  • Program update: the application window for restore grants was extended to October 16; 521 Lake Street was approved for $3.1 million in tax increment financing participation; the Parking Gallery moved to a new operator, Pro Park, on September 1; and proposals for the city-owned property at 264 Keystone are due back to City Council on November 4. See 264 Keystone Property Disposition.
  • Truckee River Vision Plan: staff summarized the 2023 plan covering 17 miles of riverfront, which drew more than 30,000 people into its public engagement. The advisory board's recommendation funded phase one at $6 million, and $7.2 million of RDA2 money is being spent this year including design for phases two and three; construction of those later phases may cost another $12 to $15 million, and redoing Believe Plaza about $20 million.
  • Wingfield Barbara Bennett Parks Master Plan: staff presented the adopted master plan, with an initial engineering estimate of $12 million for the improvements. No funding request was made, and the item was informational.
  • Parks Recreation Open Space Master Plan Update: cost recovery has risen to 40.5% of a roughly $18 million operating budget, up from 37% and 32% in earlier years, with expanded swim lessons at Moana Springs Pool.
  • Redevelopment Agency Property Plan FY2027: staff reviewed the seven parcels the agency owns outright, including the City Plaza parking lot of about 15,000 square feet. The board's one formal motion, on the plan, carried unanimously.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:05extended the window, the application

00:07window till October 16th. Uh so people

00:10have another week, week and a half uh to

00:12get those applications in. Um we did

00:16that just typically because when people

00:18start gathering their quotes and start

00:20putting their packages together, they

00:21usually need a little bit of extra time.

00:23So um but we're happy with what we've

00:25seen so far. uh existing restore

00:28projects. Uh these have come up in the

00:30past. Uh I'll just give some updates on

00:32those. Uh we expect to see scaffolding

00:34going up on the Bington building which

00:36is right on the corner of Virginia and

00:38Second Street here. Uh they've been

00:40giving their permits uh but they do

00:42believe that their scaffolding

00:44contractor should start going vertical

00:46uh to do the exterior improvements um

00:48October 12th is what I was told. Uh you

00:51may have noticed in Midtown on Virginia

00:53Street, uh the old Pinghorn accounting

00:56building is under construction for

00:58Michaels and Sons. They're doing a

00:59totally new facade and extending the

01:02building in the back. Uh that was a

01:04surprise to me as I was driving down

01:06Virginia Street the other day. Uh and

01:08then the Neon Museum, uh the Light

01:10Circus Neon Museum is very close to

01:12closing. They're uh opening, sorry. Uh

01:15they're closing on some final permitting

01:17uh and electrical issues, but it's the

01:19signs up. Um the lights are in. Uh it

01:22looks magical and we expect to

01:24participate in that grand opening fairly

01:27soon. Uh 521 Lake Street. At the last uh

01:32agency board meeting, uh 521 Lake

01:34Street's project was approved for TIF

01:37financing participation uh for 3.1

01:40million uh with the increment coming as

01:43well as a supplemental assistance. If

01:45RDA2 does get extended, that

01:47supplemental assistance stops and we

01:49would just keep uh

01:52reimbursing them to increment until our

01:54financial obligations met. Uh so thank

01:56you for your guidance on that. Uh the

01:59agency board also approved the

02:00resolutions for both the TIFF

02:02participation program and the catalyst

02:05uh project assistance program. Uh so

02:07those updates are all made. Uh you all

02:10sort of help draft those guidelines. And

02:12so we are in the process of updating the

02:15uh final guidebook document that'll get

02:17uploaded on the website as well as the

02:19application process. That way if anyone

02:21has questions on how the process works,

02:22we can kind of give that to them and

02:24it's pretty self-explanatory.

02:27Uh the next few ones, uh the Amtrak

02:30bathrooms are near completion. I would

02:32say they're done done. Uh but there are

02:34some small fine-tuning uh elements, but

02:37uh they it's it's done. So, thank you

02:40Dan Tresley uh for getting that done. Uh

02:43the dog park shade on uh Commercial Row

02:47over there is in design as well as the

02:49four street beastro lights uh going

02:52along from Evans all the way to Sutro.

02:54uh those are those ideas and designs are

02:56starting to come together. Uh the Lear

02:58project is delayed for the moment uh

03:01primarily due to some some lic licensing

03:04issues but we expect to see that come

03:06back.

03:08Uh the parking gallery we have brought

03:10on a new parking operator called Pro

03:12Park at the parking gallery. They

03:14started taking over operations September

03:161st. They've done some painting. uh

03:18they've transitioned over to some new um

03:21software to help manage monthly parking

03:24accounts. So now if you're a monthly

03:25parker, you can manage your own account

03:26online. You don't have to actually go to

03:28the kiosk on the first floor uh to get

03:30your monthly parking permit. Um and

03:33we're working through some short-term uh

03:35improvements and just cleanliness over

03:36there as as they get ramped up. And then

03:40last uh on the city side uh 264 Keystone

03:43which is the building on uh Keystone and

03:46Vine uh the city put that off for RFP

03:49proposals have been received and that

03:52those will come back November for 4th at

03:55the city council meeting to uh select an

03:57awardee uh to dispose of that property

04:00and it is in RDA uh one so that's kind

04:04of [clears throat] relative to these

04:05discussions

04:06>> and that is all I have as a review

04:08committee. done.

04:10>> Sorry, Curt Stitzer for the record. Has

04:11the review committee done any like

04:14scoring on that or is that still under

04:17under way?

04:19>> Nope. The committee has done uh the

04:21scoring. Uh we're drafting the staff

04:23reports and the staff report will have

04:25the total average scores. Uh staff won't

04:29be making a recommendation to select one

04:31project over another. We're just uh

04:33going to show the scores and allow

04:36council members to review those and

04:38engage with the proposers uh on the

04:42appropriate path forward.

04:47>> Any other questions for Brian?

04:51>> Mr. Chair, can I note something for the

04:53record? Apologize. Thank you.

04:55>> Ashley Turn city manager for the record.

04:57Just noting for those watching and Judy,

05:00just for you to know, we had some

05:01technical issues at the beginning. So,

05:03just wanted to note for the record, we

05:04do have a quorum present. Uh, attendance

05:07has been logged accordingly in the

05:09minutes because Judy got that and we had

05:11no public comment in person.

05:14>> Thank you, Mr. Chair.

05:15>> You're welcome.

05:16>> All right, let's move on to B3,

05:18presentation, discussion of the trekking

05:20river vision plan.

05:23>> Mr. Chair, Brian Mardo, revitalization

05:25manager. Um, I'm going to go through and

05:28quickly summarize uh the Chucky River

05:31vision plan that was completed in 2023

05:34that covers 17 miles of uh city of Reno

05:38riverfront as well as Washa County. And

05:40I'll note that Washa County did

05:41participate in funding of this plan. So,

05:43it's kind of both a city of Reno and a

05:45county plan. Um,

05:48it is a lot of slides, but I'm gonna fly

05:50through them fairly quickly.

05:54and Netty Alario, I just want to

05:56comment. Thank you so much for the great

05:58provision of that because it really gave

06:02um a wonderful sense of the history of

06:04us trying to use our assets to their

06:07best asset class.

06:09>> Thank you. Well, I'll mention that uh

06:12almost every downtown study or plan for

06:14the past 40 years has mentioned that the

06:17river should be a core asset. Uh but

06:20it's never been addressed independently.

06:23Uh, a lot of previous plans that I can

06:25get to have have mentioned the river,

06:27but when they talk about the river, it's

06:29usually the quality of the river and the

06:31river water itself. There's never been

06:33sort of a focus on I would say

06:35riverfront development and activity. And

06:37this is what this plan attempted to do.

06:43So, how the plan is organized? So, the

06:44first one was uh safety, water and

06:46ecological systems. First and foremost,

06:48we didn't want to um make any changes to

06:51the river in its form, function, and

06:53safety. Uh the next one was how we treat

06:55land use along the river and the design

06:58of those spaces. Third one is parks and

07:01open space primarily uh maintenance and

07:03as well as oversight of the of the river

07:05going forward. Uh mobility and

07:08connectivity because it is a a bike lane

07:10and a walking path. uh making sure that

07:12people have the ability to get around

07:14and then including public art was the

07:16last uh pillar of plan.

07:21>> Okay,

07:23>> do that. Um just on how the plan is

07:26organized. So it is 17 miles. It starts

07:29at the California border through Verdi.

07:32We've treated that as a the rural

07:33section. If you go from I would say

07:36Mayberry Park all the way to uh just

07:39past Idle Wild that is called Reno West.

07:41Uh primarily single family homes are

07:43along those river sections. Then you get

07:46into downtown uh that goes from I

07:48believe Booth Street all the way to uh

07:51we'll say um

07:54second Street Ballpark and then left is

07:57East Reno that goes from Broadhead Park

08:00all the way to Mil Street through um

08:04through uh yeah to the Spark City

08:07border. Um primarily that's mostly

08:09industrial and some some actual

08:12riverfront space.

08:15So there had been a lot of plans none in

08:17the past uh and as I mentioned none of

08:20them really gave direction on how to

08:22treat the river frontage. Most of them

08:24focused on uh water quality and sort of

08:27the environmental factors of the river

08:30itself.

08:32Uh but our consultant dig studios did go

08:34through and incorporate they went

08:35through every possible plan and sort of

08:37summarize every sort of design

08:39improvement or recommendation from those

08:41past plans. It's a lot, but they are

08:43colorcoded in depending on which plan

08:45said what. Uh, but they consolidated all

08:47those things. Uh, we didn't want to

08:49recreate the the wheel. Uh, and they

08:51incorporated some of those

08:53recommendations into the plan.

08:56Next, uh, we did go out to the

08:58community. The campaign was called

08:59SpeakUpy for the Chucky. Uh, and since

09:03in my time being here, it's probably the

09:05most engagement we've ever received on a

09:07campaign. We had over 30,000 people

09:09engaged. Uh there was a survey, but

09:11there was also an interactive map where

09:13you could go and you could pinpoint

09:14something you like or dislike about the

09:16river. Uh and so it was all interactive.

09:18So you could tell, you know, the path is

09:21broken here or I really love this part.

09:23And a lot of people engage with that.

09:25The three main things that came up are

09:27cleanliness and aesthetics, safety, and

09:29then the connectivity of the river trail

09:31itself.

09:33Uh so after that, the goals started to

09:35materialize. We want to encourage a

09:37clean and safe river. Prioritize the

09:39ecological function. Uh treat the river

09:41as a as a recreational asset.

09:45Plan for consistency of design and

09:47maintenance. What we wanted to say is

09:48once somebody engages the river, whether

09:50they go east or west, they should have

09:52sort of like a uniform experience. It

09:53shouldn't be broken up or u

09:55disconnected. And then making sure that

09:57it's a connected river so that they can

09:59sort of utilize the river uh throughout

10:02its throughout its course.

