2026-09-22 - Code Enforcement Board

Summary

Built from YouTube auto-generated captions; no agenda or minutes were located. Names and figures are as captioned and may be misspelled. Respondent names are not listed, and individual case outcomes are summarized by type.

  • The board chair opened the hearing, reminding the room that board members are unpaid volunteers. The board approved the minutes of the prior hearing and read a list of closed and withdrawn cases into the record.
  • Nearly all cases were Florida Building Code 105.1 violations for work done without a permit: additions and alterations, garage enclosures, interior remodels, roof, window and door work, fences and sheds, mechanical, electrical and plumbing work, driveways and pavers, and boat lifts and docks.
  • Cases came from across the city, in both residential and rental properties.
  • For owners making progress, the board granted many extensions (commonly 35, 77 or 126 days), often requiring a return appearance. Where owners did not appear or had not applied for permits, it sometimes shortened the timeline the City asked for or raised the daily fine.
  • Noncompliant cases were set for mandatory hearings with daily fines such as $150, $200 and $300 per day. In several cases with visible progress the board paused or declined to impose fines.
  • The largest fine discussed was $25,500 on a long-running unpermitted addition case, with other fines of $13,500, $9,450 and $8,100 in similar cases. In two compliance cases the board waived administrative costs the City had sought.
  • Board members repeatedly urged respondents to stay in contact with inspectors. Staff explained that once permits are submitted and approved, fines stop accruing and the owner can apply for lien reduction. See Code Lien Amnesty.
  • Members asked about the newer private provider option for plan review and inspection, asked staff to show the administrative-fee cost sheet, and questioned whether starting daily fines should be higher. A construction enforcement official explained that inspectors initially request 126 days because of heavy caseloads.
  • After a recess, the Deputy City Attorney gave a training presentation on board authority, voting and abstention, conflicts of interest, the Sunshine Law and public records.
  • The board adjourned after completing the agenda.

Agenda

See the Legistar calendar entry in Sources.

Sources

Video

https://www.youtube.com/watch?v=BMjAm9PNLyg

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

23:14one. Welcome to our September 22nd, 2026

23:18code enforcement board hearing. If

23:20there's anyone who wishes to speak at

23:22today's proceedings, please stand and

23:23raise your right hand.

23:26[clears throat]

23:30For those of you in line, you could

23:31raise your right hand as well. Do you

23:33swear and affirm to tell the truth that

23:35today's proceedings?

23:37>> Thank you. You all may be seated. At

23:39this time, we ask that you silence all

23:40of your devices.

23:44Board,

23:50good morning, ladies and gentlemen. My

23:52name is uh Terry Nolan. I am the

23:54chairman of the board. And uh just let

23:57you know that we are not paid employees

24:00up here. We volunteer and if you want

24:03you can volunteer as well for other

24:05boards and be part of the community. So

24:09let's have some fun.

24:12>> Oh. Oh yes. Uh they can introduce

24:14themselves. You can start.

24:17>> Ed Murphy.

24:19>> Donald Carney. Good morning.

24:20>> Alex Schneider.

24:22>> Kimberly Smith. panel attorney.

24:26>> Now we may begin.

24:28>> Our first page is our first case is on

24:32page 8. Senior Inspector Alexander

24:35Boris, property address 1609 Northeast

24:3717th A. Owner Veronica and Ernesto

24:41Cartena.

24:42Case number BE24080358.

24:47>> [clears throat]

24:47>> This case was first heard on 127206

24:50to comply by 52626.

24:53One section at $50 per day. Order

24:55recorded not complied. There are two

24:57extensions noted. Notice posted at the

25:00property on 82426.

25:02Posted at Wy'sboro Boulevard on 9826.

25:12>> Good morning.

25:15>> Can you hear me now?

25:16>> Yes. Good morning. My name is Veronica.

25:18>> Hold on. Just hold on.

25:20>> Good morning,

25:22>> Alexandra, building inspector for the

25:24city. Updating your case number and

25:26address is read. The property was cited

25:28for violation of Florida building code

25:302023 section 105.1 for work without

25:33permit regarding a rear structure

25:36adjacent to the pool. Violation remains

25:39at this time. uh permit application

25:43um has been submitted

25:45and is currently being reviewed and the

25:48respondent is here to speak.

25:53>> Morning. My name is Veronica Cartahena,

25:55owner of the property. Um basically at

25:57this point we were waiting for this the

25:59response for the permit application. Um

26:02last week um actually it was on Friday

26:06they posted that they needed some

26:07additional information and so I was um

26:10here to request for an extension.

26:14>> How much time do you need?

26:16>> I would say 90 days.

26:17>> Inspector, has she been in contact with

26:19you?

26:20>> Yes, she has.

26:20>> All right. I make a motion to grant to

26:22respond at uh 90 days.

26:25>> I'm sorry. Uh can you do it in 77 days?

26:30Well, it's I don't know. There's a lot

26:32of work in the city. I mean, it's just

26:34taking a long time to get responses from

26:37um

26:37>> we'll complete a plan review within 30

26:39days.

26:40>> Okay.

26:40>> Yeah. So, the um once the building

26:43review once building reviews um the

26:46gazebo

26:48uh then it'll you'll be able to address

26:51the electrical comments.

26:53>> Okay.

26:53>> Okay. So, what are you suggesting first

26:55of all?

26:55>> 77

26:56>> uh 77 days. Okay.

26:58>> All right. Then I I amend my motion to

27:00uh grant the respondent a 77day

27:01extension on complaints.

27:03>> Alex Schneider will second.

27:04>> All those in favor say I.

27:06>> I.

27:06>> Any opposed?

27:07>> 77 days. You have.

27:09>> Great. Thank you.

27:09>> Thank you.

27:12>> Our next case is on page 13. Inspector

27:15Searian Anescu. Property address 1001

27:19Southeast 16th Street. Owner Harborell

27:22Condo Association, Inc. Case number

27:24BE251200094.

27:27Notice posted at the property on 82126.

27:30Posted at One Brow Boulevard on 9826.

27:33[clears throat] This case was first

27:34heard on 32426

27:36to comply by 72826.

27:39One section at $50 per day. Order

27:41recorded not complied. There is one

27:43extension noted.

27:51Good morning, Barces, building inspector

27:53for the city. Presenting the case and

27:56address as read. This case has not

27:57comply. The respondent is here to speak.

28:02>> You go.

28:03>> Uh yes sir. Uh we have submitted your

28:06name and

28:07>> my name is uh Jonathan Longo the

28:08president of Harbordale Condominium

28:12>> and uh we have submitted I I have uh

28:15retained the general contractor and

28:17submitted the permit packet and we are

28:19waiting to see if we need to submit

28:21anything else

28:23as far as the with the inspectors.

28:27>> And what are you suggesting?

28:33Um, so you just retained the contractor,

28:36right? Yes, sir.

28:36>> But the plans and specs, they're already

28:39submitted.

28:39>> Correct, sir.

28:40>> Right. So,

28:41>> when were they submitted?

28:42>> A while ago. Uh, this

28:44>> Yeah, some some time ago.

28:46>> Two months ago, I believe.

28:47>> Yeah, something like that. I don't know

28:48if they've been approved yet. They had

28:49no no GC on file. So, they

28:51>> And two months ago, they should have

28:52comments back from the building

28:53department, right?

28:54>> Right.

28:55>> No, because they didn't have a GC. So, I

28:57guess it's uh they're waiting.

28:59>> We had to retain a GC. And the GC who

29:02was doing our concrete restoration for

29:05the 10-year inspection said he was going

29:07to do it and kept doing it and kept

29:08pushing it off. So, I retained my own.

29:11>> When was he retained?

29:13>> Uh, last week, sir.

29:14>> Okay.

29:16>> Has he been in contact with you?

29:18>> Yes, definitely.

29:19>> What do you recommend?

29:20>> I'll recommend 77.

29:22>> I move for a 77day extension.

29:24>> Alex Schneider second.

29:26>> All those in favor say I. I.

29:28>> Any opposed? 77 it is.

29:30>> Thanks, sir.

29:33>> Our next case is a new business case on

29:35page two. Property address 2684 Marathon

29:39Lane. Owner Santa Fe RE Investments LLC.

29:42[clears throat]

29:43Case number BE260235.

29:47I'm sorry. Senior Inspector Jose Seri.

29:51Notice [clears throat] posted at the

29:52property on 9326.

29:54posted at 1 East Broad Boulevard on 9826

29:58by the signing table.

30:02Page two, 2684 Marathon Lane.

30:09[snorts]

30:14One moment, please. Please hold.

30:25>> [clears throat]

30:35>> Good morning, Inspector Saguti. On

30:37behalf of the city, presenting the case

30:39as read, the property was cited for work

30:42without permit under Florida Building

30:44Code 2023,

30:46section 105.14.

30:50Garage enclosure alteration, garage door

30:53remover and remove it and replace for a

30:56wall. New AC unit, new electrical

30:59receptacles addition in the property in

31:02the side [cough and clears throat]

31:04and backyard.

31:06New windows and doors, [clears throat]

31:10large canopy area in the backyard, also

31:13new terrace on the second floor. The

31:16case was open in July 24,

31:202026.

31:21Inspection report was mailed in July 17,

31:242026 and notice of hearing ported the

31:28property in August 6, 2026.

31:31There is no permit in process for those

31:34violations.

31:36We are asking the board to find the

31:38violation exist to grant the property

31:40owner 126 day to come in compliance or a

31:45fine of $50 per day thereafter.

31:48I will let the respondent to speak and

31:50will request mandatory appearance.

31:54>> Hi, my name is Steven Thomas. I'm

31:56representing the Santa Fe REI uh

32:00investments and um just here to talk

32:02about um the situation I guess. Um what

32:07what would you like to hear from me?

32:09>> Why is the inspector requiring a

32:10mandatory reappearance?

32:13>> Because we want to move forward with the

32:15case.

32:17We need to have progress.

32:19>> Has he done anything to warrant that

32:21extraordinarily out of the ordinary?

32:23>> There are additions for that. Erh, I

32:26think and they are living inside the

32:28house for that is necessary to move

32:31forward as soon as possible.

32:32>> Would you rather I mean like shorter

32:35amount of time versus a mandatory a

32:37mandatory appearance we usually we're

32:38usually implementing when people don't

32:40show up and don't come communicate.

32:42>> That's why that's kind of the ordinary

32:43for us here

32:44>> the 126 days but I need to show up him

32:49when the in this date.

32:52>> Has he been in contact with you? Yes, I

32:54am in contact with the property owner

32:56and his son.

32:58>> Well, the reason you're here is doing

33:00the work without a permit. It's

33:01>> a lot of work.

33:01>> That's the That's a lot of work.

33:04>> Some of the uh if you look at the

33:06pictures, some of this stuff was already

33:08existing when we bought the place, like

33:10the awning and the overhang. If you can

33:14see the pictures, those were already

33:15existing. We built the four the two

33:18walls essentially to enclose the garage

33:20that was not really a garage.

33:24Um, so that's that's the work that we're

33:26doing.

33:26>> So the electrical work and the plumbing

33:27work was already existing.

33:28>> Well, the plumbing was about the

33:30plumbing hasn't been done. The

33:31electrical work was because they're

33:34enclosing the garage which is going to

33:35be two offices and so new electrical had

33:38to be done because there wasn't

33:39electrical. Um, but if you look at the

33:42um, you can't see them behind you, but

33:44the overhanging was already there. Okay.

33:47>> And [clears throat] the the the

33:49electrical was in uh already existing on

33:51the dock. So, if that's brought up, that

33:53was already there. We just added the

33:55pedestals. The um

33:58>> So, the existing work is still going to

33:59require a permit whether you did it or

34:01not. If it's not permitted, you're still

34:03going to need a permit

34:04>> cuz the other thing was there were

34:06inspections that came by. So, there was

34:08someone that did inspect the roof and

34:10everything. So,

34:11>> that should have been already called

34:12out. So, I don't understand why we

34:14should be um punished for that. Yeah.

34:18>> Oh, yeah. Sorry. This is the engineer.

34:20>> Sorry. Um, I'm his engineer and I just

34:22Your name? My name is uh Raa.

34:25Sorry, I have a cold. Um, I work for PES

34:28Engineering um PS solutions. Um, I'm the

34:31structural engineer doing the work, but

34:32I'm also coordinating all the other

34:34disciplines, mechanical, electrical, and

34:36everything. So, I I do understand what

34:38the building inspector is saying and

34:40they have a lot of unpermanent work over

34:42there. Um, as of right now, we have

34:44completed maybe 90% of all the

34:46structural. It doesn't seem like it's

34:48going to require a lot of modification

34:50from the structural. However, I have not

34:52justified the corner piece over there

34:54for the roof. Um the biggest um hold

34:57down that we're having right now is in

34:59terms of the electrical. They added an

35:01auxiliary electrical for their

35:03modification and we're still doing the

35:06analysis to see if the connection was

35:08correct. So, we're not too far away from

35:11permitting and there probably won't have

35:14too much modifications. So, I guess the

35:16reason why um we're here is we were

35:19hoping to get an extension to become

35:21compliant in all of those things.

35:24>> Were you retained uh before or after the

35:25violation?

35:26>> You asking for

35:26>> I don't know. That's all front end. I

35:29get a call, you know, I'm back in the,

35:31you know, the computer.

35:33>> You know, it was after the violation.

35:35>> Okay, perfect. Yeah.

35:36>> Yeah.

35:37>> Um so, uh I'm

35:40>> the city request 126 day extension.

35:43>> All right. I move that we find for the

35:44city and the violation existed alleging

35:46that we order the property owners to

35:47come into compliance by

35:49uh January 26, 2027 or a fine of $50 per

35:53day per violation will be imposed and

35:55recorded and a mandatory appearance at

35:57the January 26th hearing.

35:59>> That that should be sufficient.

36:00>> I'll second that. Ed Murphy.

36:02>> All those in favor say I.

36:04>> I.

36:04>> Any opposed?

36:06>> We hope not to see you in January.

36:08>> Okay, we will.

36:09>> Thank you. Thank you.

36:09>> Thank you.

36:12Our next case is on page 12. Senior

36:15Inspector Jorge Martinez, property

36:17address 1418 Northwest 11th Street. Case

36:21number BE25100156.

36:24Owner Casto Fun Mayor. Notice post at

36:28the property on 82726.

36:31Posted at 1 Boulevard on 9826.

36:34This case was first heard on 22426

36:38to comply by 62326.

36:40One section at $50 per day. Order

36:42recorded not comply. There is one

36:44extension noted.

36:46>> Inspector Martinez, updating case on

36:48behalf of the city. Case number and

36:50address as read. This case is not in

36:52compliance. I'm going to let the

36:53respondent speak.

36:55>> Hi. Good morning.

36:56>> Good morning.

36:58>> Your name?

36:58>> Andrew Ols and

37:00>> I am the property manager. Cost is the

37:03owner.

37:04>> Okay. Vegan. I just wanted to again I'm

37:07I used to be in planning and zoning for

37:0813 years in Biscane Park just as a

37:10reminder and and I was in your seat. So

37:13it's

37:13>> hard work isn't it?

37:14>> Yeah.

37:15>> For a volunteer it's a lot of work for

37:17Lauderdale it's even more work.

37:19>> Go ahead.

37:19>> Anyway I wanted to speak about the

37:21timeline first of the house. Um when we

37:23first got the warning um we hired a a

37:27contractor. We did the research active

37:30in Fort Lauderdale has active permits

37:33and um so that was in about June of 26.

37:38In November we he kept telling us that

37:40things are going fine going fine and

37:43then he ghosted us and he had most of

37:45our money. We paid for the permit repair

37:48for the whole project. Most of the money

37:50by the way the the on the list we didn't

37:53do we only thing we did when we bought

37:55the house is the carport. all the other

37:57things were done by the previous owner.

37:58So, we're left to clean all that up um

38:01permit-wise. So, um Jorge was even

38:04involved in trying to, you know,

38:06convince to to contact the the

38:08contractor, seeing that he's working in

38:10Fort Lauderdale, and he wouldn't return

38:11even Jorge's calls as an inspector. So,

38:14um so then we had to go through the

38:16process of getting a new contractor,

38:18everything. In the meantime, we saw you.

38:20We got a third a 90-day inspection. And

38:23in that time frame since June, um, we

38:26did submit a packet answering from the

38:29master permit. We put in then we put in

38:32a packet and we got pages of responses

38:35including needing engineers,

38:36environmental, all these things that

38:38that that were pretty overwhelming. Um,

38:42we do have a financial consideration,

38:44health considerations that happened in

38:46the last three months with me. I'm You

38:48see I'm shaking a little bit. Um and we

38:51need a three-month extension to

38:53>> to you need three more additional

38:55months.

38:56>> Yeah.

38:57>> Inspector, have they been in contact?

38:58What What's the deal? Three months. I

39:00mean, this is this has been going on

39:01since February. You went three more

39:03months now.

39:04>> Okay. Let me let me let me because he he

39:07we were in constant conversation with

39:10Jorge until June. That's when we were

39:12busy with Karen Washington with a a

39:14permit repair. Okay.

39:15>> Constant contact with Karen. I mean,

39:17she's our friend.

39:18>> Could you ask that you a cancerous care?

39:21>> Yeah, that's okay. That's okay. Um Um

39:24So, we didn't even think to call Jorge

39:27during that time because we were so busy

39:29with the other stuff and our personal

39:30stuff, but we were working with the city

39:32the whole time.

39:34>> So, what have you actually done to

39:35achieve compliance?

39:37>> Uh we hired the engineer now.

39:39>> Well, we just hired the engineer, but a

39:42we actually

39:45mayor. I'm the owner. We actually hire

39:48the the plumber and the electrician and

39:51this the GC. But what what like he said

39:54when we submit we got a list of things

39:56that we need to do. So we have to hire

39:58an engineer. We will just hire and he's

40:02working into the fix whatever it was

40:05missing.

40:06>> Inspector, have they been in contact

40:07with you?

40:08>> Not not recently. Uh

40:10>> not recently.

40:11>> No. that my last communication was that

40:15I have on on my system is 310.

40:18>> 310 March and you want three more

40:20months.

40:20>> March.

40:21>> That that's the last I have

40:24that I have.

40:26>> It can't be March because we were

40:27talking to you right before right before

40:29the the the last meeting in June.

40:31>> We were talking to you up until then.

40:34[clears throat]

40:34>> You just told us over there we talked to

40:35you last in June.

40:36>> No, it's 3:30. I show you.

40:38>> Okay. And the permits are applied for uh

40:43they've been waiting corrections since

40:46June.

40:50>> Uh okay. So the permits haven't been

40:52applied for. They're waiting correct

40:54corrections since June. Yeah.

40:56>> Recommend it. Inspector.

40:57>> Okay. The city at this moment is

41:00requesting for to come back as a messy

41:02>> but it's going to be your decision. I'm

41:05good with giving these guys 35 more days

41:07if you have you've got plans waiting for

41:10comments since June. I mean

41:13>> just show us some progress 35 days.

41:16>> So I I make a motion to grant these guys

41:1835day extension on compliance after that

41:21and we'll come back. We'll bring it back

41:23as second.

41:25>> We'll do a better job to be in touch.

41:26>> Yeah, please move forward. All those in

41:28favor say I.

41:29>> I.

41:29>> Any opposed?

41:31>> You have 35 days. But I just wanted to

41:34add we did have that in six, seven month

41:38lost time in in that time because we did

41:41hire a contractor that took all our

41:43money. So

41:44>> understood that's history. Let's move

41:45forward from here.

41:46>> Go get him.

41:48>> Thank you.

41:52[clears throat]

41:53>> Our next case is on page nine. Senior

41:56Inspector Preston Mark, property address

41:59905 Southwest 22nd Terrace. Owner Lonnie

42:03Saunders. Lonnie Saunders Revocable

42:05Trust. Case number BE2560116.

42:10Notice posted at the property on 9326.

42:13Posted at Oneboro Boulevard on 9826.

42:16This case was first heard on 82625

42:20to comply by 12726. Two sections at $100

42:23per day. Order recorded not complied.

42:26There are four extensions noted. Whoa.

42:29>> Press mark bill inspector for the city

42:31presenting case and address is read.

42:33This case is not in compliance. Uh the

42:36respondent is here to speak. Good

42:38morning. Will Astrom here on behalf of

42:40the property owner. I also have with me

42:41the property owner Lonnie Saunders. Um

42:44so since our last hearing, we have made

42:47substantial progress. Electric is now

42:49approved. Plumbing is now approved.

