Water Treatment Plant and Water System Work

At a glance

  • What: construction and upkeep tied to the city's new water treatment plant, water tanks, waterlines and sewer collection.
  • Where it stands: Council approved a maintenance facility design for the new plant (2026-10-12), emergency waterline contracts on South Illinois Avenue (approved retroactively 2026-10-12), a rental of piping and equipment to discharge flow from the new plant (2026-11-09), water tank inspection and cleaning (2026-09-14, amended 2026-11-09) and sewer collection repairs (2026-11-09).
  • Next: no date given in the sources.

Details

  • 2026-09-14: professional services agreement for inspecting seven water tanks and cleaning three (not to exceed $75,800); authorization to apply for an EPA grant for drinking water and wastewater workforce training.
  • 2026-10-12: design of a maintenance facility at the new plant (not to exceed $107,694); emergency waterline work on South Illinois Avenue approved after the fact (up to $120,000 and $50,000).
  • 2026-11-09: bid waiver for rental of piping and equipment to discharge flow from the new plant (not to exceed $120,000); amendment adding cleaning of two equalization basins ($32,000) to the tank contract; sewer collection point repairs (not to exceed $193,325).
  • Reasons and discussion were not recorded in the Notices of Proceedings.

Sources

Log

2026-09-14 - City Council

  • Approved water tank inspection and cleaning agreement; authorized an EPA workforce grant application.

2026-10-12 - City Council

  • Approved plant maintenance facility design and retroactive emergency waterline contracts.

2026-11-09 - City Council

  • Approved dewatering rental for the new plant, equalization basin cleaning and sewer collection repairs.