10:05So recommending what the plan said.

10:07First one enhancing ecology and safety.

10:12First one was uh recommendation was to

10:14provide uh setbacks and buffer access

10:16from the river. Uh some parts along our

10:18river it is very tight where we allow

10:20property lines to come up directly to

10:21the river bank and some of those saw

10:23development that close. So one of the

10:26recommendations to give us ourselves a

10:27little bit more breathing room and the

10:29ability to uh provide a little bit more

10:32access along the riverfront.

10:36Next one was to provide consistent uh

10:38lighting um envir environmentally and

10:41ecological sensitive lighting. Uh so we

10:44have a couple different light poles but

10:45these were actually installed uh going

10:47east there are solar light poles. We

10:51have the traditional light poles right

10:52downtown and I will say that um along

10:55the Riverside Drive uh also received new

10:58light poles. And just for clarification,

11:01we are not installing palm trees.

11:04>> No, no,

11:05>> actually that those aren't the ones

11:06those are the poles that were installed,

11:08but those aren't actually the ones that

11:10were installed. Uh yeah, good point.

11:14Um next one was uh managing vegetation.

11:18There's a lot of comments of the

11:19overgrowth along the river and how it is

11:22not the real safety is perceived safety

11:24along the river mainly due to areas that

11:26you cannot see in a lot of places where

11:30um maybe the overgrowth provides line of

11:33sight. Uh we call it septed kind

11:35prevention through environmental design.

11:37Uh that is the area along museum drive.

11:40And so one of those things is to make

11:42remove the overgrowth and vegetation in

11:44invasive species river.

11:49Uh and then last one was just to have a

11:51standardized site furniture package

11:53where I said where whether you go east

11:55or west it kind of feels like there's a

11:56cohesive design that include benches,

11:59trash cans, uh way stations, a lot of

12:02the materials, a lot of things like

12:04that.

12:07And then the last one on uh water

12:09quality and safety. We noticed through a

12:11lot of surveys that there are a lot of

12:14hazards in the river. There are some old

12:16dams that they just demolish them and

12:18let all the concrete uh sit there. There

12:21are some areas where you have to exit

12:22the river um to get around those

12:24obstacles as well as like rebar and some

12:27other things. And so when we when we say

12:29we want to use the river as a

12:30recreation, there is some cleanup we

12:32have to do just on uh former debris and

12:36you know safety hazards. Yes.

12:42Next one is uh promoting great

12:43neighborhoods.

12:47First recommendation was to create a

12:50overlay zone. Uh this would be 200 ft

12:52north and south of the river. If if you

12:54have a parcel that touches within that

12:57200 ft, you would be um susceptible to

13:00current design and maintenance

13:01standards, a different sort of zoning

13:03overlay, uh setback requirements, things

13:06like that. There are some riverfront

13:09codes in currently in code, uh but

13:12they're not that expansive. So what the

13:14proposal was is to create an entire

13:16overlay zone that really d drills down

13:18into the materials, the lighting, the

13:21setbacks, uh the landscaping, things

13:23like that.

13:26Um when asked uh through the survey

13:29whether you think that the city should

13:31have tools to regulate river

13:32development, 79% of people said that is

13:35important. I don't think you ever get a

13:37response that high. Uh and then people

13:40say uh 50% of people said that we should

13:43use uh economic development incentive

13:45tools to uh facilitate riverfront

13:48development and then 28% of the people

13:49had no opinion whatsoever. Uh

13:54when looking at some of those design

13:56standards, uh there were recommendations

13:58on how you mass buildings. So don't put

14:00very tall buildings right on the front.

14:02You want to set those back off the

14:04river. uh they call those point towers

14:06where the front is short but the back

14:08end is is much taller. Uh materials and

14:11design that can be sort of the materials

14:13they put on the buildings, the type of

14:15sighting, type of lighting, etc. Um

14:19access and parking was one. Uh no

14:21parking structures on the riverfront,

14:22you have to push those back.

14:25or development that is along the river.

14:26They propose a lot of like they call

14:28them Texas rafts where you do the

14:30parking structure and then do the

14:31housing around the exterior so you can't

14:34actually see the parking structure.

14:36Connectivity and open spaces. You'll see

14:38a lot of the lines of site are

14:40perpendicular to the riverfront. That

14:42way every path sort of leads its way to

14:45the riverfront. And then just focusing

14:47on green infrastructure as well as more

14:49trees, landscaping, lighting.

14:54Uh public parks and public spaces were

14:56the next one.

14:58Uh this one uh our parks director Nathan

15:02Oya will kind of highlight this, but one

15:04of the recommendations was to establish

15:06the truck uh parks district, but also um

15:09inside the parks district have sort of a

15:12highlight of how the Truckucky River

15:13gets gets managed. This would provide

15:16for the long-term management and funding

15:17needed to maintain uh the river and all

15:20the new nice stuff that's going to go

15:21along it.

15:24They did give an example of the three

15:26Rivers Parks District

15:29Rivers.

15:31It might have been Fort Wayne.

15:33>> Was Fort Wayne on the Mississippi. Okay.

15:35Anyways, um similar to how the bid

15:38operates, uh they kind of have this

15:40parks district that manages the trails,

15:42manages, uh the recreation of using

15:45those spaces, does some programming, and

15:47also manages uh all the natural

15:50resources along that area.

15:53And then they recommended the redesign

15:55of some key parks and plazas all the way

15:57through the river. to actually go

15:59through this quite expansively and give

16:01proposed recommendations to every park

16:03and plaza, not only city of Reno in the

16:05county. Uh the one on the left is

16:07obviously city plaza. We've seen a lot

16:09of design proposals here. The middle,

16:11one in the middle for West Street Plaza,

16:14uh right by Winko Park. And then the

16:17last one is

16:21a former RDA project. It's the prominade

16:23in front of the Eddi and Wild River

16:26Grill. uh they recommended be

16:27reveitating that area and doing these

16:29sort of canal lever lookout paths right

16:32there.

16:35So an example, this was West Plaza uh

16:38three years ago before it uh saw a lot

16:40of the tactical design improvements that

16:42that have been done with ARPA funding.

16:45Next,

16:48this is the proposed design where you um

16:52flatten the space, add some activation

16:54kiosks, add a little bit more

16:56landscaping, uh making a making it a

16:59little bit more modular, and then adding

17:00a plaza up in the upper right hand

17:02corner.

17:06Uh this is that prominade that I

17:08mentioned. This was a past redevelopment

17:10agency project.

17:14As I mentioned, they recommended

17:15removing all that, reveating it, doing

17:18uh can levered lookout areas. Next

17:20slide.

17:23This is the area in front of the post

17:25office. Uh when the post office was

17:28owned by the RDA briefly, there were a

17:30lot of design recommendations that this

17:32not be a parking lot, that this be some

17:33sort of plaza to marry uh marry and be

17:38designed with uh the city plaza across

17:40the way so that both areas kind of enter

17:43into the river. The next slide.

17:46This area was proposed as sort of like a

17:48flexed plaza um with new pathway going

17:51through that uh and some temporary

17:54seating and an activation retail

17:57[clears throat] activation space.

18:01Last one is city plaza as as it is

18:03currently. Uh

18:07and this is the proposed redesign. A lot

18:09of shade. Uh shade was the one thing

18:12that was notice noted when when thinking

18:14about redesigning city plaza, keeping

18:18the believe sign, keeping the space

18:20whale, keeping the uh the tree that is

18:23used for Christmas tree lighting, but

18:25also keeping it uh as a plaza so you can

18:28add a lot of people to that space. Also

18:30doing some amenities for uh children um

18:33possibly some play structures. And

18:38there's no splash pad on there. Yes. All

18:41right. Next slide. Uh that's just

18:44another rendering of that redesign.

18:48And the last was uh and this was in our

18:50CIP plan that you all saw was doing some

18:53park improvements to Broadhead and John

18:55Champion Park as we go east. That is

18:57something that could be included in

18:58phases two and three of the riverfront

19:00development is improving those parks.

19:03not a redo of those parks, but just

19:05adding some play elements.

19:10Last one. Uh this is the same massing

19:12recommendation, but if you notice, this

19:14is um the area of where waste management

19:16currently is along the river and the

19:18city's corpyard. On the tail east end is

19:21uh the existing fisherman's park. Uh so

19:24some recommendations to expand

19:26fisherman's park along the river right

19:28there.

19:31Uh, as I mentioned, every single park

19:32along the river has recommendations for

19:35improvements. Next slide.

19:38And, uh, second to last is creating

19:41connectivity. You'll notice that this

19:43pathway right behind the auto museum is

19:45really bad. That is why it's going under

19:47construction in the spring.

19:51Um, in the plan, thank you. in the plan.

19:54Uh towards the end, you'll notice that

19:56there's um you can pinpoint every

19:58proposed design change uh throughout the

20:01plan, whether it's an art element, uh

20:04something needing improvement, uh

20:06pedestrian improvements,

20:08design changes, things like that. So, it

20:10really is sort of like a just a guide

20:13book to say if you want to do something,

20:15this is where we propose you do it.

20:18Last one is uh recommending pathway

20:21changes. So this is the uh rural area u

20:24where it would be a softer pathway uh

20:27wide enough for for bikes and

20:29pedestrians with permeable shoulders and

20:32some improvements on bike infrastructure

20:34and seating and wayfinding.

20:37This is the area along Riverside Drive.

20:39It already has seen some improvements

20:41lately. Uh it does have that river uh

20:44retaining wall. This would be the

20:46redesign of that where you actually uh

20:49create a separate biking path along with

20:52the riverfront trail path that's more

20:55for pedestrians and then doing some some

20:57landscaping and some permal

21:00areas there. Uh as you get to downtown

21:04proper where we have the flood wall

21:05area, you would expand that, make it a

21:08little bit uh wider. also doing some

21:10different design materials on the ground

21:13with permeable pavers and possibly some

21:14art elements.

21:17Then this is the area behind the auto

21:19museum that is really bad. This asphalt

21:21is crumbling uh which creates a hazard

21:24but also is crumbling right into the

21:26river. And so part of that design was a

21:29canal lever trail because the area

21:32between the auto museum uh and the

21:34riverbank is so narrow that the design

21:37the initial design recommendation was

21:39canal lever trail. Fortunately the auto

21:41museum has worked with us to give um a

21:43little bit more space back. So we're

21:45going to be uh moving into their

21:47existing plaza. uh that saved us a lot

21:50of time and effort and money especially

21:53uh so that we don't have to do no longer

21:54have to do a can lever path.

21:58Last one on that is to devel develop a

22:00blueway plan. I love this idea. Uh it's

22:03sort of like wayfinding if you were in

22:05the river. So if you were tubing down

22:07the river, kayaking, swimming along the

22:09river, um how would you orient yourself

22:12if you were on the river itself? So if

22:14you're tubing, it would say, you know,

22:16this street is here, you're here, get

22:18out here, there's something else

22:19approaching, uh here's where to exit the

22:22river, etc. It is a wayfinding from uh

22:25the river being in the river primarily.