42:51Engineering permits are approved.

42:53Mechanical, it sounds like there's one

42:54or two items. We recently got comments

42:56back. it sounded like it was two small

42:58things they need to fix. And then the

43:00last thing would be building, which

43:02we've got comments back recently. It was

43:04about four or five comments that it

43:06would probably be the bulk of the time

43:07that it'll take, but even that we don't

43:09expect to take too long. So, we're we're

43:12getting close here.

43:14>> What was what was the nature of the

43:15building comments? How complicated are

43:17they?

43:18>> I don't know if you want to

43:19>> uh I don't know what the most recent

43:20ones. I I just found the uh I went

43:22online this morning. I thought there

43:24were comments, so I have to call my uh

43:26contractor and find out exactly what

43:27they are, but we've already submitted a

43:30complete set of plans from an engineer,

43:32which should have covered everything.

43:33So, I'm not sure what else he needs.

43:36>> Okay. So, uh have they been in contact

43:39with you?

43:39>> Yes, they have.

43:40>> Okay. And what's your recommendation

43:42here?

43:43>> We'll support an extension. I know

43:44they're been working on this uh

43:46diligently. They also had the uh board

43:49of adjusters approval for the variants.

43:51So we can uh support 77 days extension.

43:55>> Oh yeah. When did you receive the the uh

43:58approval from the board of adjustment?

44:01>> Board of adjustment would have been back

44:02in

44:04>> that was back in

44:06>> several months ago.

44:07>> December 2025.

44:09>> Gotcha.

44:09>> 25.

44:12>> What?

44:13>> Yeah.

44:14>> They applied in December 2025. So they

44:16got approval a while ago.

44:18>> Was that the date of the hearing or just

44:19when we applied for the board? That's

44:21when you applied.

44:21>> Okay. I believe the board of adjustment

44:23hearing itself was in somewhere in that

44:25February to April range.

44:27>> I think it's late.

44:27>> I I'll move for a 77day extension.

44:32>> I'll second the motion.

44:34>> Uh all those in favor say I.

44:36>> I.

44:37>> Any opposed?

44:38>> Oh, wait. All those in favor say I.

44:40>> I.

44:41>> Any opposed?

44:43You have 77 days.

44:44>> Thank you all for your time. Thank you.

44:48Our next case is on page 15. Senior

44:52Inspector Joseé Sargusti, property

44:54address 522, Southwest 9 Terrace. Owner

44:58[snorts] BT Coconut North Fork LLC. Case

45:02number BE25040014.

45:05Notice posted at the property on 9226.

45:08Posted at Wisboro Boulevard on 9826.

45:11This case was first heard on 92325 to

45:14comply by 12726.

45:17One section at $100 per day. Order

45:20recorded not complied. There are three

45:22extensions noted.

45:25>> Uh my name is Joseph O'Neal.

45:27>> Yeah. Hold on a second.

45:28>> Oh, okay.

45:29>> One moment, please. Please hold.

45:35>> Jose, senior building inspector for the

45:38city. Updating the case number red. The

45:41case is not comply. I will let the

45:44respondent to speak.

45:47>> Yes, we um uh had originally filed.

45:50>> First of all, your name?

45:51>> Uh Joseph O'Neal.

45:52>> Okay, go.

45:53>> We originally filed for the

45:54environmentals and you know, Army Corps

45:57or whatever the different things and we

46:00finally filed for the uh city permit.

46:04>> Okay.

46:04>> That was which was the final uh thing to

46:07be approved. So they just filed the

46:10contractor. What happened was the

46:11contractor I was he kind of ghost me

46:14sort of this guy he's come back but

46:17everything's in his name the um

46:19environmental and all those things which

46:21have already been approved. So finally I

46:24got with the guy and he filed the permit

46:26with the city.

46:27>> So since last time you were able to get

46:28the approval for the Broward County and

46:31uh and Army Corps and all that stuff

46:33that you need to do to get uh the dock

46:36work done. Is that what you're saying?

46:37>> Yes. Okay.

46:38>> Um, how much time do you think you need?

46:41>> I'd like to get 77 days, please.

46:44>> Inspector, what do you recommend?

46:46>> The city support 77day extension

46:50fines.

46:51>> Alex Schneider, I move for a 77-day

46:53extension.

46:54>> Ed Murphy. Second.

46:56>> All those in favor say I.

46:57>> I.

46:57>> Any opposed?

46:59>> You have 77 days.

47:01>> Thank you.

47:03Our

47:05next case is on page 14. Inspector

47:08Searian Anescu. Property address,

47:12[clears throat] excuse me,

47:15501 Southwest 6 A. Owner Hannah Pepe

47:19LLC. BT Coconut River LLC. Case number

47:23BE25040015.

47:26Notice posted at the property on 9226.

47:29Posted at 1 Boulevard on 9826.

47:32This case was first heard on 92325 to

47:35comply by 12726 one section at $50 per

47:39day. Order recorded not comply. There

47:41are five extensions noted.

47:44>> Oh boy.

47:45>> Sea anesco bill inspector for the city

47:47presenting the case and addresses read.

47:49This case

47:51did not comply. The respondent is here

47:53to speak.

47:55>> Uh my name is Joseph O'Neal.

47:58I apologize for the you know the long

48:00delay on this case. Initially we hired

48:04the contractor we hired uh we had

48:07architectural plans done engineering

48:09plans done. Unfortunately we had an

48:11initial walkth through with um Mr.

48:14Inesco and um

48:17subse sub subsequently he you know as

48:20this thing dragged on and we had some

48:24dis disputes

48:26they asked us to sit down have our

48:28contractor sit down with them uh Alex

48:31and um um this gentleman here and um we

48:35did that two weeks ago. Um, so we're

48:37we're redoing the architectural plans

48:40because there's an extension that the

48:42original owner put probably 30 40 years

48:44ago, who knows? And they wanted us to

48:47address that and that wasn't in the

48:49original scope of of the um violation.

48:54Then subsequently once we had the the

48:56meeting with the the gentleman, they

48:59alerted us to the fact that now they

49:01wanted that part to be permitted too,

49:04which I had nothing to do with.

49:06So, we're now drawing up those uh

49:09engineering, mechanicals, and everything

49:11for that extension.

49:14>> Is this the same contractor that you had

49:16from the last case that ghosted you and

49:18everything else?

49:18>> Uh, no, different

49:20>> different contract.

49:22>> Inspector, what do you what do you

49:23recommend here since you just, you know,

49:25you're dealing with

49:26>> How far along are they? What what's

49:27>> I mean, we we just had the meeting and

49:29we we cleared off exactly the scope of

49:32work and um hopefully this time he

49:34understood it. Um this this has been the

49:38case since the beginning. Um just that

49:41they they couldn't grasp the concept of

49:43that of that part that was illegally

49:46built some time ago

49:47>> who couldn't grasp the contract or

49:49>> no the the guy that helps him. I'm

49:51guessing he's an engineer, right?

49:53>> The the Yeah,

49:54>> he couldn't grasp the

49:55>> Well, I unfortunately it was just a

49:57little bit of a gray area in the

49:59original violation. We should have sat

50:01down with them initially. There's two

50:03properties and they they build like an

50:05addition in between the two.

50:07>> Okay.

50:07>> That created like a a new more of a

50:10living space, but that thing was there

50:12for some time. So that needs to be

50:14legalized,

50:15>> but it wasn't addressed in

50:17>> it was addressed in violation. Yeah.

50:19It's just not from from from the

50:23from the plans and from the survey, they

50:26just did not understand that that's that

50:28needs to be also addressed. When you say

50:30they, who's they?

50:33>> The gentleman that the they hired,

50:35>> inspector, how long was the argument

50:37going back and forth?

50:38>> Well, it went um plans went to ATF

50:42review.

50:43>> Yeah.

50:43>> And then we had, you know, we actually

50:47had to have a meeting with them to sit

50:49down with them so they can understand

50:51what we're requesting.

50:52>> Oh. And so the argument was that big

50:54where you needed to sit down with these

50:56guys?

50:57>> It wasn't really an argument. Not to

50:59interrupt, but it was more to be, you

51:01know, to get clarified the scope of the

51:03work.

51:04>> Yeah.

51:04>> Is that true or the argument of

51:06>> No, no, no. It's it's true. I mean, Alex

51:08should know better because he was he's

51:09doing the plan review, but yeah, it's

51:12>> was a misunderstanding on our

51:13>> misunderstanding. So, it wasn't actually

51:15argument. We're going to fight or

51:19[clears throat]

51:20>> So, how much time do you need, man?

51:22>> I I'd prefer to have the 77 days. We're

51:25having this all redrawn up and

51:26everything and as opposed to 35 days,

51:29you know.

51:29>> What do you think, Inspector?

51:31>> I the city want to oppose 77 days.

51:34>> I make a motion to grant responder to 76

51:3677day extension on compliance.

51:39>> Alex Schneider, I'll second.

51:41>> All those in favor say I.

51:43>> I.

51:43>> Any opposed?

51:46>> 77 it is.

51:47>> Thank you.

51:48>> Good luck. Our [clears throat]

51:51next case, Senior Inspector Alexander

51:54Boris on page 8, property address

51:581524, Southwest 32nd Court. Case number

52:02BE2508-0188.

52:05Owner Sharon Bachar.

52:07[clears throat and cough]

52:08Notice posted at the property on 9126.

52:11Posted at Wiseboro Boulevard on 9826.

52:15This case was first heard on 22426

52:18to comply by

52:2262326.

52:24One section at $50 per day order

52:26recorded not comply. There is one

52:28extension noted.

52:33>> Alexandra Labor bill inspector for the

52:35city updating your own case number and

52:37address is read. The property was cited

52:39for violation of Florida building code

52:412023 section 105.1 for work without

52:44permit including windows and exterior

52:47doors. Interior alteration including

52:49kitchen and bathroom remodel alteration

52:51in closure to rear porch including

52:54alterations to exterior walls

52:57and roof structure

53:00and roof covering.

53:02The uh respondent is here to speak.

53:07My name is Henry Sapir. I'm the

53:09contractor. Come,

53:10>> come close to the mic. Yeah.

53:11>> Hammy Sapir. I'm the contractor. This is

53:14the owner.

53:14>> Okay.

53:15>> We are in the process of getting the

53:17permit. It's just I guess it's a lot of

53:20items and the comments are not always

53:24clear to the architect. So, it takes

53:25time for the architect to clear up the

53:27comments because he wants to get

53:30approved. Anyway,

53:32we are on our third review.

53:36And hopefully this time will be approved

53:39or maybe a minor minor

53:42comments to get the permits. Once we

53:44have the permits, obviously we do

53:45inspections and it shouldn't be long.

53:47>> How much time do you think you need?

53:49>> How much time do you think you need?

53:52>> You know, it's most of the it's

53:54basically up to, you know, the city what

53:56it takes. I I believe in what is it 70

54:00days today? 70 90 days. We we are

54:03working on the permit. Every time we

54:05have comments, you know, we keep on

54:06working on it.

54:07>> Are you been in communication with the

54:08inspector?

54:09>> Have you been in communication with him?

54:12>> Last time we spoke, but no,

54:16>> no, during the

54:17>> We haven't spoken with him.

54:18>> What?

54:18>> You have not spoken with the inspector?

54:20>> We spoke last time in the previous

54:23hearing, just before the hearing, but

54:24not

54:25>> inspector. Are they making progress to

54:27for compliance here? What where we how

54:30these guys

54:31>> at this time? The city's uh requesting

54:33for the case to come back as a massie. I

54:36have here last communication on 94th

54:41um as far as phone conversation. That's

54:442025

54:46and

54:46>> September 25.

54:47>> September

54:49uh September 4, 2025. So last year last

54:52last year. Yes. And

54:54>> the the case uh the plan the permit

54:58application has been awaiting clients

55:00replies since July 2nd. I mean it it's

55:04been like two months. So it's not really

55:06the city, you know. I mean it's been two

55:08months since the comments uh since the

55:11balls in your court. Yeah. So

55:12>> we submitted the corrections. The

55:14corrections were submitted.

55:15>> When did you submit the correction?

55:16>> Huh?

55:17>> When did you submit it?

55:18>> Last week.

55:19>> Yeah. It's showing here that uh waiting

55:21client reply.

55:23>> I don't know the system, but we did

55:25definitely submitted the uh

55:27>> who's doing the submittal? You or your

55:29contractor here?

55:30>> I'm the contractor.

55:31>> Did you Did you finish the steps um

55:33online?

55:35>> Yes. Like

55:36>> the call.

55:38>> You haven't been calling me. So if you

55:40call me, I can um

55:42>> Oh, okay.

55:42>> Call me, you know, when I'm at the

55:44office and I can look in the system for

55:46you and I can troubleshoot where the

55:48glitch is at. But we have I haven't been

55:50receiving that communication from you.

55:52>> I have an email saying that I

55:55>> again yeah there needs to be more

55:57communication. It'll be easier.

55:59>> Okay.

56:00>> I I think you first of all you need to

56:02keep in contact with them and this is

56:04going on a while. I move for 35day

56:07extension. Let's see some movement in 35

56:09days.

56:09>> Right. Because if is there a second?

56:12>> Yeah. Alex Schneider I'll second.

56:13>> Okay. All those in favor say I. I. I.

56:16>> All those in favor say I. Please. I

56:20>> any opposed?

56:20>> Nay.

56:22>> Okay, it it passes. Uh you have 35 days.

56:26Get something going because if you come

56:27back here again, it's going to go back

56:29as a Massie and you don't you really

56:30don't want that. So you need to talk

56:32with him.

56:32>> Okay.

56:33>> Every day if you have to.

56:34>> Okay.

56:35>> Oh yeah. When when uh when it comes back

56:37as a Massie um the day after the fines

56:40start acrewing. So when it comes back

56:42back as Massie, we're we're determining

56:43whether to actually impose fees. So we

56:46don't want to have to do that. We want

56:48you guys to actually complete this and

56:50get

56:50>> just to be in touch with the inspect.

56:51>> Yeah. Get get in touch with the

56:52inspector.

56:53>> That's the most important.

56:54>> Yeah.

56:54>> Thank you very much.

56:55>> Have a good day.

56:56>> Thank you.

56:56>> Good day.

56:59>> 35.

57:01>> Our next case, senior inspector Jorge

57:03Martinez

57:05[clears throat] on page 11. Property

57:07address 910 Southwest 30th Street.

57:10Owners Steven Donughue. Homestead

57:12exempted Kathleen McGawan. Case number

57:15BE251000046.

57:18Notice posted at the property on 9326.

57:21Posted at Wy'sboro Boulevard on 9826.

57:25This case was first heard on 52626

57:28to comply by 9226.

57:31One section at $50 per day or recorded

57:33not complied.

57:35>> Inspector Martinez updating case on

57:37behalf of the city. Case number and

57:39address as read. This case is not in

57:41compliance. I'm going to let the

57:42respondent speak.

57:48Good morning everybody. Good morning. Um

57:50Kathleen McGawan here and with my

57:52husband Steven Donahghue. Thank you very

57:54much for your time today. It's

57:56embarrassing to be here again. Um it has

57:59been the summer of frustration. I can

58:01see this resounding theme of working

58:04with contractors who don't show or

58:06thinking that the work is being done and

58:09then you come not to. So, um I'm hoping

58:11since this is the first day of fall and

58:13we've just gotten letters of of approval

58:16from a engineering firm and a con and a

58:20legitimate uh contracting company that

58:24we can actually move these things

58:25forward. We have been in touch pretty

58:28regularly with Mr. uh Martinez and with

58:30Mr. Simpson. Um I mean like again a

58:33prime example is I wasn't aware that

58:35there were comments that needed to be

58:37addressed and my contractor had not. Um,

58:39so we're getting on top of that. We're

58:41going to be moving things forward. Um,

58:44and uh, you know, because he's been a

58:46no-show for us for a month, six weeks.

58:48So that's we'd like to have an

58:50extension. Feel very confident that we

58:52can now with this new a team move this

58:54forward and get this in compliance and

58:56cured.

58:57>> Have you been in contact with the

58:58inspector?

58:59>> Yes, sir.

58:59>> What was last time?

59:01>> Uh, Friday.

59:02>> The last time was 9:18.

59:04>> 9:18.

59:05>> Three or four days ago.

59:06>> Thursday.

59:07>> Yeah, sure. We we've been ghosted, you

59:09know, Steven Donahghue owner and um

59:12we've spent a lot of money like you've

59:14heard through contractors in this town

59:16>> and uh this is more than a

59:18disappointment for us, but we're moving

59:19forward. We've got an engineer already

59:21signed

59:22>> and we've got a contractor in place. We

59:24want to get this cured.

59:25>> How much time do you think you need? I

59:27would like 77 days only because now they

59:30have to go back and review everything as

59:33they're coming in and getting started

59:35and it's just it everything takes time

59:37and the good ones are really busy. So

59:40now squeezing us into their already busy

59:42schedule. I'm hoping they they've

59:44they've they're very confident they can

59:46get this, you know, accomplished, but I

59:48I I can't just completely just squeeze

59:50them right off the bat because they're

59:51just coming to the game.

59:53>> Inspector, what do you recommend? The

59:54city want to oppose to a 77day

59:56extension.

59:57>> All right. I move for a 77day extension.

59:59>> Alex Schneider, I'll second. All those

1:00:01in favor say I.

1:00:02>> I.

1:00:02>> Any opposed?

1:00:04>> 77 it is.

1:00:05>> Thank you very much.

1:00:06>> Good luck.

1:00:07>> Stay dry today, guys.

1:00:08>> Good luck, guys.

1:00:09>> Thank you.

1:00:12>> Jorge, you have the next three cases.

1:00:14Um, our next case, Senior Inspector

1:00:17Jorge Martinez on page 22. to hearings

1:00:21on PWines. Property address 2648

1:00:24Northeast 37th Drive. Case number

1:00:27BE25100181.

1:00:30Owner Christopher David Valetta Liliana

1:00:33Andrea Gil Valetta. Notice posted at the

1:00:36property on 9326. Posted at Oneboro

1:00:38Boulevard on 9826.

1:00:41This case was first heard on 22426

1:00:44to comply by 32426.

1:00:46One section at $100 per day. Order

1:00:48recorded not comply. CD is requesting to

1:00:51impose fines in amount of $3,400 which

1:00:54continues to acrue. There are two

1:00:56extensions noted.

1:00:59Inspector Martinez updating case on

1:01:01behalf of the city. Case number and

1:01:02address as read. This case is not in

1:01:05compliance.

1:01:06They have been working and the last uh

1:01:11correction was 918. So five days ago. Uh

1:01:17I'm going to let uh the respondent

1:01:19speak.

1:01:20>> Good morning.

1:01:20>> Good morning, the general contractor for

1:01:22Mr. Bayetta, the owner.

1:01:24>> Uh yes, we are now in the third round of

1:01:28reviews. We have some comments, some

1:01:30back and forth between the mechanical

1:01:32engineer and the city regarding the air

1:01:35conditioning that at the very end they

1:01:38get an agreement for removing the air

1:01:40[snorts] conditioning of the of the

1:01:42structure. And now we are changing the

1:01:47plans because the air conditioning and

1:01:50for the assuming the final submission

1:01:53for the

1:01:55for approval. Uh we are asking for 77

1:01:58days. We are in constant communication

1:02:01with Mr. Martinez and hopefully this

1:02:04this is going to end in this final round

1:02:06of um reviewing.

1:02:08>> Inspector, when was the permit

1:02:10application actually submitted? Do you

1:02:11have that information? Uh, I don't have

1:02:14that date, but I know that the last

1:02:16correction was submitted 96 8 uh, sorry,

1:02:22>> 9:16.

1:02:23>> What about the one prior to that? Do you

1:02:24know?

1:02:25>> No.

1:02:25>> Okay.

1:02:27>> Is there a reason why no one was here at

1:02:29the last meeting?

1:02:30>> An emergency must fly away from the

1:02:33country.

1:02:34>> Okay.

1:02:35>> That's why he sent it to me.

1:02:37>> I guess that wasn't comm was that

1:02:39communicated to you, inspector.

1:02:40>> Yes. Oh,

1:02:41>> they have been in constant communication

1:02:43with me.

