District Energy Decarbonization Plans

At a glance

  • What: plans by the two large Cambridge district energy operators to shift from gas to electric heat: Vicinity Energy (steam to Boston and Cambridge buildings) and MIT's campus system.
  • Where it stands: presented to the Health and Environment Committee on Oct 20 as context for thermal network planning; no city action requested.
  • Next: MIT proposed a delegation to Denmark to work out governance and owner-operator models; Vicinity's large heat pump is due online in 2028.

Vicinity Energy

  • Serves about 71 million square feet through 29 miles of pipe; four of five skyline buildings.
  • A 42 MW electric boiler has run since November 2024 and balances the grid at times of surplus power; a river-source heat pump (about 38 MW, described as the world's largest) is under construction for 2028; thermal storage is planned.
  • Targets: about 40% decarbonized after the heat pump, over half by 2035; second heat pump and a harbor-source unit in design.
  • Concern from Audrey Schulman: Vicinity is not regulated like a utility, so the city should bargain for long-term affordability when granting rights of way.

MIT

  • District system of about 10 million square feet; heat pump plant in design to recover 30 to 40% of campus heat from its cooling system, with 60 to 70% expected from a shared Boston network. Also evaluating waste heat from its research reactor cooling loop and possible boreholes.

Sources

Discussion time

About 24 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-10-20 - Health and Environment Committee 24