- Program update: the application window for restore grants was extended to October 16; 521 Lake Street was approved for $3.1 million in tax increment financing participation; the Parking Gallery moved to a new operator, Pro Park, on September 1; and proposals for the city-owned property at 264 Keystone are due back to City Council on November 4. See 264 Keystone Property Disposition.
- Truckee River Vision Plan: staff summarized the 2023 plan covering 17 miles of riverfront, which drew more than 30,000 people into its public engagement. The advisory board's recommendation funded phase one at $6 million, and $7.2 million of RDA2 money is being spent this year including design for phases two and three; construction of those later phases may cost another $12 to $15 million, and redoing Believe Plaza about $20 million.
- Wingfield Barbara Bennett Parks Master Plan: staff presented the adopted master plan, with an initial engineering estimate of $12 million for the improvements. No funding request was made, and the item was informational.
- Parks Recreation Open Space Master Plan Update: cost recovery has risen to 40.5% of a roughly $18 million operating budget, up from 37% and 32% in earlier years, with expanded swim lessons at Moana Springs Pool.
- Redevelopment Agency Property Plan FY2027: staff reviewed the seven parcels the agency owns outright, including the City Plaza parking lot of about 15,000 square feet. The board's one formal motion, on the plan, carried unanimously.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:05extended the window, the application
00:07window till October 16th. Uh so people
00:10have another week, week and a half uh to
00:12get those applications in. Um we did
00:16that just typically because when people
00:18start gathering their quotes and start
00:20putting their packages together, they
00:21usually need a little bit of extra time.
00:23So um but we're happy with what we've
00:25seen so far. uh existing restore
00:28projects. Uh these have come up in the
00:30past. Uh I'll just give some updates on
00:32those. Uh we expect to see scaffolding
00:34going up on the Bington building which
00:36is right on the corner of Virginia and
00:38Second Street here. Uh they've been
00:40giving their permits uh but they do
00:42believe that their scaffolding
00:44contractor should start going vertical
00:46uh to do the exterior improvements um
00:48October 12th is what I was told. Uh you
00:51may have noticed in Midtown on Virginia
00:53Street, uh the old Pinghorn accounting
00:56building is under construction for
00:58Michaels and Sons. They're doing a
00:59totally new facade and extending the
01:02building in the back. Uh that was a
01:04surprise to me as I was driving down
01:06Virginia Street the other day. Uh and
01:08then the Neon Museum, uh the Light
01:10Circus Neon Museum is very close to
01:12closing. They're uh opening, sorry. Uh
01:15they're closing on some final permitting
01:17uh and electrical issues, but it's the
01:19signs up. Um the lights are in. Uh it
01:22looks magical and we expect to
01:24participate in that grand opening fairly
01:27soon. Uh 521 Lake Street. At the last uh
01:32agency board meeting, uh 521 Lake
01:34Street's project was approved for TIF
01:37financing participation uh for 3.1
01:40million uh with the increment coming as
01:43well as a supplemental assistance. If
01:45RDA2 does get extended, that
01:47supplemental assistance stops and we
01:49would just keep uh
01:52reimbursing them to increment until our
01:54financial obligations met. Uh so thank
01:56you for your guidance on that. Uh the
01:59agency board also approved the
02:00resolutions for both the TIFF
02:02participation program and the catalyst
02:05uh project assistance program. Uh so
02:07those updates are all made. Uh you all
02:10sort of help draft those guidelines. And
02:12so we are in the process of updating the
02:15uh final guidebook document that'll get
02:17uploaded on the website as well as the
02:19application process. That way if anyone
02:21has questions on how the process works,
02:22we can kind of give that to them and
02:24it's pretty self-explanatory.
02:27Uh the next few ones, uh the Amtrak
02:30bathrooms are near completion. I would
02:32say they're done done. Uh but there are
02:34some small fine-tuning uh elements, but
02:37uh they it's it's done. So, thank you
02:40Dan Tresley uh for getting that done. Uh
02:43the dog park shade on uh Commercial Row
02:47over there is in design as well as the
02:49four street beastro lights uh going
02:52along from Evans all the way to Sutro.
02:54uh those are those ideas and designs are
02:56starting to come together. Uh the Lear
02:58project is delayed for the moment uh
03:01primarily due to some some lic licensing
03:04issues but we expect to see that come
03:06back.
03:08Uh the parking gallery we have brought
03:10on a new parking operator called Pro
03:12Park at the parking gallery. They
03:14started taking over operations September
03:161st. They've done some painting. uh
03:18they've transitioned over to some new um
03:21software to help manage monthly parking
03:24accounts. So now if you're a monthly
03:25parker, you can manage your own account
03:26online. You don't have to actually go to
03:28the kiosk on the first floor uh to get
03:30your monthly parking permit. Um and
03:33we're working through some short-term uh
03:35improvements and just cleanliness over
03:36there as as they get ramped up. And then
03:40last uh on the city side uh 264 Keystone
03:43which is the building on uh Keystone and
03:46Vine uh the city put that off for RFP
03:49proposals have been received and that
03:52those will come back November for 4th at
03:55the city council meeting to uh select an
03:57awardee uh to dispose of that property
04:00and it is in RDA uh one so that's kind
04:04of [clears throat] relative to these
04:05discussions
04:06>> and that is all I have as a review
04:08committee. done.
04:10>> Sorry, Curt Stitzer for the record. Has
04:11the review committee done any like
04:14scoring on that or is that still under
04:17under way?
04:19>> Nope. The committee has done uh the
04:21scoring. Uh we're drafting the staff
04:23reports and the staff report will have
04:25the total average scores. Uh staff won't
04:29be making a recommendation to select one
04:31project over another. We're just uh
04:33going to show the scores and allow
04:36council members to review those and
04:38engage with the proposers uh on the
04:42appropriate path forward.
04:47>> Any other questions for Brian?
04:51>> Mr. Chair, can I note something for the
04:53record? Apologize. Thank you.
04:55>> Ashley Turn city manager for the record.
04:57Just noting for those watching and Judy,
05:00just for you to know, we had some
05:01technical issues at the beginning. So,
05:03just wanted to note for the record, we
05:04do have a quorum present. Uh, attendance
05:07has been logged accordingly in the
05:09minutes because Judy got that and we had
05:11no public comment in person.
05:14>> Thank you, Mr. Chair.
05:15>> You're welcome.
05:16>> All right, let's move on to B3,
05:18presentation, discussion of the trekking
05:20river vision plan.
05:23>> Mr. Chair, Brian Mardo, revitalization
05:25manager. Um, I'm going to go through and
05:28quickly summarize uh the Chucky River
05:31vision plan that was completed in 2023
05:34that covers 17 miles of uh city of Reno
05:38riverfront as well as Washa County. And
05:40I'll note that Washa County did
05:41participate in funding of this plan. So,
05:43it's kind of both a city of Reno and a
05:45county plan. Um,
05:48it is a lot of slides, but I'm gonna fly
05:50through them fairly quickly.
05:54and Netty Alario, I just want to
05:56comment. Thank you so much for the great
05:58provision of that because it really gave
06:02um a wonderful sense of the history of
06:04us trying to use our assets to their
06:07best asset class.
06:09>> Thank you. Well, I'll mention that uh
06:12almost every downtown study or plan for
06:14the past 40 years has mentioned that the
06:17river should be a core asset. Uh but
06:20it's never been addressed independently.
06:23Uh, a lot of previous plans that I can
06:25get to have have mentioned the river,
06:27but when they talk about the river, it's
06:29usually the quality of the river and the
06:31river water itself. There's never been
06:33sort of a focus on I would say
06:35riverfront development and activity. And
06:37this is what this plan attempted to do.
06:43So, how the plan is organized? So, the
06:44first one was uh safety, water and
06:46ecological systems. First and foremost,
06:48we didn't want to um make any changes to
06:51the river in its form, function, and
06:53safety. Uh the next one was how we treat
06:55land use along the river and the design
06:58of those spaces. Third one is parks and
07:01open space primarily uh maintenance and
07:03as well as oversight of the of the river
07:05going forward. Uh mobility and
07:08connectivity because it is a a bike lane
07:10and a walking path. uh making sure that
07:12people have the ability to get around
07:14and then including public art was the
07:16last uh pillar of plan.
07:21>> Okay,
07:23>> do that. Um just on how the plan is
07:26organized. So it is 17 miles. It starts
07:29at the California border through Verdi.
07:32We've treated that as a the rural
07:33section. If you go from I would say
07:36Mayberry Park all the way to uh just
07:39past Idle Wild that is called Reno West.
07:41Uh primarily single family homes are
07:43along those river sections. Then you get
07:46into downtown uh that goes from I
07:48believe Booth Street all the way to uh
07:51we'll say um
07:54second Street Ballpark and then left is
07:57East Reno that goes from Broadhead Park
08:00all the way to Mil Street through um
08:04through uh yeah to the Spark City
08:07border. Um primarily that's mostly
08:09industrial and some some actual
08:12riverfront space.
08:15So there had been a lot of plans none in
08:17the past uh and as I mentioned none of
08:20them really gave direction on how to
08:22treat the river frontage. Most of them
08:24focused on uh water quality and sort of
08:27the environmental factors of the river
08:30itself.
08:32Uh but our consultant dig studios did go
08:34through and incorporate they went
08:35through every possible plan and sort of
08:37summarize every sort of design
08:39improvement or recommendation from those
08:41past plans. It's a lot, but they are
08:43colorcoded in depending on which plan
08:45said what. Uh, but they consolidated all
08:47those things. Uh, we didn't want to
08:49recreate the the wheel. Uh, and they
08:51incorporated some of those
08:53recommendations into the plan.
08:56Next, uh, we did go out to the
08:58community. The campaign was called
08:59SpeakUpy for the Chucky. Uh, and since
09:03in my time being here, it's probably the
09:05most engagement we've ever received on a
09:07campaign. We had over 30,000 people
09:09engaged. Uh there was a survey, but
09:11there was also an interactive map where
09:13you could go and you could pinpoint
09:14something you like or dislike about the
09:16river. Uh and so it was all interactive.
09:18So you could tell, you know, the path is
09:21broken here or I really love this part.
09:23And a lot of people engage with that.
09:25The three main things that came up are
09:27cleanliness and aesthetics, safety, and
09:29then the connectivity of the river trail
09:31itself.
09:33Uh so after that, the goals started to
09:35materialize. We want to encourage a
09:37clean and safe river. Prioritize the
09:39ecological function. Uh treat the river
09:41as a as a recreational asset.
09:45Plan for consistency of design and
09:47maintenance. What we wanted to say is
09:48once somebody engages the river, whether
09:50they go east or west, they should have
09:52sort of like a uniform experience. It
09:53shouldn't be broken up or u
09:55disconnected. And then making sure that
09:57it's a connected river so that they can
09:59sort of utilize the river uh throughout
10:02its throughout its course.
