What: Roof, boiler and elevator needs at Southbridge school buildings and the five-year capital plan.
Where it stands: Oct. 21: part of the Charlton Street roof replaced, Cole Avenue boiler repair nearly done, elevator inspections failed with quotes pending, and a capital plan due around March.
2026-10-21 - School Committee - Oct. 21: part of the Charlton Street roof replaced, Cole Avenue boiler repair nearly done, elevator inspections failed with quotes pending, and a capital plan due around March.