of the proposed project. Um,

35:50>> sorry.

35:51>> Make sure that it's

35:56>> N there you go.

35:57So, um, our property 296 298 Van Horn is

36:01on the left and on the right is the site

36:03of the proposed property.

36:05>> So, one second, ma'am. We're going to

36:06mark this as O2 and after tonight,

36:09you're going to have to email it into

36:10us.

36:11>> Yes.

36:11>> Thank you.

36:12>> Okay. So, good evening, members of the

36:14planning board. My name is Marla Mongro.

36:16I am a direct neighbor who lives

36:17immediately next door to the proposed

36:19project. I'm here tonight to

36:20respectfully oppose this application and

36:22the request to see variance. I

36:25understand that development is a part of

36:26a growing community. However,

36:27development should also be consistent

36:29with the existing character, scale, and

36:31quality of the neighborhood. I am

36:33concerned that this proposal does not

36:35meet that standard. The homes along Van

36:37Horn Street have an established

36:38residential character, which with a

36:40relatively consistent

36:43scale, setbacks, and appearance. The

36:45proposed development appears

36:46significantly larger and out of

36:48proportion with the surrounding homes.

36:50Approving this application could

36:51fundamentally change the existing

36:53streetscape and establish a troubling

36:55precedent for additional overdevelopment

36:57in the area. As a neighbor directly next

37:00door, I'm particularly concerned about

37:01the impact this project will have on my

37:03property and my family. Throwing

37:06construction, we can expect dust,

37:07debris, excessive noise, vibrations,

37:09heavy equipment, construction vehicles,

37:12deliveries, and increased traffic. These

37:14are not minor inconveniences when you

37:16live immediately adjacent to a

37:17construction site. They raise legitimate

37:20concerns about property damage, safety,

37:21access, and our ability to peacefully

37:23enjoy our homes. I am also concerned

37:26about the impact the construction

37:27activity will have on our shared

37:28community parking lot, which is an

37:30important resource for existing

37:32residents. Construction vehicles,

37:34equipment, deliveries, and workers could

37:35interfere with access and reduce

37:37availability for of parking for the

37:39residents who currently depend on it. I

37:42also want to emphasize that these

37:43concerns are not limited to my

37:45household. Many residents in the

37:46surrounding area share these concerns

37:48and neighbors have come together to sign

37:50a petition opposing this application

37:52that demonstrates that this is a broader

37:54community concern, not simply an

37:55individual objection from one

37:57neighboring property owner.

37:59Most importantly, I asked the board to

38:01cons care carefully consider whether the

38:03request to see variance is truly

38:05justified. The applicant may benefit

38:07from being permitted to construct a

38:09larger development, but the surrounding

38:11residents would bear many of the

38:12resulting impacts. We do not see a

38:15corresponding public benefit that

38:16outweighs the detriment to the existing

38:18neighborhood and its residents. The

38:20question before the board should not

38:21simply be whether the proposed project

38:23benefits the applicant. Of course, it

38:25does. The question is whether granting

38:27this variance provides a sufficient

38:29benefit to the community to justify the

38:31additional impact placed on the existing

38:33residents and the established character

38:35of the neighborhood. We believe that it

38:37does not. For these reasons, I

38:39respectfully ask the planning board to

38:40deny this application and the request to

38:42see variance and to protect the existing

38:45character, safety, quality of life, and

38:47residents of Van Horn Street. Thank you

38:49for your time and consideration. Thank

38:51you.

38:54>> Is there anyone else from the public?

39:04>> Each morning you give tonight is going

39:06to be the truth, the whole truth. the

39:07truth.

39:07>> I do.

39:08>> For the record, can you spell your name

39:09and give us your home address, please?

39:10>> Clarissa Filmore Brown. C L A R Y S A F

39:13I L M O R E Brown. B R O W. I live at

39:17142 144 Maple Street. Miss Brown, you

39:20have three minutes.

39:21>> Thank you. Thank you for your time on

39:24this matter of um varianc for

39:26landscaping waiver. I'm opposed to the

39:29building of fourtory rooms.

39:32>> Can you speak into the mic, please?

39:35Oh, I am opposed to the building of the

39:38fourstory six family unit threecar

39:41parking at 292 um Van Horn Street. The

39:45trees and shrubs plant planted in the

39:47ground is very important in our

39:49neighborhood. The benefits are storm

39:51water management which prevents

39:52flooding, erosion control and cleaner

39:56air. I I live one mile from Liberty

39:59State Park which is also where Hudson

40:02River is located. during very heavy

40:04rainstorms. There was flooding from um

40:07Grand Street to Johnson Street. Um

40:13this is a a flood zone. The trees and

40:18shrubs in the ground absorb the water to

40:22prevent structural damage to our homes.

40:25I also have a question um while I was

40:27reading the PDF

40:29for um GDA

40:33general development. I have some

40:36questions about it. I don't know. Can I

40:38give that to them or Okay, then I'll

40:40read from it. It says right here um

40:42>> have it ma'am, but go ahead.

40:44>> I'm I'm sorry. You have it.

40:45>> We have a copy of it. Give us the

40:47reference. So my question is for number

40:50one where it says general development

40:52application incorrect lot area which I

40:55don't know what that means. Can you

40:57explain that? Another one was for when

40:59it says supporting supporting report and

41:03documents storm water management report.

41:05It says please provide all new all new

41:08developments of five or more units

41:10regarding regardless of lot size or area

41:14disturbance. It should be considered a

41:16major development of Lafayette Park

41:19redevelopment plan. These are the ones

41:22I'm the ones I'm talking about is the

41:23highlighted ones that really stood out

41:26to me. The height and feet and stories

41:29incorrect building height standard check

41:31zoning code is the roof um attendant I'm

41:36sorry abundance 14 ft or 10 ft. Please

41:41check maximum is 10 ft permitted. set

41:43back, step back, and buffer area. It is

41:46an interior lot, not a corner lot. So,

41:49the the property is in the middle. It's

41:53not a corner house. So, there I don't

41:54know what they're basing their their

41:56facts on or their data on. Um, I read

41:59it. It also says set back be 0 feet and

42:02rear will be 25 ft. Landscaping and

42:05street trees. The landscaping percent

42:07does not match the percentage in the

42:09principal point statement. So, I mean, I

42:12read these this information. It just

42:15doesn't seem like it will fit.

42:17Okay. Um,

42:20this section right here is still under

42:23number five, archi plan requirement.

42:27>> I'm sorry, your time is up.

42:29>> Thank you.

42:30>> Thank you.

42:32>> Anyone else from the public?

42:38>> Madam Chair, there's no one from the

42:39public. I would like to close the public

42:40portion.

42:41>> Second.

42:42>> Public is closed. Mr. Burke, would you

42:44like to address some of the concerns

42:46from the community?

42:49>> Thank you, Madam Chair. Uh I I can say

42:52two things from what I I hear. One is

42:55respecting all the comments. um the um

42:59any damage done during construction or

43:02uh noise or anything else is it's it's

43:04not the jurisdiction of this board, but

43:06there are rules and regulations that

43:07that anyone h any applicant has to

43:09follow, any developer has to follow. So,

43:12[clears throat] the applicant's not

43:13allowed to uh to do anything that would

43:17damage the water flow into someone

43:19else's uh uh house or apartment uh and

43:22would have to fix it. and insurance

43:24carriers are alerted uh during the

43:26construction process uh to indemnify the

43:29other insurance carriers to make sure if

43:31any damage is done the applicant would

43:34have to pay for that. That's number one.

43:36Uh number two, from what I heard uh the

43:38testimony of uh the architect, the um

43:41flood situation actually improves uh

43:43through this um uh development. Um so to

43:47the extent that there's concerns about

43:50um flooding as a result uh it's the

43:52opposite. I think the situation is

43:54better. And then the applicant uh and

43:57the application they comply with the

43:59redevelopment plan except for uh the uh

44:02landscaping and they've improved that.

44:04Um and as the discussion unfolded uh

44:07it's almost a uh u situation where uh

44:11it's sort of a whack-a-ole. If you if

44:13you increase the landscaping, you have

44:15to get rid of parking or something else.

44:17So one the elim the complete elimination

44:20of the variance for landscaping would

44:23result in a variance request for

44:25something else. So I I don't think that

44:27improves the situation. Thank you.

44:32>> Thank you.

44:34Do you mind addressing the safety

44:36concern um for the properties

44:38surrounding the area as mentioned that's

44:40most of those properties were um came on

44:44a flat bed and was put together and is

44:47currently on center blocks if I may say

44:50that.

44:50>> That's correct.

44:51>> Okay.

44:53I I would hope that the contractor, if

44:56this project is approved, would would be

44:58uh aware of that and would take that

45:00into consideration. Um because it is it

45:03sounds like a a more sensitive situation

45:06than typical. Uh but it still is the

45:08responsibility of the contractor and

45:10therefore the owner who is the

45:11applicant.

45:12>> Okay. Thank you.

45:14>> Any board comments? Sure. Go ahead.

45:16>> Yeah. I guess two two questions for

45:18staff maybe to just clarify um as it

45:20relates to this. The first is uh the

45:22flood zone. Can you clarify if this

45:24property is in a flood zone?

45:26>> Yes,

45:26>> it is in a flood zone. Yes.

45:28>> And was that considered as part of the

45:30requirements of the design? Is it

45:31compliant related to that?

45:33>> Uh yes, it is compliant with the G

45:36requirements for the flood zone.

45:38>> Thank you. And and the second question

45:39for staff, um I believe one of the

45:41public speakers was commenting about the

45:43completeness checklist. And I don't know

45:45if you could just explain for the record

45:46kind of what that document is and what

45:48it represents.

45:49>> Yes. Uh so that was a previous checklist

45:53that was given to the applicant pointing

45:55out all of the uh issues staff

45:57identified with the project. Um once the

46:00application is deemed complete, meaning

46:02all those items are addressed, uh they

46:04are not provided with a new checklist

46:07um indicating that there are no

46:09comments. So

46:12um the woman who spoke uh she was using

46:16an old version or the most recent

46:19version. There was or there is not a new

46:22version provided when everything is

46:24compliant.

46:26>> And Ben, the comments that she was

46:27reading were obviously your comments

46:29reviewing the application finding

46:31inconsistencies between what was

46:33submitted and what was actually stated

46:35in some of the submission whether it's

46:38the principal points or the like.

46:40Correct.

46:43>> Thank you. And then Madam Chair, one

46:44question if I may for the applicant.

46:46>> Sure.

46:46>> Um, one of the public speakers commented

46:48about the lack of color. I don't know if

46:49you could just pull up the architectural

46:50rendering and if you could speak at all

46:52to the

46:53>> I'll bring back the architect for that.

46:55>> Yeah. Um,

47:15Yeah, the

47:19go all the way back to the top. All

47:21right. The Yeah, the renderings looks a

47:23little muted right this moment, but we

47:25are going to have like a more of a beige

47:27brick and like and and a gray facade

47:30with some um gray colors as well. Um, we

47:33were trying to like be

47:36um, respectful of the neighborhood. A

47:39lot of the buildings in the neighborhood

47:40are already gray in color. So, we're

47:42trying to stay with that that that

47:43pallet and we're trying to like just

47:45bring in some new pallets in terms of

47:47the um, in terms of what the brick is.

47:49So, if we go down a little bit further,

47:54you can see like these are the these are

47:56the colors of the, you know, what we're

47:58doing with the the the cast stone, the

48:00the um the the cement um the cement

48:05board and then uh cement board siding.

48:08And we even changed uh from the last

48:11meeting

48:12we went and changed all the siding from

48:15uh vinyl siding to a cement board siding

48:17per the board's um discussion and we

48:21have the uh light gray uh brick. But we

48:25can, you know, we have no problem um if

48:27the if the neighborhood would like us to

48:28make a more of a bolder statement, I'd

48:30be more than happy to change the colors

48:32of the of the building

48:34>> to uh anything they want.

48:36>> I'm sorry, ma'am. Can you just provide

48:37testimony as to what the the color

48:39schemes of the neighboring buildings and

48:41the existing buildings are?

48:42>> Yeah, there's a lot of um gray build

48:44grayish buildings in the neighborhood

48:46and there's some tans. So, that's what

48:48we're looking at. Um

48:53>> okay, you cannot shout out from the

48:56audience, please.

48:57>> The houses are like houses are gray. Not

49:00I'm considering the houses buildings,

49:02but the houses themselves are um

49:05significant similar colors to what I'm

49:07trying to provide here. I was trying to

49:10stay within the conflex of the

49:12neighborhood, but we can like I said,

49:14anything if I met with the neighborhood,

49:16I could see if they would like me to add

49:18some more color to the building.

49:21>> Thank you.

49:22>> Thank you.

49:22>> I have a I have a question, Madam Chair.

49:25>> Um why vinyl sighting? Why not like a

49:27Hardy board or something like that? We

49:29actually had the discussion last time we

49:30changed it from the vinyl to the Hardy.

49:33>> Okay.

49:33>> On the last meeting. All right.

49:35>> I changed it and reflected on these

49:36plans, the latest plans.

49:39>> Any other board comments?

49:42>> Ben, can you wrap this up quickly,

49:45please?

49:45>> Sure. Uh, so the Lafayette redevelopment

49:48plan has requirements for parking and

49:50for landscaping uh by meeting the

49:52parking requirements for the permitted

49:54density. This application is essentially

49:57unable to meet the landscaping

49:58requirements. Uh the landscaping

50:00variance is made up for by uh greatly

50:03exceeding the green area um storm water

50:07uh benefits with green roofs,

50:09underground storage and permeable

50:10pavers. Uh whereas a G um which is a

50:15storm water requirement uh of 0.25 is

50:19required at minimum. uh they were

50:21providing a amount of 0.44

50:26um after the board recommended that they

50:29add more landscaping.

50:31Um the application meets the setback and

50:35bulk requirements as well as the number

50:37of stories.

50:39Um with that all in mind, uh staff

50:42recommends approval with the uh provide

50:45the applicant agree to the conditions in

50:47the staff memo dated April 13, 2026. The

50:51applicant agrees.

50:53>> I'd like to entertain a motion.

50:55>> Madam Chair, I I'll move that we approve

50:57the application number P2025-0138

51:03with a condition outlined in the staff

51:05report.

51:09>> Can we get a second?

51:10>> Second.

51:11>> Thank you.

51:12>> All right. Uh, Vice Chair Patel.

51:14>> Hi.

51:15>> Commissioner Conway.

51:17>> No. Commissioner Stamato.

51:20>> Hi,

51:21>> Commissioner Capers.

51:23>> Um, I just I mean, we heard the

51:25community. I just want the applicant to

51:27just keep in mind the concerns of the

51:29the community and just, you know, keep

51:32that in consideration, but I vote I

51:36>> Commissioner Kaplan

51:38>> based upon what the vote is before us in

51:40terms of the application that other than

51:42a landscaping variance isn't really

51:44seeking any other variances. I tend to

51:47agree to the testimony that the parking

51:49is more important and would be

51:50detrimental to lose in exchange for

51:51landscaping, but I do have sympathies to

51:53the community. Um, but I believe that

51:55the development is aligned with with the

51:57rules otherwise. So, I will vote yes. I

52:00>> and Madam Chair Congadan,

52:02>> uh, so I want to thank the community for

52:03coming out and voicing your concerns

52:05here. Um,

52:07in regards to the variances requested, I

52:09think the um they they're not

52:12detrimental to the um public, but I

52:15would urge that the developer work very

52:19closely with the community um in hand

52:23inand in getting this project um

52:26complete. So my vote is I

52:28>> motion carries, five in favor, one

52:30opposed.

52:31>> Thank you. Yeah, if if I may, why don't

52:33u we add just a condition that the

52:35applicant will meet prior to

52:36construction, offer the community a

52:38meeting, and uh no. Okay, then I

52:42withdraw that.

52:42>> I would add the condition, but it's up

52:44to the community if they would like to.

52:46>> Absolutely.

52:50>> I'd like to move on to new business.

52:52Thank you, council.

52:53>> Thank you very much.

52:55>> Review and discussion of certified

52:57artist Joe Vez. Formal action may be

53:00taken.

53:05Ben, is that you?

53:07>> Yes.

53:07>> Okay.

53:09>> The artif artist certification board

53:12deemed the applicant meets criteria 1,

53:15two, three, four, and five, and staff

53:18recommends approval as a certified

53:19artist.

53:20>> Thank you. Any board comments?

53:24>> No.

53:25>> Anyone from the public?

53:28>> There's no one from the public. I'd like

53:29to close the public portion.

53:32>> Second.

53:32>> Public is closed. Can I I'll entertain a

53:35motion.

53:37>> Madame chair, I would like to

53:40approve the application number

53:43review and discussion of certified

53:45artist Joey Veles formal action uh with

53:48a condition outlining staff report.

53:52>> Can we get a second?

53:53>> Second.

53:54>> Thank you.

53:55>> All right.

53:55>> Uh Vice Chair Patel. I

53:58>> uh Commissioner Conway

54:00>> I

54:00>> Commissioner Stammato

54:02>> I

54:02>> Commissioner Capers

54:03>> I

54:03>> Commissioner Kaplan

54:04>> I

54:04>> and Madam Chair Congadan

54:06>> I congratulations um Mr. Villas, I'd

54:10like to call KB2026-010

54:130120. It's a review and discussion of

54:16the Let's Move JC Transportation Master

54:20Plan, a new mobility element of the

54:23Jersey City master plan. Formal action

54:25may be taken.

54:27>> Madam Chair?

54:28>> Yes.

54:28>> Uh just for the record, I'd like to

54:29recuse myself because my department has

54:32been uh behind this plan, but I I wish

54:33them the best of luck in their

54:34presentation.

54:35>> Thank you.

54:39Just be

55:05>> okay. Of course.

55:12>> Okay.

55:15>> The truth, the whole truth, and nothing

55:16but the truth.

55:16>> I do.

55:19>> Good evening, Ally.

55:20>> Good evening. Uh, so I'm Eli Gooseman.

55:22I'm a transportation planner with the

55:24Department of Infrastructure, and I'm

55:26here to speak tonight about Let's Move

55:28JC, our transportation master plan. So

55:31in 2024, the division of uh

55:33transportation planning applied for a

55:35grant to update our circulation element

55:37of the master plan. The last time this

55:39was updated was in 2013. So since then,

55:42there's been a lot of there's been a

55:44growing body of planning work along with

55:45a uh along with our rapidly growing

55:47city. So there was really a need to

55:49bring together these efforts under a new

55:50cohesive vision for our transportation

55:52system.

55:55So in this presentation, I'll quickly go

55:56through some of the project's goals and

55:58objectives, our existing condition

55:59findings, our community outreach

56:01results, as well as the recommendations

56:03that come out of this process.

56:06So throughout this process, uh we

56:09through a public outreach and speaking

56:11with our stakeholders, we decided to

56:13focus the plan around these four key

56:15goals. The first one being creating an

56:17inclusive transportation system that

56:18accommodates all users, providing

56:20reliable ways to get around the city,

56:22delivering high value affordable

56:24transportation, and supporting a quality

56:26of life by providing transportation that

56:27enhances daily living.

56:31So, we kicked off the project last

56:32summer and immediately began a

56:34comprehensive review of the

56:35transportation system while also holding

56:37pop-up events throughout the city. In

56:39the fall, uh, we launched a public

56:41survey to better understand what

56:43residents saw as the largest

56:44transportation issues in Jersey City.

56:46The results helped inform and prioritize

56:48the actions in the recommendation

56:49section. And along with conducting uh,

56:52we also conducted a modeling exercise

56:53that I'll touch on a little bit later.

56:55This was also followed by two

56:56neighborhood planning efforts uh, one

56:59being in Journal Square and the other

57:00being in the west side uh, which were

57:02also used to develop more focused plans

57:04for each neighborhood. Finally, this

57:06spring, uh, the team developed a list of

57:08recommendations that were, uh, we vetted

57:10them by the stakeholders as well as the

57:12public. And this past June, we released

57:14the final plan.

57:19>> There we go. So, public outreach was

57:22really the basis of this study. Um, and

57:24over the course of the 12 months, we

57:25engaged with over 4,000 unique

57:27participants. Uh, that was through

57:29pop-up events, stakeholder meetings, an

57:31online survey, uh, as well as some

57:33workshops that we held. We also made

57:36sure that our regional partners were

57:37involved throughout the entire uh

57:39process with multiple eating meetings

57:40with uh NJ DOT, NJ Transit, the Port

57:44Authority, Hudson County, and our

57:46neighboring municipalities to make sure

57:47that our vision also matched with their

57:49visions. Um and the feedback we received

57:52through the process was directly

57:53incorporated into the final

57:54recommendations.

57:57So the first first major task that we

57:59undertook in this study uh was a

58:01comprehensive existing conditions

58:03analysis to better understand our

58:05transportation system today and

58:06understand travel patterns as they

58:08exist. Uh and also we wanted to

58:10understand how they've changed over the

58:11past few years.

58:13So, you all are very familiar with all

58:15of the transportation options we have in

58:17Jersey City, but I just want to

58:18highlight that uh we found that 850,000

58:21jobs are accessible within 30 minutes uh

58:23using transit. And for all trips, not

58:25just commuting trips, 51% are done by

58:28driving. The other 49% are made up of

58:30walking, transit, and biking. Uh both

58:33these access to job numbers and

58:34non-driving mode shares are uniquely

58:36high compared to our pure cities.

58:40So, as mentioned, Jersey City is growing

58:41quickly. The population increased by 22%

58:44from 2010 to 2020 and is projected to

58:47increase another 25% over the next 25

58:50years. Compared to our peers, uh we are

58:52growing faster than almost every other

58:54major metropolitan area, which you can

58:55see on that graph on the right. As a

58:57part of this analysis, we also found

58:59that our senior population has grown uh

59:01pretty uh significantly as well. So, we

59:03want to ensure that all residents, no

59:04matter their age or ability, can safely

59:07and comfortably get around Jersey City,

59:09and that was a critical element of the

59:10final plan.

59:13So, while it's no secret that Jersey

59:14City is a diverse city, uh this table

59:17shows that the percentage of the

59:18population that that that identifies as

59:20a minority uh is much higher than the

59:22New the North Jersey region as a whole.

59:25So these factors uh are incredibly

59:27helpful for identifying which language

59:29to transfer or translate our materials

59:31into and also considering how we factor

59:33these into our final recommendations.

59:36So on the table on the right you'll see

59:37that growth is also not expected to

59:39happen evenly across the entire city. So

59:41over the coming years more growth is

59:43projected to happen in the west side

59:45journal square and Bergen Lafayette.

59:50So as mentioned, Jersey City has a

59:52really unique modal spit uh split

59:54compared to our peer cities. So uh two

59:57of the largest postcoid changes uh that

59:59we saw or the biking has tripled uh

1:00:01since 2019 and driving has uh increased

1:00:0510% since 2019. We also found that uh

1:00:0860% of all trips that start in Jersey

1:00:10City and within Jersey City, which has

1:00:12an impact on how we plan for

1:00:13transportation, while the remaining

1:00:15trips uh primarily travel to

1:00:16destinations outside of Hudson County.

1:00:21So now that we uh now that we got a

1:00:23better understanding of how people

1:00:24currently get around Jersey City, we

1:00:26wanted to understand how does the public

1:00:28want to get around in the future. So we

1:00:30asked residents uh asked the residents

1:00:32through ask residents this question

1:00:34through our public survey and there was

1:00:36a clear preference for taking more

1:00:37transit, walking more and uh driving

1:00:40less was uh the least preferred future

1:00:42option while responses around biking

1:00:44were more mixed

1:00:47during the course of the study. Uh we

1:00:49received thousands of responses through

1:00:51the survey, public meetings and other

1:00:52outreach efforts. The major themes that

1:00:55emerge from the feedback are organized

1:00:57here. Throughout the engagement process,

1:00:59we consistently heard that the community

1:01:01members want safer streets, better

1:01:02transit connectivity, and more equitable

1:01:04transportation investments across the

1:01:06city. Residents also raise concerns

1:01:08about enforcement, particularly about

1:01:10aggressive driving, illegal parking, uh

1:01:12which are directly related to the strong

1:01:14desire for traffic calming, and safer

1:01:16conditions for all street users.

1:01:20So in addition to evaluating what is

1:01:22currently happening on our streets, the

1:01:24project team also wanted to understand

1:01:25what could be expected based on current

1:01:27trends. So to do this, we conducted a

1:01:29scenario planning exercise that looked

1:01:31at three potential future scenarios. The

1:01:33first scenario looked at the transport

1:01:35or at what the transportation system uh

1:01:37could look like if current growth in

1:01:39transportation invest investments

1:01:41continued as it is today. The second

1:01:43looked at a scenario where the city

1:01:44prioritizes investment in city-owned

1:01:46assets uh primarily focusing on active

1:01:49transportation.

1:01:50The third looked at pairing those local

1:01:52investments with significant regional

1:01:54transit investments.

1:01:56The findings showed that continued

1:01:58growth would increase demand and

1:02:00congestion without the additional action

1:02:02and that the current transportation

1:02:03system would begin to reach its limits

1:02:05if no action was taken.

1:02:08City investments in active

1:02:09transportation can help shift more trips

1:02:11to walking and biking, but the impact

1:02:13alone is not strong enough. Combining

1:02:15city and regional transit investments

1:02:17produced the strong results for

1:02:19strongest results for Jersey City and

1:02:21significantly shifted the mode share and

1:02:22helping preserve the capacity and

1:02:24functionality of our transportation

1:02:25system. These findings helped inform the

1:02:27priorities and recommendations included

1:02:29in the plan.

1:02:31So after months of data crunching,

1:02:33outreach, we developed a long list of

1:02:35recommendations that were crafted and

1:02:36prioritized for Jersey City.

1:02:39So the plan split these recommendations

1:02:41into big moves and citywide

1:02:42recommendations. The big moves are high

1:02:45impact recommendations that may take

1:02:47more time and effort to implement, but

1:02:49are important for the city to focus on

1:02:51as we continue to grow. The city-wide

1:02:53recommendations span across the entire

1:02:55city. While all these are important uh

1:02:57part of our transportation vi vision uh

1:02:59many of these require partnerships with

1:03:01other agencies and organizations to

1:03:03implement. For example, the city will

1:03:04need to work with NJ Transit to advance

1:03:06many of the bus and light rail related

1:03:08recommendations.

1:03:10In the plan, we've identified the

1:03:11partners the city will need to work with

1:03:13uh to implement each recommendation and

1:03:14their organizing short, medium, and

1:03:16long-term activities.

1:03:18Uh we also went through a prioritization

1:03:20process that considered both public

1:03:22feedback in alignment with the plan's

1:03:23overall goals so we could identify which

1:03:25recommendations should be prioritized.

1:03:28So now I'll go through the seven big

1:03:30moves. So here's a summary of those

1:03:33seven. So the first big move uh focuses

1:03:35on Journal Square and includes several

1:03:37improvements to the area. Uh this

1:03:40includes creating a public plaza on

1:03:41Bergen Avenue with access limited to

1:03:43transit and emergency vehicles. It also

1:03:45includes transit priority improvements

1:03:47to improve improve bus flow around

1:03:49Journal Square. Bicycling, the plan

1:03:51recommends uh connecting the existing

1:03:53and planned network to the west side and

1:03:55downtown as well as future greenways.

1:03:57Finally, the city will need to

1:03:58coordinate with Port Authority and PATH

1:04:00on improvements to the Journal Square

1:04:01Plaza and station.

1:04:04The second big move focuses on expanding

1:04:07the greenwork network citywide to

1:04:09improve connectivity and ensure access

1:04:11to all parts of the city. The plan

1:04:13identifies the following greenways as

1:04:15priorities for expanding and

1:04:16strengthening the network. So you can

1:04:17see the Six Street embankment, Bergen

1:04:19Arches, Hudson River, River Riverfront

1:04:20Walkway, Mil Creek Greenway, Essex

1:04:23Hudson Greenway, and the Hackinack River

1:04:25Greenway.

1:04:28The third big move focuses on improving

1:04:30safety within and between our

1:04:31neighborhoods through a community routes

1:04:33and low traffic neighborhood program.

1:04:34These programs aim to mitigate the

1:04:36impact of traffic on residential

1:04:38neighborhoods by calming traffic,

1:04:39reducing cut through traffic and

1:04:41creating a branded act active

1:04:43transportation network that connects

1:04:44residents to key destinations.

1:04:48The fourth big move focuses on

1:04:50comprehensive overhaul to the city's

1:04:52parking system to manage uh to manage

1:04:54the curb more efficiently and fairly.

1:04:56This includes demand-based curb pricing

1:04:58where parking prices, hours, and

1:05:00locations can be adjusted based on

1:05:01demand to improve availability and

1:05:03reduce congestion caused by drivers

1:05:04circling for parking. It also includes

1:05:06more flexible curb regulations,

1:05:08including additional short-term parking,

1:05:10commercial loading zones to better

1:05:11support businesses, and reduce double

1:05:13parking throughout the city. For

1:05:15residential parking parking permits, the

1:05:17plan recommends simplifying permit rules

1:05:19and reviewing the current current

1:05:20pricing. And finally, the plan

1:05:22recommends modernizing enforcement in

1:05:25including uh exploring camerabased

1:05:26enforcement for pave parking and loading

1:05:28zones to improve compliance.

1:05:31The fifth big move focuses on advancing

1:05:33policy and governance strategies to

1:05:35better coordinate transportation

1:05:36planning and ensure that growth is

1:05:38accompanied by appropriate

1:05:39transportation investments. This

1:05:41includes establishing coordination

1:05:43roundts to facilitate more regular

1:05:45coordination between city and regional

1:05:47um agencies. It also includes developing

1:05:50impact assessment guidelines and

1:05:52potential developer requirements to help

1:05:54fund transportation improvements and

1:05:55other measures needed to manage the

1:05:57impacts of new development.

1:06:00The six big move focuses on partnering

1:06:02with Hudson County to study, develop,

1:06:04and implement bus rapid transit along

1:06:06JFK Boulevard to improve transit service

1:06:09uh throughout the city. The goal is to

1:06:11improve reliability and speed while

1:06:12strengthening connections between the

1:06:14Heights, Journal Square, Westside,

1:06:15Bergen, Lafayette, and Greenville. This

1:06:17effort would also require close

1:06:19coordination with NJ Transit to ensure

1:06:21that any improvements are integrated

1:06:23into the existing transit network. And

1:06:25the final big move focuses on working

1:06:27with NJ DOT on the redesign of Route 440

1:06:30to better serve Jersey City's growing

1:06:31population or growing transportation

1:06:33needs. The goal is to improve safety,

1:06:36better accommodate walking, biking, and

1:06:38transit, and improve pedestrian

1:06:39crossings. The redesign will also need

1:06:42to address increasing congestion along

1:06:43the corridor and ensure that route 440

1:06:45continues to function as the area

1:06:47continues to grow.

1:06:50So, it's a quick very brief overview of

1:06:52this those seven uh recommendations. And

1:06:54then we have a series of citywide

1:06:56recommendations that I mentioned that

1:06:57require more or additional um

1:06:59coordination

1:07:01um and also weren't as high of a

1:07:03priority as those seven. So, in addition

1:07:05to the big moves um we have the set of

1:07:07recommendations. The recommendations are

1:07:09grouped into six categories being

1:07:10transit, multimmoal, infrastructure and

1:07:12resilience, active transportation and

1:07:14freight, parking and curb management,

1:07:15policy and programs. So together these

1:07:17recommendations provide a framework for

1:07:19improving our transportation system. So

1:07:21I won't go through all these because

1:07:22there are a lot uh under each category.