10:05So recommending what the plan said.
10:07First one enhancing ecology and safety.
10:12First one was uh recommendation was to
10:14provide uh setbacks and buffer access
10:16from the river. Uh some parts along our
10:18river it is very tight where we allow
10:20property lines to come up directly to
10:21the river bank and some of those saw
10:23development that close. So one of the
10:26recommendations to give us ourselves a
10:27little bit more breathing room and the
10:29ability to uh provide a little bit more
10:32access along the riverfront.
10:36Next one was to provide consistent uh
10:38lighting um envir environmentally and
10:41ecological sensitive lighting. Uh so we
10:44have a couple different light poles but
10:45these were actually installed uh going
10:47east there are solar light poles. We
10:51have the traditional light poles right
10:52downtown and I will say that um along
10:55the Riverside Drive uh also received new
10:58light poles. And just for clarification,
11:01we are not installing palm trees.
11:04>> No, no,
11:05>> actually that those aren't the ones
11:06those are the poles that were installed,
11:08but those aren't actually the ones that
11:10were installed. Uh yeah, good point.
11:14Um next one was uh managing vegetation.
11:18There's a lot of comments of the
11:19overgrowth along the river and how it is
11:22not the real safety is perceived safety
11:24along the river mainly due to areas that
11:26you cannot see in a lot of places where
11:30um maybe the overgrowth provides line of
11:33sight. Uh we call it septed kind
11:35prevention through environmental design.
11:37Uh that is the area along museum drive.
11:40And so one of those things is to make
11:42remove the overgrowth and vegetation in
11:44invasive species river.
11:49Uh and then last one was just to have a
11:51standardized site furniture package
11:53where I said where whether you go east
11:55or west it kind of feels like there's a
11:56cohesive design that include benches,
11:59trash cans, uh way stations, a lot of
12:02the materials, a lot of things like
12:04that.
12:07And then the last one on uh water
12:09quality and safety. We noticed through a
12:11lot of surveys that there are a lot of
12:14hazards in the river. There are some old
12:16dams that they just demolish them and
12:18let all the concrete uh sit there. There
12:21are some areas where you have to exit
12:22the river um to get around those
12:24obstacles as well as like rebar and some
12:27other things. And so when we when we say
12:29we want to use the river as a
12:30recreation, there is some cleanup we
12:32have to do just on uh former debris and
12:36you know safety hazards. Yes.
12:42Next one is uh promoting great
12:43neighborhoods.
12:47First recommendation was to create a
12:50overlay zone. Uh this would be 200 ft
12:52north and south of the river. If if you
12:54have a parcel that touches within that
12:57200 ft, you would be um susceptible to
13:00current design and maintenance
13:01standards, a different sort of zoning
13:03overlay, uh setback requirements, things
13:06like that. There are some riverfront
13:09codes in currently in code, uh but
13:12they're not that expansive. So what the
13:14proposal was is to create an entire
13:16overlay zone that really d drills down
13:18into the materials, the lighting, the
13:21setbacks, uh the landscaping, things
13:23like that.
13:26Um when asked uh through the survey
13:29whether you think that the city should
13:31have tools to regulate river
13:32development, 79% of people said that is
13:35important. I don't think you ever get a
13:37response that high. Uh and then people
13:40say uh 50% of people said that we should
13:43use uh economic development incentive
13:45tools to uh facilitate riverfront
13:48development and then 28% of the people
13:49had no opinion whatsoever. Uh
13:54when looking at some of those design
13:56standards, uh there were recommendations
13:58on how you mass buildings. So don't put
14:00very tall buildings right on the front.
14:02You want to set those back off the
14:04river. uh they call those point towers
14:06where the front is short but the back
14:08end is is much taller. Uh materials and
14:11design that can be sort of the materials
14:13they put on the buildings, the type of
14:15sighting, type of lighting, etc. Um
14:19access and parking was one. Uh no
14:21parking structures on the riverfront,
14:22you have to push those back.
14:25or development that is along the river.
14:26They propose a lot of like they call
14:28them Texas rafts where you do the
14:30parking structure and then do the
14:31housing around the exterior so you can't
14:34actually see the parking structure.
14:36Connectivity and open spaces. You'll see
14:38a lot of the lines of site are
14:40perpendicular to the riverfront. That
14:42way every path sort of leads its way to
14:45the riverfront. And then just focusing
14:47on green infrastructure as well as more
14:49trees, landscaping, lighting.
14:54Uh public parks and public spaces were
14:56the next one.
14:58Uh this one uh our parks director Nathan
15:02Oya will kind of highlight this, but one
15:04of the recommendations was to establish
15:06the truck uh parks district, but also um
15:09inside the parks district have sort of a
15:12highlight of how the Truckucky River
15:13gets gets managed. This would provide
15:16for the long-term management and funding
15:17needed to maintain uh the river and all
15:20the new nice stuff that's going to go
15:21along it.
15:24They did give an example of the three
15:26Rivers Parks District
15:29Rivers.
15:31It might have been Fort Wayne.
15:33>> Was Fort Wayne on the Mississippi. Okay.
15:35Anyways, um similar to how the bid
15:38operates, uh they kind of have this
15:40parks district that manages the trails,
15:42manages, uh the recreation of using
15:45those spaces, does some programming, and
15:47also manages uh all the natural
15:50resources along that area.
15:53And then they recommended the redesign
15:55of some key parks and plazas all the way
15:57through the river. to actually go
15:59through this quite expansively and give
16:01proposed recommendations to every park
16:03and plaza, not only city of Reno in the
16:05county. Uh the one on the left is
16:07obviously city plaza. We've seen a lot
16:09of design proposals here. The middle,
16:11one in the middle for West Street Plaza,
16:14uh right by Winko Park. And then the
16:17last one is
16:21a former RDA project. It's the prominade
16:23in front of the Eddi and Wild River
16:26Grill. uh they recommended be
16:27reveitating that area and doing these
16:29sort of canal lever lookout paths right
16:32there.
16:35So an example, this was West Plaza uh
16:38three years ago before it uh saw a lot
16:40of the tactical design improvements that
16:42that have been done with ARPA funding.
16:45Next,
16:48this is the proposed design where you um
16:52flatten the space, add some activation
16:54kiosks, add a little bit more
16:56landscaping, uh making a making it a
16:59little bit more modular, and then adding
17:00a plaza up in the upper right hand
17:02corner.
17:06Uh this is that prominade that I
17:08mentioned. This was a past redevelopment
17:10agency project.
17:14As I mentioned, they recommended
17:15removing all that, reveating it, doing
17:18uh can levered lookout areas. Next
17:20slide.
17:23This is the area in front of the post
17:25office. Uh when the post office was
17:28owned by the RDA briefly, there were a
17:30lot of design recommendations that this
17:32not be a parking lot, that this be some
17:33sort of plaza to marry uh marry and be
17:38designed with uh the city plaza across
17:40the way so that both areas kind of enter
17:43into the river. The next slide.
17:46This area was proposed as sort of like a
17:48flexed plaza um with new pathway going
17:51through that uh and some temporary
17:54seating and an activation retail
17:57[clears throat] activation space.
18:01Last one is city plaza as as it is
18:03currently. Uh
18:07and this is the proposed redesign. A lot
18:09of shade. Uh shade was the one thing
18:12that was notice noted when when thinking
18:14about redesigning city plaza, keeping
18:18the believe sign, keeping the space
18:20whale, keeping the uh the tree that is
18:23used for Christmas tree lighting, but
18:25also keeping it uh as a plaza so you can
18:28add a lot of people to that space. Also
18:30doing some amenities for uh children um
18:33possibly some play structures. And
18:38there's no splash pad on there. Yes. All
18:41right. Next slide. Uh that's just
18:44another rendering of that redesign.
18:48And the last was uh and this was in our
18:50CIP plan that you all saw was doing some
18:53park improvements to Broadhead and John
18:55Champion Park as we go east. That is
18:57something that could be included in
18:58phases two and three of the riverfront
19:00development is improving those parks.
19:03not a redo of those parks, but just
19:05adding some play elements.
19:10Last one. Uh this is the same massing
19:12recommendation, but if you notice, this
19:14is um the area of where waste management
19:16currently is along the river and the
19:18city's corpyard. On the tail east end is
19:21uh the existing fisherman's park. Uh so
19:24some recommendations to expand
19:26fisherman's park along the river right
19:28there.
19:31Uh, as I mentioned, every single park
19:32along the river has recommendations for
19:35improvements. Next slide.
19:38And, uh, second to last is creating
19:41connectivity. You'll notice that this
19:43pathway right behind the auto museum is
19:45really bad. That is why it's going under
19:47construction in the spring.
19:51Um, in the plan, thank you. in the plan.
19:54Uh towards the end, you'll notice that
19:56there's um you can pinpoint every
19:58proposed design change uh throughout the
20:01plan, whether it's an art element, uh
20:04something needing improvement, uh
20:06pedestrian improvements,
20:08design changes, things like that. So, it
20:10really is sort of like a just a guide
20:13book to say if you want to do something,
20:15this is where we propose you do it.
20:18Last one is uh recommending pathway
20:21changes. So this is the uh rural area u
20:24where it would be a softer pathway uh
20:27wide enough for for bikes and
20:29pedestrians with permeable shoulders and
20:32some improvements on bike infrastructure
20:34and seating and wayfinding.
20:37This is the area along Riverside Drive.
20:39It already has seen some improvements
20:41lately. Uh it does have that river uh
20:44retaining wall. This would be the
20:46redesign of that where you actually uh
20:49create a separate biking path along with
20:52the riverfront trail path that's more
20:55for pedestrians and then doing some some
20:57landscaping and some permal
21:00areas there. Uh as you get to downtown
21:04proper where we have the flood wall
21:05area, you would expand that, make it a
21:08little bit uh wider. also doing some
21:10different design materials on the ground
21:13with permeable pavers and possibly some
21:14art elements.
21:17Then this is the area behind the auto
21:19museum that is really bad. This asphalt
21:21is crumbling uh which creates a hazard
21:24but also is crumbling right into the
21:26river. And so part of that design was a
21:29canal lever trail because the area
21:32between the auto museum uh and the
21:34riverbank is so narrow that the design
21:37the initial design recommendation was
21:39canal lever trail. Fortunately the auto
21:41museum has worked with us to give um a
21:43little bit more space back. So we're
21:45going to be uh moving into their
21:47existing plaza. uh that saved us a lot
21:50of time and effort and money especially
21:53uh so that we don't have to do no longer
21:54have to do a can lever path.
21:58Last one on that is to devel develop a
22:00blueway plan. I love this idea. Uh it's
22:03sort of like wayfinding if you were in
22:05the river. So if you were tubing down
22:07the river, kayaking, swimming along the
22:09river, um how would you orient yourself
22:12if you were on the river itself? So if
22:14you're tubing, it would say, you know,
22:16this street is here, you're here, get
22:18out here, there's something else
22:19approaching, uh here's where to exit the
22:22river, etc. It is a wayfinding from uh
22:25the river being in the river primarily.