22:30Last is public art. Uh there's sort of

22:33some different levels of public art. One

22:35was to create an icon or symbol for the

22:37whole entire river utilizing art for

22:40trail white finding. Functional art was

22:42one that was mentioned. Uh using art to

22:45promote safety and discovery of elements

22:48and then moving the belief sign so that

22:50it doesn't block the the view of the

22:52river. But this is something I really

22:55liked. If you break out art into

22:58different uh categories, the first one

22:59is iconic. It's a big statement piece.

23:02It's likely to stay there forever. We

23:04would say the space oil is one of those.

23:06Temporary art can be a mural, something

23:08that uh is placed uh or moves around per

23:12for a bit. Uh a mural is one discovery

23:15is, you know, artwork that has some

23:18connection to where it's placed. And

23:20last one is functional, turning bike

23:22racks and benches into art.

23:26And again, that plan has every single

23:28art recommendation, the entire scope

23:30scope of the river. Last one is now that

23:33the plan is done, how do we implement

23:35it? Um the dig studios went through and

23:39created a matrix on funding, priority,

23:42cost, etc. It's kind of really nice how

23:44they did it. We have incorporated all of

23:47this into our CIP planning based on what

23:49needs to be done immediately, uh the

23:51cost to do it, and who is the lead

23:53agency to to get that done. Uh so those

23:56all those recommendations have been

23:58included in that master CI CIP list that

24:01we showed you. Uh so the plan's been

24:04adopted. Um we used ARPA funding to

24:07kickstart a lot of these projects.

24:09Improvements to West Street Plaza was

24:11funded. Uh the wayfinding signs, trash

24:13cans, as well as the design of the river

24:16path, phase one river was designed using

24:19ARPA funds, but it is the RDA that's

24:21going to come in to pay for the

24:22improvements. uh creating a service plan

24:25uh for future parks district. Uh the

24:27idea of doing an overlay zone. Um no

24:30progress has been made on that, but

24:31we're all aware that that is uh likely

24:33needed in the future. And then a funding

24:35plan for these things.

24:38I just want to show you what has been

24:39done since this plan was completed. Uh

24:41we worked with Dig Studios and using

24:44ARPA funds uh to redesign West Street

24:47Plaza. This was the rendering of that

24:49site and this is how it turned out. Very

24:52rarely do you get renderings that turn

24:54out exactly or projects that turn out

24:56exactly like the rendering, but this

24:57came really really close. Uh this has

25:00been a success. It has been programmed

25:02with also on the river. Um what are the

25:06programs?

25:07>> Phil by the river.

25:08>> Uh yeah, Harmony on the river, the Phil

25:09Harmonic playing in the space. Uh this

25:12was a problem area that just kind of had

25:14a lot of transients uh lingering all

25:15day. It is nice to see it naturally

25:17activated now throughout the day. You'll

25:19see a lot of residents downtown just

25:21utilizing the space. It's really nice.

25:27There's agreeing to that. Uh through

25:29ARPA funding, uh you'll see from Boost

25:31Street all the way to Broadhead new

25:33trash cans that are branded as the

25:35Riverwalk as well as Riverside Drive did

25:37receive some new lighting light poles.

25:41Uh and the next one is the phase one of

25:43the uh riverfront from Lake Street to

25:46Broadhead Park. You may be seeing some

25:48of these renderings uh for the first

25:50time, but this is uh the new experience

25:53proposed that will go under construction

25:55in the spring. This is the intersection

25:57of Lake Street right by the audi museum.

26:00That is that expanded path. So, no

26:02longer do we have to do a canal levered

26:04path. The fencing for the auto museum is

26:07moving back and we have enough room to

26:08do the improvements there as well as put

26:10in a new fence.

26:13This is Museum Drive. uh that'll get

26:16some improvements as well as some way

26:17finding and a statement art piece.

26:22The path that is the historic bridge.

26:25What bridge was that?

26:28Was it Hulkcom that went? It's the old

26:31It's the old

26:33frame path that used to go up to

26:34Virginia City. So, that's a historic

26:36landmark.

26:37>> You'll notice as the river goes down, it

26:39goes below the 100red-year flood plane.

26:41So, there's minimum improvements we can

26:43do in this area. uh but it will get

26:45rellandscaped. There will be new

26:47lighting.

26:49Those red and blue lines are the

26:51existing blood levels just to um get

26:55aware. There is a a light image there of

26:58what the ex this is the area behind the

27:00former police station. There is an

27:02existing retaining wall. What is being

27:04proposed is that gets removed and it

27:06gets uh graded back with a bunch of

27:08landscaping and instead of those steps

27:10that go up to Second Street, uh this

27:13will have a meandering path that

27:15connects um to that area. That's it from

27:18looking at the old police station down

27:20into the river with some waying signs.

27:23And then last is Broadhead Park. Uh that

27:26improvement was with Renown and the

27:28parks department. So that actually

27:30exercise structure is there but there is

27:33improvements to lighting path design

27:36that

27:38I got through 68 slides as fast as I

27:40could. Uh and

27:43the the plan is quite robust extensive

27:46encourage you to look through this. We

27:48do have some hardbound copies not

27:50hardbound but bound copies if anyone

27:52does want to see those. Um, they're few

27:54and far between, but happy to lend them

27:56out to anyone that wants to see them.

27:58And I'm happy to answer any questions

28:00related to that plan.

28:02>> Do you need any cooperation from Washo

28:04County because portions of the river,

28:06especially west, are in their

28:07jurisdiction?

28:08>> Uh, yeah, that's a really good question.

28:10Um,

28:12we we will need cooperation. I imagine

28:14at some point there needs to be a

28:16concerted effort between not only the

28:18redevelopment agency but also the city

28:20parks and county because this is a plan

28:23that covers 17 miles of the river. Uh

28:25and there there needs to be a lot more

28:27coordination if we're going to see this

28:29plan sort of be put into effect all the

28:31way from the Spark City line to

28:32California border. Uh there is some

28:35discussion that uh we don't want to push

28:37people as you go west uh you get pushed

28:40onto Mayberry Drive with cars going 50

28:42miles an hour mainly because we let

28:44single family homes be built right up to

28:46the river. Uh but there is a possibility

28:49that you could get people to the north

28:51side of the river with a a bridge or two

28:53and work with NB Energy Tumbla and the

28:56railroad to do a new north path that

28:58would connect you to uh Darkstar Park.

29:01That way you never have to leave the

29:03river. And with improvements from

29:06through Mogul and Very, there is an

29:07opportunity where you could stay along

29:08the river the entire pathway.

29:10>> Not through my backyard.

29:14>> Well, we'd be on the different side of

29:15that, Kirk. But yeah. Um, so that would

29:19be uh the plan is to make sure that

29:21people have again a unified experience

29:24if they want to experience the river.

29:26>> The park district contemplated to be a

29:28regional park district ultimately. Yes,

29:31actually to answer that question, it

29:32would be much easier once a parks

29:34district are created. That way you're

29:35not dealing with city or county proper.

29:37Uh you would have an entity that kind of

29:39takes responsibility of of achieving

29:41that vision all the way through as well

29:42as the overlay zone would give some

29:45additional tools.

29:46>> Any funding required from or

29:49contemplated from the redevelopment

29:50agency right now?

29:53Yeah, everything that was inside uh

29:56everything in the implementation

29:57[clears throat] plan that is inside RDA

29:59was included in our sort of master CIP

30:02planning process because RDA2 has the

30:04funds at the moment. The idea is to do

30:06phase one is what's going under

30:08construction in the spring. And then

30:09phase two and three would get us all the

30:11way to uh about GSR um through RDA2. So

30:16you would have going east from Lake

30:19Street a brand new improved and

30:21consistently designed uh riverfront. Uh

30:24as RDA1 improvements come online or uh

30:28funding comes online uh as I mentioned

30:30it could be uh river path improvements

30:33and then plaza improvements. Uh one

30:35thing that wasn't in this plan that

30:36Nathan will cover is improvements to

30:38Barbara Bennett in Park that are

30:40proposed. Um unfortunately ID wild isn't

30:44in RDA1 but there their suggestion

30:47improvements style well area as well.

30:50>> Now the elevio um

30:53you know we've especially in the

30:55downtown area um there have been as we

30:58know you know a lot of different plans

31:00and a lot of attempts to make the spaces

31:02that we have the concrete spaces be

31:05really utilitarian and welcoming. And

31:08across the board, a big issue has always

31:11been shade.

31:13>> And um and I, you know, I remember one

31:16of the plans um that for uh Believe

31:20Plaza before it was Believe Plaza that

31:23incorporated um what what we saw

31:26illustrated there in a really wonderful

31:28shade structure, but it was so expensive

31:31at the time that it's just like, okay,

31:33we'll do this and not that. And um that

31:37I think has continued to be a challenge

31:40with the real genuine utilization of

31:42that to really have a good experience

31:45there. Brick Park, you know, now

31:48referred to as West Street Plaza, but

31:50Brick Park was so hot that nobody could

31:54use it. You couldn't do events there.

31:56You couldn't have a dance concert. You

31:59couldn't do anything because it was just

32:01so hot. And so this new you know um uh

32:06small um shade structure there has been

32:09really really helpful. So um and and on

32:14top of that we know that recently um

32:16Reno was laed as being the fastest

32:20elevating in temperature of any city in

32:23the US. And so when I look at that, I

32:26think um about our our priorities in in

32:30where our money goes to do um work on

32:33this that um you know, we only have so

32:37much money and we have a lot to do and a

32:39lot of opportunities to make this really

32:42great, but if we don't address shade, I

32:45think it'll still be more of the same.

32:47It's like, oh, great idea, but

32:50>> So, Mr. Chair, if I may respond to that,

32:53Ashley attorney, city manager for the

32:55record. That's part of why uh staff will

32:57be bringing you each of these plans over

32:59the next several months is to really set

33:01the table for your CIP conversation that

33:03will happen after the first of the year.

33:05>> Yeah.

33:05>> Um to your point, uh one your question

33:08of RDA funding. So, this board made a

33:11recommendation of funding phase one of

33:14the river project, which is $6 million,

33:16and then funding designs for phase two

33:18and three that was approved in this

33:20budget cycle. So that is $7.2 million of

33:24RDA2 funding that is in this current

33:26year being expended. Uh we anticipate

33:28bringing you in next year's CIP plan a

33:31request to fund construction for phases

33:342 and three. That will be another 12 to

33:3715 million depending on how budget

33:39shakes out. Um and then with believe as

33:43we know the space is heavily utilized

33:46but it could be more so if we had shape

33:49uh the anticipated numbers of redoing

33:51believe plaza are somewhere around the

33:53$20 million mark is what we've seen give

33:55or take depending on how expensive you

33:57want to go. So there will be a

33:58conversation for this board. Do you want

34:01to do smaller tactical improvements like

34:03we've seen at West Street for a few

34:05million or is the decision to save four

34:10or five years of increment as we know

34:12we're looking at about $5 million in

34:14increment a year coming in downtown for

34:15RDA1. Do you set aside four or five

34:18years in order to do something larger in

34:20belief plaza? So those are some of the

34:22conversations um that we'll be bringing

34:25you in your CIP process. Any

34:29questions online for staff?

