Unanimously approved a waiver, dimensional modifications (floor area ratio 2.1 where 2.0 applies; 70 ft cumulative driveway width across three curb cuts) and the final site plan for the five-story, 48-unit building with podium parking, subject to conditions including a $4,750 traffic contribution to the Main Street corridor.