MassWorks Grants for Lower Broadway and Commercial Triangle

At a glance

  • What: Two MassWorks grants accepted on October 26: $1,000,000 for Lower Broadway Phase 2 / Robin Street pre-construction (C0232-26) and $450,000 for Commercial Triangle Phase 2A pre-construction (C0233-26).
  • Where it stands: Accepted by the City Council on October 26. Other grants accepted that night are listed on the meeting page.

Built from the posted agenda and an unofficial AI-generated transcript of the meeting; no official minutes are posted yet, and roll-call tallies in the transcript are unreliable, so vote counts are omitted or hedged.

Sources

Log