34:36>> I've got a question. Oh, go ahead,

34:39Taylor.

34:42>> Oh, no. I was just saying no questions.

34:44I'm good. Sorry.

34:45>> Okay. [clears throat]

34:46Kurt

34:47>> Kurt Stitzer for the record. So, as we

34:48look at the different zones, if you

34:50will, right? Rural

34:52neighborhood, downtown, industrial to

34:56the east. Do we have a prioritization of

35:00how money would be rolled out?

35:03Are we going east first, then west? Are

35:05we going downtown, then the

35:07neighborhood, then east, then west? Like

35:09what's do we have a plan for that? Is

35:11there is that part of this

35:14strategy or is it just kind of as we get

35:16money, we see what the next priority

35:18project is?

35:20>> Yeah. to uh assist city manager Ashley

35:22Turn's point um RDA2 does have the

35:26funding available and so the priority in

35:28the action that you all have sort of um

35:32recommended is uh going east with RDA2

35:36funds and supporting phase one

35:38construction, phase two and three design

35:40and then this year we'll be asking for

35:41phase two and three construction.

35:43That'll take everything going east to at

35:45least GSR. Uh but then you get into

35:48flood authority land and you also get

35:50out of RDA's uh areas. Um so that kind

35:54of priorit prioritization wise uh those

35:58are the things that have been approved

35:59that we have the funding for. When you

36:01start to look at downtown which is

36:03redevelopment area one uh the

36:05limitations there and the priority is

36:06mainly funding. Uh so either

36:09uh you reserve some funds to do the big

36:12projects or you start to do a little bit

36:14more tactical improvements uh with the

36:16funds that you do have. The challenge

36:18going west is you start to get into city

36:21of Reno um areas. Uh that'll be based on

36:25the city of Reno's budget and then you

36:26start getting into county uh and then

36:29county's budget. Uh so in the impro

36:31implementation plan there are

36:33recommendations and the highest

36:34priorities from do it now uh and costs.

36:37So you can go through that.

36:40Are those conversations happening? Maybe

36:42not. Uh but with a parks district

36:45conversation, those could likely start

36:47picking back up.

36:49>> And the city of Reno doesn't have in

36:53their current budget

36:56the money to start allocating to this.

36:58they've got other issues, right? So,

37:00like are we just talking and focusing on

37:03the areas within RDA 1 and two and this

37:06is just another plan further east and

37:09further west that will likely get

37:11mothballled or what's what's the

37:13likelihood that this comes together

37:16because I mean I can see eminent domain

37:19lawsuits. I can see Carson Truckucky

37:22Water Conservation District issues. I

37:25can see the new flood plane that FEMA is

37:28adopting that should have been adopted

37:30by now but still hasn't been um that's

37:34changing flood planes for the worst not

37:36better through the Truckucky River

37:38corridor making improvements that much

37:41more expensive or completely unviable

37:43along the banks of the Truckucky River.

37:45Um like how are we how are we addressing

37:47that or are we just as RDA saying we're

37:50focused on RDA?

37:52So, I can speak to that. Ashley J

37:54assistant city manager for the record.

37:56Yes, is the answer to all of that. Um,

37:59ultimately this body's oversight and

38:02authority and recommendation is to the

38:04RDA which can only control where RDA

38:07boundaries touch. And so, we are

38:10bringing forward items that are in

38:12executable plans that we have the

38:14authority based off of geography. We

38:17understand that there is a massive gap.

38:19As uh Brian mentioned, this plan covers

38:2217 miles. Of that 17 miles, RDA only

38:25covers five maybe.

38:28>> Um so we understand that there are 10

38:30[snorts] plus miles of area that we have

38:33no authority nor funding that we can

38:34help with. Um I think that is part of

38:38the importance of a larger policy

38:40conversation happening with the elected

38:42bodies on the importance of a parks

38:44district. There have been some

38:46additional understandings that we found

38:48that parks districts can be created.

38:50However, they can only pay for capital

38:52improvements. They can't pay for

38:54maintenance. And so that puts us in the

38:56same issue where we are with RDA. We can

38:59create it, but we can't take care of it,

39:00which doesn't help governing bodies on

39:02the go forward. So, you're not wrong,

39:06Kirk, that there needs to be a wider,

39:09longer term solution, but it ultimately

39:11comes down to funding and then authority

39:14of which we lack outside our borders.

39:20>> Okay.

39:23>> Anyone else online have any questions

39:26for staff or comments?

39:32I see. And I'll just close with I I

39:34think the river is a huge asset. It's

39:36probably from everybody. It's I see what

39:38Boise does with their standpoint versus

39:40what we do. So I think focusing on it is

39:43is a great idea.

39:46All right. Item four

39:50presentation onfield and Barbara Bennett

39:52Parks.

39:56>> It's a scroll. The first ones

40:00Nathan Elliot, parks and recreation

40:01director for the record.

40:06I mean, we have the scroll for me or

40:07does it work even?

40:09>> It should work.

40:10>> That's nice.

40:11>> You have all your coins activities, too.

40:15>> All right. Um, just a uh want to I'll

40:18make this a little more brief. spend a

40:19little more time on our parks recreation

40:21open space master plan which is the next

40:23item. But um we uh completed a master

40:27plan for Wingfield and Barbara Bennett

40:29Park which is uh obviously a key area

40:32for what we just observed in the the

40:34river in the downtown area. Um this was

40:37adopted by council in in 2025 after some

40:42lengthy input from the community. Um but

40:44there's those the three the three sort

40:46of um converging sections of of public

40:49space with uh brick and west brick

40:52Westery Plaza, Wingfield Park, and then

40:55Barbara Bennett Park um sort of all as

40:57this nexus point for downtown gathering,

41:00recreation, uh events, things like that.

41:02So um so this is the the results of that

41:05master plan. Um again it was completed a

41:07while ago so some of this is a little

41:09stale but um first want to talk about

41:12the vision uh the mass of why did we

41:15start with this as I kind of just

41:16explained um we wanted to make this area

41:18a regional uh destination as part of the

41:21Reno parks uh recreation and open space

41:24master plan is to make uh our parks in

41:26the Truckucky River corridor a regional

41:28destination and this is is sort of the

41:30epicenter of that. Queenfield Park,

41:33Barbara Bennett Park and and West Street

41:35Plaza along with the whitewater

41:37improvements that are in there. So, um

41:39so as it gets into that uh part of those

41:42these are again from the parks

41:43recreation open space master plan part

41:45of the implementation plan in that

41:46space. So that's where this uh vision is

41:49coming from.

41:52All right. Um, so as I'll get into some

41:54maps here in a second, but um, we have

41:58uh we settled on concept C which you'll

41:59see, but the the priorities that we

42:01could do in the meantime, sort of those

42:03tactical improvements that Brian

42:04mentioned in the other spaces, security

42:06and safety, adding lighting, cameras,

42:09um, improving our our visibility from

42:11trees and vegetation. Uh again, as we

42:15plant new trees, choosing trees that

42:16will create a better canopy and allow

42:18you to view through the park rather than

42:20have uh the low the low branches that

42:23will would block visuals. Um and then

42:26also removing other items that would

42:27obstruct views, walls, other structures,

42:29things like that. So that was a lot a

42:31lot of the philosophy and what was uh

42:34put in as a part of the design. Uh one

42:36of the key elements especially in

42:37Barbara Bennett is uh improving

42:39vehicular circulation. If you've ever

42:41been to Barber Bennett Park, it's sort

42:42of wild that you uh go in one way and

42:45then you go out this other uh this other

42:47side at a a different elevation, one

42:50lane, very limited visibility, things

42:51like that. So, um so improving that as

42:54well. Um obviously trees are very

42:58important uh not only to to our

43:01community but as a part of um our

43:03council and things like that. So, a big

43:05part of this plan is how do we keep our

43:06our big trees that provide shade and

43:09keep our spaces loved and usable. Um, so

43:11that's that's the why that information

43:13is added specifically is how it would be

43:15impacted. So, this was the map uh we

43:17settled on. So, um

43:20it's obviously difficult to see each

43:22number. So, I'll get a little bit

43:23closer. Uh is it easier for me to be

43:25over here so the online people can see?

43:26Is this the better spot?

43:28>> I think they're only seeing your

43:29presentation.

43:30>> Oh, they're only seeing see me.

43:32>> Put on a coat. Oh, well. [laughter]

43:36>> All right. Well, um either way,

43:39>> so the the biggest change that we need

43:40to look at here for Barbara Bennett,

43:42we'll start at the bottom. Um is is

43:44realigning the road. We have significant

43:46challenges of where the current roadway

43:48is along the north side of the park. Um

43:51so the the preferred proposals all

43:54included realigning the road through the

43:55middle of the park. So it creates a big

43:57challenge but it also creates we we

44:00believe is the best opportunity for for

44:02the space and creating connectivity for

44:05uh Winfield Park and all the way

44:06through. So now you have almost a

44:08festival level space between the three

44:11right rather than just what is almost um

44:15siloed or cut off space here where the

44:17only way to currently access is to come

44:19across the bridge and come in this way.

44:20Uh adds a pedestrian thing. Uh it has it

44:24would have a lot of sloping here that

44:26would add more space for the the river

44:28to be utilized and accessed from a

44:29recreational component. Um so those are

44:32some of the big things. We'd reduce some

44:33of the park elements um that are more of

44:36the neighborhood park side, but most of

44:38those elements would be included now on

44:40the south side of the road. So think of

44:41your neighborhood park down here. Think

44:43of this more general event and uh

44:46community gathering space uh north of

44:48the road that would go in. So, um,

44:51reimagine the courts. Right now, we have

44:53two side by side courts as you drive by

44:55on Arlington. U, this would allow the

44:58same amount of hoops but have, uh, take

45:00up less space and again allow the road

45:01to be realigned. We'd go down to to one

45:04tennis court, uh, probably shared use

45:07with pickle ball. U, this is a very

45:09flexible space. This I and O space could

45:12be dog park. It could just be open

45:15space. There could be playgrounds added.

45:17Uh we do imagine a play structure in

45:18this space too. So moving that to the

45:20other side of the road. Um improved

45:23public bathroom spaces that would serve

45:25as the public restrooms for um the

45:28majority of the space between the three.

45:30Right? We can't put restrooms in on the

45:32island. Um we can have water uh but not

45:35much else going in there from an

45:36infrastructure standpoint. So no

45:39bathrooms there. So we want to improve

45:40and move those closer to the river for

45:42our public restrooms.