1:02:44>> No, I'm saying uh missing the last

1:02:46meeting was the reason communicated to

1:02:47you or

1:02:48>> I I don't remember that.

1:02:49>> Okay.

1:02:51>> Whenever you can't make a meeting, you

1:02:52have to tell them because we

1:02:54>> we think you're just blown us off,

1:02:56>> right? When you can't come in and make a

1:02:58meeting, you have to tell him so he can

1:03:00tell us. Otherwise, we'll assume certain

1:03:03things that you just kind of blowing us

1:03:05off.

1:03:05>> Sorry. Sorry for that. He just called me

1:03:08about the last um two days ago and told

1:03:11me Ricky I I need to go away. I got a

1:03:14family issues here and I have to fly

1:03:16away and he sent me an attorney power of

1:03:18attorney to to be here.

1:03:20>> Explain just

1:03:21>> Oh, okay. Wait. So, I think there's a

1:03:23misunderstanding. So, so that's why the

1:03:25owner is not here today. What I meant

1:03:27was last meeting it doesn't seem like he

1:03:29was here or anybody was here. Do you

1:03:31know why

1:03:31>> he was here? The owner was here the last

1:03:33meeting. Yeah.

1:03:34>> No, I don't remember. Not yeah not

1:03:36according to what we have here.

1:03:39>> Well

1:03:39>> for me for me as my first time here

1:03:42always Mr. Betta was there

1:03:44>> representing himself.

1:03:46>> Okay. So uh

1:03:48>> never miss a a hearing.

1:03:51>> Inspector are they actually making

1:03:52meaningful work to come into compliance?

1:03:54>> Yes. Yes. Uh I think the city can uh do

1:03:57the 77day extension.

1:04:00>> How about a 35day extension since we're

1:04:02at a Massie right now?

1:04:03>> Okay.

1:04:04>> Okay. Uh, I grant the respondent a 35day

1:04:07extension on compliance. We pause the

1:04:10daily fines and a mandatory reappearance

1:04:13at the October 27th, 2026 board hearing

1:04:18meeting.

1:04:19>> Alex Schneider, I'll second.

1:04:21>> All those in favor say I.

1:04:22>> I.

1:04:23>> I. Any oppose? 35 days you have.

1:04:26>> Thank you.

1:04:28>> Our next case is on page

1:04:3111. [clears throat]

1:04:32Senior Inspector Jorge Martinez.

1:04:37Property address 1505

1:04:40Southwest 9th Street.

1:04:43Owner Fouad R. Labad. Case number

1:04:47BE25020184.

1:04:51Notice posted at the property on 9226.

1:04:54Posted at One Eastboro Boulevard on

1:04:569826.

1:04:57This case was first heard on 7:225

1:05:00to comply by 11325.

1:05:03One section at $50 per day order

1:05:05recorded not comply. There are four

1:05:07extensions noted.

1:05:10Inspector Martinez updating case on

1:05:11behalf of the city. Case number and

1:05:13address as read. This case is not in

1:05:16compliance but the permit is already

1:05:19approved. It's not issued but it's

1:05:21approved.

1:05:22>> What's the difference?

1:05:23>> Yes.

1:05:24>> There's there's some uh

1:05:25>> and what's the hangup actually? Yeah.

1:05:28>> Sorry.

1:05:28>> No.

1:05:28>> Payment.

1:05:29>> Payment. Yeah. There's a payment

1:05:31missing.

1:05:32>> Oh, it's approved, but it hasn't been

1:05:34paid for.

1:05:34>> Correct. So, it's

1:05:36>> it's not issued. Yeah.

1:05:37>> So, it's waiting on payment.

1:05:38>> All right. So, you can talk now.

1:05:40>> So, the apparently what they I was told

1:05:43is that there's some hardship here.

1:05:46>> Okay.

1:05:47>> So, the city won't oppose to a 35day

1:05:49extension.

1:05:50>> What's the Do you know the Do you know

1:05:51the amount of the permit fees?

1:05:53>> I'm not sure. No. is like the thousands

1:05:56or it could be these hardships.

1:05:58>> Couple hundred bucks should be charged.

1:06:00>> It should be about 1,500.

1:06:01>> 1,500. Okay. All right, sir. You can

1:06:04talk.

1:06:05>> Name is for bad. I I need I got like you

1:06:09say the permit. I got the permit. I need

1:06:11to go pay and I need some extension like

1:06:1530-day.

1:06:16>> Okay.

1:06:16>> To pay.

1:06:18>> I move for a 35day extension.

1:06:20>> I'll second.

1:06:20>> Okay. All those in favor say I.

1:06:23>> I. Any opposed? All those in favor say

1:06:27I.

1:06:27>> I.

1:06:28>> I.

1:06:28>> Sorry.

1:06:29>> Any opposed? You have 35 days, sir.

1:06:32>> Good luck. Good luck.

1:06:35>> Our next case is on page 21.

1:06:43[clears throat]

1:06:43>> Senior Inspector Jorge Martinez.

1:06:46Property address 2425 Vimin Lane. Owner

1:06:50David Blair. Case number BE25050061.

1:06:56Notice posted at the property on 9326.

1:06:58Posted at 1 Boulevard on 9826.

1:07:01This case was first heard on 12726 to

1:07:04comply by 52626 one section at $200 per

1:07:08day. Order recorded. This case has

1:07:11complied. City is requesting to impose

1:07:13fines of $5,400

1:07:16and there [clears throat] is one

1:07:17extension noted.

1:07:18>> Inspector Martinez updating case on

1:07:20behalf of the city. Case number and

1:07:22address as read. This case is in

1:07:24compliance

1:07:25>> is

1:07:26>> yes is in

1:07:27>> comp. So the owner the city is

1:07:31requesting right now to the fines to be

1:07:33reduced to handling cost of $2,229.

1:07:38>> 2229.

1:07:41I'm going to let the respondent speak.

1:07:44>> Hi, my name is Scott Bird. I'm here in

1:07:46behalf of David Blair, the homeowner.

1:07:49I'm a friend of his. uh he gave me

1:07:51authorization to come in his behalf due

1:07:55to family matters. He couldn't make it

1:07:57here. And I've

1:08:01I been involved with with this case with

1:08:05Dave and understand what had been going

1:08:08on. He had hired a contractor from the

1:08:11beginning of the violation.

1:08:14Um,

1:08:15>> and the reason uh that it was the

1:08:19contractor that didn't follow up

1:08:21>> with being here at the meeting and doing

1:08:24what he was supposed to do, he was paid

1:08:27and they just went on and on and on and

1:08:30excuses, but so far I guess we're it's

1:08:33been

1:08:35conformed com he did follow through

1:08:38finally, but the the fines really aren't

1:08:41fair to the homeowner, But he had to

1:08:44hire a contractor. It's not his uh

1:08:47homestead home. His primary residence is

1:08:51in Kansas. And uh they wouldn't allow

1:08:55him to do it. So he looked for a

1:08:58contractor which showed up as a stellar

1:09:02reputation. But this is why this came to

1:09:04this, not David's uh neglect. And the

1:09:08money was always there to to uh complete

1:09:12what needed to be done.

1:09:15Wasn't getting done, but it's now taken

1:09:18care of. But the fines are

1:09:22it's it's not

1:09:23>> Did David do this? Did David actually do

1:09:25the work dirty?

1:09:26>> No, he be uh he was told uh he's not

1:09:30homestead.

1:09:31>> No, when I mean did he actually perform

1:09:33the work or did he buy the property with

1:09:35his existing? He No, there was uh it was

1:09:39there. He bought the property five years

1:09:41ago.

1:09:41>> Can be confirmed.

1:09:42>> Uh I'm if I'm not mistaken, the part of

1:09:46the door he did the door.

1:09:48>> Yeah.

1:09:48>> Uh

1:09:49>> what I can agree is that

1:09:51>> Excuse me.

1:09:52>> The thing I can agree is that he

1:09:54immediately hired a running permit

1:09:57runner.

1:09:58>> Okay.

1:09:59>> And he took a lot of time.

1:10:01>> The permit runner took a lot of time.

1:10:02>> Yes. And the owner has been in contact

1:10:05with me every single week.

1:10:07>> Okay.

1:10:09>> So he played ball. He didn't uh Yes.

1:10:11[clears throat]

1:10:14>> So So uh

1:10:16>> and you recommend that the fines be

1:10:18reduced to administrative costs?

1:10:20>> Yes.

1:10:20>> Okay.

1:10:22>> Fourth.

1:10:26>> What's What kind of Is this a rental

1:10:27property, a second home? What kind?

1:10:29>> He he lives here, too. Uh, some

1:10:32roommates are there.

1:10:34>> Yeah. And I'm there as well from time to

1:10:37time. Yes, I have it.

1:10:40>> I'll hear a motion to accept the uh

1:10:42reduced fines.

1:10:47>> The admin costs are I feel like this is

1:10:49higher than some of our other cases.

1:10:51Admin costs. Is there a reason for that?

1:10:54I think one of the dates he didn't

1:10:58nobody was here and the fines were

1:11:01increased. I'm not pretty sure.

1:11:03>> I mean just that's true.

1:11:05>> So So is this $2,229

1:11:08only admin cost?

1:11:10>> Yes,

1:11:11>> that's it. That's it does it does seem

1:11:13higher than usual.

1:11:15>> I make a motion that we wave all the

1:11:16fines.

1:11:17>> Thank you very much.

1:11:19>> Well, we're not done yet.

1:11:21>> Can I go?

1:11:22>> Can I get a second?

1:11:25Yeah. Alex Schneider, I'll second.

1:11:28>> Boy.

1:11:29>> All those in favor say I.

1:11:31>> I.

1:11:32>> I.

1:11:34>> All those opposed say

1:11:37yay.

1:11:40>> Your fines have been reduced. Uh J have

1:11:43been

1:11:44>> removed. Eliminated.

1:11:45>> Removed.

1:11:45>> Removed.

1:11:46>> Very lucky today.

1:11:47>> You're lucky.

1:11:47>> Very lucky today. Very much.

1:11:50>> Admin's not happy with you.

1:11:52Our next case is a new business case on

1:11:54page two.

1:11:57>> Senior Inspector Jose Serusi.

1:12:02Property address 2881 Northeast 32nd

1:12:05Street 121. Case number BE26060035.

1:12:10Owner Blaine M. Filio.

1:12:14Notice posted at the property on 82426.

1:12:18Posted at Wisboro Boulevard on 9826.

1:12:25Just like one moment, please.

1:12:32>> Senior building inspector Jose Salaguchi

1:12:34on behalf of the city presenting the

1:12:36case as read. The property was cited for

1:12:39work without permit under Florida

1:12:41building code 2023 section 105.1

1:12:46for complete apartment renovation

1:12:48including kitchen.

1:12:50The case was open in June 2nd, 2026.

1:12:53Inspection report was made on June 4th,

1:12:562026 and notice of hearing posted at the

1:13:00property in August 4, 2026.

1:13:03There are permits in process at this

1:13:05time. We're asking the board to find the

1:13:08violation exist to grant the property

1:13:10owner 126 days to come into compliance

1:13:13or a fine of $50 per day thereafter. I

1:13:17will let the respondent to speak. All

1:13:19right. [clears throat] Uh, good morning.

1:13:20My name is Blaine Fleo, the owner of uh,

1:13:23unit 121 at Wateride on the Inter

1:13:25Coastal. Um, as of last week, all my

1:13:27permits were pulled for the electrical,

1:13:29structural, and plumbing. Uh, I have

1:13:31right here the numbers and all the

1:13:34information regarding those permits. I

1:13:36also have the architectural plans from

1:13:38Michael Savise, a licensed and insured

1:13:40architect. Um, I'm I'm ready to go when

1:13:43whenever you are. I don't think I need

1:13:44an extension. And I just need 30 days to

1:13:47get the inspection approved and be done.

1:13:50>> Did you actually perform the work or did

1:13:51you buy it as is?

1:13:52>> No, I performed the work.

1:13:54>> Okay.

1:13:54>> How'd you get caught?

1:13:56>> What's that? How did you get caught?

1:13:58>> Oh, some uh another unit owner out of

1:14:00spite and

1:14:02>> just turned me in with 12 other folks.

1:14:04>> 12 others?

1:14:05>> That's a lot of us.

1:14:07>> But you you know you're not supposed to

1:14:08do the work without a permit, right?

1:14:10>> Understood. Yes.

1:14:10>> Okay. The the bottom line is you got

1:14:13caught because it's not right.

1:14:15>> Right.

1:14:15>> Okay.

1:14:16>> The dirty dozen.

1:14:19>> Uh so what what what has been done? Has

1:14:22the work

1:14:23>> been completed?

1:14:24>> Yes, sir.

1:14:25>> He's got permits and everything.

1:14:26>> What's the time the city's recommended

1:14:27him?

1:14:28>> 126 days.

1:14:29>> I move that we find for the city and the

1:14:31violations exists alleged in order to

1:14:33property owners.

1:14:36>> He the work is all done.

1:14:37>> Yes. So why does it need

1:14:40to pull the front door after?

1:14:42>> There is no problem. When it's complete,

1:14:43it's complete. We will close the case.

1:14:46>> Okay. Well, don't you need to check out

1:14:48the inspection or

1:14:50>> you you will call to the department, the

1:14:53city department, and request

1:14:54inspections.

1:14:55>> Okay.

1:14:56>> When it's [clears throat]

1:14:57But we need the permit issue only.

1:15:00>> We order the property owners to come

1:15:01into compliance by you said 126, right?

1:15:05>> Yes.

1:15:05>> July. I'm not July. uh January

1:15:09January 26, 2027 or a fine amount of $50

1:15:12per day per violation would be opposed

1:15:14and recorded.

1:15:15>> Ed Murphy second.

1:15:17>> All those in favor say I.

1:15:19>> Any opposed?

1:15:21>> You have 126 days to get it

1:15:24>> completely complete. Done. Done.

1:15:26>> Complete.

1:15:26>> Thank you.

1:15:27>> Thank you.

1:15:27>> Merry Christmas.

1:15:29Our

1:15:31next case, [clears throat]

1:15:34[snorts] Inspector Sarescue, page 14,

1:15:37property address 1201,

1:15:40Northwest First AB, owner Aaron B.

1:15:42Adams, case number BE25070089.

1:15:47Notice posted at the property on 82726.

1:15:50Posted at Wies Boulevard on 9826. This

1:15:53case was first heard on 111325 to comply

1:15:56by 22426.

1:15:58One section at $50 for a day order

1:16:01record and not comply. There are two

1:16:02extensions noted.

1:16:04>> Several building inspector for the city

1:16:06presenting the case and address as read.

1:16:08This case has not complied. The

1:16:10respondent is here to speak.

1:16:13>> Good morning. My name is Hugh Min. I'm

1:16:14here on behalf of Mr. Aaron Adams. Mr.

1:16:17Aaron Adams has been timely prosecuting

1:16:20the work needed to come into compliance.

1:16:22Mr. Adams is in contact with an

1:16:24architect as well as a flood manager

1:16:28from the city. Um, both of which are the

1:16:31balls in their court and we're waiting

1:16:33for a response from them and as such

1:16:34we're asking for a 60-day extension.

1:16:39>> What do you recommend, Inspector?

1:16:44>> This case has been um open for some time

1:16:48now. So,

1:16:50>> what is it that can you explain to them

1:16:53what where do you stand and

1:16:55>> exactly what have you done so far to to

1:16:57bring this into compliance?

1:17:01>> Good afternoon, Erin Adams. I've hired a

1:17:03architect, plumber, engineer, um, all

1:17:07that stuff. General contractor. We got

1:17:09everything uh taken care of except for

1:17:11the there's a problem with the flooding.

1:17:14Just got off the phone with the

1:17:15architect. Um, they say they want us to

1:17:18raise the structure two feet. We're

1:17:20going to try to set up a meeting with

1:17:22someone that can figure this out. So,

1:17:25>> you say brace the structure

1:17:27>> two feet.

1:17:28>> Oh, raise the structure.

1:17:29>> Yes, sir.

1:17:30>> Has any plans applications been

1:17:32submitted to the building department?

1:17:34>> Yes. Yes, they do have um they do have

1:17:37all the applications submitted

1:17:39and um I guess it's awaiting client

1:17:43response, right?

1:17:43>> Since when do you know? I don't I don't

1:17:46have the information on me. Sorry.

1:17:49>> Is okay. What's wait awaiting client

1:17:51response?

1:17:53>> What?

1:17:54>> Um I can check on you. I don't I don't

1:17:55have it in front of me.

1:18:00>> Yeah.

1:18:02>> Waiting time reply means the city did

1:18:04their plan review. Now it's in the

1:18:07property owners court to respond to

1:18:10comments.

1:18:11>> Okay. Right. And you know, I I' also

1:18:14like to, you know, let you know what the

1:18:17what the violation is. This is a case

1:18:19where they did major remodeling to where

1:18:22it got to the point that the remodeling

1:18:25exceeded 50% of the value of the

1:18:27structure. I mean I mean that's a pretty

1:18:30extensive remodel. So what that triggers

1:18:33that the the structure needs to be

1:18:35raised. So to say that this is in the

1:18:38city's court is unfair to say because

1:18:40the city is entitled to their review. So

1:18:43it's not in our court. I mean obviously

1:18:45it should be factored in that the city

1:18:47has to review it. So I would say more

1:18:50that they need to come to a realization

1:18:53raise the structure or not. Um and you

1:18:56know I don't know if they're in that

1:18:58debate stage with the planer or not but

1:19:01again uh you know to say it's in the

1:19:03city's court. No, it's in the property

1:19:05owners court that they did extend the

1:19:07remodel without a permit.

1:19:09>> True.

1:19:10>> Inspector, have they been in contact

1:19:12with you?

1:19:14>> So, I I have I have here in front of me

1:19:15the mechanical permit. It's awaiting

1:19:17initial fee payment and go back go back

1:19:20to that one. Um

1:19:23>> go back to all of them

1:19:25the record.

1:19:31>> Uh okay. Electrical sub permit says

1:19:33open. That's open for review.

1:19:37And we got to have another one. We got

1:19:40to have a building permit on us.

1:19:44>> No, that's it. Yeah.

1:19:46>> So, basically, it's in a homeowner's

1:19:48court.

1:19:50>> Yeah. Oh, pretty much. So, uh I'm

1:19:53guessing they just

1:19:56got a hold of a of a architect, right?

1:19:59So basically it's probably they're

1:20:03starting from the from the beginning,

1:20:05right? If they need to raise the

1:20:06building up, there's going to be new set

1:20:08of plans, new set of everything. So

1:20:11>> when was the last time you spoke with

1:20:12him?

1:20:12>> We we we spoke pretty much pretty much

1:20:15all I think I think the last time we had

1:20:16contact was at the was at the the

1:20:18previous hearing. Correct.

1:20:21>> So So guys, so with with your architect,

1:20:23is really raising a building within your

1:20:25wheelhouse? Is this something that

1:20:27you're going to do?

1:20:28I just heard about it uh as I walked

1:20:30into the meeting today. Just

1:20:32>> understood. Let it sink in a little bit.

1:20:34But um what do you recommend an

1:20:36inspector?

1:20:37>> Um

1:20:40>> I mean 77 days should be

1:20:45>> 77 days to

1:20:47>> 77 days will bring it over

1:20:48>> to get the permit to get the permit

1:20:50>> to get the permit and then the building

1:20:52still has to be raised. So

1:20:55>> have to figure out whether the next step

1:20:57is I move for a seven 77day extension

1:20:59with a mandatory appearance.

1:21:01>> I I think we should do 35 days of the

1:21:04mandatory reappearance.

1:21:05>> I agree.

1:21:06>> 77 days. It's that'll bring it over a

1:21:08year's time. 35 days. You can figure out

1:21:10a game plan.

1:21:11>> Take it back.

1:21:12>> Okay. All right. I'll take back the

1:21:14motion and leave it to

1:21:16>> you. You want amend it? Go ahead.

1:21:18>> I amend it.

1:21:19>> All right. Thank you, Ed. Uh, I will

1:21:20make a motion to grant the respondent a

1:21:2335-day extension on compliance in a

1:21:25mandatory appearance at the October

1:21:2727th, 2026 board meeting.

1:21:29>> Alex Schneider second.

1:21:30>> All those in favor say I.

1:21:32>> I.

1:21:33>> Any opposed?