1:07:24Uh but all of these are included on the

1:07:27project website where we have project

1:07:29our recommendation pages that go into

1:07:30depth on what each of these is.

1:07:34So, active transportation safety,

1:07:36infrastructure and resilience,

1:07:38parking, freight and curbside, uh

1:07:40management,

1:07:42and then policies and programs. And

1:07:44that's again another very quick uh

1:07:46summary of all the recommendations uh

1:07:49outside of the big seven. So, the last

1:07:51part I'm going to talk about is the

1:07:52small area plans.

1:07:55Um so as I previously mentioned uh we

1:07:57did two targeted um planning efforts in

1:08:00the journal square and westside areas.

1:08:03The purpose of these plans was to

1:08:04address the unique transportation

1:08:06challenges associated with uh each of

1:08:09these neighborhoods which are

1:08:10experiencing high levels of development

1:08:11and are expected to grow or are

1:08:13currently growing very quickly. Each

1:08:15plan includes multimmodal

1:08:16recommendations organized into short,

1:08:18medium and long-term time frames. And

1:08:20the plans were informed by uh community

1:08:22and stakeholder engagement. We held

1:08:23workshops uh in each neighborhood and

1:08:26also engaged with our um infrastructure

1:08:30partners such as the Port Authority and

1:08:31NJ Transit. And these small area plans

1:08:34complement the broader citywide uh plan

1:08:36and are also included in the

1:08:37recommendations and initiatives.

1:08:40So here are some of the key short,

1:08:42medium, and long-term priorities

1:08:44identified for the west side. In the

1:08:46short term, over the next one to three

1:08:47years, priorities include extending the

1:08:48bike network, making intersection safety

1:08:51improvements, piloting school streets

1:08:52and low traffic neighborhood strategies,

1:08:54and implementing additional loading

1:08:56zones. In the medium term, uh over 3 to

1:08:59six years, the focus shifts to larger

1:09:01improvements along Westside Avenue,

1:09:02including bus priority, bicycle

1:09:04pedestrian improvements, as well as

1:09:05traffic calming.

1:09:07Looking further ahead, the long-term

1:09:08priorities include a redesign of 440,

1:09:10development of the Hackin Hackinack

1:09:12River Greenway, and a potential or and

1:09:15the potential uh extension of the Hudson

1:09:17and light rail to Bayfront.

1:09:21So, the same approach was used for

1:09:22Journal Square with priorities uh

1:09:24identify for short, medium, and

1:09:25long-term time frames. In the short

1:09:28term, over the next one to three years,

1:09:29priorities include extending the bike

1:09:31lane network, making intersection safety

1:09:33improvements and addressing operational

1:09:34issues at the Journal Square

1:09:36Transportation Hub. In the medium term,

1:09:38over three to six years, the focus

1:09:40shifts to public realm investments,

1:09:42including streetscaping improvements,

1:09:44um, redevelopment, and pedestrian plaza

1:09:47pilots. Other priorities include

1:09:49strengthening east west bicycle

1:09:50connections, and implementing transit

1:09:52priority treatments throughout the

1:09:53neighborhood. Looking further ahead,

1:09:55long-term priorities include completing

1:09:56the bike network, enhancing connections

1:09:58to the Greenway network, and improving

1:10:00connectivity between Journal Square and

1:10:02surrounding neighborhoods.

1:10:05So, we just went through a one-year

1:10:07study in 15 minutes. So, um, thank you

1:10:11again, uh, for providing us the

1:10:13opportunity to present this. And I guess

1:10:16we're open for any questions from the

1:10:18board.

1:10:20>> Thank you for that, uh, great

1:10:22presentation. Um,

1:10:23>> could I interrupt just real quick? I

1:10:25believe you've noticed for this. Could

1:10:26we mark that into evidence?

1:10:28>> Yes.

1:10:31>> All right. Yeah, for this we have

1:10:32notices to the surrounding planning

1:10:34clerks and the Hudson County Planning

1:10:36Board. So, if Eli just bring it up to

1:10:38Santo there, our council.

1:10:42>> Madam Chair, we're going to mark it as

1:10:43A1 for purpose of the record. Thank you,

1:10:52>> Eli, if I may. Um,

1:10:54when this um study started in summer of

1:10:572025, were you initially part of the

1:11:00study?

1:11:00>> Yes. So, I was uh the project manager

1:11:02for the entire length.

1:11:03>> Gotcha. Thank you.

1:11:05>> Um was the um community meetings happen

1:11:08throughout the city in all the different

1:11:10awards?

1:11:12>> Yes. So we were very intentional to hold

1:11:13uh popup engagement as well as uh

1:11:16community meetings and workshops

1:11:17throughout the city. And we also used

1:11:19very intentionally targeted uh the

1:11:22community survey as well to all the

1:11:23neighborhoods community are um

1:11:25coordinating with the community groups

1:11:27to make sure it was pushed out communing

1:11:28with the council people to make sure it

1:11:29was pushed out. So that was a big

1:11:31emphasis of this project.

1:11:32>> And do you know what organizations were

1:11:35part of this um study? Because I see it

1:11:37says 23 organizations.

1:11:43Let's see if I have them listed. Um,

1:11:48so we met with uh outside stakeholders

1:11:50and also city stakeholders. So for

1:11:52outside stakeholders that was something

1:11:54like port authority, path, NJ transit,

1:11:56NJ dot um the port or I said the port

1:11:58authority the county. Uh we met with

1:12:00neighboring municipalities. We had

1:12:02conversations with the Hoboken Sakus uh

1:12:04and Bayon about the connections between

1:12:06the cities.

1:12:07>> Any local organizations within Jersey

1:12:09City?

1:12:09>> Yes. So we also held a series of

1:12:11>> associations.

1:12:12>> So we held a series of stakeholder

1:12:14meetings as well with the community

1:12:15organizations. So we held it with local

1:12:17advocates uh with uh you know the

1:12:19business improvement districts. Uh we

1:12:21also held and had it open to all of the

1:12:24community districts. So when we had uh

1:12:25the meeting say in journal square and

1:12:27for the west side we made sure to

1:12:28communicate and we invited all the

1:12:30community district or community

1:12:31associations in those areas. Um, and all

1:12:33the materials were uh for all the public

1:12:35meetings and all the public

1:12:36announcements were also sent out to

1:12:37every community association that we have

1:12:39on our mailing list.

1:12:40>> Okay. Thank you.

1:12:42>> Any board comments?

1:12:43>> I I have a question, Madam Chair.

1:12:45[clears throat]

1:12:46Have you met with like the MUA in

1:12:48reference to their overall plans as far

1:12:50as the infrastructure both water and

1:12:52sewers and things of that nature?

1:12:55>> So, they were a part of the stakeholder

1:12:56group. So, they were, you know, sat in

1:12:58our meetings and we helped coordinate,

1:12:59you know, these long-term visions. So,

1:13:00yes, they were. give you any projections

1:13:02as far as when they expect to complete

1:13:04the infrastructure system.

1:13:06>> So that would be outside the scope of

1:13:08what we did here. Um but it is you know

1:13:10one of the key elements of making sure

1:13:12that coordination is closer and yeah

1:13:13they sat in or they were a part of the

1:13:15technical advisory committee helping

1:13:17shape the recommendations.

1:13:18>> Okay. All right. Thank you.

1:13:20>> Mhm.

1:13:23>> Any other board comments?

1:13:25>> No. [snorts]

1:13:26>> Okay.

1:13:28Okay. At this time I would like to open

1:13:29for the public. Is there anyone from the

1:13:31public?

1:13:33>> Sure.

1:13:43>> The whole truth.

1:13:44>> I do.

1:13:47>> My name is Jack McKe. J A CK M C. My

1:13:52address is 283 Newark Avenue. 4R.

1:13:56>> Jack. Good evening. You have three

1:13:57minutes.

1:13:58>> Thank you. Good evening. Um, I want to

1:14:00thank the transportation planning

1:14:02infrastructure. Uh, a a good year of

1:14:04work boiled down into 15 minutes and I

1:14:07certainly can't address it in three. Um,

1:14:09everything listed on that very

1:14:12comprehensive PowerPoint. Great. Would

1:14:15love to see every bit of that

1:14:16implemented. Um, I should say I'm the

1:14:19campaigns manager for Hudson County

1:14:21Complete Streets. I assume we were one

1:14:23of those dozens of organizations that

1:14:25was involved in the the outreach. I

1:14:27attended a lot of these meetings. I've

1:14:29seen I've seen Eli, Lindsay, Director

1:14:32Kaplan throughout the city over the last

1:14:33year in different wards in my

1:14:35neighborhood and neighborhoods I'm

1:14:37visiting. Uh I just want to address you

1:14:40and talk about the importance of of

1:14:42blending planning and transportation. Um

1:14:46we often think about places as isolated

1:14:49static things, but in reality they work.

1:14:52It's about not just what it is, but how

1:14:54it relates to the communities next door,

1:14:57the municipalities next door. And we all

1:14:59benefit when we can get around easily.

1:15:01Business thrives, community thrives, and

1:15:03we can we will see um less

1:15:08less uh bickering over these little

1:15:11things when we can solve the bigger

1:15:12problems. The biggest one being parking.

1:15:14I mean, it is just one of those things

1:15:16that I feel and I know a lot of people

1:15:18in this community and neighboring

1:15:19communities feel that we wish it was a

1:15:21problem that was solved. And while we

1:15:23can't create more space, that that's off

1:15:26the table. No making more space,

1:15:28vertical parking is uh is incredibly

1:15:30expensive and just creates more

1:15:32congestion. So, in my opinion, it

1:15:34doesn't really solve the problem. But

1:15:35better management of the space and the

1:15:37infrastructure that we have is a way to

1:15:39solve the problem. uh give communities

1:15:43the the breath of fresh air quite

1:15:45literally that we all need. Um and and

1:15:48you know economic growth comes when we

1:15:50have interconnected communities. I mean

1:15:52that I don't have the data before me

1:15:54because I'm not the kind of guy that

1:15:55walks in with the data. Uh sorry, but

1:15:58but I know I have looked it up and I see

1:16:00things if I remember correctly, it's

1:16:02like uh pedestrian malls and uh

1:16:04microobility results in a 59% increase

1:16:07in uh storefront revenue when when they

1:16:09expose expose uh car centric communities

1:16:13to different modes of transportation and

1:16:14that's huge and very often that gets

1:16:16overlooked um because we just look at

1:16:18what we're losing but and what the costs

1:16:21are but every time we look at one of

1:16:23these projects all I can see is well we

1:16:24can't afford not to do this and I'll use

1:16:26Just two examples. JFK BRT. I know

1:16:29that's a county project. I know that's

1:16:31bigger than Jersey City alone, but I

1:16:33don't go to Bayon or North Bergen

1:16:36because it's just too much of a hassle

1:16:37to get there. I would uh and the second

1:16:40uh looking at 18th Street area in uh the

1:16:42north end of Jersey City and Hoboken is

1:16:44actually experiencing the same issue

1:16:45where development is outpacing people's

1:16:47ability to get around and we end up

1:16:49having the what I call the march of the

1:16:51jitneys and they all pile up at Grove

1:16:53Street station with each each

1:16:55development promising to give their

1:16:57people a ride and then you just have a

1:16:59bunch of vans pulled up on the on the

1:17:02sidewalks very often and uh creating

1:17:04danger uh congestion and we can do

1:17:07better. There are opportunities. Uh, and

1:17:08I'll just plug 18th Street Light Rail

1:17:10Station. It's a possibility. It's within

1:17:12our sights. Help us.

1:17:13>> Your time is up. You're true. You cannot

1:17:15complete that in three minutes.

1:17:17>> Thank you. Is there anyone else from the

1:17:20public?

1:17:20>> Madam Chair, I don't see no in the

1:17:22public. I'd like to close the public

1:17:24portion.

1:17:24>> Thank you.

1:17:25>> Second,

1:17:27>> Ben.

1:17:28>> Uh, Matthew Dilva from the planning

1:17:30department was involved in the

1:17:32stakeholder group as a representative of

1:17:34the department of city planning. Uh and

1:17:36he found that the transportation plan is

1:17:38in line with the goals of the city's

1:17:40master plan. Uh and as a result, staff

1:17:43recommends approval.

1:17:46>> Thank you.

1:17:48Any other board comments before I ask

1:17:50for a roll call? No. Okay. Roll call.

1:17:53Ben,

1:17:55>> need a motion.

1:17:57>> Motion. Sorry. Madam chair, I'd like to

1:17:58make a motion recommending the less move

1:18:01Jersey City Jersey JC transportation

1:18:03master plan and new mobility element of

1:18:05the JC master plan to the city council

1:18:08for adoption.

1:18:09>> Second,

1:18:11>> uh, Vice Chair Patel

1:18:13>> I,

1:18:13>> Commissioner Conway,

1:18:14>> I,

1:18:15>> Commissioner Stamato,

1:18:16>> I,

1:18:17>> Commissioner Capers,

1:18:18>> I,

1:18:18>> and Madam Chair Congadan,

1:18:20>> I want to thank everyone who's involved

1:18:21in this um, study. This is a lot

1:18:24compiled here and a lot of work yet to

1:18:26be done. Thank you. Thank you so much.

1:18:28Um, my vote is I

1:18:29>> motion carries. All in favor?

1:18:32>> Thank you, Ellie.

1:18:33>> Thank you.

1:18:36>> I'd like to now move on to case

1:18:382026-0117.

1:18:41Its review and discussion of reporting

1:18:43concerns determination of the scatter

1:18:46site study area 6 as an area in need of

1:18:50redevelopment and more specifically as a

1:18:52conation redevelopment area. Authorized

1:18:56by resolution 26-314

1:18:59for act formal action may be taken.

1:19:02Thank you, Commissioner Kaplan.

1:19:04>> Great job.

1:19:05>> I didn't do it, but thank you. I'm back

1:19:08for the record.

1:19:15>> Joe,

1:19:17>> good evening.

1:19:18>> Joe, let's mark notices once we get

1:19:20going.

1:19:21>> Yes. So notice of the notice of this uh

1:19:25report was um provided and uh it's

1:19:28already noted in the Tyler portal.

1:19:30They're they're all they've all been

1:19:32uploaded.

1:19:33>> So Madam Chair, we're going to mark

1:19:34those as A1 for purposes of the record.

1:19:38>> Thank you. Uh thank you for having me,

1:19:42Madame Chair, members of the board. Uh

1:19:44my name is Joseph Pongan, principal

1:19:45planner with the Jersey City Planning

1:19:47Division. I'm here to present the area

1:19:50need of redevelopment study and

1:19:52preliminary investigative report for

1:19:54scatter site 6 in Jersey City.

1:19:58Uh, as a short introduction, um, early

1:20:00this year in May 2026, city council

1:20:03authorized planning staff to draft a

1:20:04report to determine whether seven vacant

1:20:07properties uh, located all over city

1:20:10included in the scatter site area six

1:20:12uh, scatter site study area 6 uh, which

1:20:15we'll refer to uh, as study area qualify

1:20:18as an area in need of redevelopment and

1:20:20more specifically as a condemnation

1:20:22redevelopment area authorizing the

1:20:24municipality to use the power of eminent

1:20:26domain. The purpose of the study area is

1:20:30to target vacant uh vacant property

1:20:32vacant or blighted properties throughout

1:20:34Jura City which are creating a blighting

1:20:36influence on the surrounding

1:20:37communities. Should the study area be

1:20:40determined uh to be and be designated as

1:20:43an area in need of redevelopment, it's

1:20:45intended to add the study area to the

1:20:47scatter site redevelopment plan which

1:20:48was last amended September 25th in 2024

1:20:52uh and is also formerly known as the

1:20:54vacant buildings redevelopment plan.

1:20:58going over the methodology and how these

1:21:00sites were analyzed. Uh it it was a

1:21:03physical survey of all buildings on

1:21:05seven subject properties um was which

1:21:08was conducted by myself to determine the

1:21:11general physical condition of all the

1:21:12parcels within the study area. This

1:21:15survey involved an exterior visual

1:21:16evaluation as well as photographs for

1:21:18each parcel

1:21:21which you'll find in the report um and

1:21:23in this presentation. Building and

1:21:26property condition was determined by

1:21:27focusing on certain indicators such as

1:21:29windows, entranceways, siding, brick

1:21:32work, cornises, sidewalks and curbing,

1:21:34evident rubbish, uh foundations and

1:21:36retaining walls, fencing, parking,

1:21:39loading areas, uh relationship of

1:21:41buildings and land use to the

1:21:42surrounding area, condition of the

1:21:43pavement and the grounds in general.

1:21:45Factors which weighed against a positive

1:21:47rating include cracks and fissures and

1:21:49masonry and concrete, broken glass, rott

1:21:51and det rod and deteriorated wood

1:21:53elements, missing or damaged siding

1:21:55sections, evident debris and poor

1:21:57maintenance of the grounds, rust and or

1:21:59broken fencing elements, damage or

1:22:00missing sidewalks um and overcrowding or

1:22:04excessive coverage of buildings and land

1:22:06use.

1:22:08Uh these are the eight criteria um from

1:22:11uh state uh state law uh that we use for

1:22:15determination of whether the areas in

1:22:16need of redevelopment. Um

1:22:19most of the you'll find that uh the

1:22:21seven properties kind of mostly fall

1:22:23into only two or three of these but I'll

1:22:26read all eight um for the record. Uh

1:22:30first the generality of buildings are

1:22:31substandard, unsafe, unsanitary,

1:22:33dilapidated or obsolet obsolescent or

1:22:36possess any such characteristics or so

1:22:38lacking in light, air or space as to be

1:22:41conducive to a wholesome unh wholesome

1:22:43living or working conditions. The two

1:22:46the discontinuence of the use of

1:22:48buildings previously used for commercial

1:22:50manufacturing or industrial purposes.

1:22:52The abandonment of such buildings or the

1:22:54same being allowed to fall into so great

1:22:56a state of despair as to be untenable.

1:23:00Third, land that is owned by the

1:23:02municipality, the county, a local

1:23:04housing authority, a redevelopment

1:23:06agency or redevelopment entity, or

1:23:08unimproved vacant land that has remained

1:23:11so for a period of 10 years prior to the

1:23:13de adoption of the resolution and that

1:23:16by reason of its location, remoteness,

1:23:18lack of means or of access to

1:23:20development sections or portions of the

1:23:22municipality or topography or nature of

1:23:24soil is not likely to be developed

1:23:26through the instrumentality of private

1:23:29capital. The fourth areas with buildings

1:23:32or improvements which by reason of

1:23:34dilapidation, obsolescence,

1:23:36overcrowding, faulty arrangement of

1:23:37design, lack of ventilation, light and

1:23:40sanitary facilities, excessive land

1:23:42coverage, delletterious land use or

1:23:44obsolete layout or any combination of

1:23:47any of these factors are detrimental to

1:23:49the safety, health, morals or welfare of

1:23:50the community.

1:23:53Fifth, the growing lack of or total lack

1:23:55of property utilization of areas caused

1:23:57by conditions of the title, diverse

1:23:58ownership of the real properties taken

1:24:00therein or other similar conditions

1:24:02which impede land assemblage or

1:24:05discourse. The the undertaking or

1:24:08discourage the undertaking of

1:24:09improvements resulting in a stagnant and

1:24:12unproductive condition of land

1:24:13potentially useful and valuable for

1:24:15contributing to and serving the public

1:24:17health, safety, welfare. which

1:24:19conditions which condition is presumed

1:24:22to be having a negative social or

1:24:23economic impact or otherwise being

1:24:25detrimental to the safety, health,

1:24:26morals or welfare of the surrounding

1:24:28area or community in general. And the

1:24:31sixth areas in excess of five contiguous

1:24:35acres where on buildings or improvements

1:24:37have been destroyed, consumed by fire,

1:24:39demolished or altered by the action of

1:24:42storm, fire, cyclone, tornado,

1:24:44earthquake or other casualty in such a

1:24:47way that the aggregate assessed value of

1:24:49the area has been materially

1:24:50depreciated.

1:24:52Seventh, in any municipality in which

1:24:55enterprise zone has been designated as a

1:24:56new New Jersey urban enterprise act, the

1:24:59exe the execution of these act the

1:25:01actions prescribed in the act for the

1:25:03adoption of the municipality and approve

1:25:05approval by the New Jersey urban

1:25:07enterprise zone authority of the zone

1:25:10development plan for the area of the

1:25:12enterprise zone shall be considered

1:25:13sufficient for the determination the

1:25:15areas in need of redevelopment pursuant

1:25:17to section five or six of state

1:25:20or the adoption of tax abatement or

1:25:22exemption ordinance pursuant to

1:25:25provisions of the state law. Uh the

1:25:28municipality shall not utilize any other

1:25:30redevelopment powers within the urban

1:25:32enterprise zone unless the municipal

1:25:34governing body and planning board have

1:25:36also taken actions uh and fulfilled the

1:25:39requirements prescribed in PL 1992

1:25:43chapter 79 for determining the area is

1:25:45need of redevelopment or an area it is

1:25:47in need of rehabilitation and the

1:25:49municipal governing body has adopted a

1:25:51redevelopment plan ordinance including

1:25:53the area of the enterprise zone. And

1:25:55lastly, this designation of the

1:25:57delineated area is consistent with smart

1:25:59growth plan principles adopted to pursue

1:26:01under law or regulation. [sighs]

1:26:04So going over the seven properties we

1:26:06have here today, um we have 97 Charles

1:26:08Street, uh 358 Central Avenue, 195

1:26:12Baldwin Avenue, 221 ON Avenue, 205

1:26:15Clinton Avenue, 479 Bram Hall Avenue,

1:26:19and 185 Bidwell Avenue. You can see the

1:26:21map here to the right. they are

1:26:22scattered in pretty different parts of

1:26:24the city and not just kind of

1:26:26concentrated in one area.

1:26:29So, going over the side analysis for 97

1:26:31Charles Street, you'll see that it's a

1:26:33construction site and it has not been

1:26:35active for years. No active uh no front

1:26:38facade. There's no wall, no front wall,

1:26:41no uh there's doors and windows that are

1:26:43missing. It's unsafe for occupancy and

1:26:45it's in poor condition. Um, it does meet

1:26:48criteria A and D of the eight criteria

1:26:51previously mentioned.

1:26:53Uh, looking also over the parcel status

1:26:55of 97 Charles Street. It was issued a

1:26:58property vac uh, a vacant property

1:27:00notice of violation on December 10th,

1:27:032025. Uh, the latest construction

1:27:05permits that were issued for it were

1:27:07back in 2019. It had expired in 2020.

1:27:10And uh the most recent pipeline

1:27:12application was completed almost 10

1:27:15years ago, July 2017.

1:27:20A second site is the um the mixed use

1:27:23building 358 Central Avenue. Uh it has a

1:27:25discontinued ground floor commercial

1:27:27use. There's graffiti on the rolledup

1:27:29gate. Uh you'll also find out it's

1:27:30boarded up entry, so there's no way to

1:27:32enter the building um to the the upper

1:27:36story residential portion of the

1:27:37building. Has been in the state for

1:27:39about 15 years. also in poor condition,

1:27:41meets crit criteria A and B.

1:27:45Parcel status for 358 Central Avenue. It

1:27:48was issued the vacant notice violation

1:27:51on May of this year. It was registered

1:27:54as a vacant property uh May 11, 2026. Uh

1:27:58and the latest construction and plumbing

1:28:00permits were issued in April 2021, final

1:28:04in June 2021.

1:28:07Um, next is 195 Baldwin Avenue. Uh, it's

1:28:10boarded up, uh, has a boarded up entry

1:28:12and ground floor window. It has the

1:28:14leopardated front door awning. Um, and

1:28:16also has graffiti covering the front

1:28:18facade. It's been abandoned for at least

1:28:202 years. And, um, staff found it to be

1:28:23in poor condition and meets criteria A

1:28:25and D of the um, the criteria for uh,

1:28:30determination for need of redevelopment.

1:28:35Next we have 221 O Avenue. Um you'll

1:28:38find that it has boarded up entry and

1:28:40front facade windows. The structure's

1:28:42facade is dilapidated with tears along

1:28:44the wood planks on the front and

1:28:46northern sides. Uh it has a front it's

1:28:49front porch railing is falling over.

1:28:50Vines have overtaken the front entry

1:28:52stair rails. The roof membrane seems to

1:28:54be hanging over the front ledge. Uh it

1:28:57has trash all over the front yard and it

1:29:00has uh staff found it in poor condition

1:29:03and meets criteria A and D.

1:29:06Parcel status of 221 O Avenue. It was

1:29:09issued the property notice of violation

1:29:12uh property vacant property notice of

1:29:13violation on uh June 4th this year uh

1:29:17with a late with a with the latest

1:29:19reinspection for that being July 28th of

1:29:22this year. A construction code case was

1:29:24also issued for unsafe structures back

1:29:26in August 2013. That case is still load

1:29:33side analysis for 205 Clinton Avenue. Um

1:29:35it's first floor windows have plywood

1:29:37attached. So it's boarded up in the

1:29:39front the front windows. The front gable

1:29:42appears to be dilapidated. Uh trash

1:29:46there's trash in the front yard and

1:29:47staff found it to be in fair condition

1:29:49meeting area criteria A and D.

1:29:54parcel status for 205 Clinton Avenue. Um

1:29:56it was issued the vacant not property

1:29:59notice for violation in May of this

1:30:02year. Latest reinspection was about a

1:30:05week and a half from that also in April

1:30:07of this year with two to three items

1:30:09evaded. It was included in the vacant

1:30:11property registration um list uh in June

1:30:15of this year and later it did have um

1:30:18electrical and construction permits

1:30:20issued in May 2026.

1:30:25[sighs and gasps]

1:30:26Site analysis for 479 Bram Hall Avenue.

1:30:29Um front door and first floor windows

1:30:32are boarded up with plywood. Second and

1:30:34story second and third story windows are

1:30:35covered up in plastic. Heavy smoke and

1:30:38fire stands on the second story front

1:30:40facade. Column of the front column in

1:30:42the right side of the stove appears to

1:30:43be threatening collapse. Uh it's in poor

1:30:46condition and meets criteria A and D

1:30:53and uh parcel status for 479 Bramole

1:30:56Avenue issued a vacant property notice

1:30:58of violation in June of this year. Uh

1:31:00included a prop in the property vacant

1:31:03property registration list in May of

1:31:04this year. complaint. Uh there are code

1:31:08enforcement complaints. Um this is back

1:31:09in 2016 claiming it was abandoned and

1:31:11infested with cats. Um there was an

1:31:14electric permit application submitted in

1:31:1620 uh July 9th, 2026 which was denied as

1:31:20well as construction permit application

1:31:21submitted in June 17th uh 2026 which was

1:31:26also denied.

1:31:29And we have

1:31:31185 Bidwell Avenue. Um, you'll find that

1:31:34the front door, front terrace doors, and

1:31:35front facade windows are all boarded up

1:31:37with plywood. Roof appears to be

1:31:39dilapidated uh with the woodboard

1:31:42missing from this the set. Front uh

1:31:44facade is dilapidated with some of the

1:31:46siding on the dormer falling apart. The

1:31:48garage is blocked up by wire fencing.

1:31:50There's trash on the terrace. Upper

1:31:53story railing is rusted and falling

1:31:55apart. Uh there's also graffiti in the

1:31:56front facade. Staff found it in poor

1:31:58condition. Meets criteria A and D.

1:32:03Uh, as far as parcel status for 185

1:32:05Bidwell, vacant property registration

1:32:07date, September 10th of this year,

1:32:10issued vacant property notice of

1:32:11violation in August 14, 2024. There was

1:32:15a code enforcement uh construction code

1:32:17case issued for removal of rear garage

1:32:19without permits. Um, latest electrical

1:32:23and construction permits issued in uh

1:32:252022, expired in 2023.

1:32:29Um, so going over these seven

1:32:31properties, uh, we found that the seven

1:32:33properties contained in study area seeks

1:32:35meet at least two of the criteria A, B,

1:32:38and D needed to declare an area in need

1:32:40of redevelopment. Uh, city records for

1:32:42each of the seven properties in the

1:32:43study area showed that the properties

1:32:44were registered vacant, show long

1:32:46ongoing periods of inactivity and

1:32:48unsound living conditions. City staff

1:32:50recommends that the study area be

1:32:52determined as an area in need of

1:32:53redevelopment and more specifically as a

1:32:55condemnation redevelopment area with

1:32:57authorization to utilize evident domain

1:32:59and that the properties included in the

1:33:00study area be added to the scatter site

1:33:02redevelopment plan. Thank you. I'll take

1:33:05any questions if you have them.

1:33:10>> Madam chair.

1:33:11>> Sure. C could you just help how do um

1:33:14were these seven sites selected to be

1:33:16studied? I understand the council kind

1:33:18of passed a resolution to dictate that

1:33:19to us, but I'm just curious how these

1:33:21seven what the process was to identify

1:33:23them.

1:33:23>> That's correct. Oh, I think uh we

1:33:27>> uh so yeah, there was a resolution

1:33:29passed and that that list came from the

1:33:31administration

1:33:33um and there were properties selected uh

1:33:35from the apperal list, the abandoned

1:33:38properties register

1:33:40act, I think is what it's called. I'm

1:33:41not exactly sure what the acronym is.

1:33:45So, Commissioner, I think it's fair to

1:33:46say that the city keeps a record of

1:33:50buildings that are

1:33:53in condition similar to this. They're

1:33:56checking, then they're issuing

1:33:57violations through the right department

1:33:59and division, and then the governing

1:34:01body decides to authorize a resolution

1:34:04to study and move on these because of

1:34:07the reasons laid out by uh Joe and his

1:34:10testimony as to what he witnessed and

1:34:12saw in the study area. I think you'll

1:34:14notice in a lot of the pictures there is

1:34:16the uh red

1:34:19marker on the property, the red with the

1:34:21white X. And I think if anybody drives

1:34:24around the city, I am sure you will see

1:34:26other properties similarly

1:34:29uh sitting. And then I believe if you

1:34:31contact the administration, that

1:34:34property would wind up on a list to be

1:34:36studied and and moved on uh at some

1:34:39point.

1:34:41>> Thank you.

1:34:42>> Thank you. Um Joe, can we just go back

1:34:45to 205 Clinton?

1:34:47>> Sure.

1:34:50[clears throat]

1:34:51>> So, the first floor is inactive. Is that

1:34:54>> Yes, it appears to be boarded up with

1:34:56plywood on the inside of the windows

1:34:58>> on the second floor.

1:35:00Uh the second floor doesn't appear to be

1:35:02boarded up, but um uh so when we when

1:35:05when I do a survey of these um

1:35:07properties, I'm not allowed access

1:35:10inside any of them um for various

1:35:12reasons, but like for the most part,

1:35:13they're all boarded up and not

1:35:14inaccessible. So, but if you're Yeah. If

1:35:17the question is if the first story of

1:35:19this property is inactive, that appears

1:35:21to be the case. Yes.

1:35:25>> Sure.

1:35:28>> Use your mic. We we need your mic there,

1:35:30sir.

1:35:31>> Thought it was on.

1:35:32>> Can you hear me now?

1:35:33>> Yes.

1:35:34>> Good. Thanks.

1:35:34>> All right. So, my understanding is that

1:35:36right now they're not producing any tax

1:35:38revenue or anything like that. They're

1:35:40just dormant and that's about it.