22:30Last is public art. Uh there's sort of
22:33some different levels of public art. One
22:35was to create an icon or symbol for the
22:37whole entire river utilizing art for
22:40trail white finding. Functional art was
22:42one that was mentioned. Uh using art to
22:45promote safety and discovery of elements
22:48and then moving the belief sign so that
22:50it doesn't block the the view of the
22:52river. But this is something I really
22:55liked. If you break out art into
22:58different uh categories, the first one
22:59is iconic. It's a big statement piece.
23:02It's likely to stay there forever. We
23:04would say the space oil is one of those.
23:06Temporary art can be a mural, something
23:08that uh is placed uh or moves around per
23:12for a bit. Uh a mural is one discovery
23:15is, you know, artwork that has some
23:18connection to where it's placed. And
23:20last one is functional, turning bike
23:22racks and benches into art.
23:26And again, that plan has every single
23:28art recommendation, the entire scope
23:30scope of the river. Last one is now that
23:33the plan is done, how do we implement
23:35it? Um the dig studios went through and
23:39created a matrix on funding, priority,
23:42cost, etc. It's kind of really nice how
23:44they did it. We have incorporated all of
23:47this into our CIP planning based on what
23:49needs to be done immediately, uh the
23:51cost to do it, and who is the lead
23:53agency to to get that done. Uh so those
23:56all those recommendations have been
23:58included in that master CI CIP list that
24:01we showed you. Uh so the plan's been
24:04adopted. Um we used ARPA funding to
24:07kickstart a lot of these projects.
24:09Improvements to West Street Plaza was
24:11funded. Uh the wayfinding signs, trash
24:13cans, as well as the design of the river
24:16path, phase one river was designed using
24:19ARPA funds, but it is the RDA that's
24:21going to come in to pay for the
24:22improvements. uh creating a service plan
24:25uh for future parks district. Uh the
24:27idea of doing an overlay zone. Um no
24:30progress has been made on that, but
24:31we're all aware that that is uh likely
24:33needed in the future. And then a funding
24:35plan for these things.
24:38I just want to show you what has been
24:39done since this plan was completed. Uh
24:41we worked with Dig Studios and using
24:44ARPA funds uh to redesign West Street
24:47Plaza. This was the rendering of that
24:49site and this is how it turned out. Very
24:52rarely do you get renderings that turn
24:54out exactly or projects that turn out
24:56exactly like the rendering, but this
24:57came really really close. Uh this has
25:00been a success. It has been programmed
25:02with also on the river. Um what are the
25:06programs?
25:07>> Phil by the river.
25:08>> Uh yeah, Harmony on the river, the Phil
25:09Harmonic playing in the space. Uh this
25:12was a problem area that just kind of had
25:14a lot of transients uh lingering all
25:15day. It is nice to see it naturally
25:17activated now throughout the day. You'll
25:19see a lot of residents downtown just
25:21utilizing the space. It's really nice.
25:27There's agreeing to that. Uh through
25:29ARPA funding, uh you'll see from Boost
25:31Street all the way to Broadhead new
25:33trash cans that are branded as the
25:35Riverwalk as well as Riverside Drive did
25:37receive some new lighting light poles.
25:41Uh and the next one is the phase one of
25:43the uh riverfront from Lake Street to
25:46Broadhead Park. You may be seeing some
25:48of these renderings uh for the first
25:50time, but this is uh the new experience
25:53proposed that will go under construction
25:55in the spring. This is the intersection
25:57of Lake Street right by the audi museum.
26:00That is that expanded path. So, no
26:02longer do we have to do a canal levered
26:04path. The fencing for the auto museum is
26:07moving back and we have enough room to
26:08do the improvements there as well as put
26:10in a new fence.
26:13This is Museum Drive. uh that'll get
26:16some improvements as well as some way
26:17finding and a statement art piece.
26:22The path that is the historic bridge.
26:25What bridge was that?
26:28Was it Hulkcom that went? It's the old
26:31It's the old
26:33frame path that used to go up to
26:34Virginia City. So, that's a historic
26:36landmark.
26:37>> You'll notice as the river goes down, it
26:39goes below the 100red-year flood plane.
26:41So, there's minimum improvements we can
26:43do in this area. uh but it will get
26:45rellandscaped. There will be new
26:47lighting.
26:49Those red and blue lines are the
26:51existing blood levels just to um get
26:55aware. There is a a light image there of
26:58what the ex this is the area behind the
27:00former police station. There is an
27:02existing retaining wall. What is being
27:04proposed is that gets removed and it
27:06gets uh graded back with a bunch of
27:08landscaping and instead of those steps
27:10that go up to Second Street, uh this
27:13will have a meandering path that
27:15connects um to that area. That's it from
27:18looking at the old police station down
27:20into the river with some waying signs.
27:23And then last is Broadhead Park. Uh that
27:26improvement was with Renown and the
27:28parks department. So that actually
27:30exercise structure is there but there is
27:33improvements to lighting path design
27:36that
27:38I got through 68 slides as fast as I
27:40could. Uh and
27:43the the plan is quite robust extensive
27:46encourage you to look through this. We
27:48do have some hardbound copies not
27:50hardbound but bound copies if anyone
27:52does want to see those. Um, they're few
27:54and far between, but happy to lend them
27:56out to anyone that wants to see them.
27:58And I'm happy to answer any questions
28:00related to that plan.
28:02>> Do you need any cooperation from Washo
28:04County because portions of the river,
28:06especially west, are in their
28:07jurisdiction?
28:08>> Uh, yeah, that's a really good question.
28:10Um,
28:12we we will need cooperation. I imagine
28:14at some point there needs to be a
28:16concerted effort between not only the
28:18redevelopment agency but also the city
28:20parks and county because this is a plan
28:23that covers 17 miles of the river. Uh
28:25and there there needs to be a lot more
28:27coordination if we're going to see this
28:29plan sort of be put into effect all the
28:31way from the Spark City line to
28:32California border. Uh there is some
28:35discussion that uh we don't want to push
28:37people as you go west uh you get pushed
28:40onto Mayberry Drive with cars going 50
28:42miles an hour mainly because we let
28:44single family homes be built right up to
28:46the river. Uh but there is a possibility
28:49that you could get people to the north
28:51side of the river with a a bridge or two
28:53and work with NB Energy Tumbla and the
28:56railroad to do a new north path that
28:58would connect you to uh Darkstar Park.
29:01That way you never have to leave the
29:03river. And with improvements from
29:06through Mogul and Very, there is an
29:07opportunity where you could stay along
29:08the river the entire pathway.
29:10>> Not through my backyard.
29:14>> Well, we'd be on the different side of
29:15that, Kirk. But yeah. Um, so that would
29:19be uh the plan is to make sure that
29:21people have again a unified experience
29:24if they want to experience the river.
29:26>> The park district contemplated to be a
29:28regional park district ultimately. Yes,
29:31actually to answer that question, it
29:32would be much easier once a parks
29:34district are created. That way you're
29:35not dealing with city or county proper.
29:37Uh you would have an entity that kind of
29:39takes responsibility of of achieving
29:41that vision all the way through as well
29:42as the overlay zone would give some
29:45additional tools.
29:46>> Any funding required from or
29:49contemplated from the redevelopment
29:50agency right now?
29:53Yeah, everything that was inside uh
29:56everything in the implementation
29:57[clears throat] plan that is inside RDA
29:59was included in our sort of master CIP
30:02planning process because RDA2 has the
30:04funds at the moment. The idea is to do
30:06phase one is what's going under
30:08construction in the spring. And then
30:09phase two and three would get us all the
30:11way to uh about GSR um through RDA2. So
30:16you would have going east from Lake
30:19Street a brand new improved and
30:21consistently designed uh riverfront. Uh
30:24as RDA1 improvements come online or uh
30:28funding comes online uh as I mentioned
30:30it could be uh river path improvements
30:33and then plaza improvements. Uh one
30:35thing that wasn't in this plan that
30:36Nathan will cover is improvements to
30:38Barbara Bennett in Park that are
30:40proposed. Um unfortunately ID wild isn't
30:44in RDA1 but there their suggestion
30:47improvements style well area as well.
30:50>> Now the elevio um
30:53you know we've especially in the
30:55downtown area um there have been as we
30:58know you know a lot of different plans
31:00and a lot of attempts to make the spaces
31:02that we have the concrete spaces be
31:05really utilitarian and welcoming. And
31:08across the board, a big issue has always
31:11been shade.
31:13>> And um and I, you know, I remember one
31:16of the plans um that for uh Believe
31:20Plaza before it was Believe Plaza that
31:23incorporated um what what we saw
31:26illustrated there in a really wonderful
31:28shade structure, but it was so expensive
31:31at the time that it's just like, okay,
31:33we'll do this and not that. And um that
31:37I think has continued to be a challenge
31:40with the real genuine utilization of
31:42that to really have a good experience
31:45there. Brick Park, you know, now
31:48referred to as West Street Plaza, but
31:50Brick Park was so hot that nobody could
31:54use it. You couldn't do events there.
31:56You couldn't have a dance concert. You
31:59couldn't do anything because it was just
32:01so hot. And so this new you know um uh
32:06small um shade structure there has been
32:09really really helpful. So um and and on
32:14top of that we know that recently um
32:16Reno was laed as being the fastest
32:20elevating in temperature of any city in
32:23the US. And so when I look at that, I
32:26think um about our our priorities in in
32:30where our money goes to do um work on
32:33this that um you know, we only have so
32:37much money and we have a lot to do and a
32:39lot of opportunities to make this really
32:42great, but if we don't address shade, I
32:45think it'll still be more of the same.
32:47It's like, oh, great idea, but
32:50>> So, Mr. Chair, if I may respond to that,
32:53Ashley attorney, city manager for the
32:55record. That's part of why uh staff will
32:57be bringing you each of these plans over
32:59the next several months is to really set
33:01the table for your CIP conversation that
33:03will happen after the first of the year.
33:05>> Yeah.
33:05>> Um to your point, uh one your question
33:08of RDA funding. So, this board made a
33:11recommendation of funding phase one of
33:14the river project, which is $6 million,
33:16and then funding designs for phase two
33:18and three that was approved in this
33:20budget cycle. So that is $7.2 million of
33:24RDA2 funding that is in this current
33:26year being expended. Uh we anticipate
33:28bringing you in next year's CIP plan a
33:31request to fund construction for phases
33:342 and three. That will be another 12 to
33:3715 million depending on how budget
33:39shakes out. Um and then with believe as
33:43we know the space is heavily utilized
33:46but it could be more so if we had shape
33:49uh the anticipated numbers of redoing
33:51believe plaza are somewhere around the
33:53$20 million mark is what we've seen give
33:55or take depending on how expensive you
33:57want to go. So there will be a
33:58conversation for this board. Do you want
34:01to do smaller tactical improvements like
34:03we've seen at West Street for a few
34:05million or is the decision to save four
34:10or five years of increment as we know
34:12we're looking at about $5 million in
34:14increment a year coming in downtown for
34:15RDA1. Do you set aside four or five
34:18years in order to do something larger in
34:20belief plaza? So those are some of the
34:22conversations um that we'll be bringing
34:25you in your CIP process. Any
34:29questions online for staff?
