Shoreline Drive Realignment Project

At a glance

Based on auto-generated captions; names and numbers may be misheard.

  • What: construction (Sully Miller Contracting, up to $50,722,791) and construction management and inspection (PMCS Group, up to $3,735,659) contracts for the Shoreline Drive realignment, a two-phase project with a Metro loan.
  • Where it stands: Both contracts approved on October 6, 2026.