1:35:42>> Right. There's nobody living in them.

1:35:43None of the uses being used. That's just

1:35:45completely

1:35:46>> regarding tax revenue. I don't know if

1:35:48we can answer that question.

1:35:49>> Oh, right. Sorry. Yes. The t from a tax

1:35:51perspective, we don't know if because

1:35:53they're still owned by property owners

1:35:54at the moment.

1:35:56>> Somebody owns the property. It could be

1:35:58an individual. It could be a

1:35:59corporation. Could be any kind of an

1:36:01entity. They could be paying taxes. They

1:36:03could be delinquent in taxes. There

1:36:04could be tax sales that have taken

1:36:06place. None of that is necessarily known

1:36:09to planning, nor is it necessarily

1:36:12relevant to the actual criteria under

1:36:15the redevelopment statute.

1:36:17>> Right.

1:36:18>> Okay.

1:36:24>> Any other board comments?

1:36:28No, Madam Chair.

1:36:29>> Thank you.

1:36:30>> Thank you.

1:36:31>> So, at this time, I would like to open

1:36:32for the public. Do you want to take a

1:36:33I'm sorry. You want to take a break

1:36:35first?

1:36:36>> You want to finish?

1:36:36>> You want to finish? Okay. At this time,

1:36:38I would like to open for the public. Is

1:36:40there anyone from the public?

1:36:42>> Uh, Mr. Lean.

1:36:43>> Good evening again, commissioners. Uh,

1:36:45for the record, Tom Lean of Connell

1:36:46Foley. I'm here on behalf of uh the

1:36:49owners of 185 Bidwell, which were the

1:36:51last property you saw in the

1:36:53presentation there. The uh the entity

1:36:55that owns it is uh [clears throat] C A C

1:36:58E A A R LLC. Uh the gentlemen who are

1:37:02the owners are are here present with me

1:37:04this evening. Uh they are developers in

1:37:06the city of Jersey City. They have done

1:37:08multiple one and two family homes. Uh

1:37:11179 Stegman, 138 Bay View, uh 89 Oak

1:37:15Street, a couple of others. Um there's

1:37:17been a number of issues that have

1:37:19delayed uh the developers from moving

1:37:21forward with construction on this site.

1:37:23They did purchase it in 2016. Um,

1:37:26obviously COVID hit. Uh, in 2021 they

1:37:30did start clearing some de debris in the

1:37:33backyard. [clears throat]

1:37:34Um, there was a noted a violation for

1:37:37demolition of garages, but uh, the

1:37:39pictures I submitted to uh, the city

1:37:41when I brought up that I was

1:37:42representing the owners show it was

1:37:44really just a a bunch of debris. They

1:37:46were clearing it and trying to uh, to

1:37:47get the site ready for uh, construction.

1:37:50Uh at that time they also had

1:37:51conversations with the city where they

1:37:52were advised that there's a possibility

1:37:54that might not be able to demolish the

1:37:56structure because it might have some

1:37:57historic uh historic integrity to it. Uh

1:38:00as the board is aware, our demolition

1:38:02ordinance does uh prevent uh demolition

1:38:05permits from issuing if a building has

1:38:07some historic integrity to it. Um, so

1:38:10all of those things delayed them moving

1:38:12forward uh up until 2022 when they hired

1:38:15an architect to try and uh incorporate

1:38:18that structure into a new building. Uh,

1:38:21I provided those plans to city planning.

1:38:23Um, my clients are ready to move

1:38:25forward. They have registered it as a

1:38:27vacant property. Uh, they are paying

1:38:30taxes on the property. Uh, they did put

1:38:32up a safety fence to prevent people from

1:38:34accessing the rear of the property. Uh,

1:38:36I would ask that the board at least give

1:38:39my client time to file permits and move

1:38:42forward with construction uh before

1:38:44adding this to the scatter site

1:38:46redevelopment plan. Not that adding this

1:38:48does prevent them from doing it, but you

1:38:51know, we don't know if the JC has had

1:38:53conversations with a developer for that

1:38:54site. We don't know what the intent of

1:38:56that site is other than my clients who

1:38:59own it and have been taking and have

1:39:01been trying to maintain it would like to

1:39:03move forward with construction. So with

1:39:05that said, I would just submit to the

1:39:06board that you have active developers

1:39:08here. Let them develop their site. Thank

1:39:11you.

1:39:14>> Is there anyone else?

1:39:21>> Good evening. Uh Nicholas Curado for uh

1:39:24358 Central Avenue. Uh my client is

1:39:27here. Um we are here to object to

1:39:30inclusion of uh 358 Central Avenue in

1:39:33the study area for a number of reasons.

1:39:36Uh this is not a property which has been

1:39:38neglected or abandoned. Instead it has

1:39:40been stalled partly by the determination

1:39:44by historic. Um but for that decision

1:39:49this project would probably have been

1:39:51completed by now. I have Mr. Gindy here

1:39:53who is the managing member of 358

1:39:55central at 3 358 360 central Avenue LLC

1:39:59and he'd like to present some

1:40:02information that he has um and without

1:40:06belaboring a number of the uh bases for

1:40:10this objection have already been

1:40:12eloquently stated by my colleague Mr.

1:40:15Mr. Lean. Uh these are the same types of

1:40:18problems that my client has faced. My

1:40:20client has spent over $100,000 in trying

1:40:23to develop the site and he was about to

1:40:25get demolition permits, had already, as

1:40:28was mentioned on the presentation, had

1:40:30already pulled and closed permits to

1:40:33have the sewer cut uh and capped when he

1:40:36was stopped from going forward by

1:40:39historic. Um, we also know that the

1:40:41historic uh ordinance is now being uh

1:40:45being reviewed and we would like to take

1:40:48take that we would like the board to

1:40:50take that into consideration.

1:40:52My client is ready, willing and able to

1:40:54begin de begin demolition and de

1:40:56development of this site immediately.

1:40:58But without further ado, I'd like to

1:41:00introduce Jimmy Gindy, the managing

1:41:02member of this uh the owner.

1:41:08>> Sure. Do you swear affirm that any

1:41:10testimony you give tonight is going to

1:41:11be the truth? The whole truth?

1:41:12>> I do.

1:41:13>> For the record state,

1:41:14>> Jimmy Gindy. Uh, J I M Y G U I N D I.

1:41:19>> Mr. Gindy, you have three minutes.

1:41:20>> Thank you. Uh, good evening, chair and

1:41:22members of the planning board. Thank you

1:41:24for giving me the opportunity to speak.

1:41:26Uh, my name is Jimmy Gindy and I'm the

1:41:27owner of 358 Central Avenue, block 2901,

1:41:31lot 34. Uh, I understand and respect uh

1:41:34the city's responsibility to address

1:41:36unsafe properties and protect the

1:41:37community. I share that goal. Uh,

1:41:40however, I respectly object to any

1:41:42recommendation designating my property

1:41:43as being in need of condemnation for

1:41:45redevelopment and I ask that block 2901,

1:41:48lot 34 be removed from the scatter study

1:41:51site 2026 study area. I haven't

1:41:54abandoned the property and I have not

1:41:56refused to address its condition. I have

1:41:59invested substantial time and money and

1:42:01worked in good faith with demolition

1:42:02contractors, engineers, environmental

1:42:05professionals, utility companies, and

1:42:07city officials to remove any unsafe

1:42:09structure and redevelop the property. In

1:42:12December of 2021, based on an on an

1:42:15independent physical inspection of the

1:42:17building, my licensed engineer concluded

1:42:19that the structure was an eminent

1:42:21hazard, unsafe to enter, at risk of

1:42:24sudden collapse, and should be

1:42:25completely demolished.

1:42:28The construction code official

1:42:29instructed me to provide that

1:42:30engineering report and file an

1:42:32application for demolition. We complied

1:42:34with both requests.

1:42:37We retained Caravla demolition,

1:42:39submitted demolition plans and permanent

1:42:41materials, disconnected utilities and

1:42:43completed environmental and safety

1:42:45related work. Historic preservation

1:42:47concerns, demolition requirements and

1:42:49construction code requirements then

1:42:51became part of a process that never

1:42:52resulted in one clear and coordinated

1:42:55path forward. The 2019 historic staff

1:42:58determination stated that demolition

1:43:00would likely not be approved, while the

1:43:02city's later unsafe structure process

1:43:04called for demolition or correction. In

1:43:07October of 2022, the city formally

1:43:10determined that the structure was not

1:43:12sound condition and order demolition or

1:43:14correction. In 2026, I was then issued a

1:43:17summon, summon number SF390415

1:43:21for alleged failure to comply together

1:43:24with a complaint with a compliant

1:43:25information sheet asserting a pro

1:43:28asserting approximately $187,000

1:43:32in penalties.

1:43:33You heard that right. I do not raise

1:43:36these facts to criticize any individual

1:43:38or department. I raise them because they

1:43:40demonstrate a serious lack of

1:43:41coordination that I've been trying in

1:43:44good faith to overcome.

1:43:46I want to work with the city, not

1:43:48against it, to resolve the unsafe

1:43:50condition, protect the public, and move

1:43:52forward with responsible private

1:43:54development.

1:43:56Condemnation is not necessary to

1:43:58motivate me to act. I am here. I am

1:44:01invested in the property and I remain

1:44:04ready to proceed. I respectfully ask the

1:44:07board to remove block 2901 lot 34 from

1:44:10the proposed condemnation study area,

1:44:12accept my written objection and exhibits

1:44:15into the official record which I can

1:44:17provide to you. Um, and help facilitate

1:44:21an immediate coordinated meeting with

1:44:22planning, historic preservation,

1:44:25construction code, and municipal

1:44:26council. I just need one more minute.

1:44:28I'm also asking the appropriate city

1:44:30officials to review and withdraw or fair

1:44:33to to to review the withdrawal or fair

1:44:35resolution of the summons and penalty

1:44:37claim and to establish a clear, lawful,

1:44:39and expedited path for a safe

1:44:40demolition.

1:44:41>> I'm sorry, your time is up.

1:44:43>> My goal is common ground, protect the

1:44:44community, and remove the unsafe

1:44:46structure to redevelop the property

1:44:47without the need for eminent domain.

1:44:49Thank you for your time and

1:44:50consideration.

1:44:50>> Thank you.

1:44:51>> Okay.

1:44:57I don't know what it is.

1:44:58>> It's just It's just everything that I

1:44:59stated.

1:45:00>> What is it?

1:45:01>> It's just everything that I said.

1:45:02>> Give it to your attorney.

1:45:03>> Council up to the podium, please.

1:45:05>> Thank you.

1:45:09>> This is just a bound pres bound um two

1:45:12copies of the presentation that he just

1:45:14made with the exhibits.

1:45:16>> I don't know what that means. The

1:45:17presentation he made, he gave a ton of

1:45:18comments. I don't know what that is.

1:45:22This is a chronology of what he went

1:45:24through uh during the time that he was

1:45:27trying to develop the property and got

1:45:28stalled.

1:45:29>> So, we don't need that. He just

1:45:30testified to

1:45:31>> If you don't need it, then that's fine.

1:45:32>> Thank you, council.

1:45:33>> Thank you.

1:45:33>> Thank you, guys.

1:45:35>> Is there anyone else from the public?

1:45:40>> Charles Kim [clears throat]

1:45:42tonight is going to be the truth, the

1:45:43whole truth, nothing but truth.

1:45:44>> Yes.

1:45:46>> Give your home address, please.

1:45:47>> Yes. Charles Kim, 97 Charles Street.

1:45:50>> Mr. Kim, you have three minutes.

1:45:52>> Okay. Thank you. My wife and I taught at

1:45:54the nearby First Christian Pentecostal

1:45:55School. And when we purchased this home

1:45:57for us and our six children, we decided

1:45:59to update the home to suit the needs of

1:46:01our growing family. We are 70% complete

1:46:03with the renovation project.

1:46:05>> I'm sorry, is the mic on

1:46:08question. Sorry. We are 70% done with

1:46:10the renovation project. Foundation,

1:46:12framing, plumbing, electric sheathing or

1:46:14all signed off. [clears throat]

1:46:15Insulation and concrete balconies were

1:46:17installed within the past 9 months. What

1:46:20remains is windows, sheetrock, flooring,

1:46:22kitchens, bathrooms, and landscaping.

1:46:24The main delays have been the passing of

1:46:25a general contractor and with the lack

1:46:28of access to his paperwork and the

1:46:30subcontractors.

1:46:32And the second main delay has been his

1:46:33only change, which forced

1:46:34[clears throat] a redesign of the

1:46:35approved plans. The current stage is

1:46:38that the architect Alan Feld is is

1:46:40submitting the amended plans scheduled

1:46:41for this week and these were required

1:46:44[clears throat] because of the uh

1:46:45forementioned

1:46:47uh zoning change. Our intention is

1:46:49[clears throat] to complete the

1:46:50remaining 30% of the construction and

1:46:52move into our home. We request that our

1:46:54home be taken off the scatter site

1:46:55redevelopment plan. And um I would talk

1:46:59to Mr. Joseph. He said to bring

1:47:01[clears throat] receipts and plans and

1:47:02uh pictures, but I think you guys have

1:47:06pictures and if you want anything else I

1:47:07could provide it.

1:47:10>> Receipts and of what? the pictures plan

1:47:13the architectural structural drawings if

1:47:15that's necessary I could

1:47:17>> I don't

1:47:18>> I don't believe it to be necessary you

1:47:21just testified with respect to the times

1:47:23and dates of which you did

1:47:25>> but Mr. Feld has not finished his plans

1:47:28and has not submitted them yet to city

1:47:31planning. Is that fair?

1:47:32>> Right. He emailed it to me today. I'm

1:47:33going to need a couple days to talk with

1:47:35my contractor to review it and the plan

1:47:37is to submit this week.

1:47:39>> Understood. Thank you, sir.

1:47:41>> Okay. Thank you.

1:47:41>> All right. Thank you.

1:47:44>> Anyone else from the public?

1:47:47>> Madam Chair, there's no one from the

1:47:49public. I'd like to close the public

1:47:50portion.

1:47:51>> Second it.

1:47:54>> Public is closed. Matt, are you wrapping

1:47:58or

1:47:59>> Sure. Yes. Uh thank you, Madam Chair. Um

1:48:02so, um responding to those um the

1:48:06attorneys and the um property owners

1:48:08that came up today. Um I do sympathize

1:48:10that you know they do not want to see

1:48:11this these properties included in the

1:48:14list but we are going by kind of their

1:48:17the current state like one of the things

1:48:18that staff consider is the current

1:48:20status of the parcels as as refers to

1:48:22permitting or any sort of active

1:48:23projects going on and from what staff

1:48:26found there wasn't any active projects.

1:48:28I understand that you know projects can

1:48:30stall out for various reasons. Um and

1:48:34you know there's still there are still

1:48:36steps beyond this. The you know as you

1:48:38may know city council will also consider

1:48:40these items before voting on the um the

1:48:43amendment to the scatter side

1:48:44redevelopment plan. So if by the time I

1:48:47make my presentation to them there has

1:48:49been actual material progress in terms

1:48:51of um redeveloping these properties by

1:48:54those owners that is something that they

1:48:56could pro that's something that they

1:48:57could present and that city council can

1:48:59take into consideration as well. Um but

1:49:02yeah, given that and where we are right

1:49:04now from my presentation, I recommend

1:49:06that you approve the list as is as well

1:49:09as the report.

1:49:11>> Thank you, Joe.

1:49:14>> Okay.

1:49:15>> So, Madam Chair, just for purposes of of

1:49:18advising the board, uh obviously this is

1:49:22a redevelopment study area as this board

1:49:25has done in the past. Uh this happens to

1:49:28be the scatter site redevelopment study

1:49:30area with the power of condemnation.

1:49:34All that being said, the criteria are

1:49:36the eight points laid out in the statute

1:49:39as articulated by Joe in his

1:49:42presentation and chief. The charge of

1:49:44this board is to look at those criteria

1:49:46and determine from the evidence

1:49:48presented to the board whether or not uh

1:49:50that criteria is met for each of the

1:49:53subject properties and then make a

1:49:55recommendation to the governing body.

1:49:58This body does not determine the study

1:50:00area. This body does not determine

1:50:03whether it uh is an area in need. That

1:50:06happens by the governing body. We make

1:50:08the recommendation yes from our review

1:50:11it met the statutory criteria. No, from

1:50:14our review it doesn't meet the stat

1:50:16statutory criteria. That's what this

1:50:19body does. The governing body determines

1:50:22whether or not it is an area in need

1:50:25with condemnation. So, uh Joe stands by

1:50:29his report. That's the legal guidance to

1:50:31the board. And of course, uh, as has

1:50:34been done, if the board feels they want

1:50:37to take a property out, uh, and tell the

1:50:40governing body not to include that

1:50:42property as their recommendation, the

1:50:44board could do such a thing. But I think

1:50:46Joe stands by his report based on what

1:50:49he's seen. And lastly, I will tell you

1:50:51regardless of what happens, uh, I think

1:50:54council lean had indicated this, it

1:50:56doesn't necessarily mean that the

1:50:58property owner loses the property. There

1:51:00is a process. This is the beginning of

1:51:03that process. Uh so

1:51:06that's the legal guidance to the board.

1:51:09>> Thank you, Council.

1:51:10>> Thank you,

1:51:11>> Andy.

1:51:13I was going to ask Santo for legal

1:51:14guidance. So,

1:51:15>> okay. Thank you for that.

1:51:16>> Thank you.

1:51:17>> Okay,

1:51:17>> you're good.

1:51:18>> Yep. Madam Chair,

1:51:19>> I'd like to entertain a motion.

1:51:21>> Madam Chair, I'd like to make a move

1:51:23that we make case number P20260-

1:51:270117.

1:51:29We make a favorable recommendation to

1:51:30city council with a condition outlined

1:51:32in a staff report.

1:51:33>> Second.

1:51:35>> All right. Acting vice chair Patel.

1:51:37>> I.

1:51:38>> Commissioner Conway.

1:51:39>> I.

1:51:40>> Commissioner Stamato.

1:51:42>> I.

1:51:42>> Commissioner Capers.

1:51:44>> I.

1:51:44>> Commissioner Kaplan.

1:51:46>> From what was presented, it seems like

1:51:47they clearly meet the legal requirement

1:51:49of what was listed and that these are

1:51:51not new um properties. There's a lot of

1:51:55history here. So, with that, I'll vote

1:51:56I.

1:51:57>> Thank you. And lastly, Madame Chair

1:52:00Gangadin,

1:52:00>> based [clears throat] on the

1:52:01presentation and the criteria, um

1:52:04definitely um my vote is I.

1:52:07>> Thank you. Motion carries 6.

1:52:10>> We'll take a break, a 10 minutes break.

1:52:12So, I'll be back at um

1:52:167:45.

1:52:36What happened?

1:52:37>> I'd like to call KP2025-0255

1:52:41minor site plan with C variance. Address

1:52:44is 26 Bright Street.

1:52:46>> Good evening, madam.

1:52:48>> Yes, good evening madam chair,

1:52:49commissioners. Uh for the record,

1:52:51Benjamin Weine of Prime Toull and

1:52:53Misselli here on behalf of the applicant

1:52:55SDDD Capital LLC. The property in

1:52:58question as as the chair mentioned is

1:53:00for 26 Bright Street. That's block

1:53:0314106,

1:53:04lot 38. And the property is located in

1:53:07zone 3 of the Bright Street

1:53:08redevelopment plan as well as the Vanvor

1:53:10Park Historic District. The application

1:53:13before you this evening is to raise the

1:53:15site. And uh while there are no real

1:53:17site improvements now, it's currently a

1:53:19100% uh paved lot with a curb cut and

1:53:22access for vehicles. There's no actual

1:53:25uh structural improvements. The proposal

1:53:27is to raise the site and to ultimately

1:53:29construct a new four-story for family

1:53:31residential building on the property

1:53:33that is consistent almost entirely with

1:53:36the requirements of the redevelopment

1:53:38plan and the historic district. We do

1:53:41ultimately have one variance which uh

1:53:42which is going to be I think a largely

1:53:44the substance of the conversation here

1:53:45this evening. It's for building height

1:53:47of 3' 11 in above what is permitted. So

1:53:5040 ft is permitted and 43t 11 in is

1:53:54proposed and the reason for that is

1:53:56almost entirely the flood plane. Um this

1:53:59application is located with the first

1:54:01approximately 6 ft bel below the flood

1:54:05elevation line which means you cannot

1:54:07actually construct any habitable space

1:54:09until you reach that level. And so that

1:54:11is approximately 6 feet but you'll hear

1:54:13more in detail on that from our

1:54:15architect throughout the city of Jersey

1:54:17City. uh every single redevelopment zone

1:54:20and as far as I'm aware and the

1:54:22underlying zoning do actually permit the

1:54:24typically when you have a situation like

1:54:26that you don't even start your height

1:54:28calculation until 1 ft above that flood

1:54:30elevation so if that were the case here

1:54:33uh we would be a minor site plan

1:54:34application with no relief sought but

1:54:36because this is a historic district it's

1:54:38not particularly carved out in order to

1:54:41be able to start that calculation from

1:54:43that base flood elevation or a foot

1:54:45above that and that's really

1:54:46substantively the basis for the uh for

1:54:48the application and for the variance

1:54:50relief. Just a little bit of background

1:54:52here as well. Since we are located in a

1:54:54historic district, we did go to the HPC.

1:54:58We worked closely obviously with Maggie

1:54:59and her team. We went to the HPC back in

1:55:02the May and June meetings of this year

1:55:04and we were granted unanimous approval

1:55:06on a certificate of appropriateness for

1:55:08the design that you're going to see here

1:55:10this evening.

1:55:12Interestingly, after we obtained that

1:55:14approval, um we did continue uh engaging

1:55:16on a community level and through uh

1:55:18through Ben Jordan, the review planner

1:55:20here, it became known to us that the

1:55:22immediately next door neighbor, which is

1:55:2428 Bright Street, which is a large

1:55:26condominium association, um a five-story

1:55:28building, they had some concerns about

1:55:30the design that was ultimately proposed

1:55:32and approved by the HPC. And so what

1:55:34you'll see here tonight and the plans

1:55:36that are going to be presented is an

1:55:38exact mirror image of what was approved

1:55:41by the HPC. What I mean by that is we

1:55:44work closely with the condominium

1:55:45association, members of whom are here

1:55:47this evening to speak uh in support of

1:55:49this application to entirely flip the

1:55:52application that was approved by HPC. I

1:55:54then went back to Maggie and had a

1:55:56conversation and she emailed me back and

1:55:58said since nothing has changed other

1:56:00from the front perspective other than

1:56:02the location of the door which was

1:56:04proposed on the left is now completely

1:56:06mirrored and proposed on the right. It

1:56:08was her determination that we did not

1:56:10need to go back to the HPC and the

1:56:12certificate of appropriateness that was

1:56:13granted would stand. Um, with that,

1:56:16there are other site improvements which

1:56:18our project architect will go through

1:56:19with you. But as I alluded to in the

1:56:21beginning, it's removal of the curb cut

1:56:23and the what is really nothing more than

1:56:25a parking area at the moment. Obviously,

1:56:27the addition of a street tree to comply

1:56:29with your ordinance and other than that

1:56:313ft and 11in uh height variance being

1:56:34sought, a fully compliant development

1:56:36with the redevelopment plan and with the

1:56:38historic district. So, with that, I and

1:56:41I forgot to give council my notice, so

1:56:43I'll do that.

1:56:54Thank you.

1:57:19>> [clears throat]

1:57:36>> Madam Chairman, receive the affidavit of

1:57:38publication proof of mailing with

1:57:40respect to the application at 26 Bright

1:57:42Street. Council is correct. It is a

1:57:44thick notice, but it does appear to be

1:57:46in order. I will note for the record

1:57:49that there are over 300 property owners

1:57:51on the list. A1 for purpose of the

1:57:53record.

1:57:54>> Thank you. So, with that, Madam Chair, I

1:57:56have two witnesses I intend to call this

1:57:58evening. I have our project architect,

1:57:59Pittal Shukla, who will speak to the

1:58:02site design and the building that we're

1:58:03proposing, as well as the context with

1:58:05the neighborhood given obviously its

1:58:07location in a historic district. And

1:58:09then I have our professional planner,

1:58:10Carolyn Worstelle, who will speak to

1:58:11that one variance that I identified.

1:58:14>> Thank you.

1:58:23>> The whole truth.

1:58:24>> I do.

1:58:27>> First name Prial, P R I T A L. Last name

1:58:31Shukla. S H U K L A. address 182 County

1:58:37Avenue in Caucus, New Jersey.

1:58:40>> Miss Shukla, is your um license current

1:58:42and in good standing?

1:58:43>> Yes, it is.

1:58:44>> Thank you. You may proceed.

1:58:45>> Thank you. [clears throat]

1:58:48Can I How do I

1:58:53>> think it's

1:58:53>> I think it's on already.

1:58:55>> Now it's on the screen. Okay.

1:58:56>> And council, these are the same plans

1:58:58that have been submitted. Nothing's been

1:58:59changed or altered. And this is your

1:59:01plan set.

1:59:02>> That's correct. I was going to ask Miss

1:59:03Shukla to confirm that on the record

1:59:05that these are the plans that were

1:59:06indeed submitted at least 10 days in

1:59:08advance of this meeting.

1:59:08>> Yes, they are.

1:59:10>> Thank you. So, Pel, if you'll please

1:59:12walk the board through the existing

1:59:14conditions and the proposed conditions

1:59:15here this evening.

1:59:16>> Sure. [clears throat] So, the property

1:59:19at 26 Bride Street in Jersey City is a

1:59:22standard 25 ftx 100 ft lot. It's an

1:59:26interior lot 2500 square ft² lot area

1:59:30located on the north side of the Bright

1:59:33Street between Barrow Street and Grove

1:59:36Street. It is in zone 3, a residential

1:59:40infill zoning district and also within

1:59:43the Vanor Park Historic District. Today

1:59:46the lot is vacant. Our proposal fills

1:59:50that gap with a new fourstory, 4-unit

1:59:54brick residential building that

1:59:56completes the missing portion of the

1:59:59Bride Street streetscape. We want this

2:00:02building to be red as though it has

2:00:05always belonged on the block.

2:00:08Um, as you can see on this zoning

2:00:11analysis table, all bulk parameters

2:00:15comply with the proposed development

2:00:17except for one exception. The lot

2:00:21coverage is proposed at 73%.

2:00:24Required is 80%. Density at four units

2:00:29is compliant. Rear yard at 30 ft is

2:00:33compliant. The front yard matching the

2:00:36prevailing setback is also compliant.

2:00:39The proposed building height at 43 feet

2:00:4211 in against the 40 ft allowable

2:00:46baseline is the single height variance

2:00:49driven entirely by the flood elevation

2:00:52requirements.

2:00:53As you can see here um it is in flood

2:00:56zone AE with a base flood elevation of 7

2:01:00ft NAVD. The existing grade roughly is

2:01:05at 6.65 ft. The first floor occupied is

2:01:09elev elevated to the design flood

2:01:12elevation of 12 ft 1 ft of freeboard

2:01:16above the base flood. That raised first

2:01:19floor also produces a stoop which is

2:01:22exactly the historic building type found

2:01:25along the along this block. Also, the

2:01:30resulting height sits comfortably

2:01:33between the five-story building to the

2:01:35west and fourstory building to the east.

2:01:42>> [clears throat]

2:01:44>> Sheet G 100 shows the existing site plan

2:01:48as a vacant lot that is fully paved in

2:01:51concrete resulting in a 100% imperous

2:01:56condition with an existing curb cut

2:01:59along the bright street.

2:02:06The neighborhood photos

2:02:09um on sheet A501

2:02:12shows the site as it exists.

2:02:17Fully paved concrete surface vacant lot

2:02:20enclosed by chainlink fence and

2:02:23screening fence with one existing curb

2:02:26cut on Bride Street. It has no tree, no

2:02:30planting and all its storm water runs

2:02:32off directly to the combined sewer.

2:02:36It is a nonconforming condition that

2:02:39contributes nothing to the streetscape.

2:02:42Right now, [cough]

2:02:44[clears throat]

2:02:48the proposed site plan on sheet G 100

2:02:54establishes the building footprint

2:02:57indicated in the gray area with 0 foot

2:03:00front yard matching with the existing

2:03:04adjacent properties. 0 foot sideyard

2:03:07except for the west light well which was

2:03:11required for legal ventilation purposes

2:03:14and a 30 ft rare yard. Um all utility

2:03:18lines are proposed to run underground

2:03:21and will be coordinated with JCMUA and

2:03:24PSCG standards. This development

2:03:28substantially improves the existing

2:03:30non-conforming condition by eliminating

2:03:33the existing curb cut, reducing the

2:03:36existing 100% imperous coverage, adding

2:03:40street tree, adding front planter bed

2:03:44aligning with the adjacent uh building

2:03:47front planter bed towards the west. a

2:03:50landscape rare yard with perimeter

2:03:53shrubs.

2:03:57Sheet G101,

2:04:00which is the landscaping and lighting

2:04:02plan, indicates one new street tree in

2:04:06compliance with proposed Jersey City uh

2:04:09forestry standards. The green area ratio

2:04:13proposed is 0.45,

2:04:16well above the required 0.25 25

2:04:19threshold.

2:04:21The the proposed lighting consists of

2:04:24bronze downcast ballcons at the front

2:04:27facade along the entry area and rear

2:04:30facade along the uh egress passageway.

2:04:35There are uh similar walls sconces are

2:04:38proposed on the roof deck along the uh

2:04:41stair bulkhead area and all light

2:04:43fixtures are downcast residential in

2:04:46scale with no glare into the public

2:04:49right of way.

2:04:53[clears throat]

2:04:55Sheet A 100 and A101

2:04:59shows the proposed development design

2:05:02plans. Um the first floor

2:05:06consists of unit one which is a two bed

2:05:09two bath unit. The main building entry

2:05:12is proposed towards the east side of the

2:05:14facade with stoop leading to the lobby

2:05:17and one common stairs. Uh the proposed

2:05:20unit one which is a two bed two bath is

2:05:23approximate

2:05:251245 square ft apartment area with an

2:05:28accessible bathroom, living room and

2:05:31dining area at the rear opening to the

2:05:34to the yard. A side um egress corridor

2:05:39is proposed which connects the rear yard

2:05:43um and serves as a second means of

2:05:45egress.

2:05:47The se a partial cellar floor is

2:05:49proposed uh with approximate 445 square

2:05:53ft in area which is primarily used for

2:05:56storage and utility purposes only

2:05:59consisting of water meter, sump pump

2:06:02room, bicycle storage and um trash room.

2:06:08The refuge and recycling bins proposed

2:06:12stored in the cellar floor will be

2:06:14brought to the curb by building

2:06:16management only on collection days.

2:06:19Nothing is stored on the front yard.

2:06:24The seller because the property is

2:06:27located in the flood zone will be wet

2:06:29flood proof with flood vents as

2:06:31indicated on the drawings and all

2:06:34electric and um all electric meters and

2:06:37equipments are located above the design

2:06:40flood elevation on the first floor. The

2:06:43second floor consists of unit 2 which is

2:06:46three bed two bath unit approximate

2:06:491460 square ft apartment area with

2:06:53living kitchen and dining space facing

2:06:55the bright street front facade and

2:06:58bedrooms and balconies proposed towards

2:07:00the rear.