34:36>> I've got a question. Oh, go ahead,
34:39Taylor.
34:42>> Oh, no. I was just saying no questions.
34:44I'm good. Sorry.
34:45>> Okay. [clears throat]
34:46Kurt
34:47>> Kurt Stitzer for the record. So, as we
34:48look at the different zones, if you
34:50will, right? Rural
34:52neighborhood, downtown, industrial to
34:56the east. Do we have a prioritization of
35:00how money would be rolled out?
35:03Are we going east first, then west? Are
35:05we going downtown, then the
35:07neighborhood, then east, then west? Like
35:09what's do we have a plan for that? Is
35:11there is that part of this
35:14strategy or is it just kind of as we get
35:16money, we see what the next priority
35:18project is?
35:20>> Yeah. to uh assist city manager Ashley
35:22Turn's point um RDA2 does have the
35:26funding available and so the priority in
35:28the action that you all have sort of um
35:32recommended is uh going east with RDA2
35:36funds and supporting phase one
35:38construction, phase two and three design
35:40and then this year we'll be asking for
35:41phase two and three construction.
35:43That'll take everything going east to at
35:45least GSR. Uh but then you get into
35:48flood authority land and you also get
35:50out of RDA's uh areas. Um so that kind
35:54of priorit prioritization wise uh those
35:58are the things that have been approved
35:59that we have the funding for. When you
36:01start to look at downtown which is
36:03redevelopment area one uh the
36:05limitations there and the priority is
36:06mainly funding. Uh so either
36:09uh you reserve some funds to do the big
36:12projects or you start to do a little bit
36:14more tactical improvements uh with the
36:16funds that you do have. The challenge
36:18going west is you start to get into city
36:21of Reno um areas. Uh that'll be based on
36:25the city of Reno's budget and then you
36:26start getting into county uh and then
36:29county's budget. Uh so in the impro
36:31implementation plan there are
36:33recommendations and the highest
36:34priorities from do it now uh and costs.
36:37So you can go through that.
36:40Are those conversations happening? Maybe
36:42not. Uh but with a parks district
36:45conversation, those could likely start
36:47picking back up.
36:49>> And the city of Reno doesn't have in
36:53their current budget
36:56the money to start allocating to this.
36:58they've got other issues, right? So,
37:00like are we just talking and focusing on
37:03the areas within RDA 1 and two and this
37:06is just another plan further east and
37:09further west that will likely get
37:11mothballled or what's what's the
37:13likelihood that this comes together
37:16because I mean I can see eminent domain
37:19lawsuits. I can see Carson Truckucky
37:22Water Conservation District issues. I
37:25can see the new flood plane that FEMA is
37:28adopting that should have been adopted
37:30by now but still hasn't been um that's
37:34changing flood planes for the worst not
37:36better through the Truckucky River
37:38corridor making improvements that much
37:41more expensive or completely unviable
37:43along the banks of the Truckucky River.
37:45Um like how are we how are we addressing
37:47that or are we just as RDA saying we're
37:50focused on RDA?
37:52So, I can speak to that. Ashley J
37:54assistant city manager for the record.
37:56Yes, is the answer to all of that. Um,
37:59ultimately this body's oversight and
38:02authority and recommendation is to the
38:04RDA which can only control where RDA
38:07boundaries touch. And so, we are
38:10bringing forward items that are in
38:12executable plans that we have the
38:14authority based off of geography. We
38:17understand that there is a massive gap.
38:19As uh Brian mentioned, this plan covers
38:2217 miles. Of that 17 miles, RDA only
38:25covers five maybe.
38:28>> Um so we understand that there are 10
38:30[snorts] plus miles of area that we have
38:33no authority nor funding that we can
38:34help with. Um I think that is part of
38:38the importance of a larger policy
38:40conversation happening with the elected
38:42bodies on the importance of a parks
38:44district. There have been some
38:46additional understandings that we found
38:48that parks districts can be created.
38:50However, they can only pay for capital
38:52improvements. They can't pay for
38:54maintenance. And so that puts us in the
38:56same issue where we are with RDA. We can
38:59create it, but we can't take care of it,
39:00which doesn't help governing bodies on
39:02the go forward. So, you're not wrong,
39:06Kirk, that there needs to be a wider,
39:09longer term solution, but it ultimately
39:11comes down to funding and then authority
39:14of which we lack outside our borders.
39:20>> Okay.
39:23>> Anyone else online have any questions
39:26for staff or comments?
39:32I see. And I'll just close with I I
39:34think the river is a huge asset. It's
39:36probably from everybody. It's I see what
39:38Boise does with their standpoint versus
39:40what we do. So I think focusing on it is
39:43is a great idea.
39:46All right. Item four
39:50presentation onfield and Barbara Bennett
39:52Parks.
39:56>> It's a scroll. The first ones
40:00Nathan Elliot, parks and recreation
40:01director for the record.
40:06I mean, we have the scroll for me or
40:07does it work even?
40:09>> It should work.
40:10>> That's nice.
40:11>> You have all your coins activities, too.
40:15>> All right. Um, just a uh want to I'll
40:18make this a little more brief. spend a
40:19little more time on our parks recreation
40:21open space master plan which is the next
40:23item. But um we uh completed a master
40:27plan for Wingfield and Barbara Bennett
40:29Park which is uh obviously a key area
40:32for what we just observed in the the
40:34river in the downtown area. Um this was
40:37adopted by council in in 2025 after some
40:42lengthy input from the community. Um but
40:44there's those the three the three sort
40:46of um converging sections of of public
40:49space with uh brick and west brick
40:52Westery Plaza, Wingfield Park, and then
40:55Barbara Bennett Park um sort of all as
40:57this nexus point for downtown gathering,
41:00recreation, uh events, things like that.
41:02So um so this is the the results of that
41:05master plan. Um again it was completed a
41:07while ago so some of this is a little
41:09stale but um first want to talk about
41:12the vision uh the mass of why did we
41:15start with this as I kind of just
41:16explained um we wanted to make this area
41:18a regional uh destination as part of the
41:21Reno parks uh recreation and open space
41:24master plan is to make uh our parks in
41:26the Truckucky River corridor a regional
41:28destination and this is is sort of the
41:30epicenter of that. Queenfield Park,
41:33Barbara Bennett Park and and West Street
41:35Plaza along with the whitewater
41:37improvements that are in there. So, um
41:39so as it gets into that uh part of those
41:42these are again from the parks
41:43recreation open space master plan part
41:45of the implementation plan in that
41:46space. So that's where this uh vision is
41:49coming from.
41:52All right. Um, so as I'll get into some
41:54maps here in a second, but um, we have
41:58uh we settled on concept C which you'll
41:59see, but the the priorities that we
42:01could do in the meantime, sort of those
42:03tactical improvements that Brian
42:04mentioned in the other spaces, security
42:06and safety, adding lighting, cameras,
42:09um, improving our our visibility from
42:11trees and vegetation. Uh again, as we
42:15plant new trees, choosing trees that
42:16will create a better canopy and allow
42:18you to view through the park rather than
42:20have uh the low the low branches that
42:23will would block visuals. Um and then
42:26also removing other items that would
42:27obstruct views, walls, other structures,
42:29things like that. So that was a lot a
42:31lot of the philosophy and what was uh
42:34put in as a part of the design. Uh one
42:36of the key elements especially in
42:37Barbara Bennett is uh improving
42:39vehicular circulation. If you've ever
42:41been to Barber Bennett Park, it's sort
42:42of wild that you uh go in one way and
42:45then you go out this other uh this other
42:47side at a a different elevation, one
42:50lane, very limited visibility, things
42:51like that. So, um so improving that as
42:54well. Um obviously trees are very
42:58important uh not only to to our
43:01community but as a part of um our
43:03council and things like that. So, a big
43:05part of this plan is how do we keep our
43:06our big trees that provide shade and
43:09keep our spaces loved and usable. Um, so
43:11that's that's the why that information
43:13is added specifically is how it would be
43:15impacted. So, this was the map uh we
43:17settled on. So, um
43:20it's obviously difficult to see each
43:22number. So, I'll get a little bit
43:23closer. Uh is it easier for me to be
43:25over here so the online people can see?
43:26Is this the better spot?
43:28>> I think they're only seeing your
43:29presentation.
43:30>> Oh, they're only seeing see me.
43:32>> Put on a coat. Oh, well. [laughter]
43:36>> All right. Well, um either way,
43:39>> so the the biggest change that we need
43:40to look at here for Barbara Bennett,
43:42we'll start at the bottom. Um is is
43:44realigning the road. We have significant
43:46challenges of where the current roadway
43:48is along the north side of the park. Um
43:51so the the preferred proposals all
43:54included realigning the road through the
43:55middle of the park. So it creates a big
43:57challenge but it also creates we we
44:00believe is the best opportunity for for
44:02the space and creating connectivity for
44:05uh Winfield Park and all the way
44:06through. So now you have almost a
44:08festival level space between the three
44:11right rather than just what is almost um
44:15siloed or cut off space here where the
44:17only way to currently access is to come
44:19across the bridge and come in this way.
44:20Uh adds a pedestrian thing. Uh it has it
44:24would have a lot of sloping here that
44:26would add more space for the the river
44:28to be utilized and accessed from a
44:29recreational component. Um so those are
44:32some of the big things. We'd reduce some
44:33of the park elements um that are more of
44:36the neighborhood park side, but most of
44:38those elements would be included now on
44:40the south side of the road. So think of
44:41your neighborhood park down here. Think
44:43of this more general event and uh
44:46community gathering space uh north of
44:48the road that would go in. So, um,
44:51reimagine the courts. Right now, we have
44:53two side by side courts as you drive by
44:55on Arlington. U, this would allow the
44:58same amount of hoops but have, uh, take
45:00up less space and again allow the road
45:01to be realigned. We'd go down to to one
45:04tennis court, uh, probably shared use
45:07with pickle ball. U, this is a very
45:09flexible space. This I and O space could
45:12be dog park. It could just be open
45:15space. There could be playgrounds added.
45:17Uh we do imagine a play structure in
45:18this space too. So moving that to the
45:20other side of the road. Um improved
45:23public bathroom spaces that would serve
45:25as the public restrooms for um the
45:28majority of the space between the three.
45:30Right? We can't put restrooms in on the
45:32island. Um we can have water uh but not
45:35much else going in there from an
45:36infrastructure standpoint. So no
45:39bathrooms there. So we want to improve
45:40and move those closer to the river for
45:42our public restrooms.
