MacMillan Wharf Function Hall Permit
At a glance
- What: Economic Development Permit 26-4 to add function hall use at a MacMillan Wharf property by increasing its assigned Title 5 sewer flow.
- Decision (August 24): 5-0 to approve with conditions. The agenda described 1,607 additional gallons for a total of 2,317 gallons; the motion text says 1,617.
Conditions
- The applicant must consult Mass DEP on the change in use and report compliance status to Town staff.
- A licensed plumber must confirm the private grinder pump can handle the added flow.
- If used year-round, the piping below the pier must be heat traced and insulated to the connection to the Town force main.
- If not heat traced and insulated, the sewer service must be shut off at the existing below-pier isolation valve, with piping drained and filled with RV-safe antifreeze between November and March, to protect the private piping from the Harbormaster/Pier pump station.
Detail
Applicant Clifford presented; DPW Director Vincent and Community Development Director Famulare commented. Motion Miller, second Sandberg, 5-0.
Sources
- Select Board minutes, August 24, 2026 (regular): https://www.provincetown-ma.gov/Archive.aspx?ADID=35208
Log
2026-08-24 - Select Board
Permit approved 5-0 with sewer and DEP conditions.