2:07:02[clears throat]

2:07:03The third and the fourth floor is

2:07:05proposed with two duplex units um front

2:07:09and rear. The front portion which is

2:07:12unit 3 is um 2 and 1/2 bed two bath unit

2:07:17with approximate 165 square ft apartment

2:07:21area. Um unit four which is proposed

2:07:24towards the rear is a three bed 3 bath

2:07:27unit with approximate 1610 square ft in

2:07:31area. On the west, a a 4t wide light

2:07:35well is proposed for legal ventilation

2:07:38purposes uh for the bedrooms within the

2:07:40duplex unit. This light well will um

2:07:44align with the existing adjacent

2:07:46building court u line edge of 28 Bright

2:07:50Street as indicated on the uh as

2:07:53indicated with the blue dotted line.

2:07:56>> [clears throat]

2:07:57>> The roof is proposed with um um roof

2:08:00deck, private roof deck for both the

2:08:03duplex units, which is unit 3 and unit 4

2:08:06with a two 200 square ft green roofs

2:08:10along the front and rear edges and a

2:08:13screened condenser area in the center.

2:08:18The proposed front facade which is the

2:08:22south um elevation is the only public

2:08:26facing facade uh along the bride street.

2:08:29The design draws directly from

2:08:31contributing Italianate and vernacular

2:08:34brick row houses on this block

2:08:36consisting with following features. um

2:08:39belen modular red smooth brick with

2:08:43brown concave lime motor joints. Um

2:08:48windows are punched uh openings set back

2:08:51one full brick white from the facade

2:08:54providing deep shadow line of historic

2:08:57masonry. Um as you can see all windows

2:09:00are aligned in a symmetrical manner. Um,

2:09:04all windows are 3 feet wide by six feet

2:09:07tall and they are equally spaced

2:09:10approximate 2 feet apart.

2:09:13[clears throat]

2:09:14The front windows are proposed as

2:09:16fiberglass double hung windows with two

2:09:19over two divided light pattern which

2:09:22helps reinforce the vertical rhythm of

2:09:25the facade. The main um entry includes a

2:09:29custom wood entry door with glass, a

2:09:32matching wood and glass sidelight, a

2:09:35glass transom above carrying vinyl

2:09:38address um number for the building

2:09:41address. The brick wraps around the

2:09:45recessed entry with caststone lintil

2:09:48above matching the with the window sill

2:09:50and lentils. Cast top with wood cornice

2:09:55molding in dark brown color coordinated

2:09:59with the dark brown custos and lentils.

2:10:03[clears throat]

2:10:04The rare elevation

2:10:06uh which is the north facing elevation

2:10:08is not visible from the public right of

2:10:11way. Um the rare facade is treated as a

2:10:15contemporary working facade proposed

2:10:18with stucco finish with Marvin aluminum

2:10:21clad doublehung windows and sliding

2:10:24doors at balconies consisting of black

2:10:27metal railing.

2:10:30Um sheet A1 A201 and 202 indicates um

2:10:36the side facade.

2:10:39And [clears throat] as you can see, most

2:10:41of the facade is being covered by the

2:10:44existing adjacent three-story building

2:10:46and uh five-story building on both

2:10:49sides. Uh the remaining part is proposed

2:10:52to have a stuckco finish matching with

2:10:54the rare facade.

2:10:58Sheet 203

2:11:01um and 204 shows the existing and

2:11:04proposed street block plan and block

2:11:07elevation. So on A203 you can see the

2:11:12existing streetcape

2:11:14uh with the vacant lot on our side

2:11:17disrupting the

2:11:19uh continuous wall of three and

2:11:22fourstory row houses between Barrow and

2:11:24Grove Street.

2:11:26Sheet A 204 shows the proposed

2:11:30condition.

2:11:33Um, the four-story building completes

2:11:35the missing tooth in the street wall,

2:11:38aligns with the prevailing setback, and

2:11:40relates to the ne uh neighboring cornis

2:11:43line and fourstory rhythm of the block.

2:11:48[clears throat] The sighteline section

2:11:50on sheet A300

2:11:53um from the public right of way along

2:11:56bride street confirms that the rooftop

2:11:59bulkhead is not visible from bride

2:12:03street facade.

2:12:05Um I have many exterior wall section,

2:12:10enlarged door details, window details,

2:12:13cornness details,

2:12:15um materials proposed along the front

2:12:18facade. Um and lastly, the proposed

2:12:22rendering

2:12:24>> and I'm just going to stop you for one

2:12:26second. This sheet was not previously

2:12:28submitted to the board. So I would just

2:12:30like ask to ask you to identify what

2:12:32this sheet is and we can ask uh council

2:12:34to please mark this as I guess A2.

2:12:38So PTO what are we looking at?

2:12:39>> Yes it's the proposed uh exterior

2:12:43rendering of the building which brings

2:12:46it all together. a red brick rowhouse

2:12:50type building with a stoop, painted

2:12:53cornice,

2:12:54dark brown windows with a planter bed

2:12:57along the front sitting naturally

2:13:00between the neighboring buildings.

2:13:02>> Do you have a title on this sheet?

2:13:05>> It is um

2:13:07>> just says proposed fourstory 4unit

2:13:09development.

2:13:11>> Yes.

2:13:12>> Existing adjacent building photos and

2:13:14proposed building exterior rendering

2:13:16A600. Does it have a date?

2:13:21>> Uh 910 2026

2:13:24>> A2. Thank you.

2:13:28>> To summarize, a vacant fully paved lot

2:13:32with a curb cut becomes a finished

2:13:35historic district building with a

2:13:37continuous curb and sidewalk. It matches

2:13:41the prevailing front setback, cornness

2:13:44line and fourstory rhythm of the block.

2:13:48The use and density comply and every

2:13:51bulk standard complies except for the

2:13:54height. The height variance of 3' 11 in

2:13:58is driven entirely by the flood

2:14:00elevation. Without it, the building

2:14:04wouldn't comply. The design has been

2:14:07shaped through historic preservation

2:14:09review to fit the character of Van Worst

2:14:12Park Historic District. That concludes

2:14:15my testimony. I'm happy to answer any

2:14:17questions.

2:14:18>> Thank you, Prial. Um, the only question

2:14:20I actually had for you, which is shown

2:14:22on uh on this screen. Um, one of the

2:14:24historic requirements, and you do see it

2:14:26here on the rendering, is that we would

2:14:28wrap the brick around the side uh the

2:14:30exposed side facade as well. So can you

2:14:33just uh for the board confirm

2:14:35approximately how many feet back that

2:14:36brick wraparound will go?

2:14:38>> Yeah, if you see this red line that I'm

2:14:41drawing. So from the front facade, we've

2:14:45agreed to wrap it around to 25 ft.

2:14:49>> Okay. Thank you. I have nothing further

2:14:51for Miss Shukla.

2:14:52>> Thank you, Mr. Shukla.

2:14:54>> Any comments from the board?

2:14:56>> No. Oh,

2:14:57>> Madame Chair, if I may, um, could you

2:14:59just provide a little bit of testimony

2:15:00as to kind of the basement space, how

2:15:02that's accessed both for trash and the

2:15:04bicycle room that's proposed down there?

2:15:06>> Yes. So,

2:15:06>> and the height of the ceiling of that

2:15:08room, please.

2:15:09>> Sure. So, the basement is accessed um if

2:15:13I show the seller plan. Um, the first

2:15:16floor plan. So, this is the

2:15:20>> Is it a seller or is it a basement?

2:15:21>> It's a seller. So that's the main entry

2:15:25and the basement stairs are here.

2:15:27>> Seller stairs, I'm sorry. Seller stairs.

2:15:31>> I started it

2:15:32>> because the first floor is raised almost

2:15:35um 5 ft. The basement is uh if I go back

2:15:39to my elevations

2:15:43um the basement is proposed

2:15:45>> seller

2:15:47>> sorry the seller is proposed um 5 ft

2:15:52below the existing uh grade. So the

2:15:55total height of seller is 4 to I mean 7

2:15:59to 8 ft.

2:16:02>> So is that a seller then?

2:16:07Yes, I believe

2:16:07>> so more more than half is below grade

2:16:14>> more than half of the

2:16:16>> seller

2:16:17>> the excavated

2:16:18>> bottom story the bottom story more than

2:16:21half is below grade

2:16:24>> okay

2:16:25>> so it's

2:16:26>> of the excavated portion or the

2:16:28unexavated portion

2:16:29>> of the excavated portion so only the

2:16:33front if you see the seller plan only

2:16:35the front portion is being used as

2:16:38seller which is 445 square ft for the

2:16:42purposes of water meter room some pump

2:16:45room bicycle storage and trash room the

2:16:49behind area if you see here it's

2:16:52unexcavated area not in use

2:16:55>> okay

2:16:57>> and half of the

2:16:59belowra area is only as it pertains to

2:17:03the excavated ated portion.

2:17:06>> Correct.

2:17:07>> Okay.

2:17:09>> Council, I think you know where I'm

2:17:10going with that.

2:17:12>> Yes. Uh I do.

2:17:16>> Oh, no. Keep going. [laughter]

2:17:18>> I want to know where you're going.

2:17:20>> So, we're in a flood plane.

2:17:22>> Correct.

2:17:23>> So, you can't have habitable space down

2:17:25in the basement or a flood plane.

2:17:27>> Seller.

2:17:28>> Seller.

2:17:29So

2:17:30>> you can't have habitable space

2:17:33down below the flood plane.

2:17:38>> So it is not habitable. It's used only

2:17:41for storage and utility purposes.

2:17:43>> You have a bicycle rack there. No,

2:17:45>> thank you. But I was answering the

2:17:48commissioner's question.

2:17:49>> Okay. Sorry.

2:17:52>> So I understand

2:17:53>> that's why I'm asking this line of

2:17:56questioning. Right. So the question then

2:18:00turns to is it habitable space if you

2:18:03have the bike racks, the garbage

2:18:06>> and the meter room down there. It's a

2:18:08water sprinkler room. There is a

2:18:10subpump. Where are the electric and gas

2:18:12meters? Those are on the ground the

2:18:15first floor, right?

2:18:16>> Mhm. So uh gas meters are uh located

2:18:20here

2:18:22which are which are exter need to be ex

2:18:25um along the exterior facade uh based on

2:18:29the PSCG standard. The electrical meter

2:18:32closet is here

2:18:34>> and that's on the first floor.

2:18:36>> Correct.

2:18:39[snorts]

2:18:41>> I'm sorry. So the gas meters are located

2:18:43at what height? I see they're outside of

2:18:46the structure next to the stairs, but

2:18:47are they at the lower level of the low

2:18:51sunken floor?

2:18:52>> So, the stoop is uh 5t high.

2:18:56The this wall that you see,

2:18:59this wall is 5 ft high from grade going

2:19:03up to the stair. So, gas meters are

2:19:06along located on the side of that wall.

2:19:09>> At what elevation are the gas meters

2:19:12along that wall? Um

2:19:15>> are they above the

2:19:15>> below below five feet?

2:19:17>> Okay.

2:19:18>> Um so between two to two feet to five

2:19:21feet

2:19:22>> above the flood plane.

2:19:24>> No

2:19:25>> no above the existing grade.

2:19:27>> So give it to us from the flood plane.

2:19:30Can you do that calculation?

2:19:32>> Yeah. So um [clears throat]

2:19:34>> because I don't want this denied by the

2:19:36building department and then you have to

2:19:39come back and get an amendment to the

2:19:40site plan.

2:19:42>> Yeah. So, um, this is 5 ft,

2:19:47>> right?

2:19:49>> And they need to be somewhere in here.

2:19:51>> But where is the flood plane line?

2:19:54>> The flood plane line, the base flood

2:19:57plane line is here.

2:20:00>> So, it's below.

2:20:01>> So, it's below.

2:20:02>> Below. Yes.

2:20:03>> I think that's a problem.

2:20:04>> Yep.

2:20:08>> Pretel, do you know if that meets

2:20:10building code? Um I will have to check

2:20:13that. I know um electric meters for sure

2:20:17had to be located above. I'll have to

2:20:20check about the gas meters.

2:20:22>> And I thank you for your candid answer.

2:20:25Uh this is something that this board has

2:20:29become increasingly conscientious of to

2:20:33avoid problems going forward. So uh

2:20:38that was the point of the question.

2:20:40Commissioner,

2:20:43>> thank you.

2:20:43>> Sure, Andy.

2:20:44>> So, I guess if I could just to, you

2:20:46know, on the bicycle question, um, how

2:20:48many steps is between the outside grade

2:20:51and the the seller that for the bicycles

2:20:54to be moved up or down?

2:20:56>> Seven.

2:20:57>> Seven. So, does that require

2:21:01variance or is that just because the

2:21:03units are less?

2:21:03>> So, Commissioner, I'll tell you because

2:21:05Yeah. So, what and we talked about this

2:21:07beforehand. Um, it it doesn't require a

2:21:10variance because we're technically not

2:21:11required to provide bicycle space at all

2:21:13because we're less than five units. But

2:21:15what we can do, and I'll let Miss Shukla

2:21:17confirm that, we can still add that um,

2:21:20>> forget the terminology.

2:21:21>> Rail

2:21:22>> that that

2:21:23>> bike rail,

2:21:24>> right?

2:21:24>> Yes. Bike rail that allows you to to go

2:21:27down and you can place that under the

2:21:28railing. So, we can correct, Michla, we

2:21:30can still do that.

2:21:31>> Yes.

2:21:32>> Okay.

2:21:32>> Thank you, counselor. Um, and then one

2:21:34last question. Sorry, Commissioner. Um,

2:21:37so I guess if you could just walk me

2:21:38through a little bit the trash. I think

2:21:40you very clearly outlined how the trash

2:21:41is removed, but how would residents um

2:21:44do they need to exit the building to

2:21:45deposit their trash in these receptacles

2:21:47in this design?

2:21:48>> Yeah. So, uh the uh trash is stored on

2:21:52the cellar floor and the access to the

2:21:54cellar floor is proposed from the

2:21:56outside not from the inside. So, they

2:21:59will have to come out. Um however there

2:22:02will be a building management um team

2:22:06engaged and they will do um the trash

2:22:10removal during the collection days

2:22:13>> bringing it out of the building.

2:22:15>> Correct.

2:22:16>> But the residents have to bring it down

2:22:18there.

2:22:19>> I believe so.

2:22:20>> Themselves.

2:22:22>> It's only four units.

2:22:25>> I have to take my trash outside.

2:22:27>> Yeah, exactly.

2:22:29It's probably waiting for me when I get

2:22:31home.

2:22:33>> How many flights do you have to travel?

2:22:35>> Four.

2:22:37>> It's not bad.

2:22:38>> No.

2:22:39>> Stairs or flight. Actual stairs.

2:22:42>> The wife says I need to drop a couple of

2:22:44pounds. So, it's stairs.

2:22:47[laughter]

2:22:49>> Walk down, sprint up if you must.

2:22:51>> Back to 26 Bright Street.

2:22:53>> [laughter]

2:22:54>> Could you speak a little bit toward that

2:22:56egress passageway um and what the

2:22:57intended use of that is?

2:22:59>> Yeah. So um that egress passageway is

2:23:02indicated with this dotted line here

2:23:06from the cellar floor out to the street.

2:23:09>> I'm sorry I was on the um on the first

2:23:11floor. Uh so this

2:23:13>> the rear yard egress passageway.

2:23:14>> Oh egress rear yard here. Thank you. So

2:23:17that's this passageway.

2:23:24Um, and if I show you on the side plan

2:23:28that's indicated here in the dotted

2:23:30line.

2:23:32So from the rear yard, you come out this

2:23:37way.

2:23:42C could you just provide testimony as to

2:23:43what the purpose of that is in the

2:23:45intended use

2:23:46>> because um uh two family or more and

2:23:51fourstory building needs second means of

2:23:54egress from the rare yard

2:23:56>> I see

2:23:58>> how do the upper floor units access

2:24:01>> uh access

2:24:03>> the second means of egress

2:24:04>> secondary to three that's the reason why

2:24:07we made the third floor unit

2:24:10um duplex X in nature. So

2:24:16sec third and fourth floor is duplex

2:24:19unit. They have balconies.

2:24:22Um and that's how they will access the

2:24:25rear yard.

2:24:27>> How do they access the secondary mean of

2:24:30egress?

2:24:32>> Through through um a ladder attached to

2:24:35the balcony.

2:24:37>> Can you show that to me?

2:24:43It's somewhere in here.

2:24:46>> Pretel, if you go to the rear elevation,

2:24:48you might be able to see it.

2:24:51Oh, you missed it.

2:24:57[clears throat] Go up one more. Oh,

2:24:58okay.

2:24:59>> So,

2:25:01probably here.

2:25:05>> I don't see a detail of it. No, there's

2:25:08nothing too.

2:25:08>> You're drawing it as we speak.

2:25:11>> We have to go down one or something.

2:25:14>> Down ladder.

2:25:15>> No, no, no. We don't see any detail on

2:25:17this. We see the balcony, but we don't

2:25:19see a ladder coming off the balcony. Is

2:25:22there some other place we should be

2:25:24looking?

2:25:25>> Um, so the that's a building code issue

2:25:29which is which we will be eventually

2:25:31addressing it during the construction

2:25:34permit. Secondary mean of egress is not

2:25:36going to be a building code with this

2:25:38board.

2:25:39>> Yep.

2:25:39>> Okay.

2:25:40>> Right. Pretel, are we The question I

2:25:42think is, are we required in a four-unit

2:25:44building where you walk up no more than

2:25:46three stories to your unit, are you

2:25:48required a second means of eress?

2:25:50>> Up to third floor, you need second means

2:25:53of egress.

2:25:54>> So that's fourth. We have four units.

2:25:57>> Yeah, we have four units. That's why we

2:25:59made the third and fourth floor unit

2:26:01duplex. So I think

2:26:03>> so it's a threestory four unit building.

2:26:06You are you don't need second means of

2:26:09egress from the uh third four third and

2:26:12fourth floor. The back unit does not

2:26:14need it but the rare yard needs second

2:26:16means of egress.

2:26:18>> Right. So that was my question. So

2:26:20you're not required to a second means of

2:26:23egress to get out of the building given

2:26:25the class of construction that this

2:26:27building is. But you're required if

2:26:29you're in the rear yard to be able to

2:26:31get out of the building to the front of

2:26:32the building. Is that correct?

2:26:34>> Yes.

2:26:34>> Okay.

2:26:36>> So, so if I may, just to clarify,

2:26:38there's no fire escape. There's no

2:26:39ladder on the rear of the building or

2:26:41the front of the building proposed.

2:26:43>> Correct.

2:26:43>> Okay. Thank you,

2:26:48>> Matt. It looks like you might want to

2:26:49>> I was just going to say that's all

2:26:51correct. Okay.

2:26:52>> Mhm.

2:26:52>> I appreciate your testimony, Matt.

2:26:54>> Thank you.

2:26:58But going back to your question, Sento,

2:26:59in regards to the um

2:27:05>> first the seller,

2:27:08>> right?

2:27:10>> If we can go back there having the

2:27:13bicycle rack, the utilities there

2:27:17with the um

2:27:21below the flat planes. So um utility the

2:27:25sprinkler room is proposed above the

2:27:27flood plane

2:27:28>> above

2:27:29>> above the flood plane as you can see

2:27:31here on the first floor.

2:27:34>> The sprinkler room.

2:27:35>> The sprinkler room.

2:27:38>> What is the water sprinkler room in the

2:27:40cellar?

2:27:41>> It's the water meter room.

2:27:49>> I'm confused now.

2:27:52The sprinkler room is in the cellar

2:27:56>> because this is in flood zone. The

2:27:58sprinkler room has cannot be on the

2:28:00seller floor.

2:28:01>> So preach

2:28:02>> respectfully I'm looking at the plan

2:28:03that's in front of me that you now just

2:28:05scratched off the word sprinkler.

2:28:08>> Yes. Earlier we were proposing it to be

2:28:11um on the seller floor. That was very

2:28:14initial plan. Um and later on because of

2:28:18the flood zone requirements we had to

2:28:20move it on the first floor. Um initially

2:28:23it was moved towards the front of the

2:28:25street. However it was when we went uh

2:28:29at the HPC hearings uh because of the

2:28:32sprinkler room being on the front of the

2:28:34facade the windows were not aligned and

2:28:37the design was not what the HPC board

2:28:40would approve. Hence the sprinkler room

2:28:43from the first floor we had to redesign

2:28:46move it uh towards the middle of the

2:28:48building which is now being accessed

2:28:50through the um uh second means of egress

2:28:53corridor and um the seller space is used

2:28:57for uh sump some pump room and water

2:29:00water meters.

2:29:01>> So Pel, I'm going to ask you that is a

2:29:03typo that says sprinkler in the seller.

2:29:06>> Correct.

2:29:06>> Okay.

2:29:22>> [clears throat]

2:29:30>> Pat,

2:29:35>> sorry. I'm trying to get a better

2:29:37understanding on this. So, the seller is

2:29:40definitely below the flood plane.

2:29:42Correct.

2:29:42>> Yes. Correct.

2:29:43>> All right. So, you're going to have

2:29:44garbage pales down in the cellar that

2:29:47people are going to bring garbage down.

2:29:49Chances are, if there was any type of

2:29:51flood or whatever, you'll have garbage

2:29:53floating around. Question for you, how

2:29:55do you propose the water not getting

2:29:57into the cellar?

2:30:01[clears throat]

2:30:01>> So, we have flood planes and the seller

2:30:04will be wet floodproofed.

2:30:07there is no way to not I mean stop the

2:30:11water if it enters and that's the reason

2:30:13why it is used for storage and utility

2:30:16purposes only and there is no habitable

2:30:18space.

2:30:19>> So Pel can you explain to the

2:30:21commissioners what wed floodproof means?

2:30:24>> So it's uh designed as a bathtub where

2:30:27water can be retained. We have we have

2:30:30structural engineer on board and that's

2:30:32how they're going to design just the

2:30:35partial cellar floor which is used for

2:30:38storage and utility purposes as a

2:30:40bathtub.

2:30:42>> So it's going to collect the water.

2:30:45>> Yes.

2:30:46>> Yes.

2:30:46>> So and you have a bike bicycle rack

2:30:48there. So water comes it's there's a

2:30:51flooding. What happens to everybody's

2:30:53bicycle that's parked up there?

2:30:54>> It's ruined.

2:30:56>> New bikes. So, so bicycle is uh storage

2:31:01is not required to be provided as per

2:31:04the ordinance. However, we we thought it

2:31:07would be good to have it uh bicycle

2:31:10storage because it would be useful for

2:31:12people um um who will be staying here.

2:31:16So it's it's proposed as an amenity but

2:31:20it's in it is in flood zone and we are

2:31:23we are aware of it like we don't have

2:31:25control

2:31:27>> over that part

2:31:28>> over what part

2:31:29>> uh building flood zone it's it's in

2:31:32flood zone and water will get in and

2:31:35that's the reason why it will be design

2:31:37it will be wet floodp proofed

2:31:42designed as a bathtub where it uh water

2:31:45will come I know.

2:31:49>> Yes. The testimony is we're

2:31:52proposing a seller that is going to

2:31:55flood.

2:31:55>> Yeah. I think I need one more.

2:31:57>> I would like to propose a condition

2:31:59where you could separate maybe where the

2:32:02water comes in and gets uh collected

2:32:04versus where there'll be space that's

2:32:07utilized for different utilities and the

2:32:09bike rack.

2:32:11So again it's just the 400 square ft

2:32:15that we are talking about. We are not

2:32:17using the whole seller and it's just the

2:32:20partial cellar which is you being used

2:32:22for the trash storage some pump um and

2:32:27and bicycle storage. Pel to to

2:32:31Commissioner Conaway's question, is

2:32:33there a way that we can integrate

2:32:35certain mechanisms in this cellar to

2:32:38better protect I guess we're less

2:32:40concerned about the open space itself,

2:32:42but the the trash area for example and

2:32:44the bicycles,

2:32:45>> right? You have that unexcavated area.

2:32:47Is there a way maybe you could excavate

2:32:48some of that to contain some of the

2:32:50water and then the other utilities be

2:32:52left dry or I don't know what's

2:32:54necessarily possible in your

2:32:55circumstance?

2:32:57>> I don't think it works that way, right?

2:33:00The whole neighborhood's flooded door.

2:33:03>> The water is going to go down that

2:33:04staircase and into this cellar.

2:33:08>> If there's a flooding event, hence the

2:33:11reason it's in a flood zone

2:33:17>> and the garbage will float around and

2:33:19the food matter will float around and

2:33:20you'll have a terrible order.

2:33:22>> There will be food and flood and trash

2:33:25in a flood event. I hate to be cleaning

2:33:28it up. I think it will be everywhere

2:33:30regardless if it's in a area

2:33:33>> of this building when it floods it's

2:33:36pretty gross in and of itself contained

2:33:39at least in a open area it'll float away

2:33:41you know

2:33:42>> keep in mind

2:33:42>> contained

2:33:44>> do keep in mind regarding the bicycles

2:33:47again there is no requirement for them

2:33:48to provide that amenity they're choosing

2:33:50to provide that and finding space in the

2:33:53seller to do so

2:33:54>> that really doesn't concern me as far as

2:33:56the bikes are concerned I I understand

2:33:58that, you know, but what I what I'm what

2:34:01I am concerned are two issues. One, the

2:34:03electrical, you know, where that's

2:34:05located along with the gas. That still

2:34:07bothers me a little bit. And also the

2:34:09garbage.

2:34:12>> I had those concerns.

2:34:16>> I think that's everyone's concern.

2:34:18>> Well, great.

2:34:19>> We're all on the same board.

2:34:22>> Okay,

2:34:22>> Andy. I I would also ask just kind of

2:34:25how the water being located in the flood

2:34:27zone operates. Like is it a sealed

2:34:29system so that if when it does flood the

2:34:31building doesn't lose drinking water

2:34:33supply?

2:34:34>> Um

2:34:36you mean the incoming water supply?

2:34:39>> So I see in the room with the subpump it

2:34:40it is intended as a water room. Correct.

2:34:43>> Yes.

2:34:43>> So is that when that room were to flood

2:34:45in a flood event would that impact the

2:34:47water supply to the units above? Um I I

2:34:51don't know the answer to that question.

2:34:53Uh but if a property is in flood zone,

2:34:58there are three things that we do as

2:35:00design architects. One is a sump pump

2:35:04solution. One, second is bed flood

2:35:07proofing which we are doing and third is

2:35:10to provide flood vents. We have provided

2:35:14a calculation here. Three flood vents

2:35:17are required. we are providing

2:35:20for.

2:35:23>> So,

2:35:37>> no, that's a

2:35:38>> how does a flood flood vent work? the uh

2:35:42so in the event of flood the flood uh

2:35:45vent opens up and it lets the water out

2:35:48the stored water out.

2:35:51>> So in this case would it act as a

2:35:52subpump it would let it out of the other

2:35:54space.

2:35:54>> So the sump pump will be operated also

2:35:57the flood uh flood vents will be

2:35:59operated also.

2:36:02>> What level are the the flood vents on?

2:36:04>> The flood vents are um

2:36:08>> somewhere in here.

2:36:11I'm sorry. Where? Oh, okay.

2:36:18[clears throat]

2:36:20>> The water is coming in here

2:36:21>> and they allow water into the cellar in

2:36:24a flooding or out of the cellar.

2:36:26>> Got it. So when it comes down the stairs

2:36:27and and finds its way in, how so it's

2:36:29only when the water reaches that height

2:36:31and the flood.

2:36:32>> Yes.

2:36:33>> And then how does it work in this the

2:36:35unexcavated area that flood? So there is

2:36:38a some pump to pump out the water until

2:36:40it reaches to that level. Once it

2:36:43reaches to that level, there are flood

2:36:45vents.

2:36:45>> Gotcha. So is there something that keeps

2:36:47it closed so the water doesn't

2:36:49>> Yeah. For it it keeps them closed but

2:36:52once the water rises to that level um

2:36:55the the vents open up and it lets the um

2:36:59water out

2:37:01>> into the soil

2:37:02>> automatically

2:37:05>> into soil.

2:37:08I don't know answer to that question.

2:37:14>> Can you describe the um the vents for

2:37:16me? As you said,

2:37:17>> say that again.

2:37:17>> Can you please describe the vents? As

2:37:19you said, it's auto it automatically

2:37:21>> the flood the flood vents would have

2:37:23lures. Uh and once the water level

2:37:27reaches that

2:37:28>> louvers

2:37:29>> uh

2:37:30>> lures lures

2:37:32>> louvers

2:37:32>> and once the water level reaches the

2:37:34flood bends they automatically open so

2:37:37that water is out gets out.

2:37:43So,

2:37:43>> Madam Chair, I think the only question

2:37:44is, right, you're allowed to have a

2:37:46seller in a flood zone,

2:37:48>> right?

2:37:49>> You cannot have a bedroom and a unit and

2:37:53people living down there.

2:37:56>> Uh,

2:37:58you know, in terms of the garbage

2:38:00storage,

2:38:02I don't see where else you would put it.

2:38:04We don't want it outside, obviously. We

2:38:06don't want it in the side area. It's

2:38:10kind of has to go down there and god

2:38:13forbid that will become an issue from a

2:38:20compliance standpoint.

2:38:24I just don't know if those gas meters

2:38:28comply. So, I'm flagging that as a

2:38:31potential issue because if they don't

2:38:33comply, then you're going to be back

2:38:36here on that. uh if you tell me they

2:38:39comply and they're allowed to be at that

2:38:41elevation in that location,

2:38:45you know, I I want to prevent the

2:38:47amendment from having to take place. But

2:38:50if the applicant's confident, then the

2:38:53applicant's confident. So that's really

2:38:56the way I see it in terms of the seller

2:38:59and what's permitted to be down there.

2:39:02They're allowed to store down there. you

2:39:05know, if the enduser wants to put their

2:39:07bicycle down there and god forbid, I

2:39:10mean, that's

2:39:11that's something the board can wrestle

2:39:13with, but I'm concerned about obviously

2:39:17any kind of living space and things of

2:39:20that nature and really those gas meters

2:39:22from

2:39:24>> a legal standpoint.

2:39:26The electric's on the first floor. That

2:39:29sprinkler room, that's not a sprinkler

2:39:32room. That's just the water meter. again

2:39:36if the water

2:39:39regulations allow that water meter to be

2:39:42located down there. If not and it's got

2:39:45to get relocated,

2:39:48you know, you've got all the variables,

2:39:51right? You've got the historic issue,

2:39:54you've got this board's jurisdiction,

2:39:57and then the other regulators.

2:40:00So if the applicant's comfortable and

2:40:03confident that all of that meets code

2:40:05compliance and the regulatory

2:40:08compliances,

2:40:09then

2:40:11uh you know, we're going to defer to

2:40:13those individuals

2:40:15anyway in that regard. I just don't know

2:40:17if it does or it doesn't. That's why I'm

2:40:19I'm raising it.