45:45Okay. Okay. And then as you go to
45:46Wingfield or Wingfield,
45:48um the biggest change here would be we
45:51right now this this part of the park
45:53seems cut off from the road. So the big
45:55part is to move um the uh amphitheater
45:59from from what would be the uh western
46:01part of the east side to the uh eastern
46:04part of the east side. So that that
46:06really opens up the space and you can
46:08look both directions as you go into the
46:09park. Right now it's a huge brick wall.
46:11It's obviously dated. Um it's it's well
46:14utilized. It's well appreciated, but
46:15that's the big change in windfield. Not
46:18a lot of ability to uh build up or come
46:21out of the ground obviously from flood
46:22flood restrictions and things like that.
46:24So there would be a lot of process that
46:26would go into that. Um likely we would
46:28try to use sloping to create the
46:30seating. Uh right now that's limited
46:33impact. So we would be taking out we
46:35more and putting in more of a flat and
46:37flowth through design for for the
46:40amphitheater. This you can see at the
46:42point here adding some shade to your
46:44point. Netty, is that right? It's my
46:46grandma's name. So, um Netty, this would
46:50be an opportunity for for shade in
46:52what's a great space, great visual
46:54point. Awesome to watch the white water
46:56elements. Now, there's the new uh
46:59relatively functioning surf wave that's
47:01in there um that we're still working on,
47:03but uh to be able to to be a spectator
47:06and to observe that, to have art shows,
47:07to have um vendors, things like that,
47:10and be in the shade would be an
47:12opportunity there. And then, of course,
47:13as I mentioned before, the big
47:14pedestrian bridge that would connect the
47:16two spaces. Uh and really now you could
47:19look at an opportunity where there's a
47:21stage here, there's amphitheater here,
47:23stage here, there's something done at
47:24West Street. you're really starting to
47:25look at really a festival opportunity in
47:27that space.
47:29>> Nathan, I'm sorry. Could I ask you a
47:31question about the reorientation of the
47:34stage at Wingfield? Um if if the flip is
47:38from west to east, it means that the
47:42performers um if they are there from
47:44noon on have sun on them.
47:47>> Yeah, there is.
47:48>> Of course, until the sun goes down.
47:50>> Absolutely. Thanks for the question. And
47:52that was it was a point of contention
47:54especially for the Phil um and when it
47:56came to to the instruments and the
47:57instruments being in the sun before the
47:59sun would go down. Um and so part of the
48:01conversation there is what what do we do
48:03for the it's not unimportant but
48:07relatively few times that the fill would
48:08actually play. Um what can we do to
48:10modify for those few times whereas this
48:13would be uh a better user experience in
48:15most cases. And so how do we modify that
48:17from an overhang standpoint things like
48:19that? show times, understanding the
48:21study, how are our tree growths going to
48:23impact when the sun would go down and
48:25things like that. So,
48:26>> well, and and may I just point out it's
48:28not only the fill um dancer, she's in
48:31the stage, they put down Marley and
48:33Marley gets boiling hot for the feet
48:35when the sun hits it like that.
48:38>> Fair point. Fair point. Absolutely.
48:40>> So, that was May I be Mr. Chair? This is
48:44Taylor Adams. Can I be recognized
48:45quickly?
48:46>> Yes, Taylor.
48:48I have to tell you where where I think
48:49all of these are great improvements. I
48:51struggle mightily to find how any of
48:53this qualifies as redevelopment. This is
48:55a this is a functioning park. Everything
48:57that you're talking about here sounds
48:59like a general fund capital improvement
49:01to me. I mean I you know I recognize
49:03you're optimizing an existing facility
49:05and you're trying to you're trying to
49:07you're trying to fit improvements into
49:08an existing facility, but what I can't
49:10find in my head on the river I got it.
49:12There are vast sections of the river
49:14that that desperately need
49:15redevelopment. But as it relates to what
49:18you're doing here, I'm struggling to
49:20find how this how this fits within our
49:22mission. Um because all of this seems to
49:25me just the work of of the park and
49:27recck department and the citycip
49:29um planning process. But I'm I'm I'm
49:32happy to hear more and I think this is a
49:33great plan, but I struggle to see how it
49:36how this directly fits within the
49:38redevelopment bucket given the limited
49:40resources we have.
49:43So, I don't know if Ashley or Brian, you
49:45want to mention that, but uh this I
49:47think the intent that I was uh asked to
49:49come here was to talk about the
49:50different plans that are in place along
49:52the river and in downtown uh to see how
49:54those tie together. I think that's
49:56that's the overall thing what we're
49:58trying to accomplish.
49:59>> So, member Adams, I
50:00>> Yeah. So, if it's if it's your position
50:02that these do better fit within the
50:04city's budgeting process than is a CIP,
50:06then then then I'm happy to hear the
50:08plan. But if if the thought was this
50:10would come forward for redevelopment
50:11funds, I'm just I'm uh uh I'm just sh
50:14I'm just sharing my opinion on that.
50:17>> Thank you for that. Member Adams, Ashley
50:19Attorney, assistant city manager for the
50:20record. Um this item as well as B5 were
50:24requested by member Robertson in a
50:29previous item. Uh he had asked for pros
50:31plan updates and then updates as these
50:33relate into the parks district. So, you
50:37are absolutely not off in questioning if
50:40this should be a general fund item. Uh,
50:42the RDA has looked at some improvements.
50:44We brought forward the river east
50:47because we do believe that there's
50:49opportunity for redevelopment to come
50:51from those improvements once that part
50:53of the path is improved. Um, so these
50:56are on here because you got a member,
50:57but you are not wrong in your approach.
51:00>> There's no specific funding request
51:02right now.
51:02>> No.
51:03>> Perfect. And by the way, that context is
51:05is incredibly helpful. And also, I'm I'm
51:07willing to say going back to member um
51:09Oliviverio's point, I do think
51:12performance spaces that enhance the
51:13broader district absolutely are within
51:15bounds for us to discuss, but but
51:18looking at sort of the looking at park
51:20buildout uh in existing parks that I was
51:22struggling to get there. That context
51:23from the deputy city manager helps me or
51:25excuse me, assistant city manager helps
51:27me considerably. Thank you so much.
51:30>> Yeah, thank you for the question. And I
51:32think as we get into more of the park
51:34district discussion and I'll I'll give a
51:36little bit update on that in the next
51:37item. Um I think that that's really the
51:40answer um member Adams for the uh for
51:43the opportunity to improve and create
51:46better park spaces whether it's in the
51:48RDA along the river in the county in
51:50Sparks. Um that's really uh the
51:52opportunity for the public to say
51:54similar as uh it happened with the RDA
51:56creation u hey we want better here and
51:59we're willing to pay for it.
52:01Um, here's some zoom in on that. I could
52:03have got that probably a little bit
52:04faster, but there's the zoom in on
52:05wingfield. Um, you can kind of see where
52:08those elements are are from. The overall
52:11plan is, you know, uh, removing walls,
52:14things like that to to make it more
52:16visible.
52:18Uh, trying to save as many trees as
52:19possible. The shade's an awesome part of
52:21the spaces currently. We don't want to
52:23lose that. Hopefully, we would like to
52:25see the enhancement there. As you can
52:26see, a lot of new trees added in this M
52:29section to to try to help and get get
52:32tall um to to block as much of the sun
52:34as early as possible for performances.
52:39Visuals on field park amenities.
52:42There you can see sort of a terrace idea
52:44for um our seating. Obviously not a a
52:48brand new idea for for amphitheaters,
52:51but that's what we'd be looking at
52:52instead of what currently is a raised
52:54stage, more of a sunken and the water
52:56could flow out and over if there was
53:01u just some pictures. Uh
53:04Whitewater Park is something we're
53:06currently working on with uh some local
53:09folks who want to see it improved. Um
53:11we've had a very similar conversation.
53:13there is lot not a funding source to uh
53:16improve this space. So they are setting
53:18off on their own to try to uh to raise
53:20money. Um we've made it pretty clear
53:23that the RDA is not prioritizing a white
53:26water park as a part of the budget at
53:28this point. Um and to your point, member
53:32Adams uh probably shouldn't prioritize
53:34that ahead of the other items.
53:38So, I'm just going to flip through these
53:39relatively quickly to get to I think the
53:41bigger item, which is our recreation
53:43open space master plan. Uh, so here
53:45another zoom in on Barbara Bennett Park.
53:48Uh, O for flexibility in this space down
53:51here. Um, we would probably go back to
53:53the community at that point and and uh
53:56understand what the the need is. If we
53:58can get these things done, the road
54:00realigned, what would be the things that
54:02are currently there? Is there's no
54:03timeline for funding. We don't want to
54:05say, "Hey, O is definitely going to be
54:07this or that." when the community may
54:09not need it at that point.
54:15>> Yeah. Just some more visuals.
54:17There's the uh budget. Uh that's already
54:20a little stale, but uh 12 million is is
54:24what the initial uh engineering estimate
54:26was for the improvements across the
54:29three different parks, the Barbara
54:30Bennett Park, Wingfield Park, and
54:31Whitewater Park. Uh obviously that's not
54:34getting cheaper. So um we have we did
54:37include um the projects that were uh on
54:41the list in the overall and submitted
54:43them into the RDA uh budget for
54:46consideration uh as we did with
54:48Broadhead Park um John Champion Park and
54:51the parks that go through RDA2. So um
54:53they were submitted obviously all
54:55prioritized the list and council made
54:57selections. So, and I don't believe any
54:59of those were made for Barbara Bennett
55:00at this point for the whiteboard.
55:03Any questions on that one?
55:06Any questions online?
55:10All right. Thank you. Let's go to B5
55:13update on parks and recreation open
55:15space master plan. Again, this is kind
55:17of the same item. Uh Mr. Robertson's one
55:20this coming forward just for
55:21information.
55:22>> That is correct. He requested this for
55:23information and so we asked director
55:25Olad to give an update as this is a
55:28larger conversation and again lends to
55:30the policy conversation from this board
55:32of what if any improvements in these
55:35plans should the redevelopment agency be
55:37supporting. Obviously they create
55:40property tax that's something that this
55:42board is targeted with hitting.
55:44>> Okay. So I'll be using a presentation
55:46that uh we recently gave to council. One
55:48of the items um on our parks,
55:51recreation, open space master plan which
55:53was adopted in November of 2023, one of
55:57the items is to make sure we give
55:59updates on what we've accomplished. Um
56:01there was obviously concern and fair
56:03enough that a lot of plans get um
56:06presented, adopted, and then they just
56:08sit. So um we're committing to not doing
56:10that. So we have uh two out of two years
56:12provided an update to council and
56:14quarterly updates to the parks and
56:16recreation advisory board. Um so a
56:19little background this plan again was
56:21adopted in uh November of 2023. Within
56:24there there's about 70 pages of
56:25implementation um kind of step by step
56:29objective by objective uh implementation
56:31planning. And so we've broken that down
56:34um to provide those updates each year uh
56:37at each one of these overarching goals.