1:21:34>> 35 days. You have

1:21:38>> the master permit. It's awaiting client

1:21:40replies in September 18th. So they they

1:21:42submitted some stuff.

1:21:43>> Making progress.

1:21:44>> Okay. Yeah.

1:21:44>> Yeah.

1:21:45>> Keep on trucking, man.

1:21:47>> Thank you. See you in 35 days.

1:21:52>> Our next case is a new business case on

1:21:55page seven. Senior Inspector Andrew

1:21:57Gbia, page seven, property address 1401,

1:22:02Southeast 10th A. Case number be

1:22:0526060055.

1:22:08Owner Padellis

1:22:11Doagis.

1:22:13Notice post at the property on 82626

1:22:16posted at Wisboro Boulevard on 9826.

1:22:22>> Is this

1:22:27[snorts]

1:22:30nice flowers?

1:22:34>> What is that?

1:22:36>> Incognito.

1:22:38>> Good morning. Building Inspector Andrew

1:22:40Gabia for the city presenting case and

1:22:42address is read. This case was cited for

1:22:44violation of the Florida Building Code

1:22:462023 105.1. Work illegally performed

1:22:49without obtaining the required permits

1:22:51in the following manner but not limited

1:22:53to uh windows and doors, cement pave

1:22:56walkways, patio in the patio area and

1:22:59some interior renovations, kitchen,

1:23:01bathroom, structural plumbing. Uh I

1:23:03researched this property on BCPA and

1:23:05then visited it. observed two workers

1:23:08inside the fenced in area. Um

1:23:12[snorts] there is a a permitted

1:23:14chainlink fence around the property. Uh

1:23:16green mesh covering. One of these

1:23:18workers came out and said they were just

1:23:19doing touch-ups inside the house. He

1:23:21called the homeowner or contractor. I

1:23:23was denied access. This property has uh

1:23:26new windows and exterior doors. New

1:23:28cement paper walkways. Um some outdoor

1:23:31electrical like a pump for something. uh

1:23:34AC condenser was removed and the pipes

1:23:36were exposed, ready to connect a new

1:23:38one. I observed a new tile stacked in a

1:23:41pile with cement and uh I left my car

1:23:44with the worker. I returned to the

1:23:47property a couple hours later and they

1:23:48were gone. They weren't there anymore.

1:23:50This case was opened up on 64 2026. The

1:23:53inspection report was mailed on 65 2026

1:23:56and code board was scheduled in 84. The

1:23:58city is requesting the code board to

1:24:00find the violations exist and grant the

1:24:02property owner 77 days to come into

1:24:04compliance or $100 a day thereafter. The

1:24:07respondent is here to speak.

1:24:10>> Good morning. Uh my name is attorney

1:24:11Alexander Cranles on behalf of the

1:24:14homeowner. uh come bearing proof that

1:24:17there is a uh currently an engineer uh

1:24:21working on this uh actively and we're um

1:24:25actively trying to get everything into

1:24:27compliance here. Um I should have um if

1:24:31if the commission uh is

1:24:36amanable to an extension uh we we would

1:24:38push forward with this as much as

1:24:40possible.

1:24:40>> You said you have an engineer. You've

1:24:42applied for the permits. Uh no, we have

1:24:45a uh engineer and architect that is uh

1:24:47preparing all the um all the all the

1:24:50drawings of everything that was done. Uh

1:24:52and that will be uh submitting

1:24:54everything uh as soon as possible. They

1:24:55need about 30 days to get everything

1:24:57ready for submitt.

1:24:59Uh if I if we could have uh some more

1:25:01time just in case there's some changes.

1:25:02Um 77 days would be great.

1:25:04>> Inspector, what's the timeline by the

1:25:06city?

1:25:08>> Well, 77 days I think should be

1:25:10sufficient. I mean, I I haven't really

1:25:12had any contact with the owner. I think

1:25:14uh the moment when I was when I arrived

1:25:17initially at the property, I think he

1:25:18called me a day or so later, but that

1:25:21was, you know, the that was back on 64,

1:25:2465, 66, you know, so I haven't heard

1:25:27anything from uh from the owner of the

1:25:28home and nothing's been submitted. So, I

1:25:31mean, I think 77 is a good step, you

1:25:34know, and if uh, you know, it takes 30

1:25:36days for them to submit some

1:25:37applications,

1:25:39you know, we can go from there as a good

1:25:40start. I move that we find for the city

1:25:43the violations exist alleged and we

1:25:45order the property owners to come into

1:25:46compliance by December 8th, 2026 or a

1:25:50fine in the amount of $50 per day per

1:25:53violation will be imposed and recorded

1:25:55in a mandatory appearance at the

1:25:57December 8th, 2026 meeting.

1:25:59>> Alex Schneider, I'll second. Yeah, both.

1:26:01All right. All those in favor say I.

1:26:03>> I.

1:26:04>> Any opposed?

1:26:06>> 77 days.

1:26:07>> And tell you only keep in contact with

1:26:09the inspector.

1:26:10>> Now that I'm on board, I'll I'll reach

1:26:12out. I appreciate y'all. Thank you. Take

1:26:13care.

1:26:15>> That was $50, correct?

1:26:17>> No. 100.

1:26:18>> 100. Okay.

1:26:19>> Yeah.

1:26:20>> Our next case is on page 23. Senior

1:26:23Inspector Jorge Jorge Martinez.

1:26:25>> Yeah. I thought I said 50 on that.

1:26:27>> Oh, okay.

1:26:28>> Yeah.

1:26:29>> Okay. So he recommended recommended.

1:26:31>> Oh. Uh,

1:26:32>> right. I recommended 100, but if you

1:26:34recommend 50,

1:26:35>> what do you think? Were you we

1:26:36undercutting ourselves here?

1:26:38>> Well, I think that I think a $100 a day

1:26:40surely lights a fire. A spark,

1:26:43>> right? [snorts]

1:26:43>> But, you know, if you oppose that.

1:26:46>> No, I just I would I would love for you

1:26:49to support a hundred.

1:26:50>> Yeah. I mean, we are we are active.

1:26:53>> I know I said 50. I'm not not that

1:26:54crazy.

1:26:55>> So, the [snorts] the building official

1:26:56recommends 100 also.

1:26:58>> Okay. Sorry. Uh, I um make

1:27:01>> I make a new

1:27:08>> Yeah, I just misspoke. Uh, make a new

1:27:11motion to uh amend the daily fine amount

1:27:14to $100.

1:27:17>> Alex,

1:27:22>> we [snorts] need we need to vacate.

1:27:23>> Yeah,

1:27:25>> okay.

1:27:27I make a mo then okay then I make a

1:27:29motion to withdraw the motion I just

1:27:31said then I

1:27:33>> then I make a motion to vacate the uh

1:27:37[snorts] previous motion

1:27:39>> previous order I'm sorry

1:27:41>> Alex Schneider I'll second it.

1:27:43>> All those in favor say I.

1:27:45>> I.

1:27:45>> Any opposed? Motion is vacated. I make I

1:27:49move that we find for the city and the

1:27:50violation exists alleged in the order of

1:27:52property owners to come into compliance

1:27:54by December 8th, 2026 or a fine amount

1:27:58of $100 per day per violation be opposed

1:28:00and recorded and a mandatory appearance

1:28:02at the next at the December 8th, 2026

1:28:04board meeting.

1:28:04>> Alex Schneider, I'll second.

1:28:06>> All those in favor say I.

1:28:07>> I. I.

1:28:08>> Any opposed?

1:28:11>> Okay, we're good now.

1:28:12>> And now it's $100 a day.

1:28:14>> Okay.

1:28:15>> Thank you.

1:28:16>> You're welcome. Our next case, don't

1:28:18worry about it. Get it down. You don't

1:28:19have to worry about it.

1:28:20>> Jorge Martinez, page 23, property

1:28:24address 1517 Northwest 4th A. Case

1:28:28number BE24070390.

1:28:32Owner Artree LLC.

1:28:35Notice posted at the property on 83126.

1:28:38Posted at Wingsboro Boulevard on 9826.

1:28:41This case was first heard on 32525 to

1:28:44comply by 7225.

1:28:47[snorts] One section at $100 per day.

1:28:49Order reported not complied. City is

1:28:51requested to impose fines in the amount

1:28:53of $2,800

1:28:55which continues to acrue. There are

1:28:57several extensions noted.

1:29:00>> Inspector Martinez updating case on

1:29:02behalf of the city. Case number and

1:29:04address as read. This case is not in

1:29:06compliance. I'm going to let the

1:29:08respondent speak.

1:29:09>> Good morning. Alex got a monoglue. Um,

1:29:13this time it's not me. All the

1:29:15documents.

1:29:16>> Who is it then?

1:29:16>> Huh?

1:29:17>> Who is it then? Whose fault is it?

1:29:18>> Well, I'm not not assigning blame here,

1:29:20but it's just taken time for the uh the

1:29:23plan reviewers to do it. Um, the zoning

1:29:25approved it. Um, building has been on

1:29:28vacation. So, I've been to the city over

1:29:30the last couple of weeks like five, six

1:29:32times to try and push it to somebody.

1:29:35Randy saw it in building. He it was a

1:29:39clerical issue where the four letters

1:29:41that they required were in one PDF and

1:29:43he just saw the first page and didn't

1:29:45see the rest of it. So I'm having to

1:29:48reprint resubmit and uh he said once

1:29:51that's done he'll approve it today.

1:29:54>> What what

1:29:56once what what what's

1:29:59>> So there were engineer letters that they

1:30:00were requesting the building department

1:30:02was requesting uh for the the missed

1:30:04inspection. So that was the only thing

1:30:06that was missing in order for building

1:30:07to approve and that's that and then

1:30:10zoning had had already approved and

1:30:11engineering is just basically waiting

1:30:13for building to approve. So once that's

1:30:15all done it should happen today then we

1:30:18should have a permit

1:30:19>> port. May I add some uh content to this?

1:30:22>> Uh first of all it's this case is over

1:30:25two years old.

1:30:26>> Oh yes.

1:30:26>> Uh second to that so I can explain what

1:30:29he's referring to engineers letters. If

1:30:31you build the structure without a

1:30:32permit, uh you obviously concealed um

1:30:35work that the inspector would have

1:30:37normally had to look at. So therefore,

1:30:40the city will require um him to go out

1:30:43and acquire his own engineer to certify

1:30:45the work. Now, if he submitted an

1:30:47engineer's letter that didn't was kind

1:30:50of vague, the plan review is going going

1:30:52to reject it and not accept it. But more

1:30:54importantly, um this case is over two

1:30:57years old. We got it.

1:30:58>> Yeah. So, so the

1:31:00>> So, yeah, I'm inclined to because

1:31:02there's no way admin this case is over

1:31:04two years. There's no way admin costs

1:31:05are going to be under what it is right

1:31:07now. So, I'm I'm inclined to just impose

1:31:09the fines, you fix it, and then we don't

1:31:12we don't either way, we don't have to

1:31:14see you again.

1:31:15>> I'm not sure I understand.

1:31:16>> Like, what have you done in the last 30

1:31:18days to bring us in compliance? get the

1:31:20paperwork from the engineer and speak

1:31:22with the individual plan reviewers to

1:31:24get it approved because obviously

1:31:25there's time frame in, you know, each

1:31:27cycle. So, the last time it was just the

1:31:31fact that the letters were all in one

1:31:33PDF. It was just really dumb clerical

1:31:35error and not on my part. But the what

1:31:38I'm saying is that he spoke to me today.

1:31:41He sent an email. I just got it this

1:31:42morning. He says, "If you split the

1:31:44letters up, I'll approve it." and and

1:31:47that's all that we need in order to get

1:31:49the permit.

1:31:49>> Who says put the letters up? Is the city

1:31:51engineer

1:31:52>> Randy Clutter?

1:31:54>> That's one of our plan years, boys. But

1:31:56I I'd like to get a little bit more

1:31:58information on why where is the 2-year

1:32:00lapse in this. I mean, we keep talking

1:32:02about something that happened yesterday

1:32:04rather than emphasizing on there's

1:32:05[clears throat] a two allow me to speak,

1:32:07sir.

1:32:07>> Yep.

1:32:08>> Um I'd like to get a little bit more I'd

1:32:10be more sympathetic to know why was

1:32:12there a two and a half year delay here.

1:32:16We were trying to do a variance. We've

1:32:19been trying to do different work to try

1:32:21and correct it. So, because we didn't

1:32:23want to tear the whole thing down. At

1:32:25the end of the day, it was just the

1:32:26encroachment uh of the five-foot setback

1:32:29that was the the the issue. And

1:32:31obviously, the fact that we didn't have

1:32:32a permit. Again, we're talking about a a

1:32:34wooden deck here right around my pool

1:32:36around my house. So, it's not like a a

1:32:38two-story building. I get it. Still done

1:32:41correctly. I'm owning that. I have a two

1:32:43shaded structures. Am I missing

1:32:45something?

1:32:47>> No, my point is that

1:32:48>> but you said it's just a pool deck. It I

1:32:50see the case involves two shade

1:32:52structures,

1:32:53>> right? Pool deck and a pergola.

1:32:55>> Okay. You just said that it only

1:32:57involves a pool deck. So I just wanted

1:32:59clarification on that.

1:33:00>> Fine.

1:33:01>> Again, two, this has been two and a half

1:33:03years. Did you go through the variance

1:33:05process? We were trying to, but then

1:33:07after the cost involved and there were

1:33:09no asurances, then we said it that was

1:33:12probably not the right course of action.

1:33:14So, we said, "Okay, we're going to do

1:33:15the change of the work." The work's been

1:33:16done.

1:33:17>> We know that. That's why you're here.

1:33:19But I'm wondering what a two and a half

1:33:21year delay.

1:33:21>> The correction, that's what I meant to

1:33:23say. The correction has been done. We

1:33:24just needed to get the permits. And I'm

1:33:28fully aware of that.

1:33:29>> I move that we find that the violation

1:33:31was not complied with by the date

1:33:33ordered and therefore we impose the fine

1:33:36in the amount of $2,800 per section

1:33:38violation stated in the first order.

1:33:42>> I second.

1:33:44>> So what does this mean?

1:33:47>> All those in favor say I.

1:33:48>> I.

1:33:49>> Any oppose?

1:33:51>> Fines are imposed. Uh you you you really

1:33:55need to get this done. I agree. I want

1:33:57to get this done. This is terrifying.

1:33:59Every time we come up here,

1:34:00>> it's two years and uh it should have

1:34:02been done by now.

1:34:03>> I'm with you.

1:34:04>> Okay.

1:34:04>> But still, I don't know what this means.

1:34:06Are there acrewing fines?

1:34:08>> The fines are going to continue to acrue

1:34:10until this is complied. So,

1:34:12>> keep on doing. Right now, it's $200 plus

1:34:14$100 a day.

1:34:16>> So, if you're one letter away, get that

1:34:17letter done and just

1:34:19>> it's there. It's been sub point.

1:34:23So, uh, the fines are acrewing. Uh, we

1:34:27need to see him back here.

1:34:28>> No, he's done now. You're someone else's

1:34:30problem.

1:34:32>> So, what does that mean? What I mean, I

1:34:33get the permit and then what? When do

1:34:35they stop

1:34:35>> for lean amnesty? Maybe

1:34:36>> correct.

1:34:37>> No, no. My point is, do they stop

1:34:38acrewing once I get the permit? That's

1:34:40my question.

1:34:40>> Yes.

1:34:41>> Once they

1:34:43>> Please let that be it.

1:34:45>> Yes.

1:34:46>> You're saying compliance.

1:34:50After you get the permits issued, fines

1:34:52are going to stop.

1:34:53>> Okay.

1:34:54>> Board, keep in mind that there is a sec

1:34:56another phase to this. Once he gets the

1:34:59permit, yes, the code place complies,

1:35:02but he's obligated to then call for

1:35:04inspections.

1:35:04>> Of course. Yeah, I'm aware of that.

1:35:07>> And and to to the cavalier about it's

1:35:10just a shade structure. if it's not

1:35:12built properly. That's why we do this

1:35:14and have codes because during a storm

1:35:16that could be your neighbor's personal

1:35:18or their property damage when it blows

1:35:20off your pool deck. I'm aware. So that's

1:35:22why we do these.

1:35:23>> I promise. And that's why I got the

1:35:24engineer to make sure that it was okay,

1:35:26which it is. So

1:35:28>> all right.

1:35:28>> Thank you.

1:35:29>> Thank you.

1:35:30>> Yeah.

1:35:32>> Our next case is on page 17.

1:35:37>> [clears throat]

1:35:37>> Senior Inspector Joseé Salgusti.

1:35:39Property address 1318,

1:35:43Northwest 4th A-B.

1:35:45Owner Marie D. Austin,

1:35:48>> Latang Fam Revocable Trust. Case number

1:35:50BE25070241.

1:35:54Notice posted property on 82726.

1:35:57Posted at Wingsboro Boulevard on 9826.

1:35:59This case was first heard on 12726 to

1:36:03comply by 52626.

1:36:05Two sections at $50 per day. Order

1:36:07recorded not comply. There are two

1:36:09extensions noted.

1:36:15>> Wait, wait. He has to speak first.

1:36:17That's okay. No problem.

1:36:23>> Josei, senior building inspector for the

1:36:25city, updating the case number as read.

1:36:28The case is not comply. There are

1:36:31permitting process. I will let the

1:36:34respondent to speak.

1:36:37>> Hello. Um my name is Valerie Augustine

1:36:39on behalf of my mother Marie Augustine.

1:36:42Uh we did submit a permit but it was

1:36:44rejected and um the instructions ask for

1:36:46an engineer to submit a um an after

1:36:49build letter. Um it's just that

1:36:52currently I'm kind of transitioning from

1:36:54active duty to reserves and like because

1:36:56of um financial hardship I'm not able to

1:36:58hire an engineer at the moment. So, like

1:37:00a 77-day extension to save funds to um

1:37:04be able to hire an engineer.

1:37:07>> How did this even get caught? New

1:37:09plumbing fixtures.

1:37:11>> New toilet sink. They put the toilet and

1:37:14sink out for bulk pickup and that's when

1:37:16the inspectors look and see. Anytime

1:37:18they see those things out there, they go

1:37:21and inspect.

1:37:22>> Right.

1:37:23>> Is that accurate?

1:37:24>> Yeah.

1:37:24>> All right. 77. I move for 77day

1:37:27extension and thank you for your

1:37:28service.

1:37:29>> Thank you. Thank you.

1:37:31>> Second, sorry, the city doesn't oppose

1:37:3477 days suspension. Right. Okay. That

1:37:37was the motion, but

1:37:38>> thanks.

1:37:39>> All those in favor say I.

1:37:41>> I.

1:37:41>> Any oppose? 77 days.

1:37:44>> Thank you so much.

1:37:46>> Thank you.

1:37:46>> You're welcome.

1:37:48>> Our next case is

1:37:51>> Oh, I'm sorry. Want to take a break?

1:37:53>> Yes.

1:37:54>> Yeah, sure.

1:37:55>> Okay. This the city. Uh, we're going to

1:37:57take a brief recess. Thank you.

1:37:59>> Yeah.

1:51:34and we're going to resume our code

1:51:36enforcement board hearing.

1:51:38Our next case is on page 16. Senior

1:51:41Inspector Joseé Saragusti, property

1:51:44address 424, Northwest 14th A. Owner

1:51:48Leonard Gogggins. Case number

1:51:50BE26020178.

1:51:53Notice posted at the property on 83126.

1:51:56Posted at Wisboro Boulevard on 9826.

1:52:00This case was first heard on 62326 to

1:52:03comply by 72826.

1:52:05One section at $50 per day. Order

1:52:07recorded not comply. There's one

1:52:09extension noted.

1:52:26Josei, senior building inspector for the

1:52:28city, updating the case number red.

1:52:31[snorts] The case is not comply for

1:52:34complete renovation in progress,

1:52:36plumbing, electric, and a new panel.

1:52:40>> I will let the respondent to speak. the

1:52:43right case.

1:52:44>> Is that the right case? Uh

1:52:45>> 846 Northwest 14th Avenue4

1:52:49>> 424 Northwest 14th Avenue.

1:52:51>> I'm sorry.

1:52:52>> One moment, please.

1:52:53>> Give me one second.

1:52:55>> Please hold.

1:53:09Uh sorry.