2:40:21>> So council, we can do two things. Um

2:40:24both of them. So, one of them is I can

2:40:26have our structural engineer who's also

2:40:28our civil engineer on the project speak

2:40:30to the utility components um just so

2:40:33that everyone can feel comfortable. And

2:40:35with with respect to the trash, if while

2:40:38that's not a code issue, I I recognize

2:40:40this board is obviously very concerned

2:40:41with trash. I've been here enough to

2:40:43hear that that's something we can put in

2:40:45the exterior of the building outside in

2:40:47the rear. Um so that again that the

2:40:50building management would walk through

2:40:51that egress tunnel instead of walking

2:40:53from the seller. So that's an option

2:40:55that we have without running a foul of

2:40:56historic and starting to place

2:40:59enclosures outside in the front of the

2:41:00building. So I think that should

2:41:02alleviate the trash concern. And then

2:41:04with respect to the utilities, I like I

2:41:06said, I can have our structural engineer

2:41:08at least make the board comfortable with

2:41:09what is permitted down there so that

2:41:11they know what what what is permitted

2:41:13down there.

2:41:19I think you can have your structural

2:41:22certify or testify to the utility

2:41:26issues. And then with respect to the

2:41:30trash, that's that's a question for the

2:41:32board,

2:41:35>> but the plan is to obviously leave the

2:41:36bicycles down there.

2:41:37>> Yeah. I mean, the bicycles are amenity.

2:41:39At the end of the day, if the board

2:41:41preferred, we simply didn't provide

2:41:42them. We could not provide them, right?

2:41:44Um,

2:41:46>> understood.

2:41:48>> Is there any other questions for this

2:41:51witness?

2:41:51>> Madam Chair, I would just express a

2:41:52little bit of concern trying to think

2:41:54through the relocation of the trash to

2:41:55the rear yard for all but the unit on

2:41:58the first floor would now need to exit

2:41:59the building, walk through that rear

2:42:01yard egress to reach the trash to

2:42:03deposit it. So

2:42:06>> So the first floor unit does have a rear

2:42:09yard access,

2:42:11>> correct? But the the other units would

2:42:13have to come come outside as they do

2:42:14now, but instead of reaching the seller,

2:42:16it's a longer walk. So,

2:42:17>> yeah. So, the path uh path of travel to

2:42:20get to the trash increases.

2:42:22>> Right. Again, it's permitted in the

2:42:24seller where it's proposed. It was just

2:42:26an alternative if the board was more

2:42:27comfortable putting to the exterior. I I

2:42:30would not want to, like I said, start

2:42:32designing something outside in the front

2:42:34that would run a foul of historic.

2:42:37>> Concur.

2:42:40>> I don't know. My my my personal

2:42:42preference would be to remain in the

2:42:43cellar.

2:42:44>> My preference would be the same to to

2:42:46remain in the cellar

2:42:47>> an uncommon flood event as opposed to an

2:42:49everyday, you know, occurrence outside.

2:42:51But again, I'll let each commissioner

2:42:52make

2:42:53>> and and we can stipulate as a condition

2:42:54obviously that we've said there will be

2:42:56building management that in the event of

2:42:58a flood and that there is a garbage

2:43:00explosion, building management would be

2:43:02responsible for cleanup as well um in

2:43:04that, you know, 100year storm or or any

2:43:06type of event.

2:43:06>> Absolutely.

2:43:07>> And the rear yard is not above the flood

2:43:08elevation either. either.

2:43:10>> Correct. It would just It's just not

2:43:11enclosed.

2:43:12>> Correct.

2:43:12>> Correct.

2:43:13>> Let's Any other questions for this

2:43:15witness?

2:43:16>> No, I think I think we're good.

2:43:19>> Let's have the civil engineer address.

2:43:21>> I'd like to call up our civil engineer

2:43:23>> brief.

2:43:24>> Yes. You want to leave the plan up

2:43:27there? I might just

2:43:31>> Yeah, leave it up. Yes.

2:43:33>> Truth. The whole truth.

2:43:35>> Yes, I do. The record

2:43:37>> guy loss l a G o m a r s i n o and I'm a

2:43:42licensed engineer in the state of New

2:43:43Jersey. I've been here before in the

2:43:45last few months.

2:43:45>> And your license current in a good

2:43:46state?

2:43:47>> Yes, it is. It's current. Thank you.

2:43:48Okay. So, just to reiterate, I just want

2:43:50to just encompass everything that pretty

2:43:52much they were saying. So, I have civil

2:43:54and structural background as well as

2:43:56MEPs which I've done. First, the

2:43:58electric cannot be downstairs. We know

2:44:00that has to be above the the the flood

2:44:02plane. the water is okay because there's

2:44:04RPZs that protects it from going to the

2:44:07street. The question arises because down

2:44:09here the pressure is not too good.

2:44:11There's usually going to be most likely

2:44:13be a pump. So, we have to, you know,

2:44:15configure the pump. But as long as you

2:44:17pass the RPZs, you can put the pump

2:44:19anywhere else in the residence. I've

2:44:20done this a few times in Jersey City

2:44:22where they put even the pump in the rear

2:44:24and which puts, you know, beyond the

2:44:27flood, you know, elevation that they

2:44:29could keep that higher. As far as the

2:44:31gas, I don't think that's an issue too

2:44:33because this also has uh uh protective

2:44:35valves and and from release to that. So

2:44:40the major question here which I'm even

2:44:42seeing things in the last storm we've

2:44:44had a few weeks ago. I was watching

2:44:45channel 12 and they had things in Asbury

2:44:48Park with people even below grade and

2:44:49they have certain things that now are

2:44:51protective barriers. It's very

2:44:53expensive. I think this is vital space

2:44:55in the basement to give it up. I don't I

2:44:58think it's a loss. Uh it's it's really

2:45:00it's it's really good space. Now the

2:45:03vents I don't think they would be able

2:45:05to use that because you want to make

2:45:06that a bathtub. That being a bathtub

2:45:08which would have um water infiltration

2:45:11below the bottom not allowing water to

2:45:14seep in and and a lot of water water

2:45:16protective membrane around it. But the

2:45:18structure itself is encompasses. So the

2:45:22only question would be water as you said

2:45:24going down. There are doors which I saw

2:45:25on TV. Actually, there's beautiful doors

2:45:27that that actually protect the water

2:45:29from going down. Now, again, it looks

2:45:31like you're in a bunker, but it will

2:45:33provide what it would need to to protect

2:45:35the water from going into the basement.

2:45:37And we'll relieve the the vents on the

2:45:39side, so we don't want to ever water it

2:45:40at all there. So, it would almost be

2:45:42like a bunker and make it as a bunker.

2:45:45So, of course, it's not livable, but you

2:45:47know, it's I think it does its due

2:45:49diligence.

2:45:51>> Okay.

2:45:51So guy, it's your it's your testimony as

2:45:54the civil and structural engineer on the

2:45:56project that as designed this does meet

2:46:00code.

2:46:00>> This will meet code uh without without a

2:46:03doubt in in fact uh if it's done

2:46:05appropriately and not in the general

2:46:08standards has to be has the extra

2:46:09standards to meet the the flood criteras

2:46:11of the D as well. And that's rather

2:46:14expensive, but if they're willing to

2:46:16spend that type of uh money, I think

2:46:18it'll be much profitable to them.

2:46:23Okay.

2:46:24>> All right.

2:46:26>> Any other questions?

2:46:28>> No.

2:46:28>> No.

2:46:29>> Thank you.

2:46:31>> Okay. So, with that, I'll call up my

2:46:33final witness, Carolyn Worstelle, our

2:46:34professional planner.

2:46:36>> And council, we might want to mark the

2:46:38certificate of appropriateness. It

2:46:40wasn't on the portal that I can find.

2:46:42It's noted in the staff report, but

2:46:45>> Okay, no problem. Can do that.

2:46:49behind

2:46:51nothing.

2:46:51>> I do.

2:46:53>> Carolyn Worstelle, w O R S T E L L.

2:46:56>> Morell, your license current in good

2:46:58standing.

2:46:59>> It is this evening.

2:47:00>> Thank you. You may proceed.

2:47:01>> Uh thank you members of the board. Um so

2:47:03we we've heard all about this project.

2:47:05Um and that the one variance that we are

2:47:07requesting is for the building height.

2:47:11Um and we are proposing a building

2:47:13height of 43 feet 11 in where the

2:47:16maximum is permitted is 40T. Um so

2:47:19obviously as you all heard really what's

2:47:22driving this need for the additional

2:47:24height relates to the fact that we are

2:47:26in a flood zone. We do have to elevate

2:47:28that first residential floor. Um and

2:47:30that's really where the additional

2:47:32height is necessary as as mentioned. We

2:47:34we can have the the storage spaces and

2:47:37and the cellar below grade but you

2:47:39cannot have residential floor area below

2:47:43design flood elevation. And so that is

2:47:46at 12 feet. So that is where we have

2:47:48raised that first floor elevation to

2:47:52um overall um you know the the floor to

2:47:56floor heights um for all the other

2:47:58floors are your sort of typical I think

2:48:00it's um 9 foot is it 9 foot floor to

2:48:03ceiling I believe is for the lower

2:48:05floors and then 8t on the upper floor.

2:48:06So we did actually decrease the height

2:48:08of that upper floor um to try and bring

2:48:11some of that height down um and create

2:48:13you know as more as closer to the

2:48:15conforming height as possible uh while

2:48:18still providing what we think are very

2:48:19livable floor to ceiling heights for the

2:48:21the residential floors. Um and when I

2:48:24look at this um in terms of the criteria

2:48:26for um you know bulk variance C

2:48:29variances there's two different ways you

2:48:31can look at this. One is a C1 hardship

2:48:33criteria. Um, and the other is the

2:48:36benefits outweigh the detriments. That's

2:48:37a C2 criteria. I look at this um, and I

2:48:41think we could easily make a case for

2:48:43both of them. Um, in terms of the C1

2:48:46height criteria. So, um, as was was

2:48:50mentioned earlier, so everywhere else in

2:48:53Jersey City, if you're in a flood zone,

2:48:55you get to have additional height

2:48:57because they acknowledge that it's

2:48:58difficult to to build when you have to

2:49:01raise your building, right? Because you

2:49:03have to meet the state regulation.

2:49:05There's no, we can't ask for a variance

2:49:07from the state regulation. You have to

2:49:08elevate it and it's for life safety,

2:49:11right? To have people out of the flood

2:49:12zone. um everywhere else in the city

2:49:16you don't have we wouldn't be needing

2:49:18this variance but because we're in a

2:49:20historic district there's a carve out

2:49:22that says in the historic district you

2:49:24don't get that additional height

2:49:27most other buildings in most other sites

2:49:29and and properties in the historic

2:49:31district they're already developed

2:49:32they're the oldest parts of the city

2:49:34they're historically developed those

2:49:37buildings in there you you will find

2:49:40residential units that are below the

2:49:41flood plane they are allowed to

2:49:43continue. Um so you do have a historic

2:49:45context for these um buildings at lower

2:49:48elevations. We can't meet that context.

2:49:51Um you know the whole point of the

2:49:53historic district is to try and meet

2:49:55your context. Um but for these sites

2:49:58particular where you have a vacant lot

2:50:01where it's sort of we we are limited in

2:50:03terms of our height but we're also

2:50:05required to raise our elevation. So

2:50:07we're sort of getting squeezed from both

2:50:09ends. So um I do think that this is a

2:50:11hardship. um that impacts, you know,

2:50:13just a few. There aren't that many lots

2:50:16in your historic district that aren't

2:50:17developed that are, you know, subject to

2:50:20this this um flood zone uh statewide

2:50:24ordinance uh or or regulation. So, I do

2:50:27think that that creates a little bit of

2:50:28a unique burden on development of the

2:50:30new structure in the historic district.

2:50:32Um, I will also note that um the city's

2:50:36most recent um historic uh uh element of

2:50:40a master plan does have some mention

2:50:43that that this is something the city

2:50:44could should consider and look at is

2:50:46allowing that additional height because

2:50:48of the the flood zone. So, um I do think

2:50:50that there is a hardship um argument

2:50:52there. Um [snorts] but I also think that

2:50:54we can look at this from the C2 criteria

2:50:57as well that overall um the building you

2:51:00know and and and the additional height

2:51:02um creates um you know uh the the the

2:51:06benefits here outweigh the detriments.

2:51:08Um you are again getting the residential

2:51:10units out of a flood plane. You're

2:51:12creating a building that is sort of

2:51:14filling in that gap. Uh you're reducing

2:51:16the overall lot coverage of this site

2:51:18from 100% down to conforming coverages.

2:51:21were more than exceeding the green area

2:51:24ratio between the imp, you know, street

2:51:26trees, the rear yard se uh uh landscaped

2:51:29areas, green roof, green, you know,

2:51:31landscaping on the roof. So, again, I I

2:51:34think overall this project leaves this

2:51:36particular property in a much better

2:51:38position um than the current condition.

2:51:41So, I I think that you can look at uh

2:51:43this uh one variance from both both

2:51:46aspects. Um, I think it advances the

2:51:50municipal land use law. Um, you know,

2:51:52it's an appropriate use. Uh, it is a a a

2:51:56an appropriate residential use in a

2:51:58historic uh district. Uh, so consistent

2:52:01with purpose A. Um, I think it's meets

2:52:04uh purpose B securing from safety from

2:52:06fire flood. Um, you know, again, this is

2:52:10a new building that's going to meet all

2:52:11of the most recent uh fire and building

2:52:14codes. So again, it's going to be a a

2:52:17you know, reducing safety from fire and

2:52:19then obviously from flood, again, we're

2:52:21raising uh residential areas out of the

2:52:23flood plane and we're providing more uh

2:52:26reducing the impervious coverage which

2:52:27will help overall the flooding issues uh

2:52:30not only for this property but for the

2:52:32surrounding area.

2:52:34Um, I think that we are consistent with

2:52:36purpose C. Um, you know, providing

2:52:39appropriate light and air, uh, because

2:52:41we are providing conforming side, rear,

2:52:42and front yard setbacks. Um, I think

2:52:46we're consistent with purpose E

2:52:48[clears throat] to create the more

2:52:49desirable visual environment. Again,

2:52:51right now, this is a vacant lot. It's

2:52:53sort of that, you know, gaping, you

2:52:56know, tooth or hole in in the overall

2:52:58the fabric of the block. Um this will be

2:53:01create uh an appropriate uh fourstory

2:53:04four resident four-story four unit

2:53:06residential structure um that has gone

2:53:09through uh a you know rigorous process

2:53:11before the historic commission in order

2:53:13to create an appropriate uh building

2:53:16form

2:53:17and then I think it's also consistent

2:53:18with purpose I again um that was that's

2:53:21the historic you know preserving the

2:53:23historic um architectural style and

2:53:25context of the neighborhood. Um, so I do

2:53:27think that it again it it full it uh

2:53:29advances those purposes in municipal

2:53:31land use law. Uh, when looking at

2:53:34negative criteria, I don't see this

2:53:36resulting in a substantial detriment to

2:53:37the public good or the general welfare.

2:53:39Again, the requested uh uh use, the

2:53:43setbacks, the bulk requirements are all

2:53:44conforming. The only uh variance is for

2:53:47that height. Um, and again, it it is

2:53:49necessary in order to help elevate the

2:53:51building out of the flood plane. Um and

2:53:53it we have gone through the process to

2:53:55um to design the building so that it is

2:53:57consistent with the um historic

2:53:59character of the neighborhood.

2:54:02Um

2:54:04and I think overall um it doesn't result

2:54:06in a substantial impairment to the

2:54:07intent or purpose of the zone plan of

2:54:08the zoning ordinance. Um it's consistent

2:54:11with the per uh the the historic

2:54:12district to uh recognize the special

2:54:15significance of these neighborhoods

2:54:16because of their varied and

2:54:17wellpreserved historic character. And

2:54:19again, I think um that a certificate of

2:54:21appropriateness really goes into that um

2:54:24that purpose. Um it's also consistent

2:54:27with the objectives of the Bright Street

2:54:28redevelopment plan uh to integrate new

2:54:30development within the area into the

2:54:32surrounding community by encouraging the

2:54:34creation of a viable residential

2:54:35community that will complement the

2:54:37existing historic and proposed new

2:54:39development in adjacent redevelopment

2:54:41areas and historic districts. So again,

2:54:43I think it's consistent with the intent

2:54:44of the right street redevelopment plan.

2:54:46And then just again also u the overall

2:54:49Jersey City master plan to enhance

2:54:51residential neighborhoods um you know

2:54:53create that of balanced housing and

2:54:55again promote the richness of the city's

2:54:58historic assets and cultural diversity.

2:55:00So I think overall um the project uh and

2:55:03the variance meets both um the positive

2:55:05and the negative criteria um and request

2:55:08that it be granted.

2:55:10>> Thank you Carol.

2:55:11>> Thank you Carolyn.

2:55:15That would uh conclude my case and

2:55:16chief. I thank the the board for taking

2:55:19the opportunity to listen. I know we had

2:55:20to flesh out some of those uh seller

2:55:22issues. I'm glad we got there and uh

2:55:24unless there's any comments or questions

2:55:26from the board or the public. Um I would

2:55:29uh conclude my case.

2:55:30>> Thank you, Mr. Ren.

2:55:32>> Any board comments before I open for the

2:55:34public? No matter.

2:55:36>> Anyone from the public?

2:55:49is going to be the truth, the whole

2:55:50truth, and nothing truth.

2:55:51>> Yes.

2:55:53>> Please.

2:55:54>> Nicholas Wilk. N I C H O L A S W I L K.

2:55:59And I live at 28 Bright Street, Unit

2:56:01507.

2:56:03>> Nicholas, you have three minutes.

2:56:05>> Uh, hi. Thanks for having me. Um, yeah,

2:56:08I am an owner at 28 Bright Street, the

2:56:10building next door. Um, I'm on the board

2:56:14of the homeowners association,

2:56:17and I just wanted to say that we have

2:56:20been in contact uh with the team here of

2:56:2226 Bright Street. Uh, we had some

2:56:25feedback on their designs

2:56:27um as in terms of how they affected our

2:56:30our building and we coordinated and

2:56:32discussed with like the most impacted

2:56:34owners kind of up against that. there a

2:56:36lot there and we came to a consensus uh

2:56:40amongst ourselves and we support the

2:56:42project based on the latest set of

2:56:44drawings that were submitted. So just

2:56:46wanted to uh submit those comments.

2:56:49>> Thank you.

2:56:52>> Anyone else from the public?

2:56:54>> Sure. Come forth please.

2:57:02swearing testimony, the whole truth of

2:57:05the truth.

2:57:05>> I do.

2:57:08>> My name is Sarah Angelini, spelled S A R

2:57:11A H A N G E L I N I. I'm also at 28

2:57:17Bright Street, unit 405. Um I wasn't

2:57:21part of the um

2:57:22>> Mary, you have three minutes.

2:57:23>> Thank you. Thank you, board. Um I wasn't

2:57:26part of the um communications that Nick

2:57:28mentioned. Um, so I wanted to speak on

2:57:30my behalf. I am not an owner. I am a

2:57:32renter. Um, but I appreciate the

2:57:35communication that went back and forth

2:57:37and I hope we will retain open

2:57:38communication through the um, building

2:57:41process. Um, I am affected because my

2:57:44window is right there next to where that

2:57:46that light well has now been added. Um,

2:57:49and I hope that the current plans um are

2:57:51built as they are as they are now

2:57:53because it will help keep it open for

2:57:55the rest of us. Um I only have one

2:57:57question is that um if everything goes

2:58:00through tonight uh is there um a

2:58:03timeline for when the construction will

2:58:04begin?

2:58:08>> There is no timeline. There's various

2:58:11things that have to take place. I have

2:58:13no idea when Mr. Wine's client would

2:58:16start submitting for building permits

2:58:19and things of that nature, but I would

2:58:22venture to guess it won't be any sooner

2:58:24than six months. Mr. wine

2:58:26>> most likely. I mean, as obviously we're

2:58:28coming into the winter months now, so if

2:58:31you know, ground can't be effectively

2:58:32broken before it freezes, then that will

2:58:34also obviously delay the ability to do

2:58:36that.

2:58:37>> Okay. Well, in that case, I'm supportive

2:58:40of the current I'm in support of the

2:58:42current plans.

2:58:42>> Thank you.

2:58:43>> Thank you.

2:58:45>> Anyone else from the public?

2:58:48>> Madam Chair, I see no one in from the

2:58:50public. I'd like to close the public

2:58:51portion.

2:58:52>> Second.

2:58:53>> Thank you. public is closed.

2:58:55[clears throat] Ben

2:58:58>> uh staff agrees with the testimony

2:59:00provided by the applicant and from Miss

2:59:02Worstelle pertaining to the um sort of

2:59:05conflict between the state regulations

2:59:07and the city um regulations pertaining

2:59:10the uh flood zone and the allowance that

2:59:14most districts in the city get and

2:59:16reference to that. Um so staff would

2:59:20recommend approval

2:59:22uh provide the applicant agree the

2:59:24conditions from the staff memo dated

2:59:26August 10th 2026

2:59:28um with a couple extra conditions. Uh

2:59:31Mr. Wine and I spoke about a condition

2:59:34pertaining to the um the tree species

2:59:36used uh and then a condition for the um

2:59:41garbage maintenance. Um so if Mr. Wine

2:59:44agrees to that then staff would

2:59:45recommend approval.

2:59:46>> Yeah, we do. And those are the only

2:59:48other two that I had written down as

2:59:49well. And yes, we agree.

2:59:51>> Okay,

2:59:51>> Mr. Wine, for purpose of the record, I

2:59:53do want to mark the certificate of

2:59:55appropriateness from HPC. I'm showing it

2:59:59in the staff memo as

3:00:02May 11th, 2025 and June 15th uh I'm

3:00:06sorry, May 11th, 2026.

3:00:09June 15, 2026 H-25-0297.

3:00:15So that'll be A3 for the record.

3:00:17>> Correct. And council, that's a good

3:00:18point. You brought it up. There were

3:00:19also conditions of the certificate of

3:00:21appropriateness. Those I know they're

3:00:23referenced in uh in Ben's letter, but

3:00:25those would also be conditions carried

3:00:26through with an approval here this

3:00:28evening.

3:00:31>> Yes.

3:00:35>> Agreed.

3:00:37>> Okay. Madam Chair,

3:00:38>> actually uh beforehand, I just have one

3:00:40question for council. I know a member of

3:00:43the board did step away briefly um

3:00:45during testimony. Uh is [snorts] that an

3:00:49issue with regards to voting?

3:00:52>> Who stepped away?

3:00:53>> Sam just went to the bathroom.

3:00:56>> I didn't even see it. Sam, you should

3:00:58recuse.

3:01:01>> I recuse from testimony.

3:01:05>> Okay, Madam Chair,

3:01:06>> you don't have to recuse. You should

3:01:07abstain. Let me correct myself. Andy,

3:01:09you have a

3:01:10>> if I just may before we we vote, I I

3:01:12just wanted to to thank the applicant.

3:01:13It seems like you guys did proactive

3:01:14outreach to the neighbors and I I want

3:01:16to thank you and for being proactive

3:01:18about that and clearly there's a lot of

3:01:20complexity to the site and I I do think

3:01:21it's an aesthetically good-looking

3:01:23building with a lot of complexities

3:01:25figured out. So, thank you.

3:01:26>> Thank you.

3:01:28>> Um I'd like to entertain a motion.

3:01:30>> Okay. Madam Chair, I move that we

3:01:31approve application number P2025-0255

3:01:35with a condition outlined in a staff

3:01:37report. Second.

3:01:39>> All right. Uh, Vice Chair Patel.

3:01:41>> I, Commissioner Stamato.

3:01:43>> I, with one exception. If they would

3:01:45take a look at um that floodproof door

3:01:49for the basement. I'm still like hanging

3:01:50on that.

3:01:51>> Seller.

3:01:52>> Seller. Excuse me.

3:01:54>> Seller.

3:01:55>> I haven't thought about that.

3:01:57>> But if you're willing to do that, I

3:01:59would vote yes if I'm allowed to say

3:02:01that.

3:02:01>> You're not allowed to say that. Allow to

3:02:03say that. Take that back. [snorts]

3:02:06You in favor or against?

3:02:09>> Uh, all right. I'm in favor.

3:02:13>> Okay. Uh, Commissioner Capers,

3:02:15>> I.

3:02:16>> Commissioner Kaplan,

3:02:17>> I.

3:02:18>> And, uh, Madam Chair, Gongadan.

3:02:19>> Yeah. I want to thank the public for the

3:02:21neighbors for coming out and thank you

3:02:23for engaging the neighbors um, from up

3:02:26front and continue to do so as well. Um,

3:02:29my vote is I.

3:02:31>> Thank you.

3:02:31>> All right. Motion carries. Five in

3:02:33favor, one abstension.

3:02:34>> Thank you everybody.

3:02:36Thank you.

3:02:56>> Mhm.

3:03:01Sure,

3:03:12Santa.

3:03:50>> [clears throat]

3:03:51>> You okay?

3:03:58>> Gotcha. Okay, I will talk as clearly as

3:04:01I can.

3:04:03>> I'd like to call KPB204-0198.

3:04:08Preliminary and final major site plan.

3:04:11Address is 300 Central Avenue.

3:04:13>> Uh again, for the record, Tom Lean from

3:04:15Connell Foley. This is a notice

3:04:18application. I did post my affidavit to

3:04:20the portal, but I am providing a full

3:04:22copy to council.

3:04:26>> Thank you, council.

3:04:31might feel better.

3:04:37Madam Chair, receive the affidavit of

3:04:39publication proof of mailing with

3:04:40respect to the application at 300

3:04:42Central Avenue. It does appear to be the

3:04:44same one that I reviewed on the portal.

3:04:46It does appear to be in order. We're

3:04:47going to mark it as A1 for purpose of

3:04:49the record. And council, while I have

3:04:51the microphone, I notice that Mr. Garber

3:04:53has a slide presentation up on the

3:04:56screen. So we will mark that as A2. He

3:04:58can identify it and it's not going to be

3:05:0163 slides.

3:05:02>> It it is 23 slides and I told him that

3:05:05only about 18 are important. So we'll

3:05:07try to keep it to that. Um uh the

3:05:11application before you this evening is a

3:05:13request for a preliminary and final

3:05:14major site plan. Uh we are located in

3:05:17the NC zone. The property address is 300

3:05:20Central Avenue, which is block 381, lot

3:05:2326. Uh this is along a major commercial

3:05:26corridor. The existing building is a

3:05:29three-story building uh with a ground

3:05:31floor commercial area and two stories

3:05:34above. Uh it is a through lot that goes

3:05:36through to the back. Um my client uh did

3:05:40put in a request to demo this property

3:05:42about three years ago. Uh they did

3:05:45receive a determination from historic

3:05:46that portions of the facade were uh

3:05:49historic. So, we worked with planning

3:05:51and historic to uh keep portions of the

3:05:54of the facade. Um, and the to the

3:05:57project at the end is a two-story

3:05:59addition to that existing building, a

3:06:01total of 16 uh one-bedroom units, and

3:06:04there is a ground uh floor commercial

3:06:06component uh in keeping with the uh the

3:06:08NC zone requirements. I only have one

3:06:10witness this evening uh as we are not

3:06:12requesting any deviations or variances

3:06:15and that is Mr. Richard Garber.

3:06:18>> Thank you.

3:06:21Swear to affirm the testimony you're

3:06:23going to give is the truth, the whole

3:06:24truth, and nothing but the truth.

3:06:25>> I do. State and spell your name, Mr.

3:06:28Garber. Give us your business address

3:06:29and your qualification as an architect,

3:06:32I suspect.

3:06:33>> Sure. Richard Garber, G- A R E R 48

3:06:35Arlington Avenue, Jersey City. Uh,

3:06:38licensed architect uh for a long time

3:06:41>> in good standing.

3:06:42>> Yes,

3:06:42>> Madam Chair. Of course, I recommend that

3:06:44we accept Mr. Garber as a licensed

3:06:46architect in good standing. Thank you

3:06:48board and thank you Mr. Alampy. Um this

3:06:52project was actually originally approved

3:06:54back in 2014 and lapsed. Um my hair was

3:06:57not as gray then. Uh but we are back. So

3:07:00um this is a um uh I think this is an

3:07:03interesting project because it actually

3:07:05presents a nice typology for these

3:07:07deeper narrow lots in the Heights. Um as

3:07:11Mr. Lean said, this is um a three-story

3:07:13existing building. We are proposing to

3:07:15maintain the existing middle two floors

3:07:18which are what are the historic kind of

3:07:21artifacts of the building putting two

3:07:23stories on top of it. Um this is in the

3:07:26NC1 zone. It's at 300 central. You see

3:07:29it here. It's midblock. Uh and this is

3:07:32uh these are very deep uh blocks that go

3:07:35back to Cambridge. So this uh building

3:07:37is uh this building lot, excuse me, is

3:07:3925 wide by over 150 deep. Um, you can

3:07:43see here it's right on Central Avenue in

3:07:45the NC1. So, five stories of dense

3:07:48mixeduse residential is permitted. Some

3:07:51existing photos of the building. You see

3:07:54there's some signage as well as um

3:07:56pretty much a um replaced storefront at

3:07:59the um at the ground floor which we are

3:08:02are proposing to rehab. You'll notice

3:08:05here that in the existing photo there's

3:08:06a fire escape that will be removed and

3:08:09sometime I'm guessing in the 60s or 70s

3:08:12somebody opened up the facade on the

3:08:14second floor and put a double double

3:08:16hung window in. So you see it breaks the

3:08:18rhythm of it should be three and three.

3:08:19Instead we have three on the third floor

3:08:22and four on the lower floor. That will

3:08:24be maintained after discussion with

3:08:25historic. We did look at some of the

3:08:27original tax photos as Mr. Lean said um

3:08:30no variances. There are two pre-existing

3:08:32non-conforming conditions. Um, and that

3:08:35has to do with rear yard setback. Again,

3:08:37this is an existing building that's

3:08:38about 152 ft deep. Um, and it is uh zero

3:08:43on the ground floor. We are proposing

3:08:45228 on the upper floors which is

3:08:48compliant. Uh, and then the ceiling

3:08:51height at the ground floor again

3:08:53existing condition 11 ft is required. We

3:08:55are at about 10 3 and 38 of an inch. So,

3:08:58almost there. and again pre-existing

3:09:00condition. Um total lot size. So this is

3:09:03larger than a typical 25 by 100 because

3:09:06of the depth 3635.

3:09:08We're proposing an 18,575

3:09:11ft building, 16 residential units, one

3:09:14studio, 15 onebedrooms. And we are going

3:09:17up to the five stories and 55 ft as uh

3:09:20as permitted. Uh this is an elevator

3:09:22building so it will be brought up to

3:09:23current access and ADA and all that sort

3:09:25of sort of thing. And I'll show you the

3:09:27plans now. So you can see the um the

3:09:29site is a little bit oddly shaped. It's

3:09:31a little bit of a wedge, 25 wide in the

3:09:33front and then it widens a little bit as

3:09:35it moves back. Um this is the site plan.