56:39So there's the the 10 goals that are
56:42sort of summarized here and then within
56:44those there are several objectives. I
56:46believe we had about an 18page uh memo
56:49update that was sent to council. I think
56:51that was shared as a part of the packet.
56:53Not we can get that. Um but obviously
56:56don't expect everybody to read it but we
56:58want to be clear we're we're moving
57:00forward with those. So um some of the
57:02highlights for that um
57:05the biggest hurdles you know usually
57:07hurdle one through seven are funding um
57:10as as we're mostly talking about today
57:13um a we want to create a sustainable
57:15department as much as possible um our
57:18department cost recovery in FY25 was up
57:20from 32% in 23 u to 37% we've continued
57:26to improve our cost recovery to 40.5%
57:29uh of what's roughly an $18 million
57:31operational budget. Um the national
57:33average is somewhere between 25 and 30.
57:36So uh we're doing really well on our
57:38recreation side um to to meet what is um
57:43more of a nice to have um when it comes
57:45to programs and services versus the uh
57:49sort of standard uh access to public
57:51spaces that park maintenance provides
57:53which doesn't usually create a revenue
57:56on that side. So uh as a part of that
57:58goal also was to hire a fund development
58:00manager um which we've had for two in
58:03place for two years and has added nearly
58:05a half million dollars in nonoperational
58:07revenue could be grants, sponsorships,
58:09things like that. So the that's an
58:10increased amount not a uh carry on of of
58:13other agreements we have with turf and
58:15things like that. This is new money that
58:17have been brought in by that position.
58:19um moving into the sponsorship realm of
58:21of you know rebranding our spaces to uh
58:25provide opportunity for community and
58:27and business input to to help uh improve
58:29our spaces and and from a maintenance
58:32standpoint you know things like
58:33resurfacing a court adding a name on the
58:35court uh helps us do that and keep money
58:38into in our maintenance budget for other
58:39areas that don't have those
58:40opportunities.
58:43Uh so our biggest goal and and probably
58:45the most relative and I know um the RDA
58:48has uh participated in helping to fund
58:50the u completion of a park district
58:52service plan which is a required element
58:55to create a park district. Um we are are
58:58deeply engaged in that process and have
59:01a joint meeting scheduled at the end of
59:03this month with the other advisory
59:05boards for uh Wo County City of Sparks
59:08and then the Sun Valley General
59:09Improvement District. uh we are hoping
59:12for a recommendation to take that then
59:13to council um with a framework that
59:16would uh support a regional park
59:19district. So a lot of what we're talking
59:20about on the river um could be made more
59:24simple um by the creation of a park
59:26district that would oversee at least in
59:28the proposed framework the the length of
59:31the river from a recreational space and
59:33opportunity. So it's not four different
59:36um three or four different uh
59:38jurisdictions that are working on it.
59:39there would be one jurisdiction that's
59:41sort of taking the lead when it comes to
59:43recreational opportunity path
59:44improvements, things like that um to
59:47help navigate that rather than you step
59:49across the line and you're in the county
59:50versus or Sparks versus the city of
59:52Green. So again, we expect uh what we
59:55hope is an early decision point in early
59:572027 from the elected bodies um that
1:00:01would say yes, go forth, create the
1:00:03district, which would then now we get
1:00:04into the implementation of which
1:00:06employees move over, which programs and
1:00:08services move over, what budget gets
1:00:10moved over from potentially the city,
1:00:12county, and uh sparks into uh the park
1:00:15district. And then uh what are funding
1:00:18initiatives that would need to get
1:00:19started um to move uh new money into the
1:00:22space. So, uh, one of the key key
1:00:24tenants of that is we should not do this
1:00:25if it doesn't improve anything. Um, it's
1:00:28not the efficiency by itself of having
1:00:32um, one director or something like that.
1:00:34It's not going to make the difference
1:00:35that the public will see that we would
1:00:37hope by itself. So, it has to be the
1:00:39opportunity for for new funding and
1:00:41expanded funding um, to support parks
1:00:43and recreation services in the area. Uh,
1:00:46I know this is a big one. So, um, if I
1:00:49want to stop here for a second and if
1:00:51there's any questions on the park
1:00:52district, I know we provided, um, at
1:00:54least, uh, through handouts and, uh, an
1:00:57item several months ago, an update of
1:01:00where we're at. I tried to give you the
1:01:02high points going forward, but any
1:01:03questions on where the park district is?
1:01:05Well, not on what a park district is,
1:01:07but I might ask in terms of funding
1:01:09Netty Olive for the record. Um, is there
1:01:12still in place the 1 half of 1% of
1:01:16funding from room tax that goes to parks
1:01:18and rec?
1:01:19>> It is. Yes, that that there is money
1:01:21that is coming from room tax into uh
1:01:23help offset the cost of parks and
1:01:25recreation, park maintenance
1:01:26specifically.
1:01:27>> And is there any plan to renegotiate
1:01:30that or to see if there's more? I well I
1:01:33believe that's from council's discretion
1:01:34each year as a part of the budget
1:01:36process to say once again this money
1:01:39would go in as a part of I know Vicki uh
1:01:41our director of finance presents that
1:01:43each year is like hey here this is where
1:01:44the room tax breakdown is and this is
1:01:46what's going in park maintenance is
1:01:47listed as part of that so
1:01:49>> yeah it it's an opportunity certainly
1:01:51>> it's actually attorney assistant city
1:01:53manager for the record it's actually
1:01:54codified in Reno municipal code that
1:01:56half of the room tax allocation goes to
1:01:58parks maintenance right
1:02:00>> so we did more than the half cent of a
1:02:02half% % and it's just very clearly 50%
1:02:04goes directly to Nathan and then 50% is
1:02:06on the council discretionary
1:02:08>> to park maint
1:02:09>> for Nathan for fixing things.
1:02:12>> Um yes, any other questions on
1:02:15>> questions online
1:02:16>> park district I'll move on.
1:02:20Okay. So, um colorcoded that was part of
1:02:23goal number one. How do we create a
1:02:25financially sustainable operation for
1:02:27our parks and um that was item 1.1 of
1:02:32that goal of the whole implementation
1:02:34plan is to pursue um the creation of a
1:02:37park district or at least that that
1:02:39service plan to say hey we need a
1:02:40decision point. Um this was an
1:02:43opportunity I believe in 2012 I think is
1:02:46when the legislation was done and um so
1:02:48it's taken us a while to get there but
1:02:50we're moving um moving through that
1:02:52process now.
1:02:55>> Great. Um, one of the things that we're
1:02:57doing from a maintenance standpoint is,
1:02:59uh, as I talked about a few slides back,
1:03:02uh, as we charge fees for services and
1:03:05programs, uh, we asked permission from
1:03:08council to create a, um, sort of an
1:03:11allocation for for our assessments for
1:03:14any sort of if you use if you do a swim
1:03:17lesson, 5% of your fee would go towards
1:03:19an asset replacement. We didn't have
1:03:21that. We're always up against the garage
1:03:23door at a firehouse or a lease cruiser,
1:03:26things like that. We're coming in third,
1:03:28fourth, fifth generally. So, we bring
1:03:30the public chooses to use our spaces,
1:03:32pays a fee to do that. Um, most of that
1:03:34fee would continue to go to the general
1:03:36fund to offset costs, but 5% is going to
1:03:38be set aside now going forward to do uh
1:03:41asset replacements and things like that.
1:03:43So now we're not talking about um
1:03:46funding Barbara Bennett master plan with
1:03:48that, but if we if we wanted to upgrade
1:03:50a playground or replace a playchange or
1:03:53a structure, it could be used to fund
1:03:54some of those efforts, a basketball
1:03:56hoop, those types of things.
1:04:00Another thing is is how can we be more
1:04:02efficient even if without a park
1:04:04district of uh working with um Wo County
1:04:08and uh primarily Wo County since we're
1:04:11integrated into that space where if they
1:04:14have a space that's next to a space we
1:04:16maintain uh but not one that they
1:04:18maintain, how about we look at moving
1:04:20the deeds over and uh getting that
1:04:22property to um the closest jurisdiction
1:04:25from a maintenance standpoint. So good
1:04:27examples of that if the county has a lot
1:04:29of open space and trails that they
1:04:30manage and then we'll have one swath of
1:04:33land in the middle of that that um we
1:04:35would have to manage. So they would take
1:04:37on that and then we're looking at a
1:04:39place like Horseman's Park where it's
1:04:41split um
1:04:43it's split where the fire station
1:04:45literally has a county line going right
1:04:47in the middle of it. of the parcel. So,
1:04:50uh, how do we get those things aligned?
1:04:51And then we take on maintenance because
1:04:52we're already there every day and we
1:04:54don't pass each other as as a maintainer
1:04:56goes one way or the other. So, those are
1:04:58some things we're doing in in a lot of
1:05:00different spaces, but Horseman's Park is
1:05:01very close to being adjusted and, uh,
1:05:04that will then become a city park and a
1:05:05city facility.
1:05:09Uh, one of the relatively low hanging
1:05:11fruit, but um, it's something that
1:05:12people are starting to notice is new
1:05:14signage that's being put up in parks
1:05:15that u, we have very sort of bland white
1:05:18signage that um, has just become a part
1:05:20of the landscape and no one's really
1:05:22paying attention to has uh, all of the
1:05:25rules you could imagine listed. And so
1:05:27we think nobody's reading any of them.
1:05:29So we've tried to create um, hey, here's
1:05:31the big five things that you most likely
1:05:33would make a mistake and do in our
1:05:35parks. Uh we'll still hold people
1:05:38accountable for rules that aren't
1:05:39posted, but that comes with education
1:05:41and warning and things like that, but uh
1:05:43making sure that people understand um
1:05:46some of the main rules of alcohol,
1:05:48smoking, motorized vehicles is obviously
1:05:50a big one with ebikes. Um so trying to
1:05:52make sure those big things are posted
1:05:54and then hopefully read as people are
1:05:56walking in. Trying to keep it uh short
1:05:58and sweet and then educating on the
1:06:00other opportunities.
1:06:04Um something we're very proud of is
1:06:05obviously with the investment in uh the
1:06:08Moana Springs Pool and Fitness Center.
1:06:11Um swim lessons is one of the most
1:06:12important things that we do for our
1:06:14region. Uh over uh 100% increase from uh
1:06:19the opening of Moana Springs to now of
1:06:21of swim lessons for the area. Uh we
1:06:24think we still have opportunity there,
1:06:26but now we have space to start
1:06:28increasing those numbers even further.
1:06:29Now we need people to teach. So, uh, we
1:06:32presented on that to council and, uh,
1:06:34continue to work hard to make sure that
1:06:36our kids have a variety of access to our
1:06:38water and our spaces.