1:53:12The case is for yes 424 Northwest 14th

1:53:16Avenue. The case is not comply

1:53:22new fence and two shed installed without

1:53:25permit. There is a permit in process

1:53:28for the driveway and I will let the

1:53:32respondent speak.

1:53:35>> Can you turn that on?

1:53:38>> Good morning. My name is Lennon Gogggins

1:53:41and my son, this is his project. He

1:53:44should be here. But um

1:53:47>> on Well, he's doing it for me. So, you

1:53:50know, I'm trying to do the best I can on

1:53:53uh getting these permits. I I just uh

1:53:57signed off on one permit permit, the

1:53:59last permit that we were supposed to

1:54:01have, and also tow down the shed uh two

1:54:04weeks after we had left from the last

1:54:07meeting. So, the shed is done.

1:54:09>> I need to I need to inspect that one. I

1:54:11did that.

1:54:12>> Yes, we we've been trying to contact

1:54:13you. My son been trying to contact you.

1:54:16I also was there on the 27th with this.

1:54:19I was trying to see if we went, but we

1:54:22never uh got a response.

1:54:26>> Looks rare, but uh

1:54:30>> there two sheds. [clears throat]

1:54:31>> I tow it down. I tore the other one

1:54:33down. The old one is towed down.

1:54:34>> And it's a permit for another one. is

1:54:37one permit for the fence, one for the

1:54:40shed, and he said that one shed it was

1:54:44removed.

1:54:45>> So, okay. It says here two sheds. He

1:54:47said he put down one, right?

1:54:49>> Yeah. So, there's still another one.

1:54:50Yes.

1:54:51>> Yes. Only one. And

1:54:53>> for

1:54:55putting put the permit for one

1:54:58>> and the fence permit is already issued.

1:55:01>> It's issued.

1:55:02>> Yes. And the driveway?

1:55:04>> Yes. The driveway is under permit that

1:55:08is awaiting client replies since July

1:55:1127.

1:55:12>> Yeah,

1:55:13>> you need to answer something there.

1:55:15>> What's the nature of the comments?

1:55:17>> Um,

1:55:17>> sorry.

1:55:18>> The nature of the comments. Do you know

1:55:19>> the comments on the the driveway?

1:55:22>> The I didn't understand. Sorry.

1:55:24>> Okay. So,

1:55:24>> what did the city say about these the

1:55:26the driveway plans?

1:55:28>> I mean, is it something complicated? Is

1:55:30it something simple? No, I don't have

1:55:32with me the information, but he need to

1:55:34submit additional information. Right.

1:55:36>> Okay.

1:55:38>> How much?

1:55:39>> So, there's been some comments on the

1:55:41driveway

1:55:42>> that it means your son or you have to

1:55:44talk find out what those comments are.

1:55:46>> Well, we already know uh the contractor

1:55:49supposed to send sent the uh permit in

1:55:51or something. Well,

1:55:52>> okay. He sent I guess it was sent in

1:55:55comments on them. Now, those comments

1:55:58have to be addressed.

1:55:59>> Yes.

1:56:00>> Okay.

1:56:01Uh,

1:56:02>> how much?

1:56:03>> Need some more time.

1:56:04>> Okay.

1:56:05>> So, it's been about two months. You need

1:56:06to get on that contractor, get him to

1:56:08get that in there. Um, how much time do

1:56:10you think you need?

1:56:11>> Uh, 77.

1:56:13>> Inspector, what do you think?

1:56:14>> The city doesn't oppose 77day extension.

1:56:17>> Alex Schneider, I move for a 77day

1:56:19extension.

1:56:20>> Okay.

1:56:20>> Ed Murphy, second.

1:56:22>> All those in favor say I.

1:56:24>> I.

1:56:24>> Any oppose? 77.

1:56:27>> Okay. Get them. Get them going. Thank

1:56:30you. God bless you all.

1:56:32>> Have a great day.

1:56:32>> Have a good day.

1:56:38>> Our next case [clears throat] is on page

1:56:4122.

1:56:44>> Senior Inspector Jorge Martinez.

1:56:50Property address [clears throat] 2132

1:56:53Northeast 63rd Street. Case number

1:56:55BE25070049.

1:56:58owner

1:57:01Galicia revocable livable trust Jessica

1:57:04Vargas trustee notice posted at the

1:57:07property on 831

1:57:1026 posted at Wingsboro Boulevard on

1:57:129826.

1:57:13This case was first heard on 111325 to

1:57:16comply by 32426

1:57:19one section amended from $50 per day to

1:57:22$250 per day. Order recorded not

1:57:25complied. City is requested to impose

1:57:27fines in amount of $6,750

1:57:30which continues to acrue and there are

1:57:32two extensions noted.

1:57:34>> Inspector Martinez updating case on

1:57:36behalf of the city. Case number and

1:57:37address as read. This case is not in

1:57:40compliance. I'm going to let the

1:57:41respondent speak.

1:57:44>> Hi, good morning. My name is Jessica

1:57:46Chaw and I am the owner of the property.

1:57:49Um I bought the house with all

1:57:52everything as like it was. So I wasn't

1:57:56aware that permit that all of that was

1:58:00done without permits. Um after that I

1:58:03hired a runner to help me because I

1:58:06don't live here. I live in Georgia. Um,

1:58:09so I hired her, I paid her, she started

1:58:12um, submitting the permits and doing

1:58:15everything that supposedly was supposed

1:58:17to do. Um, after that I started

1:58:21receiving like just letters that said

1:58:24she was granted an extension. So I said,

1:58:26"Okay, she is working on it because it

1:58:29takes some time." Um, and then I

1:58:32received the last letter that was

1:58:34stating that fines and that nothing has

1:58:37been done. So I contacted um Mr. Jorge

1:58:41to ask him what was going on because I

1:58:44thought like everything was being worked

1:58:45on. So I I found out that um she was

1:58:50doing it very slowly and that last time

1:58:54she didn't come to the hearing which she

1:58:56tell me she was here. She said yes I was

1:58:59there for sure and she was charging me

1:59:01every time she came. Um so I spoke with

1:59:06Mr. Jorge. she he said no she didn't

1:59:08come and then so things are getting hard

1:59:11ser more serious because money is uh um

1:59:15acrewing uh so um I said well I'm going

1:59:18to be there on the next hearing so I can

1:59:21know what like really what's going on

1:59:23what's going what can I do to fix it and

1:59:25I spoke to her and she said like the

1:59:27corrections have been submitted um the

1:59:30Mr. Jorge told me there was something

1:59:32that she submit like bad like a permit

1:59:36and it has to be breaking down by one

1:59:39permit like plumbing building. So she

1:59:42told me she did already. Um I just want

1:59:45to make sure that everything gets done

1:59:47as fast as I can and I just um request

1:59:51for a 77day extension to see if I can

1:59:55work on those days to fix it.

1:59:57>> Inspector, where are we standing at with

1:59:59permitting? This has been going on since

2:00:00November of 25. Have they done anything?

2:00:05>> Permits have been applied for.

2:00:07>> Applied for?

2:00:08>> Yes.

2:00:08>> When was the application date, Dina?

2:00:10>> Uh, okay. The last corrections I see

2:00:12here is 8:27. So,

2:00:14>> couple months.

2:00:15>> No, no, no, no.

2:00:16>> 827.

2:00:18A couple weeks. I'm sorry.

2:00:20>> Time flies.

2:00:21>> So, uh, the city will oppose to a 77 day

2:00:23extension.

2:00:24>> What about the fines? Should we stop and

2:00:26then

2:00:27>> you you you purchased the house with all

2:00:29this work that has already been done?

2:00:31>> Yes, sir. Yes. Mhm.

2:00:33>> I make a motion to grant the respondent

2:00:34a 77-day extension on compliance and uh

2:00:38stop the fines, daily fines with a

2:00:40mandatory appearance at the uh December

2:00:448th, 2026 board meeting.

2:00:46>> I'll second that.

2:00:48>> All those in favor say I.

2:00:49>> I.

2:00:50>> Any opposed? 77 days.

2:00:53>> Good luck.

2:00:54>> Thank you. Also, I I put a motion out

2:00:56there to reduce the fines from 250 a day

2:00:58to $100 a day.

2:01:01>> I'll second that.

2:01:05>> Oh, what was that last one?

2:01:06>> Repeat. Repeat that.

2:01:07>> A motion to reduce the fines from $250 a

2:01:10day to $100 a day.

2:01:13>> A second.

2:01:14>> All those in favor say I.

2:01:16>> I.

2:01:17>> Any opposed?

2:01:19>> Motion carries. Down to $100 a day.

2:01:24reduce

2:01:26from 250 to 150 to 100.

2:01:34Our next case is on page 15. Senior

2:01:38Inspector Jose Saragusti, property

2:01:41address 3471 Southwest 14th Street. Case

2:01:45number BE26010195.

2:01:48Owner

2:01:50Veronica Esika

2:01:52Lea Saluran

2:01:55Maria Espironza Delea Salaran

2:01:59[clears throat] notice post at the

2:02:00property on 9326 posted at Wingsboro

2:02:02Boulevard on 9826. This case was first

2:02:06heard on 52626 to comply by 9226

2:02:10one section at $50 per day. Order

2:02:12recorded not complied. Um Alex Oh yes.

2:02:18Josei, senior building inspector for the

2:02:20city, updating the case number I read.

2:02:23>> The case is not comply. One it was um

2:02:28two structure in the side yard. One it

2:02:32was already removed and the other one is

2:02:34under permitting process since September

2:02:3816, 2026.

2:02:41I will let the respondent to speak.

2:02:43>> Uh Alex, excuse me. Do you do you swear

2:02:48and affirm to tell the truth to

2:02:49translate from English to Spanish and

2:02:51from Spanish to English?

2:02:53>> Thank you.

2:03:05for

2:03:31Anastasia.

2:03:34Young

2:04:08An inector.

2:04:18Fore

2:04:37connection.

2:05:14So,

2:05:19Extension

2:05:25solicias.

2:05:47Okay.

2:05:53>> No.

2:05:56>> Can we summarize that?

2:05:57>> Can you repeat what you said at the

2:05:59beginning so I can tell her?

2:06:06>> There are two structures.

2:06:09one in the one side that it will remain

2:06:13and the other one was already removed.

2:06:16>> Okay.

2:06:17>> The one is under permit already.

2:06:20>> Okay.

2:06:38Okay.

2:06:41>> Um, so um, her name is Maria Pansa

2:06:44Smeron. Uh, she's co- uh, owner of the

2:06:48property located 3471 Southwest 14th

2:06:51Street. her daughter Jessica Leva is

2:06:53also a uh co-owner who should have been

2:06:56here uh but she could not assist be here

2:06:59today because she's at the hospital with

2:07:01her daughter um who's got special needs

2:07:05and at this moment it's uh having a

2:07:08procedure under anesthesia. Uh for that

2:07:11reason her daughter um had to remain at

2:07:13the hospital was not able uh to be here

2:07:16today. um they have uh work they've been

2:07:21actively working um to resolve the

2:07:24issue. They've applied they've removed

2:07:27the trailer as the inspector said and

2:07:29they've uh submitted a permit

2:07:32application um for the other structure

2:07:36um in addition to modifications.

2:07:44Oh, so they've clear on the permit

2:07:46record they've put a note uh indicating

2:07:50that the structure is only going to be

2:07:52used for storage. Uh the structure

2:07:54doesn't have air conditioning and there

2:07:56were some lamps that um have been

2:07:59disconnected. Um they have photographs

2:08:02um of you know that that happened. Um

2:08:05they're she's indicating that she's not

2:08:07ignoring

2:08:09uh the city's request and they've been

2:08:11actively working on it and um they're

2:08:14requesting a twomonth um extension.

2:08:19>> The city doesn't oppose 77day extension.

2:08:24>> Has she been in touch with you? Has

2:08:26>> Okay, perfect.

2:08:27>> Weekly.

2:08:28>> All right. Alex Schneider, I move for

2:08:3077day extension.

2:08:32>> Second. All those in favor say I.

2:08:36>> Any opposed?

2:08:38>> 77 days.

2:08:39>> 77 days.

2:08:44>> Okay.

2:08:47>> Thank you.

2:08:50>> Our next case is also on page 15. Senior

2:08:54Inspector Jose Sagusi.

2:08:58>> Property address 1000 Southwest 12th

2:09:00Street. owner Rio

2:09:03B. Condo Association, Inc.

2:09:07case number BE26020154.

2:09:10Notice post at the property on 9226.

2:09:13Posted at One East Boulevard on 9826.

2:09:16This case was first heard on 72826 to

2:09:18comply by 9226.

2:09:21One section at $50 per day. Order

2:09:23recorded not complied.

2:09:27possessor, senior building inspector for

2:09:30the city, updating the case number as

2:09:32red. The case is not comply for chain

2:09:36link gate installed without permit. I

2:09:39will let the respondent to speak.

2:09:42>> Thanks. Good morning. I'll leave the

2:09:44ask. We want 77 additional days to

2:09:46comply.

2:09:46>> President, who are you?

2:09:47>> Lucas Pearlman, member of the board of

2:09:49directors of the condo association that

2:09:50owns the property. [snorts]

2:09:52Um, we'd like 77 days to comply. The

2:09:54most recent comments were from week

2:09:56ending

2:09:598:21 where we were indicated that we

2:10:02needed a full survey of the property. We

2:10:04had submitted a I guess we'll call it a

2:10:05local survey of the section of the

2:10:07property. Um uh last week week ending

2:10:109:18 we ordered from the surveying

2:10:13company the full boundary survey. Um and

2:10:15we'll submit it when we have it. Um I

2:10:17can give more detail.

2:10:19>> This is a chain fence around the entire

2:10:21property

2:10:22>> uh sort of. So, at some point in time,

2:10:2520 plus years ago, there was a chainlink

2:10:27fence installed around the property. The

2:10:29modification that was made was to remove

2:10:30an existing portion of it and put in a

2:10:32pedestrian gate. Uh, the extenduating

2:10:35circumstance was is we have a handyman

2:10:36that works for the association. We asked

2:10:38him if we needed a permit for that. He

2:10:40said no. That was obviously an incorrect

2:10:42statement. So, now we are it's already

2:10:43installed. We're trying to get that

2:10:45after the fact permit.

2:10:47>> Inspector, have they been in touch with

2:10:48you?

2:10:49>> Yes.

2:10:49>> Uh, are you opposed to 77 days? The city

2:10:52support 77 days.

2:10:53>> Alex move for a 77day extension.

2:10:57>> I'll second the motion.

2:11:00>> I'll second the motion.

2:11:02>> All those in favor say I.

2:11:04>> I.

2:11:04>> Any oppose?

2:11:06>> 77.

2:11:07>> Thank you all.

2:11:07>> Thank you.

2:11:08>> Thank you.

2:11:09>> Thank you. Our next case is on page 18.

2:11:13Senior Inspector Preston Mark hearing to

2:11:16impose fines. Property address 22

2:11:18Northeast 16th Place. Owner Scott

2:11:21Morris. C. Thank you. Case number

2:11:24BE25110110110173.

2:11:29Notice posted [clears throat] at the

2:11:30property on 82426. Posted at Wies

2:11:33Boulevard on 9826. This case was first

2:11:36heard on 32426 to comply by 52626.

2:11:40One section at $50 per day. Order

2:11:42recorded non-complied. The city is

2:11:45requested to impose fines in amount of

2:11:47$4,50 which continues to acrue. There's

2:11:50one extension noted.

2:11:52>> Preston Mark, building inspector for the

2:11:53city presenting case and address is

2:11:55read. This case is not in compliance.

2:11:57The city's requesting to impose fines.

2:11:59The respondent is here to speak.

2:12:06>> Not yet. There you go. Now it is your

2:12:09name?

2:12:09>> Scott Morris.

2:12:13I have been battling contractors and

2:12:16illness all summer long and working as

2:12:18best I can. I do have a electrical

2:12:21contractor finally to get this

2:12:23electrical work done. There's a permit

2:12:25in the process. Uh we have our

2:12:29engineering and information here. I also

2:12:31have plans for the kitchen area, but

2:12:34they say they can't do it until the

2:12:36power is on.

2:12:37My electrician has told me that once the

2:12:40permits are done, dealing with FPL to

2:12:42get the main power reconnected will

2:12:45probably be at least 60 days.

2:12:48Just telling you what I've been told.

2:12:50[snorts]

2:12:51Between the work being done and FPL

2:12:54getting set up and all the inspections,

2:12:55they said it'll be about 60 days.

2:12:57>> So, what have you done so far to come

2:12:58into compliance?

2:13:00>> Hired an electrician,

2:13:02hired a contractor to do the kitchen.

2:13:05>> I've got

2:13:07I basically interviewed nine different

2:13:10contractors and six of them just

2:13:11disappeared.

2:13:12>> Was this work done by you or is it what

2:13:14you

2:13:14>> No, I had a contractor who disappeared

2:13:16on me. Okay.

2:13:17>> Originally, and you know that, needless

2:13:19to say, has caused a lot of problems

2:13:21getting a new contractor because no one

2:13:22wants to take over the work that's half

2:13:24done.

2:13:25>> Inspector, has any permits been applied

2:13:27for?

2:13:27>> No, no permits been applied for the

2:13:29original electrical permit, which was

2:13:31applied for prior to the the uh

2:13:34violation. That permit is expired. And

2:13:36there's also a a permit for board up of

2:13:39windows u which basically shows expired

2:13:43but there was a permit for windows which

2:13:45was completed uh and uh since then

2:13:49there's been no submissions for any

2:13:52permits. Well, CW Fisher Electric is the

2:13:55contractor I'm using, and I had to send

2:13:57a letter to the old guy who no longer is

2:14:01available, but I got a registered or

2:14:03whatever it is letter sent off to his

2:14:06address based on the permit and I

2:14:09submitted all that to CW Fischer and

2:14:10they told me that they are in the

2:14:12process of applying for the new permit.

2:14:15>> Yeah, they haven't submitted anything.

2:14:17>> Inspector, has has Scott been in touch

2:14:19with you? No,

2:14:21>> I did try to call on two different

2:14:23occasions and leave a message just to

2:14:25update you and

2:14:26>> I I have no no

2:14:30information that you called.

2:14:32>> That's what happened the last time we

2:14:33talked to when we were in

2:14:34>> I remember that as I show I have not

2:14:38received one call from you.

2:14:40>> Okay.

2:14:41>> Now we we also have another case open

2:14:44for the expired permits

2:14:47>> that the electrical permit. Yes, it's

2:14:50expired.

2:14:50>> I understand. That's why we're trying to

2:14:52get a new one and get the old contractor

2:14:54off of that one.

2:14:58>> What else do I have to do besides that?

2:15:00I mean, I have to send him a letter and

2:15:01notify him.

2:15:02>> You need to get permits for the work

2:15:06that is

2:15:08not in compliance.

2:15:10>> Correct. The electric we're talking

2:15:11about the electrical

2:15:12>> electrical, structural, plumbing.

2:15:15>> Okay. I thought you see it all. I mean,

2:15:18you got your electrical done, but what

2:15:20about the rest?

2:15:20>> Well, plumbing is a new issue that we

2:15:23talked about, you and I, originally, and

2:15:25you said there was no plumbing issues

2:15:26that the bathrooms look fine.

2:15:28>> Don't recall having that discussion with

2:15:29you, sir. Sorry.

2:15:30>> Okay.

2:15:34>> Sounds like you need to get a general

2:15:35contractor to to umbrella this all under

2:15:39>> under him.

2:15:42>> Financially, that's going to be very

2:15:43difficult. But I'm doing the best I can

2:15:45with the available resources that I

2:15:47have. I even have to put in a loan

2:15:49against my 401k in order to do this. But

2:15:52I am doing it as judiciously as I can.

2:15:56Board, can I ask a question? Um, how far

2:15:59along is the project? Is it completely

2:16:02100% completed? Um,

2:16:06>> who's this? That's a building official

2:16:08in the back seat.

2:16:09>> I'm sorry. What' you say?

2:16:10>> Yeah. No, I just Preston, do you know do

2:16:12we know if this is 100% complete?

2:16:14>> I haven't been uh I've been I have not

2:16:17been there for a reinspection. So the

2:16:19work is obviously in the condition my

2:16:22understanding it should be still in the

2:16:23condition that I uh saw it when I sat.

2:16:26>> Is the work completely completed?