3:09:39Uh there is a basement and you can see

3:09:41that we are proposing two new stairs as

3:09:43well as an elevator and some utility

3:09:45space. The basement will be relegated to

3:09:47commercial storage. Uh this is a

3:09:49basement by the way. Um the first floor

3:09:51plan, uh you could see the elevators,

3:09:54the elevator and stairs highlighted in

3:09:57orange. Um we have a very narrow given

3:09:59the the narrowness of the site elevator

3:10:02lobby that accesses that elevator and

3:10:04then circulates through the building

3:10:06with bike storage and then a small um uh

3:10:09commercial entry and storefront that uh

3:10:11opens up and is given to um given to the

3:10:15rest of that first floor. the units

3:10:17layout because this is a deep lot we

3:10:19actually can provide two masses. So the

3:10:21massing of this is I think is an

3:10:22interesting typology for these type of

3:10:24sites up in the heights. So you have two

3:10:26building masses connected by a hallway

3:10:29and there's a small courtyard in the

3:10:31front. And so instead of you know a

3:10:33typical 25 by 100 lot where you'd

3:10:36basically get the front of this

3:10:38organization you're basically getting

3:10:39two of those and that works perfectly

3:10:41well with light and air and code and

3:10:43those sorts of things. So this stack. So

3:10:45you see the third floor um fourth floor

3:10:49and the fifth floor as such. Um the roof

3:10:52plan, we are not proposing anything on

3:10:54the roof of this building. Uh and that

3:10:56is in keeping with the original

3:10:58approval. We don't need to. the

3:11:00elevations. We talked about the

3:11:01restoration of the brick on that second

3:11:03and third floor. And there will be a

3:11:06metal panel provided on the ground floor

3:11:08with new storefront windows as as well

3:11:11as metal panel on the uh the proposed

3:11:13addition which is set back just slightly

3:11:16to to give precedent and allow that kind

3:11:18of existing historic facade to project.

3:11:21Um on the interior facads that you see

3:11:25here, this is actually the rear facade.

3:11:26There's um a hardy batten panel which is

3:11:29a cementitious fiber panel very typical

3:11:31on these buildings in the Heights. We're

3:11:33proposing stucco on the sides. Um the

3:11:36courtyard elevations are more of uh the

3:11:39stucco and a mix of the stucco which

3:11:41wraps and then the Hardy Batten um

3:11:43product that you see here with a a kind

3:11:45of fun window pattern. Um and then the

3:11:48uh block elevation. Um uh again as of

3:11:52right elevation not all the buildings

3:11:54are maxed out on the block here. um but

3:11:56we are permitted to do so and we have uh

3:11:59just some his uh details that we've gone

3:12:02through with the the HPO as well as the

3:12:04planning office and then we just have a

3:12:06kind of axonometric um in situ that

3:12:09shows how that massing sort of works and

3:12:11that's the presentation. Thank you

3:12:13>> Mr. Garber.

3:12:15Any questions from the board?

3:12:17>> Yeah, could you just highlight and walk

3:12:19through the the trash removal and

3:12:22process?

3:12:22>> Yeah, sure. So, um I will zoom in on

3:12:26this plan. You see the ground floor.

3:12:30Um we have a lobby. We have mailbox and

3:12:34then bike storage, right? And then

3:12:36behind the bike storage. I'm trying to

3:12:37get the mouse to move that way. Is a

3:12:40modest trash room that has containers.

3:12:43Um trash will be stored here. And you

3:12:45will see that we have I believe trash uh

3:12:49rooms on the upper floors as well. Let

3:12:51me just kind of go in here and you'll

3:12:52see. So we have um

3:12:56uh that that lower floor for for um uh

3:13:00yeah there actually I'm sorry on this in

3:13:02this building there is only trash on

3:13:04that ground floor which will be stored

3:13:05in and brought out on on days of

3:13:07collection. Yep. And in terms of the

3:13:10commercial space they will store their

3:13:11trash in the in the basement. C

3:13:14>> could you just testify the number of

3:13:16units in the building and the size of

3:13:17that trash room and you know how many

3:13:19containers are there to service the

3:13:20building?

3:13:21>> Sure. As I suggested, 16 residential

3:13:23buildings. I put it up again. One

3:13:24studio, 15 onebedrooms. That trash room

3:13:27is about 12 feet wide. We're showing

3:13:29three containers. We do expect that, you

3:13:31know, trash will be stored in units

3:13:33brought down there. There will be a

3:13:35building super here that will bring the

3:13:36trash out on collection days and we

3:13:38think that that should work uh just

3:13:40fine. It's not a not a huge amount of of

3:13:42units in this building.

3:13:43>> So, that's going to be carded down.

3:13:45>> Sorry. Um carted down. Is that how

3:13:47that's this is going to work? from each

3:13:49floor.

3:13:50>> Each the residents will have to bring

3:13:51their own trash down and to the trash

3:13:53room. Yeah.

3:13:54>> All right. And you will have an elevator

3:13:56in

3:13:56>> there is an elevator. Yep. Yep. No

3:13:58problem.

3:14:00>> And there will be I'm told uh so that

3:14:02the this this property owner actually

3:14:06happens to own several buildings on this

3:14:08block. So they have a building super

3:14:09that goes around through them. They they

3:14:11own an two immediately adjacent

3:14:14properties to this as well as one on the

3:14:15400 block. So, this will Well, I guess

3:14:18you'll have private pickup for what? The

3:14:19commercial area.

3:14:20>> Um, the commercial area only will have

3:14:23private pickup. I think the size of the

3:14:24building we could we could use the

3:14:26municipal Yeah, the municipal pickup.

3:14:28Yeah.

3:14:30>> All right.

3:14:31>> Any other board comments?

3:14:34>> Thank you, Mr. Garber.

3:14:36>> Great.

3:14:38Um, I just want to let the board know I

3:14:41am in receipt of comments that we

3:14:43received from the MUA dated September

3:14:4524th, 2026. I have reviewed these with

3:14:48our engineer and we can comply or we can

3:14:51work with uh the JCMUA to address them.

3:14:53I'm also in receipt of a planning memo

3:14:56uh prepared by Cameron Black dated uh

3:14:59July 28th, 2026. There are four

3:15:02conditions listed within and we can

3:15:03agree to all of them.

3:15:05>> Thank you.

3:15:05>> Thank you, Mr. Lee. At this time I would

3:15:07like to open for the public. Is there

3:15:08anyone from the public?

3:15:10>> Madam Chair, there is no one from the

3:15:12public. I'd like to close public motion.

3:15:14>> Second.

3:15:15>> Public is closed. Ben.

3:15:18>> Uh so as Mr. Lean testified to, Cameron

3:15:21Black prepared a staff memo uh provided

3:15:24July 28th, 2026. Um as Mr. Lean has

3:15:27agreed to the conditions, the four

3:15:29conditions in that uh staff recommends

3:15:31approval.

3:15:32>> Thank you. I'll entertain a motion.

3:15:35Madame Chair, I'd like to move

3:15:39move that we approve application number

3:15:41P2024-0198

3:15:45>> with a condition outlined in a staff

3:15:46report.

3:15:47>> Second it.

3:15:49>> Uh, Vice Chair Patel,

3:15:51>> I.

3:15:52>> Commissioner Conway,

3:15:53>> I.

3:15:54>> Commissioner Stamato,

3:15:55>> yes.

3:15:56>> Commissioner Capers,

3:15:57>> I.

3:15:58>> Commissioner Kaplan,

3:15:59>> I.

3:15:59>> And Madam Chair Gangadan,

3:16:01>> I.

3:16:01>> Motion carries. All in favor?

3:16:03>> Thank you all. Have a great night.

3:16:04>> You too.

3:16:05I'd like to call KP2025-0161.

3:16:09It's preliminary and final major site

3:16:11plan with C variances. Address is 146

3:16:14Academy Street.

3:16:21[clears throat]

3:16:22>> Mr. Harrington.

3:16:23>> Yes. Good evening, Madam Chairwoman,

3:16:25commissioners. Uh for the record,

3:16:26Charles Harrington on behalf of the

3:16:28applicant. Uh I did provide public

3:16:31notices, so I have the originals here

3:16:33for councel.

3:16:37Thank you, Mr. Harington.

3:16:47Take your time.

3:16:50>> Madam Chair, I receive the affidavit of

3:16:52publication proof of mailing with

3:16:53respect to the application at 146

3:16:55Academy Street. It does appear to be in

3:16:57order. We're going to mark it as A1 for

3:16:58the record.

3:16:59>> Thank you.

3:17:01>> Okay. Thank you. So, uh, the project,

3:17:05uh, that we have here before you tonight

3:17:06is, uh, we've been working, um, for some

3:17:09time now with with staff. It's, uh, it's

3:17:12a little bit of a

3:17:14it, there are some difficulties with the

3:17:17property, um, in coming to the design

3:17:19that we have here tonight. Uh, because

3:17:22it's located in zone 4 within this

3:17:25Journal Square redevelopment plan. It's

3:17:28also located within uh, the Palis

3:17:30Protection Overlay District. uh commonly

3:17:32referred to as the peepod. Uh and that

3:17:35that's a district that runs along the

3:17:37Palisad Cliffs. So uh that comes into

3:17:40play as part of the one of one of the

3:17:41variances we're requesting tonight

3:17:43because you'll see during the

3:17:44presentation that the property directly

3:17:46to the east um as you go towards the the

3:17:50county offices uh there at the end of

3:17:52Academy Street. This is that that's

3:17:54where it's located. There's this little

3:17:56outcropping of of um of rocks. uh and

3:18:00it's could be defined as a as a cliff

3:18:02because it kind of juts out and then and

3:18:05then has a sheer drop. Um so if that's a

3:18:08cliff then then we're asking for relief

3:18:11from from the setback requirements in

3:18:13the peep pod. Um but is the other

3:18:18variances we're asking for is uh with

3:18:20regard to the front yard variance. Um

3:18:22that is at upon the request of uh

3:18:25planning staff. We pulled the building

3:18:27up uh closer uh to the front line so we

3:18:30could create more space in the back and

3:18:32and more light and air uh to the uh

3:18:34properties behind us. Um there's also

3:18:38we're asking for relief with regard to

3:18:40the maximum building height by 2.8 ft.

3:18:43Uh that's also a result of the existing

3:18:45site conditions where this property um

3:18:48is towards the eastern end of of Academy

3:18:51Street. So it slopes down uh from the

3:18:54west to the east. So, if you're if

3:18:56you've gone to the county administration

3:18:58building um or the county building there

3:19:00where they have their main offices, uh

3:19:02you'll know that you're as you're going

3:19:03down Academy Street, it slopes down uh

3:19:05that's uh to there. So, you you have a

3:19:08pretty good grade change. Uh so, that's

3:19:10what we're dealing with um as part of

3:19:12this this project. Um the property is

3:19:1768t wide uh and approximately 16 1/2 ft

3:19:21deep. So, it's uh a little a little over

3:19:244,700 square feet, 4,736

3:19:28uh square feet. It's currently developed

3:19:30with a two family home uh with three

3:19:32stories. And you'll see the existing

3:19:35condition. You'll have a retaining wall

3:19:37at the front. So, it's it's uh it's

3:19:39already uh up uh because of uh so it's a

3:19:42unique a new unique condition as well

3:19:45there that that we were trying to work

3:19:46with planning to uh to to come to this

3:19:49development. Um what we are proposing is

3:19:52a fourstory um building with 13 units

3:19:56and 16 bike spaces and with a seller. I

3:19:59know seller and and basement was a a big

3:20:02uh oh I'm sorry I'm uh a big discussion

3:20:05last time you'll see during this

3:20:06presentation is also a seller uh because

3:20:09it's uh below grade. Um so we are uh

3:20:13requesting um the three deviations that

3:20:16that I outlined. It's the front yard

3:20:17setback, the relief from the uh peepod

3:20:22uh setback and and the height of 2.8 ft.

3:20:26Uh we uh we have I have three witnesses

3:20:29tonight. I'm going to start with um uh

3:20:31Mr. Lag Lagarimo who was here just

3:20:34previously on on the uh the Bright

3:20:37Street application and then we have uh

3:20:39Mr. Lewis is our architect and then

3:20:41Carolyn Worstelle um again for the

3:20:43planning purposes. So, with that said,

3:20:45I'm going to bring up Guy.

3:20:52Do

3:20:52>> I have to swear in again?

3:20:54>> You do not need to swear in again.

3:20:55You'll be recognized. You recognize

3:20:57you're still under oath.

3:20:58>> Okay. Thank you. Okay.

3:21:00>> Yes.

3:21:01>> Yes.

3:21:02>> Thank you. And just state your name for

3:21:05purposes of

3:21:06>> Logs.

3:21:07L A G O M A R S I N O. Okay. So this is

3:21:12rather obscure site here as we may all

3:21:15know. Uh on a personal I grew up in

3:21:17Jersey City and I've passed this many

3:21:19times coming up and it's always was a

3:21:21site that's an eyes saw especially

3:21:24coming up after the sheriff uh the

3:21:26sheriff uh building there. You have this

3:21:28this this

3:21:31building here. Uh I think we've went

3:21:34back and forth a lot on this with the

3:21:36architect as well with the zoning as far

3:21:38as this cliff issue and uh we're looking

3:21:41at the photo right now and I don't see

3:21:44all my experience I've been in that that

3:21:46is not on their property that is on an

3:21:48adjacent property but the cliff never

3:21:49was there. This is rock. It's solid

3:21:52rock. It's not uh it's not the policies

3:21:55where you see up past the George

3:21:57Washington Bridge where you have pieces

3:21:59of of uh uh of of of

3:22:02basalt rock peeling off. This is not the

3:22:05case here. Uh we we are now let's go

3:22:09back. So I just wanted to let this know

3:22:10because obviously uh go back to this

3:22:12side. So, so basically if you look at

3:22:16this I uh you look to the to the right

3:22:19sides you have that line there that's

3:22:20the elevation line that delineates the

3:22:23rock the rock contour and and the cliff

3:22:27face the we are 13 feet from uh the edge

3:22:31of that cliff but the cliff is

3:22:33>> I'm sorry to interrupt could you speak

3:22:34into the mic?

3:22:35>> I'm sorry. I'm sorry. So the cliff

3:22:37really is not a it's not a steep cliff

3:22:40or you would think like even when you go

3:22:41to the bath station you see like it's

3:22:44only about six or seven feet before it

3:22:46it it it it slopes off. Again that's not

3:22:49their property that's someone else's

3:22:50property that we building to the lot

3:22:52line. There will be a retaining wall

3:22:53there. We have taken borings here. There

3:22:56was uh rock level at this elevation was

3:22:59a little bit lower than actually I

3:23:01thought that at point that we might not

3:23:02be able to have a seller. Again, we

3:23:04don't have the whole site, but we only

3:23:06have one or two uh boards where we had

3:23:09enough that you can put a seller in. Uh

3:23:11again, there's the contours here do

3:23:13change and shift, but that later on

3:23:15we're not proposing and I think that

3:23:17that that uh upper

3:23:20upper right corner uh I have rock crop.

3:23:23That was a note that they asked me to

3:23:24put in that basically the site will not

3:23:27be impacted uh by any construction and

3:23:30that the cliff I mean obviously some

3:23:32stones here or there may may be uh

3:23:35affected and there might be new fissures

3:23:37in the rock but overall the cliff will

3:23:40not be impacted at 13 ft with the rock

3:23:42uh density that they have here.

3:23:45That being said uh the site now is

3:23:48elevated and the site to the north of it

3:23:50is also elevated. Uh all that's going to

3:23:52have to be excavated and the site to the

3:23:56to the east will be excavated to where

3:23:58they're going to have to obviously uh

3:24:00build this the basement and uh it's

3:24:03doable. I mean, of course, as I said my

3:24:05last testimony, it's doable with with a

3:24:07fee and a price, but the client thinks

3:24:09it's worth it. Um the the building to

3:24:12the north would obviously have to be uh

3:24:14shored up to where it's be supported

3:24:16where they bu build this lot and the

3:24:18retainables as well. Um as from the

3:24:20civil perspective there's roof there's a

3:24:23roof gardens we're going to keep and

3:24:25maintain based upon the NJ uh uh

3:24:29circumstances where we need to have the

3:24:30amount of percentage as well as the

3:24:33drainage uh that we're going to still

3:24:35provide some piping there to the street.

3:24:37Uh the landscaping of course there's no

3:24:40landscaping in front right now. the the

3:24:41sidewalk is there, but we're we're

3:24:43trying to bring this into compliance

3:24:45with ADA as well, but obviously it's a

3:24:47slope. So, the sidewalk, we're going to

3:24:49try to maintain the existing uh slopes

3:24:52um in the street with new uh new three

3:24:55three new trees. And I think that's uh

3:24:57pretty much encompasses my testimony

3:24:59tonight uh and it respect for this site

3:25:02because it's uh it's well needed.

3:25:06>> Thank you. Any board comments?

3:25:08No.

3:25:09>> Thank you.

3:25:12Okay, next up is Mr. Lewis as he stands

3:25:15up to take his place. Mr.

3:25:17>> Lewis, do you swear affirm the testimony

3:25:18you're about to give be the truth, the

3:25:20whole truth, and nothing but the truth?

3:25:21>> Yes, I do.

3:25:22>> And if you could state and spell your

3:25:23name for the record.

3:25:24>> My name is Jeffrey Lewis. J E F R E Y L

3:25:27E W I S.

3:25:28>> Licensed architect, state of New Jersey.

3:25:30>> Yes, sir. Active and in good uh

3:25:32standing.

3:25:33>> Thank you,

3:25:33>> Madam Chair. We should accept Mr. Lewis

3:25:35as an architect.

3:25:36>> Thank you. You may proceed, Mr. Lewis.

3:25:38>> Okay, great.

3:25:40So, uh, as was mentioned, uh, we are

3:25:43proposing a new four-story 13-unit

3:25:45residential building on this site here.

3:25:47Uh, that breaks down to nine one-bedroom

3:25:50apartments that average 620 ft and four

3:25:53two-bedroom apartments that average

3:25:541,039 ft. It's a very oddly shaped lot.

3:25:58Uh, the depth is is well under what is

3:26:01uh typical. It ranges from 63 1/2 ft to

3:26:04about 77 1/2 ft in depth. Uh, and as was

3:26:08mentioned, we do have this existing

3:26:09retaining wall. It's about 8 ft tall or

3:26:12so at the front of the property line,

3:26:14which kind of elevates our whole site up

3:26:16over the street level. Uh, we are

3:26:19keeping that retaining wall at the front

3:26:20of the building, building right on top

3:26:22of it. Uh, which which means we have a 0

3:26:25foot front yard setback. Uh, the

3:26:27building has sideyard setbacks of 3'5 in

3:26:30on the left, 3'8 in on the right, and

3:26:323'8 in in the back. All these are

3:26:35compliant. Uh this area is used uh half

3:26:39of the space is permeable pavers as well

3:26:41as a staircase down where we will cut

3:26:44away a small section of the retaining

3:26:46wall to provide uh for a means of egress

3:26:48out of the building. That would be our

3:26:50second means of egress. Then the other

3:26:52half here is just going to be

3:26:54landscaping.

3:26:56Uh as was mentioned sitewise, new

3:26:58concrete curbs, new concrete sidewalks,

3:27:00three new street trees.

3:27:02Um,

3:27:04jumping right into the floor plans. This

3:27:06is the cellar that was discussed. On the

3:27:09right side of the seller, we're

3:27:10proposing a 1,600 ft recreation area.

3:27:13This is for building tenants. It has a

3:27:16half bath and a little kitchenet in the

3:27:18back of the building. I mean, the back

3:27:19of the space, excuse me. And then on the

3:27:21left side, we have utility area, our

3:27:24trash area, as well as our bicycle

3:27:25storage. Uh, this this space is served

3:27:28by uh two stairs as well as the

3:27:30elevator.

3:27:32Um, and I do want to kind of stop here

3:27:34for a second because we have our trash

3:27:38area down here and we were proposing

3:27:39originally for people to for building

3:27:42tenants to bring their trash to the

3:27:43basement and then a building management

3:27:45company would bring that trash out

3:27:47through the back door around the back

3:27:49all the way around to the front.

3:27:52I get the impression that this board

3:27:54might not like that. We do have a um a

3:27:58different an alternate prepared if if I

3:28:00could show that instead of these floor

3:28:02plans would

3:28:02>> absolutely.

3:28:04>> Okay,

3:28:04>> before you go there, uh Jeff, we go back

3:28:07to the cover.

3:28:08>> Chuck, let's be really good about

3:28:09getting on the mic.

3:28:10>> Okay. Sorry.

3:28:11>> Oh, I'm sorry. Yeah, Mike's not here. Um

3:28:14Yes. So, if we uh if you could go to the

3:28:16front page there, there's a photo there

3:28:17of the site. I think that that would

3:28:19help the board to understand what we're

3:28:21looking at initially.

3:28:23>> Yeah, I don't actually have the front.

3:28:25and we just have that open.

3:28:27>> Do you have guy's plans?

3:28:30>> He has it on the front page as well,

3:28:33>> please. Um Mike is not here, so we can

3:28:35be on the closer to the mic as well.

3:28:41>> There's that extra one behind you,

3:28:42Chuck, if you need that one

3:28:46>> down here.

3:28:46>> Down to here.

3:28:47>> Yeah, it's a picture right there.

3:28:54Sorry, I'm working with a new computer

3:28:55here. I'm

3:28:57not very good at it.

3:29:00And that's too small still, right?

3:29:02>> Yeah, we can make it a little harder.

3:29:11>> What are we looking at?

3:29:13There you go. Yeah, I just wanted the

3:29:15board to to have the the benefit of

3:29:17seeing the existing property and how we

3:29:19have the retaining wall and what we're

3:29:20dealing with as part of this

3:29:21development. I think it gives a better

3:29:23perspective.

3:29:25>> Okay.

3:29:27>> Thank you.

3:29:28>> So, I do want to with that switch to the

3:29:31set of plans that I just referenced. Uh,

3:29:33and we have to mark this.

3:29:34>> Can you Oh, sorry.

3:29:37>> So, I do want to switch to the new plans

3:29:39that I just mentioned uh to address the

3:29:41trash situ trash situation.

3:29:43Um

3:29:44>> let's mark them as A2. How many she is

3:29:46it a full set or

3:29:48>> it's seven sheets of drawings uh with

3:29:50today's date as the um revision date.

3:29:55So you can see on these drawings

3:29:59on the left side we have changed things

3:30:01up. Uh there are two major changes. The

3:30:04first is that we are proposing a trash

3:30:05shoot in the building. So trash will go

3:30:07from a chute at each floor down to this

3:30:09trash room. Uh the second thing that

3:30:12we're proposing to change is we're going

3:30:15to add in the recre in the recreation

3:30:17area a small ramp and doors out the

3:30:20side. This is the low point of the site.

3:30:22So this is the point that's closest to

3:30:23the stairway, I mean to the sidewalk

3:30:25level. So we only have to come up about

3:30:27a foot, a foot and a half. So this is

3:30:28something we can make work. And we would

3:30:30just have to remove a little bit of um

3:30:33the existing retaining wall on this side

3:30:35as well. So we would be removing some on

3:30:36this side, some on this side. And what

3:30:38this would do is this would provide this

3:30:40seller space with direct access to the

3:30:42street which obviously would benefit the

3:30:44the trash removal. We can get that right

3:30:46out uh on a very short run without going

3:30:49through the building and also the bike

3:30:51storage which is in the basement and now

3:30:52would be accessible without having to

3:30:54use any sort of stairs or anything like

3:30:56that. Um so we would like to propose

3:30:59this as the floor plan as opposed to uh

3:31:01what was previously shown. And to

3:31:04continue on, there are very just minor

3:31:06changes to the upper floors. Um,

3:31:09starting at the front of the building, I

3:31:11do want to mention at the left side,

3:31:12we're cutting away a section of

3:31:13retaining wall, which provides access to

3:31:16the stair that goes around to the back

3:31:17of the building to provide the second

3:31:19means of egress. Uh, we also, it also

3:31:21provides access to the right here where

3:31:23we have a lift. This is our ADA access

3:31:25to that uh, first floor to the raised

3:31:28level. So, there's a lift here which

3:31:30would bring us to this area here. We're

3:31:32also removing a section of retaining

3:31:34wall in the center of the building to

3:31:35provide for the main stair up to the

3:31:37building. Uh all the apartments in the

3:31:40building are ADA adaptable. They all

3:31:42have washerd dryer in the unit and have

3:31:44uh ducted heat and air conditioning. Uh

3:31:46we do have four apartments on this

3:31:48floor. One of them is a two-bedroom and

3:31:50three of them are one-bedroom

3:31:52apartments. Uh the change that we made

3:31:55to address the trash is here in the

3:31:56center where we have a trash shoot which

3:31:59will be seen on each floor and a

3:32:00recycling closet which also will be on

3:32:02each floor. Uh the recycling closet

3:32:05would be emptied by building management.

3:32:07The trash shoot would go directly to the

3:32:09trash room and the trash room from the

3:32:11trash room trash would be brought to the

3:32:13street by building management.

3:32:16Also on this floor, the last thing to

3:32:17note is the second stair in the back

3:32:19here has a hallway out to the back to

3:32:21provide that second means of egress

3:32:23around the side of the building.

3:32:27Uh this is the second floor. We are

3:32:29stepping uh stepping the building uh

3:32:32back at the rear of the building to

3:32:33comply with the rear yard setback. Um

3:32:36there are three apartments on this floor

3:32:38now and two of them have rear private

3:32:41decks. We're using the roof of that

3:32:43first floor for private decks for these

3:32:44two apartments here.

3:32:48This is the third and the fourth floor

3:32:49plan. These are actually exactly the

3:32:51same as the second floor. The only

3:32:53difference is that we're replacing uh

3:32:55the roof decks on the back with with a

3:32:56balcony for each of these apartments.

3:33:02Uh here we have the uh roof plan. Both

3:33:05stairs and the elevator uh come up to

3:33:08the roof. Uh we have an amenity space.

3:33:11It's 279 ft and we're proposing it as a

3:33:14gym. Uh the rest of the space is roofed

3:33:17is used as roof deck with the exceptions

3:33:19of uh green tray green roof trays for

3:33:22planting areas on the left side and the

3:33:24front here as well as on the right side

3:33:26here and this back corner of the

3:33:28building which is used for uh equipment

3:33:31for condensers and this would be

3:33:32screened from the roof deck area.

3:33:39Uh with that, I'm going to jump back to

3:33:41my original drawings

3:33:46to talk about the uh building

3:33:48elevations. So this is the front

3:33:49elevation. Uh as mentioned, we are

3:33:52keeping uh much of that front retaining

3:33:54wall. Uh we'll provide a new smooth

3:33:56stuckco finish on that wall with a

3:33:58charcoal gray uh color. Uh above that,

3:34:01the new building is a main mainly a

3:34:04brick building. We're doing this with

3:34:06three different brick colors. So the

3:34:08lower three levels will have a darker

3:34:10brown brick. The upper uh level has a

3:34:13light brown brick and then we have a

3:34:14cream brick band uh here between the

3:34:17third and fourth floors uh separating

3:34:19the two. At the top of the building we

3:34:21have a charcoal gray uh fiber cement

3:34:24panel cornice. We have black frame

3:34:26windows, black aluminum railings where

3:34:28we have them. Uh and at the top of the

3:34:30building we have a bulkhead which is

3:34:32obviously set back from the front of the

3:34:33building and is finished in a light gray

3:34:36smooth stucco.

3:34:38Mr. Lewis, did I hear you correctly?

3:34:40We're not replacing that retaining wall.

3:34:42We're just resurfacing it.

3:34:44>> That is correct. We are keeping the

3:34:45retaining wall where we can and

3:34:47refinishing it.

3:34:51>> Um this is the right side of the

3:34:53building. Uh again, you can what you can

3:34:55see here is we are wrapping all the

3:34:57building finishes from the front around

3:34:59the side. So that's all the bricks as

3:35:00well as the uh the corners to the

3:35:02building. The exception I would say to

3:35:04that would be at the second floor we're

3:35:06only returning the brick about 10 ft and

3:35:08then we're changing that to a smooth

3:35:10stuckle finish at the ground level and

3:35:12that would be charcoal gray to match the

3:35:14retaining wall.

3:35:16Uh we also can see at the back of the

3:35:19building where we have those roof decks.

3:35:20We're providing uh 6ft privacy screens

3:35:23around those uh those decks.

3:35:28This is the left side. Again, we're

3:35:30returning all the finishes with the

3:35:32exception of the first and second floor,

3:35:35um, which we're doing with the smooth

3:35:36stuckle finish. You could also see the

3:35:38staircase, uh, which is providing that

3:35:40second means of egress.

3:35:43And then lastly, here's the rear

3:35:44elevation. Again, we're wrapping so

3:35:46we're wrapping around all four sides

3:35:48with the brick. And here you can see the

3:35:50balconies, those enclosed uh patios as

3:35:53well as the the back stair of the

3:35:55building which is actually open instead

3:35:57of being a closed stair to provide a

3:35:59little more openness at the back.

3:36:02Um that concludes my presentation unless

3:36:04there's anything else you want me to

3:36:05address.

3:36:06>> Uh no any any questions from the board.

3:36:09>> So brick stucco finish back to brick on

3:36:14that first floor.

3:36:18This should be stucco at the ground

3:36:20floor of the first floor of the second

3:36:22floor here and then brick everything

3:36:25above.

3:36:26>> I was thinking brick all around but

3:36:35>> I'm sorry I'm just a little bit

3:36:36confused. So what you're sharing right

3:36:38now is this what's in the portal or is

3:36:39this a different

3:36:40>> This is the elevations have not changed

3:36:42only the floor plans

3:36:45>> the balconies that you'll have that 2 in

3:36:473 in opening on the bottom of the

3:36:50balconies.

3:36:50>> Yes, it'll be less than two inches.

3:36:52Yeah.

3:36:52>> Perfect. Okay. Thank you.

3:36:55>> So to address the change in the floor

3:36:57plan, the only elevation that will

3:36:58change is the door being added to that

3:37:01one side of the building.

3:37:04>> Correct.

3:37:05>> The door. And yeah, we just cut away a

3:37:06little bit of retaining wall there.

3:37:10>> Okay.

3:37:11>> Yeah,

3:37:11>> because there wasn't a path to the

3:37:13sidewalk in that location previously,

3:37:15>> correct? The path previously went all

3:37:18the way around the back of the building

3:37:19and all the way around to the front.

3:37:22>> Okay. So, we're taking a shortcut.

3:37:25C

3:37:25>> could you just put that revised seller

3:37:27plan on the screen just for one more

3:37:29second?

3:37:30>> Of course. that it's on a hill

3:37:32building, right?

3:37:34>> So, is that ramp going up or down? For

3:37:37>> it's going it's going up. We're actually

3:37:39about a foot a foot and a half below the

3:37:41sidewalk level in our cellar at this

3:37:43point.

3:37:44>> What's the ceiling height for

3:37:46[clears throat] that area, including

3:37:47where where it ramps up?

3:37:48>> Oh, I forgot if it's eight or nine feet,

3:37:50but we do have we did do that math. We

3:37:52have the height the ceiling height

3:37:54there.

3:37:54>> Okay.

3:37:55>> Ceiling height was an issue for a lot of

3:37:56things here.

3:37:58Y

3:37:59>> a question I have is in the cellar, do

3:38:02you have what do you have a compactor

3:38:04basically uh being fed by the shoots?

3:38:07>> We because it was only a 13-unit

3:38:09building, we were going to propose to

3:38:11not use a compactor and just have a

3:38:12rolling bins at the bottom that the

3:38:14chute would lead directly to

3:38:15>> drop right into the rolling bins.

3:38:16>> Yes.

3:38:17>> Okay.

3:38:20>> Any other board comments?

3:38:24>> Thank you. Thank you, Mr. Lewis.

3:38:26>> Just apologies. Please redirect this if

3:38:28you have another expert, but I just saw

3:38:29in the staff memo u a note to testify

3:38:32about cliff erosion. I don't know if

3:38:33that's

3:38:34>> Yes, we we could have uh Guy come up

3:38:37again. We we did speak to that and

3:38:39review that. I'll let Guy address that.