1:06:42Uh we also started as a part of that
1:06:44Arena Swims pilot program where um our
1:06:47hope long term is to work with the
1:06:48school districts and uh private schools,
1:06:51charter schools uh to create this as a
1:06:53part of the school day where um when our
1:06:55pools are a little slower during the uh
1:06:57school day, bringing kids over as a
1:06:59three to four week field trip that would
1:07:01allow um them to get water safety
1:07:03lessons where um if they fell in the
1:07:06water, they would go from not being
1:07:08likely to survive to um being able to
1:07:10get get out of the water on their own.
1:07:12So, it's very simple, very low low bar,
1:07:15but we want to make sure that if a child
1:07:16falls in a body of water, they have a
1:07:18chance to float and get to the side. So,
1:07:21um we did a pilot program with that and
1:07:23we're hoping to expand that atmosphere.
1:07:26Uh we've also been working closely as a
1:07:29part of goal five. Um, Pembroke Flat
1:07:31Fields is another opportunity that's
1:07:33been sort of laboring over over the last
1:07:36uh I don't know 8 to 10 years to try to
1:07:39get Flatfields built at the uh Pemroke
1:07:41property which is right off of uh
1:07:43Veterans Parkway and Pembroke. Um we
1:07:47have moved to a final design and we're
1:07:49at 100% design review right now uh to
1:07:52build uh 10 flat fields in that space um
1:07:55which I think is another great
1:07:57opportunity for um economic impact and
1:08:00and tourism uh along with the Mill
1:08:03Avenue or the Mill Street project
1:08:05between Rock and McCarron with Turfma
1:08:08which will hopefully also become a park
1:08:10that would include flatfield space. Uh
1:08:12that would uh there's about a 50 field
1:08:15uh shortfall as you can see in the pros
1:08:18uh plan. Um and that would help with
1:08:20about 19 to 20 fields that uh would give
1:08:23us practice space and also the ability
1:08:24to attract tournaments to the area.
1:08:27So, RISA, our Reno You Sports
1:08:29Association, uh, helped to fund the
1:08:32final design of that project. And so,
1:08:34we're looking forward to move forward
1:08:35with a a fund fundraising campaign and
1:08:38things like that to help build that
1:08:39project. And again, hopefully all of
1:08:41that will move into the uh the park
1:08:43district if they decide to vote on that.
1:08:46I'll create an art in the park program
1:08:48to try to to bring art and beauty into
1:08:50the space. Um, a lot of this is
1:08:52education as people could do this um
1:08:54without our permission or without our
1:08:56help, but we're trying to jump start
1:08:57that process with a few public art
1:09:00displays. I guess it was the last one.
1:09:02Um, so we're looking to expand that into
1:09:04the different uh areas, but right now
1:09:06bysentennial Park was our initial launch
1:09:08point. Um, there's a semi-permanent
1:09:10display in there that allows an artist
1:09:12to come in, hang up their art, sell
1:09:14their art. Um, and we hope that
1:09:16continues to expand and bring beauty
1:09:18into the park. So,
1:09:20Thank you.
1:09:21>> All right, with that again, that's all
1:09:23part of a very large memo of a very
1:09:25large plan. Um, but if there's any
1:09:27questions, happy to answer.
1:09:29>> Any questions online?
1:09:35>> Thanks for the presentation.
1:09:36>> Sure.
1:09:38>> Item six.
1:09:41>> Hey, Mr. Chair. Uh
1:09:48Brian McCardle, for the record, I'm
1:09:50going to be presenting uh the
1:09:51redevelopment ay's property plan for
1:09:53fiscal year 27. Uh this would um give us
1:09:57direction on the existing properties
1:09:59that the RDA owns outright. Uh there are
1:10:03many properties throughout the city,
1:10:05primarily along the retra corridor that
1:10:07were jointly deed to both the city and
1:10:09the redevelopment agency. uh we have
1:10:12sort of uh put the onus on the city that
1:10:14as they dispose of those properties the
1:10:16RDA uh quick claims their the their
1:10:19ownership in those properties so they
1:10:21can be sold off. Um I don't have an
1:10:23answer as to why they were jointly dated
1:10:25back in the day but I do think it was
1:10:26likely because of the bonding or
1:10:28retract. Um I just hit something. Hold
1:10:31on.
1:10:33Uh and so we're just highlighting the
1:10:36seven pieces the seven parcel that the
1:10:38redevelopment agency owns outright.
1:10:41Uh so just to highlight we're
1:10:45getting direction on which property
1:10:47should be disposed, retained, uh should
1:10:49we find a use for them um lease them out
1:10:52or partner into any sort of P3s for
1:10:55their future bonding.
1:10:58Uh so you know managing uh assembling
1:11:01managing selling off property has been a
1:11:03huge part of the reading agency in the
1:11:05past. Part of the bonds that were just
1:11:07paid off uh that were taken on in the
1:11:09late 90s actually allowed the UN uh the
1:11:12redevelopment agency to assemble many
1:11:14parcels right along downtown that
1:11:16allowed uh the movie theater site to be
1:11:17built. Uh the Riverside artist loss as
1:11:20well as the mates were purchased. Um
1:11:22actually the post office as well were
1:11:24all purchased by the redevelopment
1:11:25agency in the late 90s. Uh and what they
1:11:27did uh they worked with master
1:11:28developers to find long-term sort of
1:11:31operators of those properties and
1:11:33develop develop those. Uh so the the
1:11:36Riverside ARS lofts were able to be
1:11:38restored and retained. Uh the Mapes
1:11:41wasn't as fortunate but there were three
1:11:43attempts to try that. And then
1:11:46we didn't do a tiff deal for the Padio
1:11:48but the redevelopment DC owned the land.
1:11:50Uh so there was a development agreement
1:11:51done where I believe they discounted the
1:11:53land to the developer uh to get that
1:11:56project going. So the way the
1:11:58redevelopment treats land uh
1:12:00strategically can be a huge
1:12:02redevelopment tool. uh and that's part
1:12:04of uh the property plan. And so just
1:12:07some general categories, uh you can
1:12:09retain a piece of property. Essentially,
1:12:11that's telling uh staff to hold, do
1:12:13nothing, uh keep the status quo. When I
1:12:16say selling a property, typically it's
1:12:18we have no interest. We don't want to be
1:12:21prescriptive to what the future use is.
1:12:23So just go sell it. And that can be
1:12:24through a public option or fairly light
1:12:26RFP process. But the idea is we just
1:12:29don't want it anymore. It can generate
1:12:31some revenue. um go sell it. For
1:12:34properties that we do own that have a
1:12:36use, uh consider um either doing a lease
1:12:40uh a ground lease. There are some sites
1:12:43that we could transfer to a different
1:12:44agency. And then last is partnering. And
1:12:47that's in a case where we do have a
1:12:49piece of property, we want to be very
1:12:51prescriptive as to what we want on that.
1:12:53And so we would either do development
1:12:55agreements or open up to some P3 where
1:12:57we uh envision with either the de
1:12:59investor, the developer or some other
1:13:01entity what the future of that site
1:13:03looks like.
1:13:06Here's a map of the existing seven sites
1:13:09going from east or going from west to
1:13:11east. The first one is the small plaza
1:13:13next to uh it used to be Java Jungle and
1:13:16Cafe Capello. It's part of West Plaza.
1:13:19Uh there was a small area uh carved out
1:13:22under redevelopment a ay's control so
1:13:24that we could lease it to the cafe
1:13:26space. Since there is no tenant in the
1:13:28cafe space, the lease currently sits
1:13:30with the property owner so that when
1:13:32they go to get a potential tenant, that
1:13:34tenant has the ability to use that uh
1:13:36that that plaza right next door that
1:13:39patio space. Uh the next one is 135
1:13:42North Sier Street. That's the parking
1:13:43gallery. Uh that is a revenue generating
1:13:46asset for the redevelopment agencies.
1:13:47So, the recommendation there is to
1:13:49retain that property. Um, the one we'll
1:13:51go deep into in the in the next few
1:13:53slides is uh it's been called a few
1:13:56things. Right now, the address is Zero
1:13:57South Center Street. Uh, we call it the
1:14:00City Plaza parking lot. Um, and in years
1:14:03past, maybe a decade or so or more ago.
1:14:05Uh, in past staff reports, they referred
1:14:07to it as the 10 North Virginia site. Uh,
1:14:10where they proposed retail
1:14:12redevelopment. If you go towards the
1:14:14river up there, uh the Rita agency does
1:14:17own a slice of riverfront path. Um it is
1:14:20unimproved path right behind the Reno
1:14:22Oasis ballpark. The idea is to possibly
1:14:25uh transfer that back to the city of
1:14:27Reno. I believe that was a retract
1:14:29parcel, so it was deed to the reloc. Um
1:14:32probably better in the city's hands. The
1:14:35next two sites on East Commercial Row,
1:14:37there is ex an existing purchase sale
1:14:39agreement for those as well as as a
1:14:42existing existing tip agreement that
1:14:44we've done with the developer of that
1:14:46site. And then last is fire station one
1:14:49on East Fourth Street. That was done
1:14:51when the Reno Aces ballpark went in. Um
1:14:54they there was a relocation package for
1:14:55the fire department to relocate to that
1:14:58four street. Uh and so the development
1:15:00agency owns the land
1:15:03facility.
1:15:05And this is just a list of those sites.
1:15:07Uh fire station one, uh no changes
1:15:09there. Recommendation is to retain that
1:15:11property, keep the status quo. The
1:15:14Valleo town homes, that's that uh
1:15:16project where we're allowing the
1:15:18developer to assemble the remaining
1:15:20sites and we have the tiff agreement. Um
1:15:23so nothing to do there. Uh those have
1:15:25been extended, giving him more time, but
1:15:26we're coming up on five years since
1:15:28since that original agreement was
1:15:30drafted. Uh so we'll keep an eye on that
1:15:33as the final agreement of waste
1:15:35management comes into play. The river
1:15:37path behind the aces, we're recommending
1:15:40that uh this advisory board and the
1:15:43agency board uh evaluate and discuss
1:15:46transferring that property back to the
1:15:47city of Reno.
1:15:49Last is the park well next is the
1:15:51parking gallery. Um no changes there. We
1:15:53are doing some long-term asset planning
1:15:55and maintenance needs on that parking
1:15:57gallery. We should see revenues increase
1:15:59uh with future improvements uh customer
1:16:02expectations, some growth in the area as
1:16:04well as potential rate increases. The
1:16:07West Plaza Cafe, we're maintain we're
1:16:09suggesting maintaining that lease uh for
1:16:11your future tenant at that site. And
1:16:13then last is City Plaza, the parking lot
1:16:16on that site.
