Jones Run Floodwall Repairs

At a glance

  • What: Change Order 1 ($19,833.75) with Construction Services Plus, LLC for added structural and concrete work on the Jones Run flood gate behind Buffalo Trace.
  • Where it stands: Approved on consent July 27, 2026, 5-0. Final contract total $78,533.75.
  • Next: None recorded.
  • Freshness: Possibly stale: the newest information here is from August 2026. Later Board agendas (Sep 28, Oct 12) were image-only and were not read, so any later action is not reflected.

Details

  • Water seepage beneath the wall washed out asphalt, creating a safety concern for vehicles. The repair replaces the asphalt pad with reinforced concrete and fixes structural deficiencies; at the Army Corps of Engineers' request the threaded inserts for the steel supports were replaced and the concrete sill was re-poured at a slightly higher elevation for drainage.
  • Original bid $58,700.00 plus $19,833.75 equals $78,533.75. Stantec designed the repair.
  • Consent calendar moved by Commissioner May, seconded by Commissioner Richardson; all five members present voted yes (Commissioners Richardson, Unger, May, Smith-Willis and Mayor Wilkerson), none against.

Sources

Log

2026-07-27 - Board of Commissioners

Change order approved on consent, 5-0.