3:38:43>> Yes. Uh what I originally

3:38:45[clears throat]

3:38:46did speak about the cliff on that photo

3:38:49there, the cliff erosion, it's not as

3:38:52steep as you may think it is like you

3:38:54would see down further down with the

3:38:57path. When the path comes out, the cliff

3:38:59there is really rough and it's steep and

3:39:02there's a lot of erosion on it. This is

3:39:03not the case here. It's gradual and then

3:39:06it slopes off there down to where the uh

3:39:09the sheriff's offices are. So your

3:39:12opinion is it will not have an effect?

3:39:13>> No, it will not have effect. Of course,

3:39:15they're going to have uh soil erosion in

3:39:17place and protective barriers and as

3:39:20they build they'll protect it, but I

3:39:22don't see that being the case here.

3:39:23>> Thank you. And and the change in the

3:39:25seller plan as presented doesn't impact

3:39:27that?

3:39:27>> No, not at all. Not at all. I mean

3:39:29maintaining the retaining wall I mean

3:39:31those things is hopeful but I think with

3:39:33the the site the excavation it's it's

3:39:36highly improbable that the retaining

3:39:38wall will be maintained in its place

3:39:40unless

3:39:41>> we trying to maintain it to help with

3:39:44>> any type of

3:39:46>> the intent is to retain it if we can if

3:39:48not we'll replace the

3:39:49>> question was why

3:39:52>> and if it's cost then the answer is cost

3:39:54if it's to

3:39:55>> the do something I I would Let's have

3:39:58one speaker and use the mic, please.

3:40:00>> I would say it could be a little bit

3:40:01cost, a little bit um ease of

3:40:03construction, and a little bit historic

3:40:05value. A little of all of it.

3:40:08>> Okay,

3:40:08>> we'll see.

3:40:11>> Okay, thank you.

3:40:12>> Good.

3:40:13>> Thank you, Mr. Lewis.

3:40:15>> Okay, thank you, Mr. Harington.

3:40:16>> Our next uh witness is Carolyn

3:40:18Worstelle.

3:40:20>> What do you want,

3:40:22>> Miss Worstelle? Just recognize that

3:40:24you're still under oath. Please. Yes, I

3:40:26recognize I'm still under oath. Um, can

3:40:29we go to

3:40:32maybe the

3:40:35on the plans, the first page that has

3:40:38like the survey and whatnot,

3:40:40>> there's like a

3:40:42>> it was on the architectural plans. Yeah,

3:40:44this that one right there.

3:40:47>> Okay.

3:40:50Um, so yes, so we're we're here um this

3:40:54evening uh for a couple of uh variances.

3:40:56Uh well, first of all, there's some

3:40:58deviations and then variance. I'm going

3:41:00to speak to the variance first um

3:41:03because I think uh that is um the peepod

3:41:07uh variance. Um and we were just talking

3:41:09about that, so I think that's the best

3:41:11segue there. Um so this is um we're

3:41:16requesting a variance for the setback

3:41:18from the cliff face.

3:41:20Um and so the peep pod requires that

3:41:24there be a minimum building setback line

3:41:26of 30 ft from the top of the cliff. Um

3:41:29so the cliff is defined as exposed

3:41:32bedrock that has a vertical

3:41:35>> do

3:41:36the sheer vertical um face. So

3:41:41>> there is a exposed bedrock line as as

3:41:44was testified um by the engineer um that

3:41:48is here on the right hand side of the

3:41:49screen that is not on our property. It's

3:41:51on the adjacent property. Um but there

3:41:54are portions the the hatched gray area

3:41:56is where you're seeing like the 30foot

3:41:58setback. So there are portions of our

3:42:01property that are within that 30-foot

3:42:03setback that are going to be proposed to

3:42:05be disturbed. Now when we look at the

3:42:09peep pod and the purposes of the peep

3:42:13pod for that disturbance the buffer um

3:42:15it really comes down to you know what

3:42:18what is the intent of the peep pod and

3:42:20it's first to preserve an identified

3:42:21resource which is the palisades cliff

3:42:23[snorts] face um and then the second one

3:42:26is for the safety to prevent development

3:42:28on steeply sloped sites which might

3:42:30trigger landslides

3:42:31so

3:42:33addressing that first item of you know

3:42:35what is the identified resource. Um,

3:42:38this is not, while it meets the

3:42:40definition of a cliff face because it's

3:42:42exposed bedrock that's vertical. This is

3:42:45not a grand cliff face which people

3:42:47think of when they think of the

3:42:48Palisades. We're talking about like 1

3:42:51foot to I think it's maybe uh 10 ft um

3:42:54at the at the northern side of it. So

3:42:57that's that's the the height difference.

3:42:59A cliff that we're defining is is um is

3:43:02again is not very large. Um, and there's

3:43:05already been a lot of historic

3:43:07development and disturbance of this

3:43:09resource. Um, so the existing property,

3:43:12and you sort of see it here on the the

3:43:14screen, but um, there's an existing um,

3:43:19garage and retaining wall that stretch

3:43:23from the our property onto the adjacent

3:43:25property. So there's already a

3:43:27disturbance that is is historically

3:43:29within that peepod area that is you know

3:43:32um disturbing this uh you know the the

3:43:36the

3:43:38environmental the resource. Um and when

3:43:41you look farther north you do see that

3:43:43there are many other structures that

3:43:45already have again similar conditions

3:43:47where there are retaining walls and um

3:43:50disturbance within that 30-foot uh

3:43:52setback area. So again, I I think that

3:43:55um we're really not having a greater

3:43:58impact on the resource than what is

3:43:59already there. Um so I I think that you

3:44:02know there's really not an impact in

3:44:04that respect. When the other aspect of

3:44:06it is looking at significant increase to

3:44:08safety um as was testified um by the

3:44:12engineer, he doesn't believe that

3:44:13there's going to be a significant impact

3:44:15or or uh increase in risk of um

3:44:18landslides. Um so again I I don't

3:44:21believe that there's any real impact um

3:44:23from that. So I do believe um that uh

3:44:27you know the the the benefits here I'm

3:44:31going to look at this as a see-through

3:44:32the benefits here of designing a new

3:44:35structure with um you know removing some

3:44:38of those intrusions into the existing

3:44:40peepod area um and again replacing um or

3:44:44not replacing but but uh working on this

3:44:47site that is sort of a historical isore

3:44:50with that large retaining wall and

3:44:51creating a building that is going to

3:44:53engage engage the sidewalk um and create

3:44:55a much more inviting uh streetscape I

3:44:58think is really um a benefit of this

3:45:01application. So I think overall here the

3:45:03benefits of the project outweigh any

3:45:06minor detriments to what is already an

3:45:09impacted resource.

3:45:12Um we are also requesting two deviations

3:45:16from the redevelopment plan.

3:45:19Um, and so that goes to uh the maximum

3:45:22building height in feet and the front

3:45:24yard setback. Um,

3:45:27so I'm going to address the front yard

3:45:28setback first. Um, so the standard is

3:45:31that you are to required to match an

3:45:34adjacent building. Um, so there's one

3:45:36adjacent building to this site. It is

3:45:38here at the corner. Um, and it is set

3:45:40back from the uh um Academy Street. uh

3:45:47uh

3:45:48uh right ofway line. Um but what we're

3:45:51proposing to do is essentially match

3:45:54what is the historic

3:45:56um uh or not the historic but the

3:45:59character of the existing property which

3:46:01is that there is a large retaining wall

3:46:04on this property right at the zero foot

3:46:05property line. We're proposing to match

3:46:08and maintain uh that uh retaining wall

3:46:12um to the best of the abilities. And

3:46:13then there is a portion of the retaining

3:46:15wall that actually goes off our property

3:46:17and goes onto the adjacent property at

3:46:19the corner. So again, that portion of

3:46:21the retaining wall would be retained. So

3:46:23what we're trying to do is match the

3:46:26setback of the retaining wall that

3:46:28exists on our property today and extends

3:46:30from our property onto the adjacent

3:46:32property. Um so again we think that this

3:46:34is a is uh the better solution um for

3:46:37this this um application and again

3:46:41really will activate the street frontage

3:46:43which is otherwise right now just a

3:46:45blank wall um with the property

3:46:47elevated.

3:46:49The third the second uh deviation we're

3:46:51requesting is the building height and

3:46:53feet. Uh we're proposing a height of um

3:46:5746.8 8 ft where a maximum building

3:47:00height of 44 feet is permitted. So we're

3:47:03requesting a deviation for 2.8 ft. Um so

3:47:07again I I think and Jeeoff maybe you can

3:47:10go to an elevation or or one of the the

3:47:12cutthroughs the

3:47:15>> the sections.

3:47:16Um so this property is kind of uniquely

3:47:19affected by the topography. Um,

3:47:23so we have uh can you do one of the

3:47:25building the front the front facade

3:47:27building section or maybe the front

3:47:29facade?

3:47:30>> I give you the front facade right here.

3:47:31>> Okay. So we'll we'll work with that. Um,

3:47:34so as you can see, Academy Street uh has

3:47:38a has a grade. It goes from

3:47:42uh from the west down to the east. So we

3:47:44do have a sloping u uh

3:47:48uh front condition. Um so our finished

3:47:52grade is taken at the midpoint of the uh

3:47:55center of the building. Um so that's

3:47:57where we sort of set our our height is

3:47:59we measure it from. Uh but then when you

3:48:02look at the building from front to back

3:48:03and maybe I've maybe I can do that

3:48:06myself.

3:48:09If you can look at from front to back,

3:48:10you can see here in this section, the

3:48:13sidewalk is here on the left side of the

3:48:15screen and then it's an immediate

3:48:17straight up and then it continues to

3:48:19slope up as we go to the rear of the

3:48:21building. Um, so we have some very

3:48:23unique um topographic conditions for

3:48:26this particular property that has um

3:48:29sort of necessitated how we have our

3:48:32first residential floor is sort of

3:48:34elevated. Um, we're not at a flood zone

3:48:37like my last uh application. Uh, but we

3:48:40do need to have it elevated for

3:48:43a certain uh building code reasons in

3:48:45order to provide adequate um window

3:48:48space um within what is what is already

3:48:52a a very elevated site. So because we

3:48:55have to elevate our first residential

3:48:57floor sort of up in order to be able to

3:49:00um use it for residential purposes, we

3:49:03we are requesting a couple of additional

3:49:05feet, the 2.8 ft um so that we can

3:49:09provide uh

3:49:12an appropriate uh height as measured

3:49:15from the sidewalk.

3:49:19Um so again when we look at height and

3:49:22we turn look at what are the potential

3:49:24the impacts on light and air um again we

3:49:27are we've pushed the pulled the building

3:49:30um closer to Academy Street so that we

3:49:32can provide more setbacks um from the

3:49:35rear. Um so again we're we're going to

3:49:38um mitigating some of the the impacts of

3:49:41that minimal 2.8 ft by having that

3:49:43increased front yard setback. Um,

3:49:48so again, I I don't see this as being a

3:49:50really substantial uh impacts with the

3:49:522.8 ft. Um, but it does allow for a a

3:49:55usable building. Um,

3:50:00[sighs and gasps] I think overall uh the

3:50:03variances and the project advanced the

3:50:05purposes of the municipal land use law.

3:50:07Um, I think it's an appropriate use

3:50:10consistent with purpose A um through an

3:50:12appropriate multif family building in

3:50:13the Journal Square neighborhood. Um I

3:50:15think it's an appropriate population

3:50:16density consistent with purpose E. Um

3:50:19des promoting the more uh desirable

3:50:22visual environment consistent um

3:50:25purpose I. So again um this is a site

3:50:28where right now you have a sort of a

3:50:30blank wall and you know it's straight up

3:50:33and what we're going to be creating is a

3:50:35more um activated facade and and

3:50:39frontage and I think that's really going

3:50:40to be to the benefit of the overall

3:50:42block into the neighborhood. Um I don't

3:50:45see substantial detriment to the public

3:50:46good or the general welfare. Um again

3:50:49you know the project is going to be

3:50:50designed um

3:50:54to you know all modern building code and

3:50:55zoning code or building uh building and

3:50:58fire codes um as well as providing ADA

3:51:02accessibility to a building. Um

3:51:05and uh you know I think that there's no

3:51:08significant increase uh to safety risks

3:51:12uh for the uh intrusion into the pod

3:51:14buffer zone. Um so I think that that

3:51:17there's really uh no substantial

3:51:18detriment. Um I don't see substantial

3:51:21impairment to the intent or purpose of

3:51:23zone planner zoning ordinance. Um it's

3:51:25promoting the purpose of zone 4 of the

3:51:27the Journal Square redevelopment plan to

3:51:29provide new housing uh within uh the

3:51:32Journal Square transportation area. Um

3:51:35and consistent with uh the plan

3:51:37objectives to create um new housing um

3:51:41and to um maximize use of rooftop open

3:51:46space for um residential recreation and

3:51:48green roofs. Um and again uh consisting

3:51:52uh several uh goals of the master plan

3:51:57to enhance residential neighborhoods and

3:51:59creating that diversity of housing. Um

3:52:01so I think overall um

3:52:04the positive and negative criteria can

3:52:05be have been met um and that both the

3:52:08the the variances and the deviations can

3:52:10be granted.

3:52:12>> Thank you.

3:52:14>> Okay, that that completes our

3:52:15presentation.

3:52:17>> Thank you, Mr. Harrington. Is there any

3:52:18board comments?

3:52:21>> I just have one question. Sure. Uh for

3:52:24this actually for uh Jeff.

3:52:26>> Um on the front facade where the new um

3:52:30exit is going, is that window to remain

3:52:34because that's going to be now hallway

3:52:35as opposed to that recreation uh area.

3:52:38>> Yeah, we we it it is but we we're going

3:52:41to keep the window.

3:52:43>> Okay. Is it going to be

3:52:44>> We actually although we actually are

3:52:46just going to I think we're going to put

3:52:48the ramp in the recreation area. I don't

3:52:50think it's going to be separated from

3:52:51it.

3:52:52>> Okay.

3:52:52>> Yes.

3:52:53>> Because we we want to get that light

3:52:54into the recck room.

3:52:55>> All right. Very good.

3:52:58>> Thank you. At this time, I'd like to

3:52:59open for the public. Is there anyone

3:53:01from the public?

3:53:02>> There's no one from the public. I'd like

3:53:03to close public portion.

3:53:05>> Second.

3:53:06>> Public is closed.

3:53:09Mat Ben.

3:53:11I'm I'm here on behalf of uh Matt Dilva.

3:53:15Um I consulted with him on on the review

3:53:18of this application. I also reviewed the

3:53:20the application materials um uh before

3:53:23uh coming here today. Um the

3:53:28uh Mr. Silva did prepare a staff memo

3:53:30dated August 18th, 2026

3:53:33um in which he uh lays out the the

3:53:37application and makes several

3:53:38recommendations should the the board

3:53:40make a motion to approve. I'd just like

3:53:43to have the applicant uh if they haven't

3:53:45already um uh put on the record that

3:53:48they would they find the conditions

3:53:52acceptable.

3:53:53>> Yes. Yes, we do.

3:53:55Um staff agrees with the testimony of

3:53:59their applicant. Uh we uh

3:54:02as in addition to their professional

3:54:06planner testimony, staff recommends

3:54:08approval.

3:54:09>> Thank you. I would like to entertain a

3:54:11motion.

3:54:11>> Madam Chair, I move that.

3:54:12>> Sorry. Before I go for the motion, um

3:54:14Mr. Harrington, are you in agreement

3:54:17with the staff conditions?

3:54:19>> Yes, we are. Okay.

3:54:21as amended with the new plans

3:54:25>> as amended to ask for

3:54:27>> madam chair I move that we approve

3:54:29application number the staff application

3:54:32number P2025-0161

3:54:37>> as amended this

3:54:38>> as amended go ahead

3:54:42>> the 929 Jeffrey Lewis floor plans

3:54:45>> the 929 Jeffrey Lewis plan

3:54:49>> with a condition outlined in the staff

3:54:50board.

3:54:52>> Second it.

3:54:57>> Uh, Vice Chair Patel

3:54:59>> I.

3:54:59>> Commissioner Conway

3:55:01>> I.

3:55:01>> Commissioner Stamato

3:55:03>> I.

3:55:03>> Commissioner Capers

3:55:04>> I.

3:55:05>> Commissioner Kaplan.

3:55:06>> Complex site but good work. Thank you. I

3:55:10>> uh Madam Chair Gangadan

3:55:12>> I.

3:55:12>> Motion carries. All in favor?

3:55:14>> Thank you.

3:55:14>> Thank you. Thanks everyone.

3:55:17Um,

3:55:19we will take a five minutes break, but I

3:55:21am very sure we will not be getting to

3:55:25KP2025-0169,

3:55:28which is 506 Summit Avenue.

3:55:31>> Council,

3:55:32>> would you like to carry council?

3:55:34>> Good evening, Madam Chair, council,

3:55:36commissioners. Gerard Pizzill from Gova

3:55:39Burns on behalf of the applicant.

3:55:41>> Just just do that whole thing again.

3:55:43>> Okay. I just said good. It was very

3:55:44stylish doing it on the walk, but please

3:55:47on the mic.

3:55:47>> I didn't want to ignore the question

3:55:48from Madam Chair. So, good evening,

3:55:50Madam Chair, commissioners. Gerard

3:55:52Pizzill from Gova Burns on behalf of the

3:55:54applicant 500 Summit Avenue Owner LLC.

3:55:57Uh we would agree to carry due to the

3:55:59lateness of the hour where we are at in

3:56:01the agenda. Uh with preservation of

3:56:03notice, I did I do have the uh my

3:56:06affidavit on the portal. I do have it

3:56:08with me, council, if you want to take it

3:56:10now or at the next appearance when we

3:56:13call. appearance. We're going to carry

3:56:15it with the preservation of that notice.

3:56:17You're going to take wave the time for

3:56:18the board to act.

3:56:20>> Correct.

3:56:21>> And

3:56:24that's October

3:56:29>> 13 or 27.

3:56:31>> I think it's 27.

3:56:32>> When do we want to carry this?

3:56:38>> 27.

3:56:39That's the next

3:56:41>> uh

3:56:42>> 13th is the next.

3:56:43>> Yeah.

3:56:44>> That full or no?

3:56:47>> Uh it's actually not full.

3:56:49>> No.

3:56:50>> Okay.

3:56:50>> We'll carry to October 13.

3:56:52>> Thank you. Thank you all.

3:56:54>> Thank you.

3:56:54>> Thank you, council.

3:56:56>> We'll take a five minutes break and

3:56:57we'll be back. Right back.

3:57:10>> [snorts]

3:57:18>> I'd like to call the meeting back to

3:57:19order.

3:57:21I'd like to call KP2024-00008

3:57:25preliminary and final major site plan

3:57:27with C variances. [clears throat]

3:57:29Address is 33 Division Street.

3:57:32>> Um, we have a hard stop at 10:30.

3:57:34Understood.

3:57:35>> Okay.

3:57:39>> Uh for the record, Tom Lean from Connell

3:57:42Foley here on behalf of the applicant.

3:57:45This is a notice case. I did post my

3:57:48affidavit of notice on the portal, but I

3:57:50will provide same to council.

3:57:57Thank you, Mr. Lee.

3:58:02Madam Chairman, receive the affidavit of

3:58:04publication proof of mailing with

3:58:05respect to 29-39 Division Street here in

3:58:08the city. Does appear to be the original

3:58:10of the notice that was posted on the

3:58:12portal. I've had the opportunity to

3:58:14review it. Does appear to be in order.

3:58:16Just going to mark it as A1 for purpose

3:58:18of the record.

3:58:19>> Thank you.

3:58:20>> Thank you, council. Uh the application

3:58:23before you tonight is a request for

3:58:25preliminary and final major site plan

3:58:27approval with deviations. Uh the

3:58:29property is located within the Enos

3:58:31Jones redevelopment plan area. It is at

3:58:34the end of 8th Street where A and

3:58:36Division meet, right across from Enos

3:58:38Jones Park. Uh for those of you familiar

3:58:41with the area, that's where the World

3:58:43Boxing Gym is. Uh the proposal this

3:58:46evening is to develop an eight-story

3:58:48building containing uh 115 units, 85

3:58:52parking spaces, and a ground floor

3:58:54retail space. uh we are utilizing a

3:58:57bonus within the redevelopment plan. Uh

3:59:00the bonus is essentially you are allowed

3:59:02additional height and any of the units

3:59:04that are contained with that additional

3:59:06height relate to a monetary payment for

3:59:09the improvement of Enos Jones Park. So

3:59:12we have um I just want to make sure I

3:59:14have the calculation right. We have an

3:59:16additional 48 units at $35,000

3:59:20uh a unit that results in a bonus uh

3:59:22bonus payment of $1.68 68 million to

3:59:26improvements to the Enos Jones Park. Uh

3:59:29we are the designated redeveloper for

3:59:31this property. Um we will if approved

3:59:34that money uh will be uh put in escrow

3:59:37with the redevelopment agency and as

3:59:39improvements are required for the park

3:59:41they will be dealt with through the uh

3:59:43the agency. Uh I do have three witnesses

3:59:46this evening. Uh my first witness is

3:59:48Mike Resnik who is our civil engineer.

4:00:15Do

4:00:15>> you swear affirm the truth, whole truth,

4:00:17and nothing but the truth? So I help you

4:00:18God.

4:00:18>> I do.

4:00:19>> And if you could state and spell your

4:00:20name for the record.

4:00:21>> Michael Risk. R I Z K.

4:00:24>> And Mr. Risk, your qualifications.

4:00:27>> I'm a licensed professional engineer and

4:00:29my license is uh current and in good

4:00:31standing. Madam Chair, we've obviously

4:00:33qualified Mr. Risk in the past. I ask

4:00:35that the board recognize him as a

4:00:37professional engineer.

4:00:38>> Thank you. You're qualified. You may

4:00:40proceed.

4:00:41>> Thank you.

4:00:43>> It's not coming up.

4:01:02There we go. There we go. [cough]

4:01:05Uh, this is the site plan set that was

4:01:07submitted and is on the portal. I'll

4:01:09just give a brief brief uh overview of

4:01:11the site. As Mr. Lean mentioned, it is

4:01:14on the corner of Division Street and 8th

4:01:16Street across the street from uh Enos

4:01:18Jones Park. Uh, you have the turnpike uh

4:01:21right here on the west side of the

4:01:23property.

4:01:25Um I do have an exhibit that I will use

4:01:28for the next

4:01:30>> remark. This is A2. Does it have a date

4:01:32and a title?

4:01:33>> Yes, it is titled landscape plan

4:01:36rendering

4:01:38and it's dated uh 113 2026

4:01:43>> A2.

4:01:46[snorts]

4:01:47So this is just a colorized uh plan of

4:01:50the site plan and the landscape plan

4:01:52showing the uh building the uh proposed

4:01:55sidewalk and uh curb that we're

4:01:57proposing. There are existing trees

4:02:00along the frontage on 8th Street and

4:02:02Division Street that we are uh proposing

4:02:04to keep. And then we are proposing some

4:02:07landscaping along the uh building and

4:02:11along the rear of the property. Um there

4:02:14is one curb cut currently. We are

4:02:16proposing to move it uh still along

4:02:19Division Street so that it can provide

4:02:21access to the parking garage. [snorts]

4:02:26Uh oh, I'm going back to the site plan

4:02:30uh set that was and I'm going to the uh

4:02:33sheet C41 which is the uh grading and

4:02:36drainage plan. So, in terms of storm

4:02:39water, the site is a major development

4:02:41uh per the Jersey City storm water

4:02:43control ordinance. And we are proposing

4:02:45a detention basin here located at the

4:02:48front of the property in underneath the

4:02:49parking garage. There's also a green

4:02:52roof on this site. We're proposing about

4:02:547,300 square ft of green roof. Um, this

4:02:58site is has been designed to meet the

4:03:01city's storm water requirements as well

4:03:03as the state storm water requirements.

4:03:06And um we're just going to go back to

4:03:08the exhibits, a second exhibit that

4:03:10shows

4:03:12uh this this exhibit is titled roof site

4:03:15plan and it's also dated uh 113

4:03:19A3

4:03:20>> and it just gives you an a brief

4:03:24uh overview of the rooftop with all the

4:03:26green space uh the green roof that we're

4:03:28proposing in on the site.

4:03:35Turning to uh sheet C501 of the site

4:03:38plan set. So in terms of utilities, we

4:03:40are proposing new storm water, sanitary,

4:03:43electric, gas, which will all connect

4:03:45within the existing infrastructure on

4:03:47Division Street. Uh we have received a

4:03:49comment letter from MUA and we'll work

4:03:52with them to address those comments.

4:04:07Um, for site lighting, we are proposing

4:04:09uh some building mounted lights along

4:04:12the building on Division Street and on

4:04:158th Street. Um, and it does meet the

4:04:17city's uh lighting requirement, minimum

4:04:19lighting requirements.

4:04:23Uh, and this site is in a flood hazard

4:04:25area and we have uh received D approval

4:04:28for this site already.

4:04:30>> That that concludes my testimony.

4:04:33>> Thank you.

4:04:34>> I [clears throat] just uh have one

4:04:35question. Um the you mentioned that the

4:04:37trees that are on site are existing. Uh

4:04:40we were asked to keep those by the city

4:04:43and forestry. Correct.

4:04:44>> Correct. Yes. So the we coordinated with

4:04:46the Jersey City Forester as well as the

4:04:48community. We had uh community meetings

4:04:50and they requested that we keep the

4:04:52existing mature trees as opposed to

4:04:54removing them and planting new smaller

4:04:57trees.

4:04:58>> R related to that, I also saw that

4:05:00there's plantings in the planting strip.

4:05:03Are those to be maintained by the

4:05:04applicant?

4:05:05>> Yes, those will be maintained by the

4:05:07applicant. They along the building you

4:05:09you're referring to

4:05:10>> along along this the curb line.

4:05:14>> I I believe they will be I mean

4:05:17>> Yes. The the answer is yes. We we will

4:05:19be maintaining the landscape that's on

4:05:21site. Yes.

4:05:21>> Okay. You get a mic over there, Tom.

4:05:25>> Um just want to make sure we're getting

4:05:26everything on them.

4:05:27>> Gotcha. Yep.

4:05:28>> Um could you just go to the real quick?

4:05:31>> Yep.

4:05:31>> Yes. Okay.

4:05:33>> You're talking about

4:05:35>> Yep. the 20CC

4:05:3846 CRC's all that.

4:05:41>> Yes. So that will be maintained by the

4:05:43applicant.

4:05:44>> Thank you.

4:05:44>> U and sorry just one more question. And

4:05:46uh we did meet with the JCMUA prior to

4:05:49us even putting the site plan in correct

4:05:51to discuss some of the improvements that

4:05:52are going into the street. The building

4:05:54across the street has already done some

4:05:56of that work, but in our conversation

4:05:57with the JCMUA, we'll be contributing to

4:06:00the work that's being put in the street.

4:06:01Correct.

4:06:01>> Correct.

4:06:02>> I have nothing further.

4:06:04>> Thank you. Any other board comments?

4:06:07>> Thank you,

4:06:09Mr. Le. Next witness, please.

4:06:10>> Yes. Uh Mr. Vandermark, my architect.

4:06:16>> [clears throat]

4:06:33[cough]

4:06:36>> Lot of wires there, Mr. Vandermark.

4:06:38>> Yeah, I got a bad battery.

4:06:40>> Is that alien wear?

4:06:49Okay.

4:06:50>> Swear affirm testimony. You're about to

4:06:52give be the truth, the whole truth, and

4:06:53nothing but the truth.

4:06:54>> I do.

4:06:54>> State and spell your name for the

4:06:55record.

4:06:56>> Sure. Anthony C. Vandermark Jr. Van and

4:06:59Der M A R K. Principal of MVMK

4:07:02architecture 36014 Street Hoboken, New

4:07:05Jersey.

4:07:06>> Licensed architect in the state of New

4:07:08Jersey in good standing.

4:07:09>> Yes, sir.

4:07:10>> Thank you, Mr. Vandermark. Madam Chair,

4:07:12obviously we've qualified Mr. Vandermark

4:07:14numerous times in the past. I recommend

4:07:16the board accept his qualifications as a

4:07:18licensed architect.

4:07:20>> Thank you. You may proceed, Mr.

4:07:21>> Thank you, councel.

4:07:22>> Uh Mr. Vandermark, before you start, I

4:07:24just want to Mr. Risk mentioned that we

4:07:26did meet with the Enos Jones Community

4:07:27Group. Um as you're going through the

4:07:29presentation, if you could just

4:07:30highlight anything that we uh did in the

4:07:33project in um response to the comments

4:07:35that we got.

4:07:36>> Council, we're going to mark this as A4.

4:07:39We'll mark the whole slide.

4:07:41presentation. Does it have a date, Mr.

4:07:42Vandermark?

4:07:43>> That's correct. Uh the slide

4:07:44presentation uh would be uh 12125.

4:07:48Um 27 slides in total. Um I am prepared

4:07:52to use potentially uh maybe half of

4:07:55those slides uh for this evening's

4:07:57presentation.

4:07:58>> Thank you.

4:07:59>> Um once again, thank you very much for

4:08:01being here and uh we are here to propose

4:08:03an eight-story um 115 unit residential

4:08:06building with 86 parking spaces. as

4:08:09previously uh testified to. Uh top

4:08:12lefthand corner, we have an uh 18,298

4:08:16square foot um completely impervious

4:08:18site. Uh over to the southern portion of

4:08:21the leg of the site, we have the

4:08:23one-story masonry world boxing gym.

4:08:26Directly across the street, we have the

4:08:28eightstory plus amenity uh level

4:08:30Alexander, which is a condominium

4:08:32building. Um uh also as part of previous

4:08:35testimony is that uh we do have a

4:08:38planter strip on the front at the curb

4:08:40line. Um and then we also have a

4:08:42sidewalk and then an additional planter

4:08:43strip up against the sight line.

4:08:46Pre-existing uh 13 trees in total. Um we

4:08:49potentially might be removing one for

4:08:51sliding the curb cut further north on

4:08:53the site. What we're going to be doing

4:08:55is we will replace uh any trees uh that

4:08:57were removed uh as part of the new

4:09:00construction. any of the pre-existing

4:09:02trees. What we're going to do is we are

4:09:03going to provide uh tree surrounds in

4:09:05compliance with the forestry standard uh

4:09:07as part of this application, but the

4:09:09existing three trees are to remain

4:09:14proposed application you have before you

4:09:16um we are requesting three variances

4:09:18that Mr. Bellamy will testify to. We are

4:09:20proposing for a uh an additional two

4:09:23feet for the curb cut. So we uh the the

4:09:27requirement for the Enus Jones uh

4:09:29mid-rise transition zone uh is 14 ft. We

4:09:33are proposing 16. Um we are not

4:09:35proposing setbacks uh at the seventh and

4:09:38eighth floor of 8 ft which is also a

4:09:40variance. And then we are asking for a

4:09:42height variance of an additional 2 ft

4:09:44and that's to accommodate some

4:09:45additional parking and a third layer of

4:09:47stacker parking. Of the 115 residential

4:09:50units, 60 of these units are

4:09:52onebedrooms. 37 of these units are

4:09:54onebedrooms plus den. Seven of these

4:09:56units are two bedrooms. And 11 of these

4:09:58units are two bedrooms plus den. Again,

4:10:01we are proposing 86 parking spaces. We

4:10:04will comply uh with the EV charging

4:10:06station requirement uh as mandated by

4:10:09the state, which I believe is 15. Um we

4:10:13are also uh providing uh storm water uh

4:10:16detention as previously testified to.