2:16:28>> It is not. It is in the condition it was

2:16:29when he saw it. I was in the process of

2:16:31getting a new service and in that

2:16:33process a new interior panel put in the

2:16:35house.

2:16:35>> Okay. Just so you know that to change

2:16:38the contractor for your expired permit

2:16:40is no more than a one-week process. It's

2:16:42just a matter of sending a letter to the

2:16:44previous contractor as a courtesy. Um

2:16:47you mail it, you you show us a copy of

2:16:49the uh return receipt from the post

2:16:52office and the permit gets transferred.

2:16:54It's so total in one week process.

2:16:56>> That is exactly what my electrician told

2:16:58me when we did it. And then they said

2:17:00the city requires a copy of the letter

2:17:02also.

2:17:02>> Right. That's just a copy of the letter

2:17:04that you sent. I didn't have a copy

2:17:05because I had sent it.

2:17:06>> But my point is is that it only takes a

2:17:08week. So we'll we'll do you can contact

2:17:10me. I'll make sure that we get that

2:17:12done, you know, and then you call for

2:17:13inspections

2:17:15>> and I am literally dropping off a new

2:17:17copy of the letter to the electrician

2:17:19tomorrow. So

2:17:21>> it's just that the you know the the

2:17:23violations it's almost

2:17:25>> I'm well aware

2:17:26>> it's almost a year old. Um

2:17:28>> I've had some major medical issues over

2:17:30the past year. I'm dealing with what I

2:17:31can. I'm literally fighting to get this

2:17:34done as quick as possible. My

2:17:36understanding was the exterior of the

2:17:37house was the issue, which I spent most

2:17:39of last year bringing up to code and

2:17:41everything and got that all taken care

2:17:42of. And then this hit me right after

2:17:44that ended.

2:17:46>> Okay. Just so you know, I mean, I don't

2:17:48encourage owner builder permits and

2:17:51>> Oh, is it? Okay, never mind.

2:17:54>> I mean, I had the fence replaced last

2:17:56year. I had the house painted. had the

2:17:58windows replaced, you know, and upgraded

2:18:01and, you know, it's been, needless to

2:18:03say, a financial nightmare. I

2:18:05understand.

2:18:06>> Just just as a point of correction and

2:18:08just some additional info, the

2:18:11electrical permit was for the uh

2:18:14installation of the new panel,

2:18:17not the interior remodel.

2:18:20>> And that was something I did not know my

2:18:22electrician said without me. I thought

2:18:25it was for all of it. I didn't know it

2:18:27was just for part of it.

2:18:29>> And even the plans he gave me show the

2:18:31interior and the exterior panels.

2:18:33>> So you would need to submit new

2:18:35information

2:18:37um to uh include all the requirements

2:18:41for the interior model, the electrical,

2:18:44the plumbing and the structural work

2:18:45that was completed. If there is and I

2:18:48believe there you may or may not have

2:18:50had a mechanical there. Uh

2:18:53>> what's a mechanical

2:18:55>> AC? No, there's no AC on the property.

2:18:57>> So once you get those permits submitted

2:19:00and approved, then you can apply for a

2:19:03lean amnesty.

2:19:06>> What do you recommend, Inspector?

2:19:09>> Impose the fines.

2:19:14>> Is this going to make it harder to do

2:19:15anything else?

2:19:17>> Okay. So, uh, we're here to impose

2:19:20fines. Okay, board. I can't do it.

2:19:29You guys got to do something. Jeez,

2:19:31>> I'm reluctant to do

2:19:33>> I mean, [sighs]

2:19:34you have not done anything in terms of

2:19:36finding contractors. I mean, I

2:19:38understand you got to interview and I've

2:19:40>> No, I've hired

2:19:40>> I would do the same thing on interview,

2:19:42but I mean, you can't whistle Dixie all

2:19:44this time and not actually pull the

2:19:46trigger on something, man.

2:19:47>> Sir, I hire I interviewed nine different

2:19:50contractors. Several of them said they'd

2:19:52get back with me, the first ones, with a

2:19:54proposal. Never did. Two weeks go by and

2:19:56you never and you could follow up and

2:19:57you then you finally a couple of them

2:19:59said, "We're not interested in the

2:20:00work." I finally got a hold of an

2:20:02electrician that will do the work.

2:20:03>> What about the What about the You had to

2:20:04pull a master permit here. You got

2:20:06structure stuff involved. So, you need

2:20:07like a general contractor, not you. This

2:20:10is

2:20:11>> the structure. When we say the

2:20:12structure, we're talking about the dry.

2:20:14>> Well, I mean, you got you got plumbing

2:20:15here. You've got cabinets. You've got

2:20:17structural. That requires a general

2:20:19contractor.

2:20:20>> It's part of the kitchen is plumbing.

2:20:21>> Yeah. That requires a plumbing

2:20:24subcontractor.

2:20:24>> This This is also a rental propert.

2:20:27>> It's not It's not been rented in 20

2:20:29years,

2:20:30>> right? Well, that's why I would think

2:20:32you would It gives you an incentive to

2:20:35comply the case. So, you could rent it

2:20:36out and make Because you mentioned

2:20:38there's financial hardship. I agree with

2:20:40you, sir, but it was getting I had a lot

2:20:43of problems with people breaking in and

2:20:44damaging things. That's why we're in the

2:20:46position we are. And I just threw up my

2:20:47hands and decided to sit on it as

2:20:49opposed to doing anything. I've been

2:20:51paying my taxes. I've been maintaining

2:20:52it. But the fact is it's difficult and

2:20:55I'm doing my best to get it under

2:20:57control now.

2:20:57>> So, do you plan on keeping the the house

2:20:59empty?

2:21:00>> I think my son is going to move into it.

2:21:02>> Okay.

2:21:02>> That's you know, he's 25,

2:21:05>> right? Sir, I I sympathize with you if

2:21:08you know you want to take my card. Uh

2:21:10I'll I'll do everything to help you on

2:21:11our end as far as expediting it, but

2:21:14it's going to take you to take the

2:21:16initiative to hire um licensed

2:21:19professionals to do the best I can.

2:21:22>> I mean, that's all I can do. And I mean,

2:21:24>> a fine at this stage of the game is just

2:21:26going to make that that much harder.

2:21:29>> I I mean, we were discussing here.

2:21:32I I think the consensus among the board

2:21:34is to throw you a bone, give you 35

2:21:37days. Um we're not going to impose fines

2:21:39today, but give you 35 days just to have

2:21:42some kind of substantial pro in 35 days.

2:21:45You should be able to hire a full set of

2:21:46contractors, plumbers,

2:21:48>> show some progress,

2:21:49>> general contractors, all that stuff

2:21:51here. I mean,

2:21:52>> okay,

2:21:52>> I'm glad you're doing your due

2:21:54diligence, but you're going to have to

2:21:55pull the trigger, man. Okay. So, needs

2:21:57to know.

2:21:57>> When you say pull the trigger, I mean,

2:21:59once I have a kitchen guy ready to put

2:22:02in the kitchen,

2:22:03>> you need to pull permits first, man. You

2:22:04need to apply for permits.

2:22:05>> Okay. I guess I could have him do that

2:22:07because he doesn't need electricity to

2:22:08do that, but Okay.

2:22:09>> I mean,

2:22:10>> I mean, there's the plan right there. I

2:22:11mean,

2:22:12>> you just have to have a hire a

2:22:14contractor who who can act as your, you

2:22:17know, liaison and and knows what to do

2:22:20with the city, get the permits. And so,

2:22:21>> does the city have a list of these

2:22:23contractors that are reputable?

2:22:25>> Okay. All right. I make a motion to

2:22:27grant the respondent a 35day extension

2:22:30on compliance and to pause the fines

2:22:34with a mandatory appearance at the

2:22:37October 27th, 2026 board meeting. Please

2:22:42come back with like some progress, man.

2:22:44>> Alex Schneider, I'll second. Yeah. And

2:22:46make sure the inspector knows everything

2:22:47that's

2:22:48>> All those in favor say I.

2:22:49>> I.

2:22:50>> Any opposed?

2:22:51>> Yes. Please keep keep in contact with

2:22:53the inspector and and with the building

2:22:55official.

2:22:56>> I'll ask again. Is a city have a list of

2:22:59competent local contractors that are

2:23:01reliable?

2:23:01>> No, the No,

2:23:03>> they there's not they can't do that.

2:23:05>> Okay. Just asking.

2:23:07>> All right. Thank you.

2:23:08>> Thank you.

2:23:09>> Our next case, Senior Inspector Alexand

2:23:11Alexander Boris on page 20.

2:23:15It's a [clears throat] hearing to impose

2:23:16fines. Property address 1229 Northeast

2:23:19Third A. Case number BE26050047.

2:23:24Owner Zamina Pa, Inc. Notice posted at

2:23:28the property on 9326.

2:23:30Posted at One Brow Boulevard on 9826.

2:23:34This case was first heard on 5626 to

2:23:36comply by 62326.

2:23:39One section at $750 per day. Order

2:23:42recorded not comply. City is requesting

2:23:44to impose fines in amount of $25,500

2:23:48which continues to acrue. There's one

2:23:50extension noted.

2:23:52>> Alexandra police building inspector for

2:23:54the city updating your own case number

2:23:56and address is read. The property was

2:23:58cited for violation of Florida building

2:24:00code 2023 section 105.1 work without

2:24:03permit for CME walls for addition at the

2:24:08rear of the building. Interior and

2:24:11exterior alteration including

2:24:12mechanical, electrical and plumbing.

2:24:14Structural alteration including

2:24:15replacement of loadbearing partitions.

2:24:18exterior walls, wall sheathing, wirelap.

2:24:21The interior of the structure um was

2:24:24fully gutted with all wall covering

2:24:26removed. Selected windows and door have

2:24:29been removed. Alterations to the

2:24:31electrical service. Um a permit

2:24:35application has been submitted for a

2:24:37total demolition

2:24:39and the uh respondent is here to speak.

2:24:42>> Good morning, Himemenas. I'm the

2:24:44property owner. Um, we are in the

2:24:46process of getting the permit approved.

2:24:49>> What's the hangup with it?

2:24:51>> Um, well, she's a representative from

2:24:53the company that is going to demo the

2:24:55property.

2:24:56>> Yeah. It's just that we didn't realize

2:24:57that you needed a plumbing per

2:25:01>> car. Speaking to the microphone.

2:25:03>> Speaking to the microphone.

2:25:04>> Carried Carbonel.

2:25:05>> Uhhuh.

2:25:06>> We weren't aware that you needed a

2:25:08plumbing permit prior to getting a

2:25:10demolition permit. So, we'll be

2:25:12>> You kept the plumbing, don't you?

2:25:14>> Correct. But

2:25:15>> I mean that just goes without saying.

2:25:17>> But in the city of Miami day,

2:25:20>> we're not in Miami.

2:25:21>> Obviously. Obviously, this was our first

2:25:23permit. So, apologies for that. But we

2:25:26went ahead and we we have the plumbing

2:25:28permit application signed and will be

2:25:30submitted today so that the permit can

2:25:32continue running.

2:25:36Okay. So, the only thing that we're

2:25:39pending for the permit to be approved,

2:25:40it's a landscape department that they're

2:25:42asking for us to, I guess, remove some

2:25:46of the trees. So, we're going to go to

2:25:47the city and speak with them now. And

2:25:49the plumbing permit building has been

2:25:51approved. Um, what got us delay was the

2:25:54FPL letter, the gas company letter,

2:25:56mechanical, it was a bunch of

2:25:58requirements in order to to get the

2:26:00permit approved. Now, the only thing

2:26:02pending is the plumbing. I I mean I I I

2:26:04can recall that the big the big hubbub

2:26:07about this particular case was we were

2:26:09going into hurricane season and you had

2:26:12a structure that was blatantly unsafe

2:26:15threat to public safety. I mean and

2:26:18bless your soul you did the right thing

2:26:20for the moving demolition but I mean

2:26:22>> doesn't take 6 months to get a

2:26:24demolition permit as big as demolition

2:26:26permit.

2:26:26>> We didn't start with the demolition

2:26:28permit. So whenever we whenever the

2:26:31inspector gave me the violation, I did

2:26:34plans. It took me two weeks to do the

2:26:35plans to fix the violation. However,

2:26:38when I sat with the entire building

2:26:40department, they advised me that it will

2:26:42be better to demo the property instead

2:26:44of just fixing whatever was repair.

2:26:48>> So that I lost a month there. Then I

2:26:51hired them

2:26:52>> in order to apply for the demo permit

2:26:54because then I was going to go that

2:26:55route instead.

2:26:56>> When were you when were you guys

2:26:57engaged? July June

2:26:59>> July

2:27:01>> W June

2:27:02>> June

2:27:05>> July

2:27:06>> inspector they've been in contact with

2:27:07your office

2:27:12>> uh yes we've been um in contact

2:27:16um

2:27:18I'm looking here there is uh the the

2:27:21plumbing it's one of the issues and the

2:27:24landscaping and I believe building

2:27:26there's something with dust control. Um,

2:27:28all the other ones appear to have been

2:27:33approved.

2:27:35Um, and you're right, we have another

2:27:38case um separate case addressing the

2:27:40unsafe situation because of this

2:27:43unpermanent work and and that's the

2:27:46reason why uh the city cannot does not

2:27:49support the extension at this time.

2:27:51>> I mean, we we're done extending. We're

2:27:52we're here to here to impose some some

2:27:55fine monies. the meter was already taken

2:27:57care of which it was the unsafe place.

2:27:59Um it was within the week that I came

2:28:01that you mentioned it. So FPL already

2:28:04took care of it. We're just literally

2:28:05just waiting for the approval of the

2:28:07permit to go in and demolish the

2:28:08property.

2:28:09>> Or just to clarify, the city would not

2:28:11recommend them to demo. We certainly

2:28:15suggest, you know, let them know that

2:28:16there's two options. Either get a permit

2:28:19or they could demo to um comply the

2:28:21case, but we wouldn't recommend it. Um

2:28:24it she chose to because the cost to

2:28:27rehab an old structure um outweighed um

2:28:32you know an demoing it. So that was her

2:28:35choice.

2:28:36>> That is absolutely

2:28:36>> again this is a case where there was

2:28:38blatant disregard. They built the entire

2:28:40addition on the back of home and gutted

2:28:42the main structure. Um as far as the

2:28:45plumbing permit that's a two-day permit

2:28:48by a plumber and the intent of that is

2:28:50to cap off the sewer line. It's a

2:28:53typical demo permit requirement as far

2:28:56as I know throughout the state. Um, but

2:28:59nonetheless, it's a [snorts] per

2:29:00requirement here. It takes no more than

2:29:03two days. You get a plumber, he goes out

2:29:06there, he caps off the sewer line, we

2:29:08inspect it. That's one of the that's

2:29:10part of the checklist items in order to

2:29:12get a demo permit,

2:29:14>> which will be submitted today.

2:29:15>> Yeah.

2:29:16>> I'm sorry.

2:29:16>> It will be submitted today.

2:29:18>> Right. But it, you know, everything is

2:29:20done the day, you know, the day you have

2:29:22to go to court, but you you we've waited

2:29:24till June for this.

2:29:25>> So, excuse me, Joe, you said uh the city

2:29:27did not recommend demoing the structure.

2:29:31>> They suggested it.

2:29:32>> We give you the option.

2:29:33>> We give you the option to comply the

2:29:35case,

2:29:36>> okay,

2:29:36>> of either getting a permit for the

2:29:38illegal addition,

2:29:40>> okay,

2:29:40>> or you get it, you could demolish it.

2:29:42It's two choices.

2:29:43>> Gotcha.

2:29:43>> So, I went with the first option the

2:29:45first month and I did plans and

2:29:47everything. So I lost a month. Then I

2:29:49sat with the building department. They

2:29:50should they gave me suggestions like he

2:29:52said. So then that's when I decided I'll

2:29:54go ahead and demo the property. So that

2:29:56was another month in order for me to

2:29:58apply and do and get all of the letters,

2:30:00the engineer letters. FPL took almost a

2:30:03month to reply back to me to actually go

2:30:05back and take care of the meter. Um the

2:30:07gas company took another month as well.

2:30:10So I've been doing what I'm supposed to

2:30:11do. It's just a it's timing. So now

2:30:15three of the departments approved me

2:30:17already. I'm just waiting for the

2:30:18plumbing permit which is going to be

2:30:20taken care of today. So I guess I mean

2:30:22within 30 days I will say that less than

2:30:2530 days we should be able to demo the

2:30:27property. Port we would we would suggest

2:30:30holding to the imposition of fines and

2:30:32then

2:30:33>> Rhonda.

2:30:34>> Yes sir.

2:30:34>> Rhonda

2:30:35>> uh Rhonda Hassan uh city attorney's

2:30:37office. We would suggest holding to the

2:30:39imposition of fines and then once the

2:30:40property owner comes into compliance,

2:30:43they can apply for lean amnesty.

2:30:45>> I I agree. I would even tinker with the

2:30:48notion of increasing the daily fine

2:30:50amount to the max $1,000.

2:30:55>> Like I said, this has been going on and

2:30:58again I mean that structure is just

2:31:00lucky hurricane hasn't hit.

2:31:04>> So are you making a motion?

2:31:18the pictures.

2:31:21>> Is anyone living in the property right

2:31:22now?

2:31:23>> No.

2:31:23>> Is it is it safe for human? And uh uh

2:31:26what's the word? Uh

2:31:28>> no. The structures the structure is

2:31:29empty.

2:31:30>> The structure is empty. It's not

2:31:32habitable.

2:31:32>> Yeah. We're waiting literally to go in

2:31:34and demo. We're just waiting for the

2:31:36demo permit so we can demolish the

2:31:38property.

2:31:40>> I uh move that I move that we find the

2:31:43violations were not complied with by the

2:31:46date ordered and therefore we oppose the

2:31:48fine

2:31:50of $25,500

2:31:52per section violation stated in the

2:31:54first order.

2:31:56>> Can I get a second?

2:32:01>> A second.

2:32:02>> August. All those in favor say I.

2:32:04>> Oh, hey, Madam Secretary, call the roll.

2:32:06>> We got a big fine here, man.

2:32:13>> Yes.

2:32:16>> Yes.

2:32:24>> Yes.

2:32:26>> Yes.

2:32:32Okay. Uh,

2:32:33>> and why I'm inclined to do this is

2:32:35because we have a lean amnesty program

2:32:37in the city of Fort Lauderdale. Rhonda,

2:32:39would you would you be able to explain

2:32:40that a little bit to to the respondent?

2:32:44>> Um, they they can speak with staff about

2:32:48about that.

2:32:49>> Yeah. Okay. Yeah, sure.

2:32:51>> So,

2:32:52continue doing what you're doing to

2:32:54bring this in compliance. Um, and the

2:32:56fines are still continuing to acrue.

2:32:59Just just so you guys know there's no

2:33:01confusion there.

2:33:03>> Don't don't be totally scared by the the

2:33:05fines. Be scared. But they can come down

2:33:09if you do your your your compliance.

2:33:12Okay.

2:33:13>> Trying to fix this.

2:33:14>> I know 25,000 sounds like a lot and it

2:33:16is a lot but do the right thing. Do your

2:33:18thing and

2:33:20>> well we can do our thing too. report.

2:33:21But I also like to remind them it's it's

2:33:24um [snorts] to their benefit to um get

2:33:27this done while we're under the 15%

2:33:31amnesty program as opposed to in October

2:33:34it's going to go to it's going to be

2:33:35increased to only a 50% reduction as

2:33:39opposed to 85 what we have today.

2:33:41>> Oh, it's incentive.

2:33:43>> Yeah, you got a monthly

2:33:44>> and that begins October 1st.

2:33:46>> Two weeks.

2:33:48>> Okay.

2:33:49>> Seating working together.

2:33:50>> All right. Thank you.

2:33:51>> Thanks.

2:33:52>> You're welcome.

2:33:53>> Next,

2:33:54>> our next case is on page three. Senior

2:33:58Inspector Preston Mark, property address

2:34:014,800 Bay View Drive, 601. Case number

2:34:04BE26060025.

2:34:08>> Owner Shu Joan Shu Sun. Notice posted at

2:34:12the property on 82726. Posted at 1 East

2:34:16Boulevard on 9826.