45:45Okay. Okay. And then as you go to

45:46Wingfield or Wingfield,

45:48um the biggest change here would be we

45:51right now this this part of the park

45:53seems cut off from the road. So the big

45:55part is to move um the uh amphitheater

45:59from from what would be the uh western

46:01part of the east side to the uh eastern

46:04part of the east side. So that that

46:06really opens up the space and you can

46:08look both directions as you go into the

46:09park. Right now it's a huge brick wall.

46:11It's obviously dated. Um it's it's well

46:14utilized. It's well appreciated, but

46:15that's the big change in windfield. Not

46:18a lot of ability to uh build up or come

46:21out of the ground obviously from flood

46:22flood restrictions and things like that.

46:24So there would be a lot of process that

46:26would go into that. Um likely we would

46:28try to use sloping to create the

46:30seating. Uh right now that's limited

46:33impact. So we would be taking out we

46:35more and putting in more of a flat and

46:37flowth through design for for the

46:40amphitheater. This you can see at the

46:42point here adding some shade to your

46:44point. Netty, is that right? It's my

46:46grandma's name. So, um Netty, this would

46:50be an opportunity for for shade in

46:52what's a great space, great visual

46:54point. Awesome to watch the white water

46:56elements. Now, there's the new uh

46:59relatively functioning surf wave that's

47:01in there um that we're still working on,

47:03but uh to be able to to be a spectator

47:06and to observe that, to have art shows,

47:07to have um vendors, things like that,

47:10and be in the shade would be an

47:12opportunity there. And then, of course,

47:13as I mentioned before, the big

47:14pedestrian bridge that would connect the

47:16two spaces. Uh and really now you could

47:19look at an opportunity where there's a

47:21stage here, there's amphitheater here,

47:23stage here, there's something done at

47:24West Street. you're really starting to

47:25look at really a festival opportunity in

47:27that space.

47:29>> Nathan, I'm sorry. Could I ask you a

47:31question about the reorientation of the

47:34stage at Wingfield? Um if if the flip is

47:38from west to east, it means that the

47:42performers um if they are there from

47:44noon on have sun on them.

47:47>> Yeah, there is.

47:48>> Of course, until the sun goes down.

47:50>> Absolutely. Thanks for the question. And

47:52that was it was a point of contention

47:54especially for the Phil um and when it

47:56came to to the instruments and the

47:57instruments being in the sun before the

47:59sun would go down. Um and so part of the

48:01conversation there is what what do we do

48:03for the it's not unimportant but

48:07relatively few times that the fill would

48:08actually play. Um what can we do to

48:10modify for those few times whereas this

48:13would be uh a better user experience in

48:15most cases. And so how do we modify that

48:17from an overhang standpoint things like

48:19that? show times, understanding the

48:21study, how are our tree growths going to

48:23impact when the sun would go down and

48:25things like that. So,

48:26>> well, and and may I just point out it's

48:28not only the fill um dancer, she's in

48:31the stage, they put down Marley and

48:33Marley gets boiling hot for the feet

48:35when the sun hits it like that.

48:38>> Fair point. Fair point. Absolutely.

48:40>> So, that was May I be Mr. Chair? This is

48:44Taylor Adams. Can I be recognized

48:45quickly?

48:46>> Yes, Taylor.

48:48I have to tell you where where I think

48:49all of these are great improvements. I

48:51struggle mightily to find how any of

48:53this qualifies as redevelopment. This is

48:55a this is a functioning park. Everything

48:57that you're talking about here sounds

48:59like a general fund capital improvement

49:01to me. I mean I you know I recognize

49:03you're optimizing an existing facility

49:05and you're trying to you're trying to

49:07you're trying to fit improvements into

49:08an existing facility, but what I can't

49:10find in my head on the river I got it.

49:12There are vast sections of the river

49:14that that desperately need

49:15redevelopment. But as it relates to what

49:18you're doing here, I'm struggling to

49:20find how this how this fits within our

49:22mission. Um because all of this seems to

49:25me just the work of of the park and

49:27recck department and the citycip

49:29um planning process. But I'm I'm I'm

49:32happy to hear more and I think this is a

49:33great plan, but I struggle to see how it

49:36how this directly fits within the

49:38redevelopment bucket given the limited

49:40resources we have.

49:43So, I don't know if Ashley or Brian, you

49:45want to mention that, but uh this I

49:47think the intent that I was uh asked to

49:49come here was to talk about the

49:50different plans that are in place along

49:52the river and in downtown uh to see how

49:54those tie together. I think that's

49:56that's the overall thing what we're

49:58trying to accomplish.

49:59>> So, member Adams, I

50:00>> Yeah. So, if it's if it's your position

50:02that these do better fit within the

50:04city's budgeting process than is a CIP,

50:06then then then I'm happy to hear the

50:08plan. But if if the thought was this

50:10would come forward for redevelopment

50:11funds, I'm just I'm uh uh I'm just sh

50:14I'm just sharing my opinion on that.

50:17>> Thank you for that. Member Adams, Ashley

50:19Attorney, assistant city manager for the

50:20record. Um this item as well as B5 were

50:24requested by member Robertson in a

50:29previous item. Uh he had asked for pros

50:31plan updates and then updates as these

50:33relate into the parks district. So, you

50:37are absolutely not off in questioning if

50:40this should be a general fund item. Uh,

50:42the RDA has looked at some improvements.

50:44We brought forward the river east

50:47because we do believe that there's

50:49opportunity for redevelopment to come

50:51from those improvements once that part

50:53of the path is improved. Um, so these

50:56are on here because you got a member,

50:57but you are not wrong in your approach.

51:00>> There's no specific funding request

51:02right now.

51:02>> No.

51:03>> Perfect. And by the way, that context is

51:05is incredibly helpful. And also, I'm I'm

51:07willing to say going back to member um

51:09Oliviverio's point, I do think

51:12performance spaces that enhance the

51:13broader district absolutely are within

51:15bounds for us to discuss, but but

51:18looking at sort of the looking at park

51:20buildout uh in existing parks that I was

51:22struggling to get there. That context

51:23from the deputy city manager helps me or

51:25excuse me, assistant city manager helps

51:27me considerably. Thank you so much.

51:30>> Yeah, thank you for the question. And I

51:32think as we get into more of the park

51:34district discussion and I'll I'll give a

51:36little bit update on that in the next

51:37item. Um I think that that's really the

51:40answer um member Adams for the uh for

51:43the opportunity to improve and create

51:46better park spaces whether it's in the

51:48RDA along the river in the county in

51:50Sparks. Um that's really uh the

51:52opportunity for the public to say

51:54similar as uh it happened with the RDA

51:56creation u hey we want better here and

51:59we're willing to pay for it.

52:01Um, here's some zoom in on that. I could

52:03have got that probably a little bit

52:04faster, but there's the zoom in on

52:05wingfield. Um, you can kind of see where

52:08those elements are are from. The overall

52:11plan is, you know, uh, removing walls,

52:14things like that to to make it more

52:16visible.

52:18Uh, trying to save as many trees as

52:19possible. The shade's an awesome part of

52:21the spaces currently. We don't want to

52:23lose that. Hopefully, we would like to

52:25see the enhancement there. As you can

52:26see, a lot of new trees added in this M

52:29section to to try to help and get get

52:32tall um to to block as much of the sun

52:34as early as possible for performances.

52:39Visuals on field park amenities.

52:42There you can see sort of a terrace idea

52:44for um our seating. Obviously not a a

52:48brand new idea for for amphitheaters,

52:51but that's what we'd be looking at

52:52instead of what currently is a raised

52:54stage, more of a sunken and the water

52:56could flow out and over if there was

53:01u just some pictures. Uh

53:04Whitewater Park is something we're

53:06currently working on with uh some local

53:09folks who want to see it improved. Um

53:11we've had a very similar conversation.

53:13there is lot not a funding source to uh

53:16improve this space. So they are setting

53:18off on their own to try to uh to raise

53:20money. Um we've made it pretty clear

53:23that the RDA is not prioritizing a white

53:26water park as a part of the budget at

53:28this point. Um and to your point, member

53:32Adams uh probably shouldn't prioritize

53:34that ahead of the other items.

53:38So, I'm just going to flip through these

53:39relatively quickly to get to I think the

53:41bigger item, which is our recreation

53:43open space master plan. Uh, so here

53:45another zoom in on Barbara Bennett Park.

53:48Uh, O for flexibility in this space down

53:51here. Um, we would probably go back to

53:53the community at that point and and uh

53:56understand what the the need is. If we

53:58can get these things done, the road

54:00realigned, what would be the things that

54:02are currently there? Is there's no

54:03timeline for funding. We don't want to

54:05say, "Hey, O is definitely going to be

54:07this or that." when the community may

54:09not need it at that point.

54:15>> Yeah. Just some more visuals.

54:17There's the uh budget. Uh that's already

54:20a little stale, but uh 12 million is is

54:24what the initial uh engineering estimate

54:26was for the improvements across the

54:29three different parks, the Barbara

54:30Bennett Park, Wingfield Park, and

54:31Whitewater Park. Uh obviously that's not

54:34getting cheaper. So um we have we did

54:37include um the projects that were uh on

54:41the list in the overall and submitted

54:43them into the RDA uh budget for

54:46consideration uh as we did with

54:48Broadhead Park um John Champion Park and

54:51the parks that go through RDA2. So um

54:53they were submitted obviously all

54:55prioritized the list and council made

54:57selections. So, and I don't believe any

54:59of those were made for Barbara Bennett

55:00at this point for the whiteboard.

55:03Any questions on that one?

55:06Any questions online?

55:10All right. Thank you. Let's go to B5

55:13update on parks and recreation open

55:15space master plan. Again, this is kind

55:17of the same item. Uh Mr. Robertson's one

55:20this coming forward just for

55:21information.

55:22>> That is correct. He requested this for

55:23information and so we asked director

55:25Olad to give an update as this is a

55:28larger conversation and again lends to

55:30the policy conversation from this board

55:32of what if any improvements in these

55:35plans should the redevelopment agency be

55:37supporting. Obviously they create

55:40property tax that's something that this

55:42board is targeted with hitting.

55:44>> Okay. So I'll be using a presentation

55:46that uh we recently gave to council. One

55:48of the items um on our parks,

55:51recreation, open space master plan which

55:53was adopted in November of 2023, one of

55:57the items is to make sure we give

55:59updates on what we've accomplished. Um

56:01there was obviously concern and fair

56:03enough that a lot of plans get um

56:06presented, adopted, and then they just

56:08sit. So um we're committing to not doing

56:10that. So we have uh two out of two years

56:12provided an update to council and

56:14quarterly updates to the parks and

56:16recreation advisory board. Um so a

56:19little background this plan again was

56:21adopted in uh November of 2023. Within

56:24there there's about 70 pages of

56:25implementation um kind of step by step

56:29objective by objective uh implementation

56:31planning. And so we've broken that down

56:34um to provide those updates each year uh

56:37at each one of these overarching goals.