4:10:18And again 86 parking spaces, 58 bikes.

4:10:21Um we are over the requirement for

4:10:23parking spaces.

4:10:25One of the hurdles uh that we had to

4:10:26deal with was uh there is an easement um

4:10:29in relation to the turnpike extension.

4:10:32We had to be a certain distance away uh

4:10:34from the turnpike extension and the

4:10:35graphic to the right uh in this slide is

4:10:38the easement line. Um so our building

4:10:41actually had to be set back in off the

4:10:43side property line on 8th Street as you

4:10:44can see in this graphic 8 foot one. Uh

4:10:46so we do comply uh and uh we do have uh

4:10:50approval uh from the turnpike authority

4:10:51on this. So again um building had to be

4:10:54slid in and the footprint is slightly

4:10:56smaller uh than what could potentially

4:10:59uh be an as of right project.

4:11:02Uh again, working our way around the

4:11:04site, um we have a 5-ft planter strip at

4:11:06the curb line, a 5- foot uh sidewalk,

4:11:09and then we have a 5-ft inground planter

4:11:12around the base of the uh both street

4:11:14frontages at the base of the building.

4:11:16Um one of the comments that just came in

4:11:18from um New Jersey, excuse me, Jersey

4:11:21City Engineering is that they want the

4:11:22sidewalk expanded to 6 ft. We will

4:11:25comply with that. We will take the one

4:11:26foot out of the uh building line planter

4:11:29box leaving you four feet which is still

4:11:32way more than enough to uh plant the

4:11:33bushes as being proposed. Um if you work

4:11:36your way into the interior we have uh

4:11:39again 86 uh parking spaces in the form

4:11:41of mechanical. This will be a uh valet

4:11:44system so nobody will be parking their

4:11:46own cars. Um we have the uh 16t wide

4:11:49curb cut coming in off of division. Um

4:11:51we have um a warning indicator light uh

4:11:54in the sidewalk of an LED type and then

4:11:57we also have a audible strobe uh at eye

4:12:00level uh for pedestrian safety. We have

4:12:03uh uh excuse me we have permeable pavers

4:12:06at the entry points at the main lobby at

4:12:09the trash removal location at the retail

4:12:12entry uh and at the transformer location

4:12:14on 8 street. Top lefthand corner is 58

4:12:17bikes. So we have a complete bicycle

4:12:19storage room. We have an elevated

4:12:21sprinkler pump uh space which is above

4:12:23the flood plane. I know one of this this

4:12:25was one of the questions in the previous

4:12:26application that's accessed from the mid

4:12:29landing uh of that uh stairwell number

4:12:31two u centralized lobby accessed from

4:12:34division street uh and also with the

4:12:37fire command center uh the trash

4:12:40compactor and trash removal. Uh we have

4:12:43two access points. One that goes

4:12:44directly out to the street here. Um and

4:12:46they'll also um if the management

4:12:48company chooses to do so, uh they can

4:12:50load and unload within the drive uh of

4:12:53the proposed parking area.

4:12:57Uh three-dimensional uh perspective of

4:12:59the corner retail space. Um just getting

4:13:01into the building elevation design. This

4:13:03building is an all aluminum composite

4:13:06material uh bow and white uh with a

4:13:08terracotta color uh window liner. Uh the

4:13:11windows themselves are a charcoal gray

4:13:13as you can see here in this graphic.

4:13:17Uh we have a small mechanical area. We

4:13:20have switch gear um and the electrical

4:13:22meters elevated out of the flood plane

4:13:24uh above the transformer space. Small

4:13:27storage area for building management.

4:13:29And we have an elevated lobby uh that's

4:13:31lifted out of the flood plane uh which

4:13:33is a requirement by NJD.

4:13:37uh second floor uh third, fourth, fifth,

4:13:41sixth, seventh, and eighth uh

4:13:42residential units. I highlight the

4:13:44second floor is uh we do have uh a 10-ft

4:13:47uh interior courtyard terrace space with

4:13:511,412 ft of extended green roof on the

4:13:54outside of that terrace space. There

4:13:56will be privacy screens in between the

4:13:58terrace space, but as you can see here,

4:13:59we have seven onebs, uh six onebedroom

4:14:02plus den, uh one two and two bedrooms

4:14:06plus den. So blue, red, yellow and

4:14:09orange indicate the unit types centrally

4:14:11located two elevators with a trash room

4:14:14with a trash shoot. Um the recycling uh

4:14:16is uh stored on that level. Building

4:14:20maintenance will be taking it down to

4:14:21the garage and then ultimately uh being

4:14:24recycled.

4:14:25Uh graphic to the right. Um just for the

4:14:28note at floors seventh and 8 again we

4:14:30are requiring a variance relief for an

4:14:318ft setback which is part of the

4:14:33redevelopment plan. that area gained by

4:14:36moving the building line out. Uh those

4:14:38additional two floors at that 8 ft has

4:14:41been deducted from the floor plan at

4:14:42floors 2 through 8 on the interior side

4:14:45of the court uh excuse me courtyard. So

4:14:47the uh so there is actually a deduction

4:14:49of 541 square ft of floor area. We are

4:14:53not asking for any additional uh floor

4:14:55area as part of the setback relief.

4:14:58The floors are standard uh uh in unit

4:15:01type. They they range from you know 16

4:15:03units 17 units and then the upper uh

4:15:06most floors we have again 16 and then

4:15:09ultimately 15 um 48 in total as part of

4:15:12the bonus area as Mr. Lean had

4:15:14previously testified to is that uh this

4:15:16is a contribution of $1,680,000

4:15:19to the Enus Jones Park uh for those

4:15:21additional three floors and of those 48

4:15:24units. the roof plan. Uh we are

4:15:27proposing a 2,150 foot amenity space um

4:15:31with uh again uh outdoor uh green area

4:15:34of 2,67

4:15:36ft of extensive green roof. Um my text

4:15:39to the bottom lefthand corner in this

4:15:40graphic is that we are proposing 5,629

4:15:44square ft of extensive green roof which

4:15:46is the equivalent of 28 uh% of the lot

4:15:49area. We do have some uh outdoor amenity

4:15:51space on the roof as well. centrally

4:15:53located uh screened in uh mechanical

4:15:56area in between the bulkheads uh and the

4:15:58amenity space.

4:16:00Building exterior uh we are in the AE

4:16:02flood plane. So the building had to be

4:16:04elevated uh approximately 6'6 uh above

4:16:07the sidewalk. Um the first floor uh

4:16:10excuse me sidewalk level to the first

4:16:12floor. Uh we have 24'2 in and each floor

4:16:16is 10'4 floor to floor. uh uh the

4:16:20principal roof line or the height of the

4:16:22principal roof line at eight stories is

4:16:2490 feet. So that's 88 which is permitted

4:16:26plus the two uh additional as far as the

4:16:28uh variance uh request. We have an

4:16:31additional 10-ft high uh amenity space

4:16:33and then we have elevator overrun for an

4:16:35additional 7 ft on top of that 10 making

4:16:37it 17 ft tall. Again the amenity space

4:16:40and all the uh bulkhead uh material will

4:16:43be aluminum composite material. There

4:16:45will not be any ephas as part of this

4:16:47application.

4:16:49uh dusk rendering once again of the

4:16:51proposed project. As you can see at the

4:16:53street level, the pedestrian line uh we

4:16:55have uh canopy awnings uh at the

4:16:58residential entry point as well as the

4:17:00corner retail space. Um this is uh

4:17:03projecting in cantal even they didn't

4:17:04touch the ground

4:17:07again uh 8 street elevation

4:17:12interior courtyard elevations again

4:17:14staggered window pattern ACM composite

4:17:16material

4:17:18and we feel because of the building's

4:17:19location uh we'll have minimum uh shadow

4:17:22impact uh we have you know rising in the

4:17:25east uh to the south we have shadows

4:17:27being cast towards underneath the

4:17:30turnpike extension mention we have a

4:17:32large right away and then you hit the

4:17:34park. So there's zero impact and other

4:17:36than more or less midday uh summertime

4:17:38uh when you might have potentially um

4:17:41you know baseball games or sporting

4:17:42events uh that that shadow will be

4:17:44directly overhead but again minimal

4:17:47impact. Maybe later in the day there

4:17:49might be uh some shadow cast at the base

4:17:51of the exa Alexander but this concludes

4:17:53my presentation. I I think we have a

4:17:55very good application here tonight.

4:17:58>> Thank you Mr. Fandmark.

4:17:59>> Thank you. Any board comments?

4:18:01>> Uh yeah, I have one comment.

4:18:04>> Um you mentioned the stagable parking in

4:18:07lie of an emergency. Is there any type

4:18:09of backup system so that the cars would

4:18:11be able to still be retrieved?

4:18:13>> Yes, very good question. Uh uh uh all

4:18:16the uh breakers that will uh be attached

4:18:18to this mechanical parking system uh

4:18:21will be uh connected to the generator.

4:18:23It'll be located on the roof. In the

4:18:25event uh that the power does go out,

4:18:27generator will kick in and you will have

4:18:28access to remove your car uh in the

4:18:30event that you need it.

4:18:32>> Awesome. Thank you.

4:18:33>> Absolutely.

4:18:34>> Mr. Vandermark, I just want to highlight

4:18:36it. Yes.

4:18:36>> When we met with the community, we made

4:18:38a few changes. I just if you wouldn't

4:18:39mind just running through what

4:18:41originally we had proposed and the

4:18:43comments we received and how we

4:18:44addressed them.

4:18:44>> Yes. Um uh uh one of the comments was uh

4:18:48the original curbcut uh proposal was

4:18:50actually on the deadend portion of 8

4:18:52street uh where my cursor is located

4:18:54here. Um uh the neighborhood or the

4:18:57community uh you know does like to hold

4:19:00sporting events and they do uh

4:19:02potentially use that part of the street

4:19:04for uh certain activities uh you know

4:19:06parking uh and staging events and so

4:19:09forth. So they did not want the conflict

4:19:11between these events uh uh and

4:19:13ultimately uh the parking spill over to

4:19:15be in conflict uh you know with this

4:19:17garage door and the ingress egress of

4:19:19the garage. Therefore they requested us

4:19:21to move it to division street. Um so uh

4:19:24uh to be uh obviously good neighbors and

4:19:27uh by the request what we did was we

4:19:29actually moved the curb cut and that

4:19:31garage entry point the furthest away

4:19:32from the intersection as we possibly

4:19:35could uh as part of this property. As

4:19:37you can see it's uh located here. um

4:19:39twoft uh variance relief just to give

4:19:41you a little bit more room uh to get in

4:19:43and out of this garage. Again, from 14

4:19:45to 16, we don't think this is a large

4:19:48variance request. Um we originally had a

4:19:51corner amenity space as part of this

4:19:52application. Uh they requested uh a

4:19:55retail space that could potentially

4:19:57service uh uh the park. Uh we complied

4:20:00and we gave them a 762 foot retail space

4:20:03at the corner. They did want some

4:20:06additional parking. uh the application

4:20:08that was presented to them originally

4:20:10was compliant at 58 parking spaces. They

4:20:13requested actually more parking as part

4:20:15of this application. So we we did go to

4:20:18the extra level of mechanical parking

4:20:20thus providing 86 uh parking spaces.

4:20:24That is uh part and parcel why we did

4:20:26trigger uh the additional twoft request

4:20:28to elevate the first floor to get that

4:20:30additional level of parking as per the

4:20:32neighborhood's request for more parking.

4:20:34>> Thank you. Okay, here I have a question.

4:20:37>> As far as the garbage uh collection is

4:20:39concerned, that's this is going to be

4:20:40done privately for the private

4:20:42residential and the commercial areas.

4:20:45Correct.

4:20:45>> Yes, sir.

4:20:46>> All right. Great.

4:20:47>> Andy,

4:20:48>> um are there any affordable units

4:20:51proposed?

4:20:52>> Uh there are not. um in this

4:20:54redevelopment plan uh and as part of

4:20:56this application is not required and

4:20:57again we are not asking for any

4:21:00additional square footage uh or units

4:21:02that's not in compliance with the

4:21:03redevelopment plan.

4:21:05>> Okay.

4:21:05>> Yeah. I I would just put on the you know

4:21:07this this redevelopment plan was really

4:21:09designed with that community and what

4:21:11they had asked at that time was for

4:21:14money to be set aside for improvements

4:21:16to the park. So that's that's the

4:21:18tradeoff here and that's what drove the

4:21:20bonus.

4:21:21>> Okay, makes sense. Thank you. Um,

4:21:24referencing I guess the transportation

4:21:26memo. Um, would they mention for

4:21:29pedestrian safety providing a curb

4:21:30extension on the southwest corner of Aan

4:21:32Division? Is that something that you're

4:21:35>> We will certainly comply with that and

4:21:36provide.

4:21:37>> Awesome. And they also reference um to

4:21:40ensure a minimum sixoot sidewalk width.

4:21:42Um, is that

4:21:43>> Yeah, as as I testified to earlier, we

4:21:45will absolutely do that. and the

4:21:46deduction will come from the uh building

4:21:49baseline planter box as opposed to the

4:21:51matching uh planter strip along the curb

4:21:53line.

4:21:54>> Thank you.

4:21:55>> Sure.

4:21:55>> Um and then I also saw on the portal was

4:21:56a letter from the turnpike authority. Um

4:21:59are you in compliance with I guess what

4:22:02they believe is their easement that

4:22:03covers some of the sidewalk proposed on

4:22:05your property?

4:22:06>> Yeah, correct. Yes, we are. We are

4:22:08compliant

4:22:09>> and that's agreed to and resolved

4:22:11between the turnpike and the applicant.

4:22:12>> Correct. Yes.

4:22:13>> Awesome. Thank you. And then um one last

4:22:16question, this is from the staff memo

4:22:18kind of where they list the variances.

4:22:20Um one of them which may be applicable

4:22:23for for the architect. Um the

4:22:25requirement is the building shall

4:22:26emulate surroundings and the staff memo

4:22:29references the proposed is an aesthetic

4:22:30anomaly. I don't know if you can provide

4:22:32the testimony to that for the record.

4:22:34>> Yeah. Yeah. And and and um you know our

4:22:36firm has been fortunate enough to work

4:22:37here in Jersey City for what is really

4:22:4025 years now. And um you know we believe

4:22:43that buildings uh uh when we design

4:22:45buildings should be uh a building

4:22:46designed of this time and uh because of

4:22:49the location of this structure um being

4:22:52uh an outlier uh in this particular

4:22:54neighborhood and it's in the

4:22:55redevelopment plan not the historic zone

4:22:58um uh in addition we do now have the

4:23:00Alexander uh directly across the street.

4:23:02I'm not saying that uh you know uh this

4:23:05is the reason every application has to

4:23:07stand within its own merits but uh you

4:23:09know we think we do have a a nice

4:23:11contemporary design and a very good

4:23:13addition to this neighborhood.

4:23:15>> Thank you.

4:23:16>> Thank you.

4:23:17>> Thank you.

4:23:19>> Uh my [clears throat]

4:23:20last

4:23:22uh witness is Sam Bellamy who is our

4:23:24planner

4:23:28>> swear from testimony about to give you

4:23:29the truth the whole truth and nothing

4:23:30but the truth. Yes, I do.

4:23:33>> State and spell your name, Mr. Bellamy.

4:23:34>> Samuel Bellamy. Last name B E L L A M Y.

4:23:38And I am a licensed professional planner

4:23:39in the state of New Jersey. That license

4:23:40current and good standing.

4:23:42>> Madam Chair, obviously we're very

4:23:44familiar with Mr. Bellamy. The board

4:23:46should [clears throat] accept him as a

4:23:47expert in the field of planning.

4:23:49>> Thank you. You may proceed, Mr. Bellamy.

4:23:51>> Thank you. And I think M Mr. Vandermark

4:23:53really did a good job of covering the

4:23:54the variance relief. So I'll I'll just

4:23:56be brief and summarize it. Uh we are in

4:23:58the Enos Enos Jones redevelopment plan

4:24:00zone two there's three uh bulk variances

4:24:03deviations one building height we're at

4:24:0690 feet above DFE where 88 ft above DF

4:24:09is permitted uh the minimum step back

4:24:12above the sixth floor 0 feet proposed

4:24:14where 8 ft's required maximum curb cut

4:24:17width 16 ft proposed where 14 ft's

4:24:19permitted and then the one building

4:24:21design waiver um for the inconsistent um

4:24:24building typology I think Mr. Vanderm

4:24:26Mark just covered in his testimony. Also

4:24:28add I think the contemporary design of

4:24:30the building kind of blends into some of

4:24:32the the bulk variance relief and

4:24:34mitigates the impacts of the additional

4:24:36height and also the step back above the

4:24:38sixth floor. I think that the varying

4:24:40window sizes and the staggered layout I

4:24:43think kind of presents as a building

4:24:45that you know may not see the standard

4:24:47eight stories and that step back. So I

4:24:49think from a visual perspective it's

4:24:51mitigated through that building design.

4:24:53Um the building height really is related

4:24:55to the uh stacking system for the

4:24:57parking spaces provided in the ground

4:24:59floor and that was at a request of the

4:25:01community to provide the additional

4:25:03parking spaces beyond what's required.

4:25:05Um and then finally the the curb cut

4:25:07width. I think the additional 2 ft

4:25:09allows for better access into the garage

4:25:11and reduces any conflict of vehicles

4:25:13going in and out. So overall I think all

4:25:15these deviations can be granted where

4:25:17the benefits would outweigh the

4:25:18detriments. I don't see a substantial

4:25:20detriment to the general welfare here. I

4:25:22think the building overall is consistent

4:25:24with the redevelopment plan and where we

4:25:27don't provide the step back above the

4:25:28sixth floor in the front. I think we're

4:25:30providing additional space in the rear

4:25:32uh providing for adequate light air and

4:25:33open space. Um overall, I think this

4:25:36project's consistent with the

4:25:36redevelopment plan. So I don't see a

4:25:38substantial impairment to the zone plan

4:25:40or zoning ordinance here. And then

4:25:42finally, I do think this project

4:25:44promotes the purposes of the municipal

4:25:45land use law. It's a permitted use. Um,

4:25:48and we're also adding the additional

4:25:49retail space at the ground floor. Again,

4:25:51uh, at the request of the community, so

4:25:53it is an appropriate use and development

4:25:55of the site. We're at a density that's

4:25:57consistent with the surrounding area.

4:25:59And as I testified to, I think we are

4:26:00providing adequate light, air, and open

4:26:02space consistent with purpose C. Um, so

4:26:05with that, I think this project does

4:26:06meet the positive and negative criteria.

4:26:08Again, I think Mr. Vandermark really

4:26:09covered the the proofs in his testimony

4:26:11and I agree with it. Um, but I'd be

4:26:13happy expand on anything or answer any

4:26:15questions the board might have. Thank

4:26:17you, Mr. Bellamy. Any board comments?

4:26:21>> Thank you.

4:26:22>> Thank you,

4:26:24>> Mr. Lee.

4:26:25>> Yeah, I'll just put on the record that I

4:26:26am in receipt of a memo from planning

4:26:28dated today, September 29th, 2026. I've

4:26:31reviewed the conditions therein and they

4:26:33are acceptable to uh my client.

4:26:35>> Thank you. At this time, I'd like to

4:26:36open for public. Is there anyone from

4:26:38the public?

4:26:41>> Please come forward, sir.

4:26:53Hi, I'm uh Robin Chu. I'm the owner of

4:26:56396 7th Street, which borders the south

4:27:00side of this property. So, seventh the

4:27:03entrance is on Division Street. The um

4:27:06>> All right. Square you in, sir.

4:27:08>> Okay. Oh,

4:27:09>> I am swear affirmed testimony about to

4:27:11give be the truth, the whole truth, and

4:27:12nothing but the truth. Yes.

4:27:14>> And could you state and spell your name?

4:27:16>> Uh, first name Robin, last name Chu T E

4:27:21W.

4:27:22>> And your address, sir?

4:27:24>> Uh, 396 7th Street. Thank you.

4:27:27>> Robin, you have three minutes.

4:27:29>> Uh, yeah, we we border the the south

4:27:32side of the property like on 7th Street.

4:27:35>> You speak into the mic.

4:27:36>> I guess it's on the the um the side of

4:27:39the property because the front is on

4:27:40Division Street. So our our main request

4:27:42is that during um construction we have a

4:27:46a f because our backyard

4:27:49backs right onto the property. So when

4:27:50they demolish the boxing gym um it's

4:27:53going to be completely open and uh we we

4:27:56unfortunately have experience with the

4:27:58building on the other side of us was

4:28:00developed sort of eight years ago and uh

4:28:03they built they put a chain link fence

4:28:05there during construction and we had

4:28:07graffiti and all kinds of problems. So

4:28:09we would request a on the south side of

4:28:12the property of their property bordering

4:28:15our property that they put a a high

4:28:18wooden or or substantial fence during

4:28:21construction.

4:28:22>> How high?

4:28:23>> Sure.

4:28:24>> Well, the fence on the other side is

4:28:26like 9 ft. So I guess it would match

4:28:28that 9 foot fence.

4:28:31>> I I can't see that's a problem. We're

4:28:33going to have to do the normal site

4:28:35safety uh plans that we would for any

4:28:37projects that will be submitted to um to

4:28:40uh the building department. Uh I can

4:28:42take your information. The uh the

4:28:44property owner uh is is a local

4:28:46businessman right in the area here. I'm

4:28:48glad I'm sure he'd be glad to even meet

4:28:50and talk with you about what will be

4:28:51done with the property. So that's

4:28:53something we can we can definitely agree

4:28:54to and we'll keep in touch.

4:28:56>> Okay.

4:28:58>> Okay. Uh I guess the only the other

4:29:00comment was on the the the architect was

4:29:03talking about the shade. I mean our

4:29:05property is a twostory building. Uh and

4:29:08there's going to be a lot of shade

4:29:10there. Um so there is there is a shade

4:29:13impact on the south side. Um the uh

4:29:21you talked about there were there were

4:29:22some balconies or or patios on the south

4:29:25side of the building. So, I don't know

4:29:27which which floor would they be on,

4:29:30>> like how high up would the patios be?

4:29:33>> Uh, those patios are going to be at

4:29:35floor two. Um, and they're approximately

4:29:3722 feet uh above the sidewalk level, but

4:29:40there will be privacy screens on both

4:29:42sides and uh at the front of those

4:29:44balconies. So, that they will not be

4:29:45able to look directly down into your

4:29:47yard. And there's also a substantial

4:29:49extensive green buffer zone in between

4:29:52those balconies uh and the uh rear yard

4:29:55of the properties to the south.

4:29:58>> Okay.

4:29:59>> Thank you.

4:30:01>> All right.

4:30:02>> Thank you.

4:30:02>> Thank you. Thank you.

4:30:03>> The fence is the main thing.

4:30:05>> Is there anyone else from the public?

4:30:08>> There's no one from the public. Madam

4:30:10Chair, I'd like to close public motion.

4:30:12>> Second.

4:30:12>> Second.

4:30:13>> Public is closed.

4:30:15Mat or Ben? I am uh filling in for

4:30:17Cameron today. Um Cameron provided a a

4:30:21memo dated 929 2026.

4:30:25Uh the applicants council put on the

4:30:27record that they will comply with the

4:30:30conditions therein. Um I just wanted to

4:30:33um get a little more um on one of the

4:30:37conditions and them meeting it. One of

4:30:40them says that you're going to uh the

4:30:41applicant must uh execute an RDA with

4:30:44the JCA prior to construction. I presume

4:30:47that that you understand that to mean

4:30:49before signature plans are released um

4:30:52to you guys or or is it before permits

4:30:55are applied for?

4:30:57>> My understanding generally when we have

4:30:59that condition it's before permits are

4:31:02applied for. Okay.

4:31:03>> Just because a lot of the times

4:31:04>> when you have a lender involved they

4:31:06they do want to sometimes review those

4:31:08plans. So I I I'm hoping we could keep

4:31:11it at before permit are applied for.

4:31:14>> All right. So the my only issue is I not

4:31:18the plan doesn't have a payment schedule

4:31:21for the contribution that's presumed to

4:31:23an RDA. Um

4:31:25>> um and I I

4:31:26>> that is to be done before permits.

4:31:30>> That's well just give me one second. I

4:31:33want to talk about

4:31:40>> it's not

4:31:41>> it's not

4:31:45>> it says pursuance already

4:31:47>> um Mr. Ward I I was reminded by Mr.

4:31:50Harrington, there is a schedule in the

4:31:51redevelopment plan, I believe. I believe

4:31:53there's one payment prior to permits and

4:31:55one payment prior to CO.

4:31:57>> Okay. We'd like to add that as a

4:31:58condition as well.

4:31:59>> That's fine.

4:32:00>> Okay. Yeah, let's put that payment

4:32:02schedule in as a condition and spell out

4:32:04the contribution amounts uh in your

4:32:06resolution.

4:32:08>> Um with that, um I'd like to just say

4:32:11that staff finds the testimony put on

4:32:13the record satisfactory. We agree with

4:32:15the proofs they put on the record. Um

4:32:18the application

4:32:19uh did a good job of meeting with uh

4:32:22community feedback and addressing some

4:32:24of the comments from our review agents

4:32:26um as well as those put on the record

4:32:28here tonight like with regards to the

4:32:30bumpout. Um

4:32:33staff uh recommends approval with

4:32:35conditions.

4:32:36>> Thank you,

4:32:37>> Madam Chair. Matt, is the bumpout a

4:32:39condition as well?

4:32:40>> Uh that's incorporated into the review

4:32:42agent comment. That's one of the

4:32:44conditions in there. So yeah, we'll look

4:32:46to see that incorporated in revision uh

4:32:50Brazil compliance plans.

4:32:52>> Okay,

4:32:53>> I'd like to entertain a motion.

4:32:55>> Madam chair, I move that we approve

4:32:57application number P2024-00008

4:33:01with a condition outlined in a staff

4:33:03report.

4:33:04>> Second it.

4:33:06>> Vice Chair Patel

4:33:07>> I.

4:33:08>> Commissioner Conway

4:33:09>> I.

4:33:10>> Commissioner Stamato

4:33:11>> I.

4:33:12>> Commissioner Capers

4:33:13>> I.

4:33:13>> Commissioner Kaplan

4:33:14>> I. and madam chair congaden

4:33:16>> I

4:33:16>> motion carries all in favor

4:33:18>> thank you so much everyone have a good

4:33:19>> thank you at this time I'd like to move

4:33:22on to resolutions

4:33:23>> thank you madam chair madam chair we

4:33:25have 13 resolutions here this evening

4:33:28first resolution is a resolution of the

4:33:29city of Jersey city planning board case

4:33:31number P2025-0266

4:33:34the applicant just salads 99 Hudson

4:33:37Street LLC address is 99 Hudson Street

4:33:40Jersey City New Jersey block 14507

4:33:43lot one decided on April 11th,

4:33:46memorialized this evening.

4:33:49Second resolution is city of Jersey City

4:33:50Pling board in the matter of 206 OEN

4:33:53Avenue LLC application number

4:33:55P2026-000049

4:33:58decided August 25th memorialized this

4:34:01evening for minor site plan approval

4:34:02along with bulk variances. Third

4:34:05resolution is a resolution of the city

4:34:06of Jersey City Planning Board case

4:34:08number P2025-0172.

4:34:12The applicant is Amaja Ali, address 219

4:34:15Freeman Avenue, Jersey City, New Jersey.

4:34:17It's block 14601, lot 7.01, decided on

4:34:21Tuesday, August 25th, 2026. Memorialized

4:34:24this evening. Minor site plan approval.

4:34:27Fourth resolution is a resolution of the

4:34:29planning board of Jersey City P2025-0246

4:34:34premises 250-254

4:34:36Fairmont Avenue

4:34:39Jersey City, New Jersey block 15003, lot

4:34:4220 preliminary final major site plan

4:34:44with C variances

4:34:46decided August 25th memorialized this

4:34:49evening.

4:34:51Fifth resolution of the city of Jersey

4:34:53City plane board in the matter of 252

4:34:55Monttoello Avenue LLC. Case number

4:34:59P200073.

4:35:02The applicant is 252 Monaceel LLC.

4:35:05It was memorialized this evening,

4:35:08September 29th, 2026.

4:35:13Six resolution is a resolution city of

4:35:15Jersey plane board in the matter of 1723

4:35:17and 1721 Kennedy Boulevard. It's

4:35:19application number P2025-0253

4:35:24was decided on September 8th and

4:35:26memorialized this evening. It was an

4:35:28application for preliminary and final

4:35:29major site plan approval with bulk

4:35:32variances and DW design waiverss.

4:35:36Seventh resolution is a resolution of

4:35:38the planning board of city, Jersey City,

4:35:39case number P2025-0186,

4:35:44130 Central Avenue, Jersey City, New

4:35:46Jersey, block 4902, lot one, preliminary

4:35:49and final major site plan application

4:35:52decided August 25th, memorialized this

4:35:54evening. Resolution of the planning

4:35:56board of the city, Jersey City, 248

4:35:59Erie, Owner LLC.

4:36:01Final major site plan approval with

4:36:03deviations for 248 Erie Street and

4:36:05209-215

4:36:0715th Street, Jersey City, block 7105,

4:36:10lots two and three, case number

4:36:12P2025-0235.

4:36:17Ninth resolution is the resolution of

4:36:18the planning board of city, Jersey City.

4:36:20The applicant was 95 Webster JC LLC. was

4:36:24for minor site plan approval 197 Webster

4:36:26Avenue here in the city block 2904 lot

4:36:2918 case number P2025-0239

4:36:3410th resolution resolution of the

4:36:36planning board of Jersey City Ogden and

4:36:38Z and Brinsky LLC minor site plan

4:36:41approval 199 Webster Avenue Jersey City

4:36:44block 2904 lot 17 case number P2025-0240

4:36:5111th resolution is a resolution for

4:36:53Culver Holdings LP for a one-year

4:36:55extension for preliminary and final

4:36:57major site plan 212 to 230 Culver Avenue

4:37:01block 2171 lots 18 and 19.01. It's case

4:37:05number P2026-04.

4:37:1112th resolution is a resolution of the

4:37:12planning board of Jersey City. Case

4:37:15number P2024-099.

4:37:18The applicant is the Community

4:37:19Development LLC, 565 Communal Avenue,

4:37:22block 18603,

4:37:25lot 17.01, decided April 25th,

4:37:28memorialized this evening for

4:37:30preliminary and final major site plan

4:37:31with C variances. Final resolution is a

4:37:34resolution of the plan board of city,

4:37:35Jersey City, recommending the Hudson

4:37:37County Plaza study area as a

4:37:39non-combination area in need of

4:37:40redevelopment.

4:37:42Can I

4:37:43>> have a second? Second. Roll call.

4:37:45Second.

4:37:48>> Uh, Vice Chair Patel,

4:37:49>> I.

4:37:50>> Commissioner Conway,

4:37:51>> I.

4:37:51>> Commissioner Stamato,

4:37:53>> I.

4:37:53>> Commissioner Capers,

4:37:54>> I.

4:37:54>> Commissioner Kaplan,

4:37:55>> I.

4:37:56>> And Madam Chair Congadan,

4:37:57>> I.

4:37:57>> Motion carries. All in favor?

4:38:02Second. Second. Second.

4:38:05Start it.