2:34:21Preston Mville building inspector with

2:34:22the city presenting case and address as

2:34:24read. This property was cited for

2:34:26violation under Florida building code

2:34:28105.1 work illegally performed without

2:34:31obtaining the required permits in the

2:34:32following manner but not unlimited not

2:34:34limited to uh new flooring uh kitchen

2:34:38and bathroom remodel including plumbing,

2:34:40electrical and also water heater and AC

2:34:43uh installed without permits. Uh, the

2:34:46case was open 62206. Inspection report

2:34:49mail 642026 and code board notice mailed

2:34:52842026.

2:34:55I visited this property to investigate

2:34:57the possibility of work being done

2:34:58without permits and met with Terry, the

2:35:02building property manager who gave

2:35:03access to the unit. Um during my

2:35:06inspection I did note that the work

2:35:10mentioned above was in the process of

2:35:13being completed and as a result I issued

2:35:15a stop work order. I spoke with the

2:35:18owner on one or two occasions and she

2:35:20stated that she's in the process of

2:35:22hiring a contractor to pull the permit.

2:35:24president of permits. Uh I think she has

2:35:28one permit in process for the

2:35:30soundproofing on the flooring and

2:35:34that's it. Uh the city's requesting that

2:35:37the board find that the violations exist

2:35:38and grant the property owner 126 days to

2:35:41come in compliance or a fine of $50 a

2:35:43day thereafter. The respondent is here

2:35:45to speak.

2:35:47>> Uh hi, how are you? Uh my name is Luan.

2:35:51I'm the owner of the property.

2:35:52>> Go closer. goes to the microphone. Yeah.

2:35:54>> Uh yes. Uh

2:35:58the AC and the uh hot water heater when

2:36:02I purchased the property, they already

2:36:04there. So I I did not aware of that. And

2:36:08also uh I already have [clears throat]

2:36:12my contractor and they already they

2:36:15working as soon as I get the violation

2:36:18notice we work on the uh permit. But as

2:36:22the HOA they really give me hard time.

2:36:25They didn't give me approval letter.

2:36:27It's like a back and forth. It's like

2:36:29more than two months. So it's like a

2:36:32delay the process. But my general

2:36:34contractor they already submit

2:36:36[clears throat] a permit and uh I I

2:36:39wanted to request like uh 77 days to

2:36:43extension. So we already working on

2:36:46that. Well, the HOA letter is not

2:36:49required uh for the city and we're uh

2:36:53recommending 126 days for you to get the

2:36:57permits.

2:36:58>> Oh, this Thank you so much. I appreciate

2:37:00you guys.

2:37:01>> Have you been inspector? Has she been in

2:37:03touch with you?

2:37:04>> Yes.

2:37:04>> Okay. Yes. Stay in touch with the

2:37:05inspector. I move that we find the city

2:37:07and the violation existed allegedly. We

2:37:08order the property owners to come into

2:37:10compliance by uh January 26, 2027 or a

2:37:13fine of $50 per day per violation will

2:37:15be opposed and recorded.

2:37:17Okay.

2:37:18>> Second.

2:37:18>> I'll second.

2:37:22>> All those in favor say I. I.

2:37:24>> Any opposed?

2:37:25>> You have 126 days.

2:37:27>> Oh, thank you.

2:37:27>> You're welcome. Thank you.

2:37:28>> Merry Christmas.

2:37:32>> Oh god. Our next case is on page 13.

2:37:35Inspector Searian Anescu. [snorts]

2:37:38[clears throat]

2:37:39>> Property address 1120 Northeast 17th A.

2:37:42Owner Diane Properties LLC. Case number

2:37:46BE25070034.

2:37:49Notice posted at the property on 82426.

2:37:52Posted at one boulevard on 9826. This

2:37:55case was first heard on 111325

2:37:59to comply by

2:38:01>> 32426. Two sections at $50 per day.

2:38:04Order recorded not comply. There are

2:38:07three extensions noted.

2:38:15See anesco, building inspector for the

2:38:17city, presenting the case and address as

2:38:19read. This case has not complied. The

2:38:21respondent is here to speak.

2:38:24>> Hi, good morning. My name is Juan

2:38:25Restrepo. I'm here to speak on behalf of

2:38:27the owner. Um I was in front of you guys

2:38:31two months ago uh where we were waiting

2:38:34um variance scheduling. Um, right before

2:38:38scheduling, Karen from Varian tells us

2:38:41that we need an FPL letter saying if

2:38:44it's okay to encroach in the East. Uh,

2:38:48so right now we're in the process of

2:38:50speaking with FPL to get that

2:38:52encroachment approval.

2:38:55>> Where does the city stand, Inspector?

2:38:59>> We we've been in communication and um

2:39:01they're they are doing their due

2:39:03diligence on this. When when are like

2:39:06when is the uh what hearing are you

2:39:09going to be on before the uh

2:39:10>> I would like the 77 day. Um oh for

2:39:13variance so I'm waiting on FPL uh that

2:39:16timeline they didn't really give us a

2:39:18concrete because it has to go through

2:39:20legal and all that. Um so obviously my

2:39:24goal is the soon the earliest available

2:39:26for variance but we're just pending on

2:39:28FPL at this moment.

2:39:30>> When is the next variance meeting? um

2:39:33>> monthly

2:39:33>> in Nove it would be November.

2:39:36>> Okay.

2:39:36>> For FPL.

2:39:38>> No, no, no. For variance.

2:39:39>> Variance would be the next hearing.

2:39:43>> You should get the FPL letter by then, I

2:39:45would assume.

2:39:46>> Well, to get on it, you need to be able

2:39:47to submit your application with

2:39:49>> Rhonda. Is the variance meeting at the

2:39:51beginning of the month or the end of the

2:39:52month?

2:39:53>> It is the beginning of the month.

2:39:54>> The beginning of the month.

2:39:55>> Yes, sir.

2:39:56>> Thank you.

2:39:56>> And when do you need to submit your

2:39:58application packet beforehand

2:40:00>> uh for variance? Yeah, like two weeks

2:40:02before. So it's like the first week of

2:40:04the month for the next month. So I would

2:40:08need to upload first week of October for

2:40:10the November hearing

2:40:11>> which is in two weeks.

2:40:12>> Correct.

2:40:13>> That's going to be tight.

2:40:15>> Well, so 77 days I think.

2:40:18>> Well, at least to see come back and give

2:40:19us an update.

2:40:20>> Yeah. Um we're okay with that.

2:40:23>> All right. I move for a 77day extension.

2:40:26>> Alex Schneider second.

2:40:28>> All those in favor say I.

2:40:29>> I.

2:40:29>> Any oppose? 77 days it is.

2:40:33>> Thank you guys.

2:40:33>> Thank you.

2:40:34>> Our next case is a new business case on

2:40:37page three.

2:40:40>> Senior Inspector Preston Mark.

2:40:43Property address

2:40:453250

2:40:47Northeast 28th Street. Owner Le Circle

2:40:50by the Beach Condo Association, Inc.

2:40:52Case number BE260316.

2:40:56Notice posted at the property on 82826.

2:40:59posted at one boulevard 9826.

2:41:02>> Preston Mark M, building inspector for

2:41:04the city presenting case and address is

2:41:06read. This property was cited for

2:41:07violation of the Florida bill in code

2:41:09105.1. Work illegally performed without

2:41:12obtaining the required permits in the

2:41:14following manner but not limited to the

2:41:16installation of two French drains in the

2:41:18parking lot of the building. This case

2:41:20was open 529 2026. inspection report

2:41:24mailed 642026 and codeboard notice

2:41:27mailed 84206.

2:41:30I visited this property after receiving

2:41:32an anonymous complaint as noted uh

2:41:36during my research. I found that there

2:41:38was a pool permit issued BLCPS25030534

2:41:46which was pulled and successfully passed

2:41:47all inspections. However, at the time of

2:41:50the inspection, I uh my review, I

2:41:52noticed that there were two at the time

2:41:55of my visit to the property uh

2:41:58inspection, I noticed two French drains

2:42:00installed in the parking lot that

2:42:02connected to the pool drain. Our record

2:42:04showed that the work was not part of

2:42:06[clears throat] the original permitted

2:42:09uh work and was done after the fact. I

2:42:11spoke with the property manager, Wendy

2:42:13Darling, who indicated that the work was

2:42:15done in conjunction with the pool

2:42:17repair, but was not sure. I spoke with

2:42:20the pool contractor who agreed to get

2:42:21these permits uh for the work. Uh and he

2:42:25did admit that it was done during the uh

2:42:28remodel. However, today there is no

2:42:31permit pulled for this work. The city is

2:42:32requesting that the board find that the

2:42:34violations exist and grant the property

2:42:36owner 126 days to come in compliance or

2:42:39a fine of $100 a day thereafter.

2:42:45>> The respondent is here to speak.

2:42:47>> We're okay with that extension.

2:42:50>> I'm sorry. My name is Melissa Laour. I'm

2:42:51the president of the board for the

2:42:53circle by the beach association. We were

2:42:55not aware that the uh drainage, I guess

2:42:59the flow from the drainage and the pool

2:43:01was not included in the original permit.

2:43:03And because the permit was approved and

2:43:05closed um in April, uh we've been having

2:43:09difficulty getting the contractor to

2:43:11accept responsibility of not uh

2:43:14addressing that drainage and the

2:43:15permitting properly. Um we have to well

2:43:18not we have to we've been in contact

2:43:19with a forensic engineer um because

2:43:22we're under the impression that things

2:43:24will have a new scope of work will have

2:43:26to occur because we do not trust this

2:43:28contractor at this point. We are hiring

2:43:30a forensic engineer. It's coming this

2:43:32week to survey the property and let us

2:43:34know exactly what we need to have

2:43:35pulled. Therefore, she can submit the

2:43:37payment. We can have the permit

2:43:38submitted for us instead of outside of

2:43:40this engineer or sorry outside of the

2:43:42contractor.

2:43:44Inspector, have they been cooperative

2:43:45with your

2:43:46>> Yes, very cooperative.

2:43:50>> What was it? It was $50 per day. 126.

2:43:54>> I move that we fine for the city and the

2:43:55violation exists as alleged that we

2:43:56order the property owners to come into

2:43:57compliance by January 26, 2027 or fine

2:44:01of $100 per day per violation will be

2:44:03imposed and recorded.

2:44:05>> I'll second that motion.

2:44:06>> All those in favor say I.

2:44:08>> I. Any opposed?

2:44:11>> Merry Christmas.

2:44:12>> Thank you.

2:44:13>> Thank you. Have a good one.

2:44:20>> Our next case is on page nine.

2:44:25>> Senior Inspector Andrew Jeb.

2:44:29>> Property address 424 Hrix Isle.

2:44:34Case number BE262

2:44:370120.

2:44:41Posted at property 827206

2:44:46posted at one Broward Boulevard 98 2026

2:44:52first heard

2:44:54June 23rd 2026 to comply by September

2:44:5822nd 2026

2:45:00one section at $50 per day recorded not

2:45:05complied.

2:45:15Andrew Gbia, building inspector for the

2:45:17city, presenting case and address is

2:45:19read. This case is not complied. The

2:45:21respondent is here to speak.

2:45:24>> Okay.

2:45:24>> Hi, good morning. David Castella, owner

2:45:26of the property at 424 Hendricks Isle.

2:45:29Um, I did secure a contractor to pull

2:45:32the permits and bring

2:45:34um bring the charger into compliance um

2:45:38back in April.

2:45:40Um, it's just it's it's taking him this

2:45:43long and I've been in constant contact

2:45:45with him. I had to pay for an architect

2:45:48and engineer to do uh plans and a

2:45:51required letter by the city. I think it

2:45:53was submitted um a couple of weeks ago

2:45:57finally by the contractor. So, I've been

2:45:59on a weekly basis pushing the contractor

2:46:01to get this to get this permitted.

2:46:05>> Inspector, has he been in touch with

2:46:06you?

2:46:07um not necessarily in touch with me, but

2:46:10I know from reading records he the uh

2:46:12the city's requiring him to get an

2:46:14additional electrical permit for the uh

2:46:16for the uh the charging station.

2:46:18>> What do you recommend?

2:46:19>> Excuse me.

2:46:19>> What do you recommend? Sorry.

2:46:21>> Um

2:46:24>> I think that permit was pulled by the

2:46:26contractor on the 27th of September.

2:46:28>> Yeah, the notes on that were uh was

2:46:30stating that that they're requiring an

2:46:33additional electrical permit for that.

2:46:35Uh, I think that,

2:46:37you know, 35 days should be sufficient.

2:46:41>> All right, Alex Schneider, I move for a

2:46:4235day extension.

2:46:44>> I'll second.

2:46:46>> All those in favor say I.

2:46:47>> I.

2:46:48>> Any opposed?

2:46:50>> 35 days it is.

2:46:51>> Thank you.

2:46:52>> Welcome.

2:46:57>> Our next case is on page 13.

2:47:02Inspector Seiveria, Ionq.

2:47:06Property address 1731 Southeast 15th

2:47:10Street,

2:47:12sweet 209.

2:47:15Case number be 251200069.

2:47:20owner David

2:47:23Gab Gabaldon

2:47:25and Mariana Gabaldon.

2:47:29Posted at property August 21st, 2026.

2:47:33Posted at 1 East Broward Boulevard

2:47:36September 8, 2026. First heard March

2:47:4024th, 2026. To comply by July 28, 2026.

2:47:45One section at $50 per day. Order

2:47:48recorded not complied. There is one

2:47:50extension noted.

2:47:53>> Seanco building for the city presenting

2:47:56the case and address as read. This case

2:47:57is not complied. The respondent is here

2:47:59to speak.

2:48:00>> Good morning all. My name is Armando

2:48:02Aras. I'm here on behalf of the owners.

2:48:05Um the permit is I would say 99%

2:48:10uh almost getting approved. We were

2:48:12asked since last time that we came here,

2:48:16we were asked to get an electrical so

2:48:18permit. We already have the electrical

2:48:20so permit and then we were also asked um

2:48:24right at the last minute for a plumbing

2:48:26sub permit and we're in the process of

2:48:28getting a plumbing sub permit. We

2:48:30submitted all the paperwork. It's just

2:48:31getting reviewed by the city and getting

2:48:33approved in a few days. I would say in

2:48:36less than 35 days we will get everything

2:48:38resolved.

2:48:40Inspector, have they in touch with you?

2:48:44>> Did we?

2:48:45>> We spoke last time when I when I

2:48:46>> last time in in court. Yeah.

2:48:48>> The

2:48:50>> about Yeah.

2:48:51>> What do you recommend?

2:48:53>> Uh, okay. So, last time I check the

2:48:58master permit was awaiting client reply

2:49:00on 8 since 81.

2:49:04I'm trying to see now. Yeah. So the Oh,

2:49:08they have a

2:49:10>> the nature of the comments

2:49:11>> 811. They do have a um private provider

2:49:15for an interior modeling.

2:49:18Um

2:49:20>> yeah, like I said, the the electrical

2:49:22submit is already approved and paid for.

2:49:24>> Yeah, I'm looking

2:49:25>> and we're doing the same thing with the

2:49:26plumbing.

2:49:26>> Awaiting client reply for for the

2:49:30electrical

2:49:31September 14.

2:49:33How extensive is this interior?

2:49:36>> It's complete interior alteration. So,

2:49:37they did they did everything.

2:49:40>> How did you get caught, man?

2:49:42>> What is it?

2:49:43>> Yeah.

2:49:43>> How did you get caught?

2:49:45>> Oh, no. It was I'm representing the

2:49:47client. I'm I'm just the the one dealing

2:49:49with the city and the permits and the

2:49:53>> Alex Schneider. I'll move for a 35day

2:49:54extension.

2:49:57>> Say don't oppose 35 days.

2:49:58>> Okay, then I'll second it.

2:50:00>> All those in favor say I.

2:50:02>> I. Any opposed?

2:50:05>> You have 35 days.

2:50:06>> Thank you so much. Thank you.

2:50:08>> Our next case is on page 13.

2:50:12Inspector Seescu and Searian, just to

2:50:15let you know, you have the next three

2:50:16cases.

2:50:18[clears throat] Property address.

2:50:20>> Page 13.

2:50:21>> Okay.

2:50:22>> Property address 1731.

2:50:25>> Oh, that's the one you just did.

2:50:27>> Yeah.

2:50:28>> Okay.

2:50:29>> She She didn't mark it off my list.

2:50:31Oh, it's her fault. Here comes that bus.

2:50:34>> Okay, so just turn over to page 14.

2:50:36Property address 2621

2:50:39Southwest 18th Street. Case number

2:50:41BE25050056.

2:50:45Owner

2:50:47Deanna Leon

2:50:49or Lon Homestead exempted Evangelio

2:50:53Galendez. Notice posted at the property

2:50:55on 9326.

2:50:58posted at 1 Boulevard on 9826. This case

2:51:01was first heard on 111325

2:51:03to comply by 32426.

2:51:06One section at $50 per day. Order

2:51:08recorded not comply. There are three

2:51:10extensions noted.

2:51:13>> Several building inspector for the city

2:51:15presenting the case and address is read.

2:51:17This case is not complied. The

2:51:18respondent is here to speak.

2:51:20>> Hi, good morning. My

2:51:23>> my name is Janet. and the permit running

2:51:25that is helping the owner to comply and

2:51:28most of the permit has been issued roof

2:51:31vans. We are on the last permit which is

2:51:34for the

2:51:36driveway. Last time I came here and you

2:51:39gave me 35 days which is more that we

2:51:43need by that time but the engineer has a

2:51:46medical issues. So we couldn't submit

2:51:49the last correction that is needed for

2:51:51structural department. So he's back on

2:51:54contract. So I believe he has a lot of

2:51:57work as he mentioned to complete with to

2:52:01complete and [snorts] as soon as we get

2:52:03the plans to

2:52:05resubmit it back and just comply with

2:52:08the comments I think we will be done

2:52:11because this is the last thing that we

2:52:13are waiting cuz most of the permit has

2:52:16been issued.

2:52:17>> I think we need to bring this back as a

2:52:19massie. It's been going on since

2:52:21November and uh I would be inclined to

2:52:24increase your daily fine amount as well.

2:52:27>> Can I can I say something?

2:52:28>> Sure.

2:52:29>> Okay. So, basically they had a lot of

2:52:31work and um they're down to the last

2:52:35five yards I would say. Um it's all

2:52:38about the driveway that was done without

2:52:41permit. So, this is the only thing they

2:52:43have they have left.

2:52:44>> Yeah. is the thing that the engineer

2:52:46have. There was someone regarding with

2:52:49water specialist because as he have

2:52:52concrete in most of the property around

2:52:56they have to do some calculation that he

2:52:58has to find another person that help him

2:53:00with this plan and in the middle of this

2:53:02time he got his medical issues and we

2:53:04just stuck in this part but he just back

2:53:07you know working.

2:53:09All right, Alex Schneider, I'm going to

2:53:11put a motion for an extension of a 35day

2:53:14extension, but also raise the daily

2:53:16fines to $150 a day. So, if you don't

2:53:20get it done by then and then we send it

2:53:21to Massie, the fines will be raised.

2:53:24>> When's how long the extension?

2:53:25>> 35 days.

2:53:27>> I'll second that motion.

2:53:29>> 150.

2:53:29>> All those in favor say I.

2:53:30>> I. Any opposed?

2:53:34>> Okay. Thank you.

2:53:35>> Good luck.

2:53:37Our next case is a new business case on

2:53:39page four. Inspector Searian Onescu,

2:53:43property address 826 Northwest 14th Way.

2:53:49Excuse me. [cough and clears throat]

2:53:50>> Four.

2:53:51>> Case number BE2603

2:53:53010 0. Owner Nikra Johnson Leola Cannon

2:53:59Estate. Notice posted at the property on

2:54:0283126. posted at one east boulevard on

2:54:059826.

2:54:08>> Okay. Seanco building inspector for the

2:54:11city presenting the case and address as

2:54:13read. This property was cited as a

2:54:15violation of the Florida building code

2:54:17105.1. This building has been illegally

2:54:20altering construction work illegal

2:54:22performed without obtaining the required

2:54:24permits in the following manner and not

2:54:25but not limited to split system air

2:54:27conditioning unit and city ordinance

2:54:309280B.