56:39So there's the the 10 goals that are

56:42sort of summarized here and then within

56:44those there are several objectives. I

56:46believe we had about an 18page uh memo

56:49update that was sent to council. I think

56:51that was shared as a part of the packet.

56:53Not we can get that. Um but obviously

56:56don't expect everybody to read it but we

56:58want to be clear we're we're moving

57:00forward with those. So um some of the

57:02highlights for that um

57:05the biggest hurdles you know usually

57:07hurdle one through seven are funding um

57:10as as we're mostly talking about today

57:13um a we want to create a sustainable

57:15department as much as possible um our

57:18department cost recovery in FY25 was up

57:20from 32% in 23 u to 37% we've continued

57:26to improve our cost recovery to 40.5%

57:29uh of what's roughly an $18 million

57:31operational budget. Um the national

57:33average is somewhere between 25 and 30.

57:36So uh we're doing really well on our

57:38recreation side um to to meet what is um

57:43more of a nice to have um when it comes

57:45to programs and services versus the uh

57:49sort of standard uh access to public

57:51spaces that park maintenance provides

57:53which doesn't usually create a revenue

57:56on that side. So uh as a part of that

57:58goal also was to hire a fund development

58:00manager um which we've had for two in

58:03place for two years and has added nearly

58:05a half million dollars in nonoperational

58:07revenue could be grants, sponsorships,

58:09things like that. So the that's an

58:10increased amount not a uh carry on of of

58:13other agreements we have with turf and

58:15things like that. This is new money that

58:17have been brought in by that position.

58:19um moving into the sponsorship realm of

58:21of you know rebranding our spaces to uh

58:25provide opportunity for community and

58:27and business input to to help uh improve

58:29our spaces and and from a maintenance

58:32standpoint you know things like

58:33resurfacing a court adding a name on the

58:35court uh helps us do that and keep money

58:38into in our maintenance budget for other

58:39areas that don't have those

58:40opportunities.

58:43Uh so our biggest goal and and probably

58:45the most relative and I know um the RDA

58:48has uh participated in helping to fund

58:50the u completion of a park district

58:52service plan which is a required element

58:55to create a park district. Um we are are

58:58deeply engaged in that process and have

59:01a joint meeting scheduled at the end of

59:03this month with the other advisory

59:05boards for uh Wo County City of Sparks

59:08and then the Sun Valley General

59:09Improvement District. uh we are hoping

59:12for a recommendation to take that then

59:13to council um with a framework that

59:16would uh support a regional park

59:19district. So a lot of what we're talking

59:20about on the river um could be made more

59:24simple um by the creation of a park

59:26district that would oversee at least in

59:28the proposed framework the the length of

59:31the river from a recreational space and

59:33opportunity. So it's not four different

59:36um three or four different uh

59:38jurisdictions that are working on it.

59:39there would be one jurisdiction that's

59:41sort of taking the lead when it comes to

59:43recreational opportunity path

59:44improvements, things like that um to

59:47help navigate that rather than you step

59:49across the line and you're in the county

59:50versus or Sparks versus the city of

59:52Green. So again, we expect uh what we

59:55hope is an early decision point in early

59:572027 from the elected bodies um that

1:00:01would say yes, go forth, create the

1:00:03district, which would then now we get

1:00:04into the implementation of which

1:00:06employees move over, which programs and

1:00:08services move over, what budget gets

1:00:10moved over from potentially the city,

1:00:12county, and uh sparks into uh the park

1:00:15district. And then uh what are funding

1:00:18initiatives that would need to get

1:00:19started um to move uh new money into the

1:00:22space. So, uh, one of the key key

1:00:24tenants of that is we should not do this

1:00:25if it doesn't improve anything. Um, it's

1:00:28not the efficiency by itself of having

1:00:32um, one director or something like that.

1:00:34It's not going to make the difference

1:00:35that the public will see that we would

1:00:37hope by itself. So, it has to be the

1:00:39opportunity for for new funding and

1:00:41expanded funding um, to support parks

1:00:43and recreation services in the area. Uh,

1:00:46I know this is a big one. So, um, if I

1:00:49want to stop here for a second and if

1:00:51there's any questions on the park

1:00:52district, I know we provided, um, at

1:00:54least, uh, through handouts and, uh, an

1:00:57item several months ago, an update of

1:01:00where we're at. I tried to give you the

1:01:02high points going forward, but any

1:01:03questions on where the park district is?

1:01:05Well, not on what a park district is,

1:01:07but I might ask in terms of funding

1:01:09Netty Olive for the record. Um, is there

1:01:12still in place the 1 half of 1% of

1:01:16funding from room tax that goes to parks

1:01:18and rec?

1:01:19>> It is. Yes, that that there is money

1:01:21that is coming from room tax into uh

1:01:23help offset the cost of parks and

1:01:25recreation, park maintenance

1:01:26specifically.

1:01:27>> And is there any plan to renegotiate

1:01:30that or to see if there's more? I well I

1:01:33believe that's from council's discretion

1:01:34each year as a part of the budget

1:01:36process to say once again this money

1:01:39would go in as a part of I know Vicki uh

1:01:41our director of finance presents that

1:01:43each year is like hey here this is where

1:01:44the room tax breakdown is and this is

1:01:46what's going in park maintenance is

1:01:47listed as part of that so

1:01:49>> yeah it it's an opportunity certainly

1:01:51>> it's actually attorney assistant city

1:01:53manager for the record it's actually

1:01:54codified in Reno municipal code that

1:01:56half of the room tax allocation goes to

1:01:58parks maintenance right

1:02:00>> so we did more than the half cent of a

1:02:02half% % and it's just very clearly 50%

1:02:04goes directly to Nathan and then 50% is

1:02:06on the council discretionary

1:02:08>> to park maint

1:02:09>> for Nathan for fixing things.

1:02:12>> Um yes, any other questions on

1:02:15>> questions online

1:02:16>> park district I'll move on.

1:02:20Okay. So, um colorcoded that was part of

1:02:23goal number one. How do we create a

1:02:25financially sustainable operation for

1:02:27our parks and um that was item 1.1 of

1:02:32that goal of the whole implementation

1:02:34plan is to pursue um the creation of a

1:02:37park district or at least that that

1:02:39service plan to say hey we need a

1:02:40decision point. Um this was an

1:02:43opportunity I believe in 2012 I think is

1:02:46when the legislation was done and um so

1:02:48it's taken us a while to get there but

1:02:50we're moving um moving through that

1:02:52process now.

1:02:55>> Great. Um, one of the things that we're

1:02:57doing from a maintenance standpoint is,

1:02:59uh, as I talked about a few slides back,

1:03:02uh, as we charge fees for services and

1:03:05programs, uh, we asked permission from

1:03:08council to create a, um, sort of an

1:03:11allocation for for our assessments for

1:03:14any sort of if you use if you do a swim

1:03:17lesson, 5% of your fee would go towards

1:03:19an asset replacement. We didn't have

1:03:21that. We're always up against the garage

1:03:23door at a firehouse or a lease cruiser,

1:03:26things like that. We're coming in third,

1:03:28fourth, fifth generally. So, we bring

1:03:30the public chooses to use our spaces,

1:03:32pays a fee to do that. Um, most of that

1:03:34fee would continue to go to the general

1:03:36fund to offset costs, but 5% is going to

1:03:38be set aside now going forward to do uh

1:03:41asset replacements and things like that.

1:03:43So now we're not talking about um

1:03:46funding Barbara Bennett master plan with

1:03:48that, but if we if we wanted to upgrade

1:03:50a playground or replace a playchange or

1:03:53a structure, it could be used to fund

1:03:54some of those efforts, a basketball

1:03:56hoop, those types of things.

1:04:00Another thing is is how can we be more

1:04:02efficient even if without a park

1:04:04district of uh working with um Wo County

1:04:08and uh primarily Wo County since we're

1:04:11integrated into that space where if they

1:04:14have a space that's next to a space we

1:04:16maintain uh but not one that they

1:04:18maintain, how about we look at moving

1:04:20the deeds over and uh getting that

1:04:22property to um the closest jurisdiction

1:04:25from a maintenance standpoint. So good

1:04:27examples of that if the county has a lot

1:04:29of open space and trails that they

1:04:30manage and then we'll have one swath of

1:04:33land in the middle of that that um we

1:04:35would have to manage. So they would take

1:04:37on that and then we're looking at a

1:04:39place like Horseman's Park where it's

1:04:41split um

1:04:43it's split where the fire station

1:04:45literally has a county line going right

1:04:47in the middle of it. of the parcel. So,

1:04:50uh, how do we get those things aligned?

1:04:51And then we take on maintenance because

1:04:52we're already there every day and we

1:04:54don't pass each other as as a maintainer

1:04:56goes one way or the other. So, those are

1:04:58some things we're doing in in a lot of

1:05:00different spaces, but Horseman's Park is

1:05:01very close to being adjusted and, uh,

1:05:04that will then become a city park and a

1:05:05city facility.

1:05:09Uh, one of the relatively low hanging

1:05:11fruit, but um, it's something that

1:05:12people are starting to notice is new

1:05:14signage that's being put up in parks

1:05:15that u, we have very sort of bland white

1:05:18signage that um, has just become a part

1:05:20of the landscape and no one's really

1:05:22paying attention to has uh, all of the

1:05:25rules you could imagine listed. And so

1:05:27we think nobody's reading any of them.

1:05:29So we've tried to create um, hey, here's

1:05:31the big five things that you most likely

1:05:33would make a mistake and do in our

1:05:35parks. Uh we'll still hold people

1:05:38accountable for rules that aren't

1:05:39posted, but that comes with education

1:05:41and warning and things like that, but uh

1:05:43making sure that people understand um

1:05:46some of the main rules of alcohol,

1:05:48smoking, motorized vehicles is obviously

1:05:50a big one with ebikes. Um so trying to

1:05:52make sure those big things are posted

1:05:54and then hopefully read as people are

1:05:56walking in. Trying to keep it uh short

1:05:58and sweet and then educating on the

1:06:00other opportunities.

1:06:04Um something we're very proud of is

1:06:05obviously with the investment in uh the

1:06:08Moana Springs Pool and Fitness Center.

1:06:11Um swim lessons is one of the most

1:06:12important things that we do for our

1:06:14region. Uh over uh 100% increase from uh

1:06:19the opening of Moana Springs to now of

1:06:21of swim lessons for the area. Uh we

1:06:24think we still have opportunity there,

1:06:26but now we have space to start

1:06:28increasing those numbers even further.

1:06:29Now we need people to teach. So, uh, we

1:06:32presented on that to council and, uh,

1:06:34continue to work hard to make sure that

1:06:36our kids have a variety of access to our

1:06:38water and our spaces.