1:16:18It is, I want to say, a quarter of an
1:16:22acre, 15,000 square feet. when the
1:16:25redevelopment agency bought the mates uh
1:16:27and this site, the idea was as it
1:16:30started getting developed and the mates
1:16:31got uh demolished that city council at
1:16:35the time said we want a plaza but we
1:16:36also want some retail component on that
1:16:38site and so they split the uh the plaza
1:16:41and gave the east side to the
1:16:43redevelopment agency to entertain a
1:16:45future retail or commercial use. Uh
1:16:48there has been plenty of attempts uh
1:16:50over the past decade or so or so which I
1:16:54can highlight here in a second. Um but
1:16:57long history of trying to get a
1:16:59commercial use. At one point there was a
1:17:00RFP and a and a poser selected. Uh that
1:17:05changed and then there was another one
1:17:07selected. Uh but that ran into the great
1:17:09recession and nothing came of it. There
1:17:11is currently no budget that we have in
1:17:13RDA1 to do anything on the site even to
1:17:16get some consulting to explore potential
1:17:18options. So if the direction is to
1:17:21restart conversations around commercial
1:17:23use, we'll have to budget into uh find
1:17:25the budget in this year or budget into
1:17:27next year uh the cost to re to look into
1:17:30that. But we are proposing re
1:17:32maintaining the property uh for for some
1:17:36use with the idea that we could uh
1:17:38potentially in the meantime uh have some
1:17:40intern.
1:17:44So going back uh into history in 2004
1:17:48when the maid site was demolished uh
1:17:51there was a large effort to put an ice
1:17:54skating rink on the site and a shade
1:17:56structure uh and there was a proposed
1:17:58design to build a threetory commercial
1:18:01use on that lot. That is kind of why
1:18:03that parcel is kind of uh has the
1:18:06elliptical shape to it. Uh the plaza was
1:18:10developed. Um, if you look from city
1:18:12hall down, you'll notice that most of
1:18:13this plaza looks the same. It's just
1:18:16that they did not build the shade
1:18:17structure. However, they did do the
1:18:19footings for the state shade shade sale
1:18:21structure. Uh, that's massive uh amount
1:18:24of infrastructure on that site. Uh, as
1:18:26well as a lot of the underground
1:18:27infrastructure has been placed to
1:18:29maintain that. However, uh, some of that
1:18:32was, I believe, damaged with the
1:18:34Virginia Street Bridge. And so the uh
1:18:38equipment to do an ice skating rink on
1:18:40that site, it would kind of have to be
1:18:42redone. But these are some of the images
1:18:44from the architect she and Ben were
1:18:46pagod at the time uh to redevelop the
1:18:48site
1:18:51at a later date. Uh the the the RFP
1:18:55selection to do that fell through and so
1:18:57in 2007 they cleared the deck and opened
1:19:00up RFPs again for this commercial site.
1:19:02They selected Iron Veress Equities LLC.
1:19:06Uh John Papus was the selected developer
1:19:08for that site. This is the rendering
1:19:10that was proposed. Um when that came
1:19:12back, because the canopy structure was
1:19:15not moving forward, the developer asked
1:19:18for more time, six months more time so
1:19:21that they could not only redesign their
1:19:22site, but propose additional retail
1:19:24space and then possibly to redesign the
1:19:26canopy to fit their design and
1:19:28aesthetic. Uh and so the agency at the
1:19:31time gave them six more months to go
1:19:33back and do another preliminary design.
1:19:35Unfortunately, they ran into the great
1:19:37recession and that kind of died in the
1:19:39water. Uh and that didn't go anywhere.
1:19:41But that is the proposed commercial use
1:19:43that was uh proposed on that site at the
1:19:46time. And so that brings us to today. Uh
1:19:49so
1:19:51some things to be considered is some
1:19:53interim management. Uh we could evaluate
1:19:56what the maintenance needs are. It is an
1:19:58existing parking lot, could be used as a
1:20:00parking lot, but it's going to require
1:20:01some improvements. Uh, safety, security,
1:20:05um,
1:20:07and possibly a different use. We've
1:20:08heard pickle ball, we've heard other
1:20:10uses, but if we want to entertain those,
1:20:13uh, it will require some budget to
1:20:14explore those options. In the meantime,
1:20:17we can do some preliminary due
1:20:18diligence. So, we go out and we, uh,
1:20:20evaluate the needs of the site, uh, redo
1:20:22the surveys. The biggest one is the
1:20:24flood. Uh, as member Stitzer mentioned,
1:20:27the flood maps have changed and I do
1:20:29think that flood is possibly the biggest
1:20:31um obstacle on this property now.
1:20:33>> So, we could expend some resources to
1:20:35look into those uh challenges and then
1:20:38later once those are established, we can
1:20:40come back with a strategy and
1:20:41potentially uh with the guidance of this
1:20:44body and the board uh possibly be put
1:20:46out for RP again to see what is out
1:20:48there and sort of vision its future use.
1:20:54What we're asking is uh that this body
1:20:56recommend acceptance or you recommend
1:20:59acceptance recommend the agency board
1:21:02that they adopt this plan uh and give
1:21:04some direction on these properties. Uh
1:21:06that picture right there is the original
1:21:08site that is the majestic theater that
1:21:10was on that corner and then next to it
1:21:12was the original YMCA right on these
1:21:15sites. These did have structures um on
1:21:17these at one point, but the the
1:21:20recommendation is to uh support the plan
1:21:22uh retain that parking lot and allow us
1:21:26the ability to go out and start um
1:21:28planning for for its future use.
1:21:32So with that, that's the proposed
1:21:34recommendation.
1:21:36>> Questions in the room
1:21:39online? Anyone have any comments or
1:21:42questions?
1:21:43>> Yeah. Um, I mean, I think that
1:21:47[clears throat]
1:21:49I just wonder if we're creating work
1:21:51that's unnecessary or spending money
1:21:53that may be unnecessary, if that's going
1:21:57to eventually get wrapped up into a
1:21:59future
1:22:01improvement of the plaza,
1:22:04um, as we were kind of talking about
1:22:05earlier in this meeting with the river
1:22:08plan. Um, or are we planning to keep
1:22:11that out of any plaza improvements and
1:22:13try and create some sort of, you know,
1:22:17retail
1:22:18property that could be more viable
1:22:21because of improvements done to the
1:22:24plaza? Um, I'm just kind of curious if
1:22:28we're
1:22:30thinking about the long-term
1:22:33implementation vision for that as it
1:22:35relates to the long-term hopes and goals
1:22:38for Believe Plaza improvements
1:22:46because the rendering I saw earlier
1:22:48today didn't show a retail building on
1:22:50that. It was incorporated into those
1:22:53overall
1:22:54plaza improvement design.
1:22:58>> mean, I I kind of take this as yes, they
1:23:00would look at that as well, but uh this
1:23:03is a preliminary step to just figure out
1:23:05what you could do in terms of
1:23:07entitlements and restrictions on the
1:23:09flood authority or flooding maps and
1:23:12etc. So, they kind of go hand in hand in
1:23:14my in my mind. They could be parallel
1:23:16paths, but the necessity of trying to
1:23:18activate that plaza, you got to figure
1:23:21out what you can do first before you can
1:23:23decide what you want to do there.
1:23:25>> So, I see the approval of this plan is
1:23:27just kind of given that authority of
1:23:29taking that. I think that's a simple
1:23:31conversation with Trina Mcon and and her
1:23:33department say what's the new flood the
1:23:37new flood map once finally adopted by
1:23:39FEMA which the city of Reno is already
1:23:42making riverfront development designed
1:23:44to
1:23:46um and is there anything viable is a is
1:23:50a structure on this site viable without
1:23:54having to do flood wall improvements
1:23:57without having to raise the site
1:24:00multiple feet.
1:24:03I mean, that's that's probably a pretty
1:24:05basic first question that would
1:24:07disqualify
1:24:10whether this thing can be developed
1:24:11vertically or not. Andy Alio. Um I what
1:24:16I had understood was the question on the
1:24:19table is in regard to these properties
1:24:22owned by RDA. Um recommendations are
1:24:26hold get rid of that just very
1:24:30basically. Do we hang on to them and
1:24:33evaluate? Do we let them go? Is that
1:24:36what we're talking about right now?
1:24:38>> Yeah, Brian Mardle. Uh that's correct.
1:24:40If the recommendation is to hold and do
1:24:42nothing, then it informs us when we go
1:24:44into our budgeting and planning that the
1:24:46idea is to just not uh you know just to
1:24:49keep it as is and not take any act
1:24:51further action on this property. Um
1:24:54some of the recommendation here is to uh
1:24:57potentially consider an interim use, go
1:24:59out and do some preliminary due
1:25:01diligence. We don't have funding for
1:25:02those, but that would inform our budget
1:25:03next year. and then at some date once we
1:25:06have the answers to a lot of these
1:25:08questions uh sort of potentially go out
1:25:11and entertain this but it would be
1:25:13considered a shovel ready site. Um we
1:25:16don't have those answers to those
1:25:17questions right now.
1:25:22>> Any other questions, comments from folks
1:25:24online?
1:25:29Doesn't look like it. So staff, what
1:25:32you're looking for from us is a
1:25:34recommendation to advance the
1:25:37property plan to the board for their
1:25:40consideration.
1:25:44>> Anyone can I get a motion?
1:25:46>> Netty Aliverio, I um I move that. Could
1:25:51we see that again? The
1:25:54thing
1:25:55>> I was thinking I remember part of that,
1:25:57but it'll come back.
1:26:00Yeah. Okay. I move to recommend the
1:26:03redevelopment agency board accept the
1:26:06FY2027
1:26:08redevelopment agency property plan and
1:26:11direct staff to proceed with property
1:26:14specific strategies identified in the
1:26:16plan, including evaluating potential
1:26:19sales, leases, transfers, retention, and
1:26:23future redevelopment opportunities.
1:26:26>> All said. Do I have a second?
1:26:32Member Harris. Second.
1:26:34>> Thank you. I've got a motion and a
1:26:36second. Any discussion?
1:26:41>> Hearing none. All in favor?
1:26:43>> I
1:26:44>> I
1:26:47Any oppose?
1:26:50Motion carries unanimously.
1:26:53All right. Item C, board commission
1:26:56committee member reports and
1:26:57announcements. Anybody have any
1:26:58announcements or comments?
1:27:04Seeing none, D. Future agenda items.
1:27:09>> Anyone have a recommendation for a
1:27:11future agenda item? Mr. Stitzer?
1:27:14>> No, I was coughing. Sorry.
1:27:16>> Sorry.
1:27:18[snorts]
1:27:19>> All right. Seeing none. E. Public
1:27:22comment. Anybody from the public?
1:27:25Seeing none.
1:27:27Journment. Move to adjourn.
1:27:29>> Move to adjourn.
1:27:30>> Second. All in favor?
1:27:32>> I.
1:27:32>> I.
1:27:33>> We'rejourn. Thanks everyone for your
1:27:35time.
1:27:39>> Thank you. Excellent.