1:06:42Uh we also started as a part of that

1:06:44Arena Swims pilot program where um our

1:06:47hope long term is to work with the

1:06:48school districts and uh private schools,

1:06:51charter schools uh to create this as a

1:06:53part of the school day where um when our

1:06:55pools are a little slower during the uh

1:06:57school day, bringing kids over as a

1:06:59three to four week field trip that would

1:07:01allow um them to get water safety

1:07:03lessons where um if they fell in the

1:07:06water, they would go from not being

1:07:08likely to survive to um being able to

1:07:10get get out of the water on their own.

1:07:12So, it's very simple, very low low bar,

1:07:15but we want to make sure that if a child

1:07:16falls in a body of water, they have a

1:07:18chance to float and get to the side. So,

1:07:21um we did a pilot program with that and

1:07:23we're hoping to expand that atmosphere.

1:07:26Uh we've also been working closely as a

1:07:29part of goal five. Um, Pembroke Flat

1:07:31Fields is another opportunity that's

1:07:33been sort of laboring over over the last

1:07:36uh I don't know 8 to 10 years to try to

1:07:39get Flatfields built at the uh Pemroke

1:07:41property which is right off of uh

1:07:43Veterans Parkway and Pembroke. Um we

1:07:47have moved to a final design and we're

1:07:49at 100% design review right now uh to

1:07:52build uh 10 flat fields in that space um

1:07:55which I think is another great

1:07:57opportunity for um economic impact and

1:08:00and tourism uh along with the Mill

1:08:03Avenue or the Mill Street project

1:08:05between Rock and McCarron with Turfma

1:08:08which will hopefully also become a park

1:08:10that would include flatfield space. Uh

1:08:12that would uh there's about a 50 field

1:08:15uh shortfall as you can see in the pros

1:08:18uh plan. Um and that would help with

1:08:20about 19 to 20 fields that uh would give

1:08:23us practice space and also the ability

1:08:24to attract tournaments to the area.

1:08:27So, RISA, our Reno You Sports

1:08:29Association, uh, helped to fund the

1:08:32final design of that project. And so,

1:08:34we're looking forward to move forward

1:08:35with a a fund fundraising campaign and

1:08:38things like that to help build that

1:08:39project. And again, hopefully all of

1:08:41that will move into the uh the park

1:08:43district if they decide to vote on that.

1:08:46I'll create an art in the park program

1:08:48to try to to bring art and beauty into

1:08:50the space. Um, a lot of this is

1:08:52education as people could do this um

1:08:54without our permission or without our

1:08:56help, but we're trying to jump start

1:08:57that process with a few public art

1:09:00displays. I guess it was the last one.

1:09:02Um, so we're looking to expand that into

1:09:04the different uh areas, but right now

1:09:06bysentennial Park was our initial launch

1:09:08point. Um, there's a semi-permanent

1:09:10display in there that allows an artist

1:09:12to come in, hang up their art, sell

1:09:14their art. Um, and we hope that

1:09:16continues to expand and bring beauty

1:09:18into the park. So,

1:09:20Thank you.

1:09:21>> All right, with that again, that's all

1:09:23part of a very large memo of a very

1:09:25large plan. Um, but if there's any

1:09:27questions, happy to answer.

1:09:29>> Any questions online?

1:09:35>> Thanks for the presentation.

1:09:36>> Sure.

1:09:38>> Item six.

1:09:41>> Hey, Mr. Chair. Uh

1:09:48Brian McCardle, for the record, I'm

1:09:50going to be presenting uh the

1:09:51redevelopment ay's property plan for

1:09:53fiscal year 27. Uh this would um give us

1:09:57direction on the existing properties

1:09:59that the RDA owns outright. Uh there are

1:10:03many properties throughout the city,

1:10:05primarily along the retra corridor that

1:10:07were jointly deed to both the city and

1:10:09the redevelopment agency. uh we have

1:10:12sort of uh put the onus on the city that

1:10:14as they dispose of those properties the

1:10:16RDA uh quick claims their the their

1:10:19ownership in those properties so they

1:10:21can be sold off. Um I don't have an

1:10:23answer as to why they were jointly dated

1:10:25back in the day but I do think it was

1:10:26likely because of the bonding or

1:10:28retract. Um I just hit something. Hold

1:10:31on.

1:10:33Uh and so we're just highlighting the

1:10:36seven pieces the seven parcel that the

1:10:38redevelopment agency owns outright.

1:10:41Uh so just to highlight we're

1:10:45getting direction on which property

1:10:47should be disposed, retained, uh should

1:10:49we find a use for them um lease them out

1:10:52or partner into any sort of P3s for

1:10:55their future bonding.

1:10:58Uh so you know managing uh assembling

1:11:01managing selling off property has been a

1:11:03huge part of the reading agency in the

1:11:05past. Part of the bonds that were just

1:11:07paid off uh that were taken on in the

1:11:09late 90s actually allowed the UN uh the

1:11:12redevelopment agency to assemble many

1:11:14parcels right along downtown that

1:11:16allowed uh the movie theater site to be

1:11:17built. Uh the Riverside artist loss as

1:11:20well as the mates were purchased. Um

1:11:22actually the post office as well were

1:11:24all purchased by the redevelopment

1:11:25agency in the late 90s. Uh and what they

1:11:27did uh they worked with master

1:11:28developers to find long-term sort of

1:11:31operators of those properties and

1:11:33develop develop those. Uh so the the

1:11:36Riverside ARS lofts were able to be

1:11:38restored and retained. Uh the Mapes

1:11:41wasn't as fortunate but there were three

1:11:43attempts to try that. And then

1:11:46we didn't do a tiff deal for the Padio

1:11:48but the redevelopment DC owned the land.

1:11:50Uh so there was a development agreement

1:11:51done where I believe they discounted the

1:11:53land to the developer uh to get that

1:11:56project going. So the way the

1:11:58redevelopment treats land uh

1:12:00strategically can be a huge

1:12:02redevelopment tool. uh and that's part

1:12:04of uh the property plan. And so just

1:12:07some general categories, uh you can

1:12:09retain a piece of property. Essentially,

1:12:11that's telling uh staff to hold, do

1:12:13nothing, uh keep the status quo. When I

1:12:16say selling a property, typically it's

1:12:18we have no interest. We don't want to be

1:12:21prescriptive to what the future use is.

1:12:23So just go sell it. And that can be

1:12:24through a public option or fairly light

1:12:26RFP process. But the idea is we just

1:12:29don't want it anymore. It can generate

1:12:31some revenue. um go sell it. For

1:12:34properties that we do own that have a

1:12:36use, uh consider um either doing a lease

1:12:40uh a ground lease. There are some sites

1:12:43that we could transfer to a different

1:12:44agency. And then last is partnering. And

1:12:47that's in a case where we do have a

1:12:49piece of property, we want to be very

1:12:51prescriptive as to what we want on that.

1:12:53And so we would either do development

1:12:55agreements or open up to some P3 where

1:12:57we uh envision with either the de

1:12:59investor, the developer or some other

1:13:01entity what the future of that site

1:13:03looks like.

1:13:06Here's a map of the existing seven sites

1:13:09going from east or going from west to

1:13:11east. The first one is the small plaza

1:13:13next to uh it used to be Java Jungle and

1:13:16Cafe Capello. It's part of West Plaza.

1:13:19Uh there was a small area uh carved out

1:13:22under redevelopment a ay's control so

1:13:24that we could lease it to the cafe

1:13:26space. Since there is no tenant in the

1:13:28cafe space, the lease currently sits

1:13:30with the property owner so that when

1:13:32they go to get a potential tenant, that

1:13:34tenant has the ability to use that uh

1:13:36that that plaza right next door that

1:13:39patio space. Uh the next one is 135

1:13:42North Sier Street. That's the parking

1:13:43gallery. Uh that is a revenue generating

1:13:46asset for the redevelopment agencies.

1:13:47So, the recommendation there is to

1:13:49retain that property. Um, the one we'll

1:13:51go deep into in the in the next few

1:13:53slides is uh it's been called a few

1:13:56things. Right now, the address is Zero

1:13:57South Center Street. Uh, we call it the

1:14:00City Plaza parking lot. Um, and in years

1:14:03past, maybe a decade or so or more ago.

1:14:05Uh, in past staff reports, they referred

1:14:07to it as the 10 North Virginia site. Uh,

1:14:10where they proposed retail

1:14:12redevelopment. If you go towards the

1:14:14river up there, uh the Rita agency does

1:14:17own a slice of riverfront path. Um it is

1:14:20unimproved path right behind the Reno

1:14:22Oasis ballpark. The idea is to possibly

1:14:25uh transfer that back to the city of

1:14:27Reno. I believe that was a retract

1:14:29parcel, so it was deed to the reloc. Um

1:14:32probably better in the city's hands. The

1:14:35next two sites on East Commercial Row,

1:14:37there is ex an existing purchase sale

1:14:39agreement for those as well as as a

1:14:42existing existing tip agreement that

1:14:44we've done with the developer of that

1:14:46site. And then last is fire station one

1:14:49on East Fourth Street. That was done

1:14:51when the Reno Aces ballpark went in. Um

1:14:54they there was a relocation package for

1:14:55the fire department to relocate to that

1:14:58four street. Uh and so the development

1:15:00agency owns the land

1:15:03facility.

1:15:05And this is just a list of those sites.

1:15:07Uh fire station one, uh no changes

1:15:09there. Recommendation is to retain that

1:15:11property, keep the status quo. The

1:15:14Valleo town homes, that's that uh

1:15:16project where we're allowing the

1:15:18developer to assemble the remaining

1:15:20sites and we have the tiff agreement. Um

1:15:23so nothing to do there. Uh those have

1:15:25been extended, giving him more time, but

1:15:26we're coming up on five years since

1:15:28since that original agreement was

1:15:30drafted. Uh so we'll keep an eye on that

1:15:33as the final agreement of waste

1:15:35management comes into play. The river

1:15:37path behind the aces, we're recommending

1:15:40that uh this advisory board and the

1:15:43agency board uh evaluate and discuss

1:15:46transferring that property back to the

1:15:47city of Reno.

1:15:49Last is the park well next is the

1:15:51parking gallery. Um no changes there. We

1:15:53are doing some long-term asset planning

1:15:55and maintenance needs on that parking

1:15:57gallery. We should see revenues increase

1:15:59uh with future improvements uh customer

1:16:02expectations, some growth in the area as

1:16:04well as potential rate increases. The

1:16:07West Plaza Cafe, we're maintain we're

1:16:09suggesting maintaining that lease uh for

1:16:11your future tenant at that site. And

1:16:13then last is City Plaza, the parking lot

1:16:16on that site.

1:16:18It is, I want to say, a quarter of an

1:16:22acre, 15,000 square feet. when the

1:16:25redevelopment agency bought the mates uh

1:16:27and this site, the idea was as it

1:16:30started getting developed and the mates

1:16:31got uh demolished that city council at

1:16:35the time said we want a plaza but we

1:16:36also want some retail component on that

1:16:38site and so they split the uh the plaza

1:16:41and gave the east side to the

1:16:43redevelopment agency to entertain a

1:16:45future retail or commercial use. Uh

1:16:48there has been plenty of attempts uh

1:16:50over the past decade or so or so which I

1:16:54can highlight here in a second. Um but

1:16:57long history of trying to get a

1:16:59commercial use. At one point there was a

1:17:00RFP and a and a poser selected. Uh that

1:17:05changed and then there was another one

1:17:07selected. Uh but that ran into the great

1:17:09recession and nothing came of it. There

1:17:11is currently no budget that we have in

1:17:13RDA1 to do anything on the site even to

1:17:16get some consulting to explore potential

1:17:18options. So if the direction is to

1:17:21restart conversations around commercial

1:17:23use, we'll have to budget into uh find

1:17:25the budget in this year or budget into

1:17:27next year uh the cost to re to look into

1:17:30that. But we are proposing re

1:17:32maintaining the property uh for for some

1:17:36use with the idea that we could uh

1:17:38potentially in the meantime uh have some

1:17:40intern.

1:17:44So going back uh into history in 2004

1:17:48when the maid site was demolished uh

1:17:51there was a large effort to put an ice

1:17:54skating rink on the site and a shade

1:17:56structure uh and there was a proposed

1:17:58design to build a threetory commercial

1:18:01use on that lot. That is kind of why

1:18:03that parcel is kind of uh has the

1:18:06elliptical shape to it. Uh the plaza was

1:18:10developed. Um, if you look from city

1:18:12hall down, you'll notice that most of

1:18:13this plaza looks the same. It's just

1:18:16that they did not build the shade

1:18:17structure. However, they did do the

1:18:19footings for the state shade shade sale

1:18:21structure. Uh, that's massive uh amount

1:18:24of infrastructure on that site. Uh, as

1:18:26well as a lot of the underground

1:18:27infrastructure has been placed to

1:18:29maintain that. However, uh, some of that

1:18:32was, I believe, damaged with the

1:18:34Virginia Street Bridge. And so the uh

1:18:38equipment to do an ice skating rink on

1:18:40that site, it would kind of have to be

1:18:42redone. But these are some of the images

1:18:44from the architect she and Ben were

1:18:46pagod at the time uh to redevelop the

1:18:48site

1:18:51at a later date. Uh the the the RFP

1:18:55selection to do that fell through and so

1:18:57in 2007 they cleared the deck and opened

1:19:00up RFPs again for this commercial site.

1:19:02They selected Iron Veress Equities LLC.

1:19:06Uh John Papus was the selected developer

1:19:08for that site. This is the rendering

1:19:10that was proposed. Um when that came

1:19:12back, because the canopy structure was

1:19:15not moving forward, the developer asked

1:19:18for more time, six months more time so

1:19:21that they could not only redesign their

1:19:22site, but propose additional retail

1:19:24space and then possibly to redesign the

1:19:26canopy to fit their design and

1:19:28aesthetic. Uh and so the agency at the

1:19:31time gave them six more months to go

1:19:33back and do another preliminary design.

1:19:35Unfortunately, they ran into the great

1:19:37recession and that kind of died in the

1:19:39water. Uh and that didn't go anywhere.

1:19:41But that is the proposed commercial use

1:19:43that was uh proposed on that site at the

1:19:46time. And so that brings us to today. Uh

1:19:49so

1:19:51some things to be considered is some

1:19:53interim management. Uh we could evaluate

1:19:56what the maintenance needs are. It is an

1:19:58existing parking lot, could be used as a

1:20:00parking lot, but it's going to require

1:20:01some improvements. Uh, safety, security,

1:20:05um,

1:20:07and possibly a different use. We've

1:20:08heard pickle ball, we've heard other

1:20:10uses, but if we want to entertain those,

1:20:13uh, it will require some budget to

1:20:14explore those options. In the meantime,

1:20:17we can do some preliminary due

1:20:18diligence. So, we go out and we, uh,

1:20:20evaluate the needs of the site, uh, redo

1:20:22the surveys. The biggest one is the

1:20:24flood. Uh, as member Stitzer mentioned,

1:20:27the flood maps have changed and I do

1:20:29think that flood is possibly the biggest

1:20:31um obstacle on this property now.

1:20:33>> So, we could expend some resources to

1:20:35look into those uh challenges and then

1:20:38later once those are established, we can

1:20:40come back with a strategy and

1:20:41potentially uh with the guidance of this

1:20:44body and the board uh possibly be put

1:20:46out for RP again to see what is out

1:20:48there and sort of vision its future use.

1:20:54What we're asking is uh that this body

1:20:56recommend acceptance or you recommend

1:20:59acceptance recommend the agency board

1:21:02that they adopt this plan uh and give

1:21:04some direction on these properties. Uh

1:21:06that picture right there is the original

1:21:08site that is the majestic theater that

1:21:10was on that corner and then next to it

1:21:12was the original YMCA right on these

1:21:15sites. These did have structures um on

1:21:17these at one point, but the the

1:21:20recommendation is to uh support the plan

1:21:22uh retain that parking lot and allow us

1:21:26the ability to go out and start um

1:21:28planning for for its future use.

1:21:32So with that, that's the proposed

1:21:34recommendation.

1:21:36>> Questions in the room

1:21:39online? Anyone have any comments or

1:21:42questions?

1:21:43>> Yeah. Um, I mean, I think that

1:21:47[clears throat]

1:21:49I just wonder if we're creating work

1:21:51that's unnecessary or spending money

1:21:53that may be unnecessary, if that's going

1:21:57to eventually get wrapped up into a

1:21:59future

1:22:01improvement of the plaza,

1:22:04um, as we were kind of talking about

1:22:05earlier in this meeting with the river

1:22:08plan. Um, or are we planning to keep

1:22:11that out of any plaza improvements and

1:22:13try and create some sort of, you know,

1:22:17retail

1:22:18property that could be more viable

1:22:21because of improvements done to the

1:22:24plaza? Um, I'm just kind of curious if

1:22:28we're

1:22:30thinking about the long-term

1:22:33implementation vision for that as it

1:22:35relates to the long-term hopes and goals

1:22:38for Believe Plaza improvements

1:22:46because the rendering I saw earlier

1:22:48today didn't show a retail building on

1:22:50that. It was incorporated into those

1:22:53overall

1:22:54plaza improvement design.

1:22:57I

1:22:58>> mean, I I kind of take this as yes, they

1:23:00would look at that as well, but uh this

1:23:03is a preliminary step to just figure out

1:23:05what you could do in terms of

1:23:07entitlements and restrictions on the

1:23:09flood authority or flooding maps and

1:23:12etc. So, they kind of go hand in hand in

1:23:14my in my mind. They could be parallel

1:23:16paths, but the necessity of trying to

1:23:18activate that plaza, you got to figure

1:23:21out what you can do first before you can

1:23:23decide what you want to do there.

1:23:25>> So, I see the approval of this plan is

1:23:27just kind of given that authority of

1:23:29taking that. I think that's a simple

1:23:31conversation with Trina Mcon and and her

1:23:33department say what's the new flood the

1:23:37new flood map once finally adopted by

1:23:39FEMA which the city of Reno is already

1:23:42making riverfront development designed

1:23:44to

1:23:46um and is there anything viable is a is

1:23:50a structure on this site viable without

1:23:54having to do flood wall improvements

1:23:57without having to raise the site

1:24:00multiple feet.

1:24:03I mean, that's that's probably a pretty

1:24:05basic first question that would

1:24:07disqualify

1:24:10whether this thing can be developed

1:24:11vertically or not. Andy Alio. Um I what

1:24:16I had understood was the question on the

1:24:19table is in regard to these properties

1:24:22owned by RDA. Um recommendations are

1:24:26hold get rid of that just very

1:24:30basically. Do we hang on to them and

1:24:33evaluate? Do we let them go? Is that

1:24:36what we're talking about right now?

1:24:38>> Yeah, Brian Mardle. Uh that's correct.

1:24:40If the recommendation is to hold and do

1:24:42nothing, then it informs us when we go

1:24:44into our budgeting and planning that the

1:24:46idea is to just not uh you know just to

1:24:49keep it as is and not take any act

1:24:51further action on this property. Um

1:24:54some of the recommendation here is to uh

1:24:57potentially consider an interim use, go

1:24:59out and do some preliminary due

1:25:01diligence. We don't have funding for

1:25:02those, but that would inform our budget

1:25:03next year. and then at some date once we

1:25:06have the answers to a lot of these

1:25:08questions uh sort of potentially go out

1:25:11and entertain this but it would be

1:25:13considered a shovel ready site. Um we

1:25:16don't have those answers to those

1:25:17questions right now.

1:25:22>> Any other questions, comments from folks

1:25:24online?

1:25:29Doesn't look like it. So staff, what

1:25:32you're looking for from us is a

1:25:34recommendation to advance the

1:25:37property plan to the board for their

1:25:40consideration.

1:25:44>> Anyone can I get a motion?

1:25:46>> Netty Aliverio, I um I move that. Could

1:25:51we see that again? The

1:25:54thing

1:25:55>> I was thinking I remember part of that,

1:25:57but it'll come back.

1:26:00Yeah. Okay. I move to recommend the

1:26:03redevelopment agency board accept the

1:26:06FY2027

1:26:08redevelopment agency property plan and

1:26:11direct staff to proceed with property

1:26:14specific strategies identified in the

1:26:16plan, including evaluating potential

1:26:19sales, leases, transfers, retention, and

1:26:23future redevelopment opportunities.

1:26:26>> All said. Do I have a second?

1:26:32Member Harris. Second.

1:26:34>> Thank you. I've got a motion and a

1:26:36second. Any discussion?

1:26:41>> Hearing none. All in favor?

1:26:43>> I

1:26:44>> I

1:26:47Any oppose?

1:26:50Motion carries unanimously.

1:26:53All right. Item C, board commission

1:26:56committee member reports and

1:26:57announcements. Anybody have any

1:26:58announcements or comments?

1:27:04Seeing none, D. Future agenda items.

1:27:09>> Anyone have a recommendation for a

1:27:11future agenda item? Mr. Stitzer?

1:27:14>> No, I was coughing. Sorry.

1:27:16>> Sorry.

1:27:18[snorts]

1:27:19>> All right. Seeing none. E. Public

1:27:22comment. Anybody from the public?

1:27:25Seeing none.

1:27:27Journment. Move to adjourn.

1:27:29>> Move to adjourn.

1:27:30>> Second. All in favor?

1:27:32>> I.

1:27:32>> I.

1:27:33>> We'rejourn. Thanks everyone for your

1:27:35time.

1:27:39>> Thank you. Excellent.