2:54:32There are building parts which are

2:54:34deteriorated and not maintained. Rear

2:54:36structure and roof in this repair. This

2:54:39case was open on March 13, 2026. The

2:54:42inspection report was sent on April 6,

2:54:452026. Codeboard hearing was scheduled on

2:54:48July 30th, 2026. During the inspection

2:54:51of the property, it was observed that a

2:54:53newly installed mini split air

2:54:55conditioning unit has been placed on the

2:54:56right side of the structure when view

2:54:59from the street. A search of the permit

2:55:01records confirmed that no permits were

2:55:02obtained for the installation of this

2:55:04mechanical equipment. In addition of a

2:55:07review of the public available aerial

2:55:09imagery and on-site evaluation revealed

2:55:11that the rear structure previously part

2:55:14of the interior space currently has no

2:55:17roof and is in a state of disrepair. The

2:55:19area is exposed to elements creating

2:55:22potential safety and structure concerns.

2:55:24Based on this findings, violations have

2:55:26been created. The city is requesting the

2:55:28code board to find that the violation

2:55:30exists and to grant the property owner

2:55:33126 days to come into compliance or a

2:55:35fine of $50 per day thereafter. The

2:55:38respondent is here to speak.

2:55:41>> Hello.

2:55:42>> Hello.

2:55:43>> Your name?

2:55:43>> Good morning. I'm Nikitra Johnson.

2:55:47Um do I start from the beginning,

2:55:49>> please?

2:55:51>> Are you the owner?

2:55:52>> I am the owner.

2:55:53>> Yes. Um my grandmother passed away

2:55:56November 19th, 2025 and I inherited her

2:56:00home and this is the home that I

2:56:02inherited. Um subsequently after that I

2:56:06paid the taxes towards the end of

2:56:08November and when I questioned a couple

2:56:10of things that's when I understood that

2:56:13her previously deceased sister was still

2:56:16on the home. She died prior in CO. So my

2:56:20first step was to open up probate to get

2:56:23all of the property in my name. And so

2:56:26that's the process that I was working

2:56:29towards when I received this information

2:56:33in April.

2:56:35So um I will say my grandmother who died

2:56:38at 89 years old was still in her right

2:56:41mind and did everything in decency and

2:56:43in order. Um, so to learn that this

2:56:46wasn't done properly was very much so a

2:56:48shock to me. Um, but I did reach out to

2:56:51the individual who she hired to put in

2:56:54the mini splits. Um, and I asked him

2:56:56about his availability to go back and

2:56:58pull the permit and he stopped talking.

2:57:02And so that's when I learned further

2:57:04that he was not um Yeah.

2:57:09So, um, I'm a school teacher in Orange

2:57:12County and that's where I reside. And

2:57:14so, that kind of sort of led me into the

2:57:16summer where I had to get a second job

2:57:19to kind of sort of start to fulfill

2:57:20these obligations. And that's where I am

2:57:22now. So, I did um hire someone to get a

2:57:26mechanical permit um that will bring

2:57:29that mini split up to date and in

2:57:31compliance. And that's currently in the

2:57:33works right now. Um and then the

2:57:36inspector has been very gracious and

2:57:37very supportive and helping me

2:57:39understand what to do next in terms of

2:57:42the back structure. So my idea is to

2:57:45demo it um to bring that into

2:57:47compliance. And so that's my next step

2:57:50um moving forward.

2:57:52>> Is the house occupied currently?

2:57:54>> Yes.

2:57:54>> Who occupies it? So, interesting enough,

2:57:57my uncle who had a stroke

2:58:00um right before my grandmother passed

2:58:03resides in the home. And when the AC

2:58:06went kapoot this summer, I was excited.

2:58:09So, I was like, I'll just take it out

2:58:11and that'll be in compliance.

2:58:13Unfortunately, because of his stroke, he

2:58:15needed the AC. So, he's there. And the

2:58:18mental uh my cousin Frankie who's always

2:58:21lived there, that's his been his

2:58:22childhood home. He also resides there as

2:58:25well.

2:58:26>> How long did you How long has your

2:58:27grandmother owned the property?

2:58:28>> Oh, it's been in that family. My

2:58:30grandfather built that home.

2:58:32>> Wow. That's cool.

2:58:34>> And it survived several It survived all

2:58:36the hurricane. So,

2:58:38>> yeah.

2:58:38>> How How are you with the probate? How's

2:58:40that? Because I know that can take a

2:58:41long time.

2:58:42>> That's where Yeah. So, interesting.

2:58:43Today, I go with a notary to have some

2:58:47deeds signed over to me so that I can

2:58:49get progress.

2:58:51>> Yeah. There's eight of them that I have

2:58:53to deal with. So, I have four of them on

2:58:55board today.

2:58:56>> So, board just just for for um uh

2:59:01comment legal commenting purposes, the

2:59:04notice as set forth on your agenda as is

2:59:07reflected in BCPA. She owns the property

2:59:10right now as she stated. So, while the

2:59:13probate may be an ancillary process to

2:59:16clean up the second property owner,

2:59:18which is the estate of Leola Cannon, um,

2:59:23Miss Johnson has the full authority to

2:59:26act on behalf of the property to obtain

2:59:28permits on the property. And so, the

2:59:31probate really isn't necessarily gerine

2:59:33to our proceedings today. There's no

2:59:36barrier for her.

2:59:37>> Inspector, how did this get on your

2:59:38radar?

2:59:39>> Thank you.

2:59:40If I remember correctly, someone that

2:59:42did some work on the back room, right?

2:59:44It was the was the the complainant. So,

2:59:48>> someone did work on that back room

2:59:50that's you see the roof, it's off of it.

2:59:53>> So, my grandmother hired a roofer. Um,

2:59:55and then the city came out to do the

2:59:57inspection because he had started the

2:59:59process of retiling the roof cuz it's a

3:00:01flat roof.

3:00:02>> And so, the city came out to do the

3:00:04inspection and then cited him and told

3:00:06him he needed to get that structure

3:00:08fixed. and so he stopped working on it.

3:00:13Um, so that's basically how that works.

3:00:16[clears throat]

3:00:17>> Okay. And your recommendation was

3:00:19>> 126 days and $50 per day thereafter. I

3:00:21move that we find to the city and the

3:00:23violations exist alleged and we've

3:00:25ordered the property owners to come into

3:00:26compliance by

3:00:29January 26, 2027 or a fine in the amount

3:00:33of

3:00:35be $50 per day. Per violation be imposed

3:00:39and recorded.

3:00:40>> Alex Schneider will second.

3:00:41>> All those in favor say I. I.

3:00:43>> Any opposed? You have 126.

3:00:46>> Good luck.

3:00:47>> Thank you.

3:00:48>> Thank you.

3:00:49>> Happy New Year.

3:00:50>> Thank you. Our next case is also a new

3:00:54business case on page six. Senior

3:00:56Inspector Andrew [laughter] Debia,

3:00:58property address 1031 Northwest 13th

3:01:01Street. Case number BE260293.

3:01:06Owner Roxanna Rodriguez Perez. Notice

3:01:09posted at the property on 82726. Posted

3:01:12at 1 East Royal Boulevard on 9826.

3:01:33Andrew Gbia, building inspector for the

3:01:35city, presenting case and addresses

3:01:37read. This uh property was cited for

3:01:39violation of the Florida Building Code

3:01:412023 105.1. work illegally performed

3:01:44without obtaining the required permits

3:01:46in the following manner, but not limited

3:01:48to uh an interior remodel, two bathrooms

3:01:51in a kitchen with a split unit AC. This

3:01:54case was opened on 629 2026. The

3:01:57inspection report was mailed on 772026.

3:02:01Code enforcement board was scheduled on

3:02:028:18 2026. I visited this property on

3:02:067626.

3:02:07I first observed the new split unit AC

3:02:10system attached to the west wall of the

3:02:11house. then did some research by the by

3:02:15uh then research done by code officer

3:02:17Marie Aras showed interior pictures of

3:02:20two remodeled bathrooms and a kitchen.

3:02:23These modifications would include

3:02:24structural, plumbing, electrical, and

3:02:26mechanical permits. There are no permits

3:02:28on record for any of this were

3:02:29completed. I left a courtesy note in the

3:02:31door and uh I've been emailing the uh

3:02:33the owner of the home and uh we spoke

3:02:36previously. Uh, the city is requesting

3:02:39the code board fine that the violations

3:02:40exist to grant the property owner 126

3:02:43days to come into compliance or $50 a

3:02:45day thereafter. The respondent is here

3:02:47to speak.

3:02:49>> Good morning. My name is Lady Fer. I'm

3:02:52behalf of the owner and we already um

3:02:56ready to submit to the city. We received

3:02:58the plans for the design team and um

3:03:02just request little more time to comply.

3:03:06I think that those days well is enough

3:03:11to

3:03:13>> inspector. Has the respondent been in

3:03:16contact with your office? Are they

3:03:17playing both?

3:03:19>> Uh I've we we've chatted by email. Um

3:03:23you know, I I don't see any reason why

3:03:25it shouldn't take her anything more than

3:03:26126 days to come into compliance.

3:03:28>> Now, I mean, have they they've been

3:03:30they're they're in talk

3:03:32>> they cooperating is what I'm trying to

3:03:33say.

3:03:34>> Cooperating. I wouldn't say we've

3:03:35necessarily had many conversations, but

3:03:37you know, it's noted that we have, you

3:03:40know, so

3:03:41>> I move that we find for the city in

3:03:43violation exists as alleged we order the

3:03:44property owners to come into compliance

3:03:45by January 26, 20 27 or a fine of $100

3:03:49per day per violation will be imposed

3:03:50and recorded.

3:03:52>> I'll second. All those in favor say I.

3:03:56>> Any opposed? You have 126 days.

3:03:59>> Thank you. Our

3:04:02next case, senior inspector Joseé

3:04:04Salagusti on page 18 to Harrington and

3:04:07Pulse Wines, property address 2538

3:04:10Northeast 8th Street. Case number

3:04:13BE26010158.

3:04:15Owner Kayla Rodriguez, homestead

3:04:18exempted.

3:04:19>> What? What page?

3:04:20>> 18 [clears throat]

3:04:21bottom.

3:04:22>> Got it. Thank you.

3:04:23>> Alejandro Tori Ba. Notice post at the

3:04:27property on 83126.

3:04:30Notice posted at Wingsboro Boulevard on

3:04:329826.

3:04:34This case was first heard on 62326 to

3:04:37comply by 82526.

3:04:40One section amended from $100 per day to

3:04:42$300 per day. Order recorded. Comply the

3:04:45city's request to impose fines in amount

3:04:47of $5,700.

3:04:51>> Hi, good morning.

3:04:52>> Not yet. Let the inspector speak.

3:04:55>> Thank you. Professor Ruti, building

3:04:57inspector for the city presenting the

3:04:59case number as read. The case is comply.

3:05:03>> I will let the respondent speak.

3:05:06>> Hi, good morning. Uh, we did all the the

3:05:10job that needs to

3:05:12>> I'm sorry. My name is Kayla Rodriguez.

3:05:15>> I'm the owner of the property.

3:05:16>> Thank you.

3:05:17>> And we did comply. We next day after we

3:05:22have the hearing, we hired a contractor.

3:05:25He put all the pull pull all the

3:05:28permits.

3:05:29We were while we were waiting for the

3:05:31permits to be approved. H because a

3:05:34deadline was coming. We proactively

3:05:38to avoid any issues. We remove the

3:05:40pavers and we plant grass

3:05:44in August the 20th.

3:05:47I have the the digital printing of the

3:05:51picture if that is needed and I send the

3:05:54the an email to the city explaining that

3:05:58that's all

3:05:59>> that's what we have.

3:06:01>> Is that correct inspector?

3:06:02>> Yes. The they remove the violation.

3:06:06>> There is a permit for the next war but

3:06:09nothing to do with this violation. This

3:06:12violation is already compliant. It has

3:06:15fines and I don't know.

3:06:19>> Yeah.

3:06:22>> Do you want

3:06:23>> Yes. I the the fines to be removed and

3:06:31>> the city

3:06:33will support the administrative fines

3:06:38of $1,166.

3:06:42So

3:06:43>> was the violation

3:06:44>> it's compi it's all compiled compied

3:06:47saying

3:06:48>> was it complied before violations would

3:06:50have started to occur? Yes,

3:06:52>> the violation as soon as we have the

3:06:57information, we inspect the property and

3:07:00we comply the case.

3:07:04>> It's comply. Yes.

3:07:08>> Motion for

3:07:09>> I mean I'm confused here. I mean all you

3:07:10had to do was pull the papers and put

3:07:12saw that's that's a day's work. How did

3:07:14this rack up 19 days?

3:07:16>> That's what I'm trying to figure out.

3:07:17>> The the constru the con the Um the

3:07:22general contractor told us not to worry

3:07:24about that as soon as he did the thing.

3:07:27But things get extended. I said, "No,

3:07:29no, no. Let's move it, remove it, and

3:07:32put it back there. The the grass."

3:07:33>> So, inspector, in order for them to

3:07:35comply, they had to pull the pavers, put

3:07:37sat down. Right.

3:07:38>> Yes. They removed the paper and put the

3:07:40grass.

3:07:41>> When did they first call you to say this

3:07:42has been completed?

3:07:44>> I don't have the here the information.

3:07:45>> That's what I'm trying to figure out

3:07:46here. But uh I

3:07:50when I have the information that they

3:07:52comply Yeah. I think it was a Thursday

3:07:55or Friday. I went on Monday and and put

3:07:59the the the date before.

3:08:04>> I I agree. Um in what it's a little

3:08:07confusing because I've been dealing with

3:08:09the complaintant on this and

3:08:11>> I believe they complied within the time

3:08:13frame. Um

3:08:16I mean definitely was admin costs that

3:08:18were acrewed. So, you know, I definitely

3:08:20would support, you know, reducing it to

3:08:22that. Um, but

3:08:25>> there was a there was a lag from when

3:08:28the case was created um to when, you

3:08:31know, they came into compliance. Um, but

3:08:33since, you know, it's been in front of

3:08:35the board um I believe they meant I

3:08:37think it was a 60 they were they had to

3:08:39comply within either 30 or 60 days.

3:08:42Again, it was about, you know, 30 pavers

3:08:45that they created a parking area inside

3:08:48the swale um close to the corner. Um

3:08:52but, you know, they

3:08:54they did come into compliance.

3:08:56>> I make a motion now we wave the fines.

3:08:58>> What What day did you guys come into

3:09:01compliance?

3:09:01>> The 20th.

3:09:02>> The 20th of August.

3:09:03>> Yes.

3:09:05>> Uh yeah, Alex Schneider, I'll second

3:09:07that.

3:09:07>> All those in favor say I.

3:09:09>> I.

3:09:10>> Any oppose? lines have been waved.

3:09:13>> Thank you. Thank you so much.

3:09:14>> God bless you all.

3:09:16>> Thank you.

3:09:17>> God bless.

3:09:18>> Thank you.

3:09:19>> Merry Christmas.

3:09:21>> Our next case is on page 20.

3:09:24>> Senior Inspector Alexander Boris. Page

3:09:2620. Property address 572 West Dayton

3:09:30Circle. Case number BE25050095.

3:09:34Owner and Lewis Fabian.

3:09:38>> [clears throat]

3:09:38>> Notice posted at the property on 9326

3:09:41posted at Wise Brow Boulevard on 9826.

3:09:44This case was first heard on 111325 to

3:09:47comply by 22426

3:09:50one section at $50 per day. Order

3:09:52recorded not comply. The city is

3:09:54requested to impose fines in amount of

3:09:56$1,400

3:09:58which continues to acrue. There are two

3:10:00extensions noted.

3:10:02>> Alexander Alvarez, building inspector

3:10:04for the city, updating you on case

3:10:06number and address is read. The property

3:10:07was cited for a violation of Florida

3:10:09building code 2023 section 105.1 for

3:10:13work without permit regarding a garage

3:10:16enclosure. Uh case is not complied. Uh

3:10:20initially the owner had applied for the

3:10:22enclosure permit and then decided to

3:10:27abandon that project and convert back to

3:10:30a garage. So, they've applied for their

3:10:34uh new garage door uh replacement

3:10:37permit. The uh permit was just recently

3:10:41issued. Uh we're just waiting for

3:10:45the violation to be removed, per se. The

3:10:48wall needs to be removed, garage door

3:10:50installed, and and and I would have to

3:10:52go do an inspection. They understand all

3:10:54of this.

3:10:56>> [snorts]

3:10:57>> So, we're waiting for the violations to

3:11:01be removed. You said

3:11:04>> technically the violation remains

3:11:05because the unpermitted work is still

3:11:07there. Uh the intent is to remove the

3:11:10violation, meaning remove the wall that

3:11:13was built to enclose the garage. Once

3:11:16that wall is removed, the violation is

3:11:19removed. Then

3:11:20>> uh the the the garage it's the intent is

3:11:24to convert it back to a garage. So the

3:11:27garage door would have to be installed

3:11:29and we would have to do an inspection,

3:11:31make sure the inside, you know, it's in

3:11:33fact the garage.

3:11:34>> Do they need a demolition permit for

3:11:35that?

3:11:36>> A demolition? No. To remove the wall?

3:11:38>> No, not for that wall.

3:11:39>> So they can do it anytime.

3:11:40>> Has a permit uh for the new garage door

3:11:43been pulled yet? It was just issued.

3:11:45Yes.

3:11:46>> Just Okay. So, now you [laughter]

3:11:49>> Hi, good morning. My name is Anise

3:11:50Fabian. I'm the owner of the property.

3:11:53>> And as Mr. Alvarez stated, we did get

3:11:56the um permit finally. Um Luigi is the

3:12:02contractor, so just waiting to see when

3:12:05he's going to start

3:12:07taking the wall down. Um, we're still

3:12:11trying to get a price on the garage

3:12:13doors because they're not cheap. I'm on

3:12:15a fixed income, but we are working um

3:12:18towards getting the garage doors

3:12:20and getting no um violation removed.

3:12:24>> Luigi, when are you going to tear this

3:12:25wall down?

3:12:26>> Well, my name

3:12:30>> number one.

3:12:33Speak to the microphone and tell us your

3:12:34name. Same thing. And number one,

3:12:36congratulation is a new place here.

3:12:40[laughter]

3:12:41New place.

3:12:41>> Quite nice. Thank you.

3:12:43>> I like this place. All right. Second

3:12:45time I need a little time. Whatever. The

3:12:48last time I speak after I got it.

3:12:52>> Uh they told me here

3:12:55the other the other place is about six

3:12:59months.

3:13:01You know the after the per six months of

3:13:03the you know they finish the job. How

3:13:06many day your guy give it to me they

3:13:09finish the job.

3:13:10>> Inspector have they been in contact with

3:13:12you?

3:13:13>> They have been in contact.

3:13:14>> Are they good people?

3:13:17>> Of course.

3:13:18>> All right. Good. Um

3:13:20>> since you only need to tear a wall down

3:13:22to get the permit issued, which will

3:13:23bring us in compliance. Correct.

3:13:26>> The structure would have to be um

3:13:29>> inspected. inspected to make sure that

3:13:33>> meaning all this can be done within 30

3:13:35days. Correct? No. Theoretically?

3:13:37>> No. No. No. No. No. No.

3:13:41>> No. The lady, she don't got no much

3:13:42money.

3:13:43>> I'm sorry. Tear down a wall.

3:13:44>> I can do one day.

3:13:46>> Yeah. Tear the wall.

3:13:47>> Yes.

3:13:48>> But she don't got no money.

3:13:50>> But we can't tear the wall down and not

3:13:52have the doors to put the doors down.

3:13:53>> Well, I mean, you have six months to put

3:13:55Once the permit's issued, you got six

3:13:56months. So, I mean

3:13:57>> Oh, okay. And once the permit's issued,

3:13:59you're you're we're it's done with us.

3:14:01>> Oh.

3:14:02>> So that's what I'm saying. 35 days you

3:14:03usually tear away.

3:14:04>> They don't they don't have So let me

3:14:06just clarify. They don't have a permit

3:14:09to [clears throat] enclose the garage.

3:14:11So that's the violation. So the

3:14:12violation still remains. They have a

3:14:15permit which is the road to come into

3:14:18compliance, right? So they're going to

3:14:19they need to remove the wall. And once

3:14:22the wall is removed, the unpermanent

3:14:23work, we need to do an inspection, make

3:14:26sure that you know there's no other

3:14:28things since we never been inside the

3:14:30garage. So when when it was enclosed, we

3:14:32don't know to what extent, right? So

3:14:34we'd have to follow up by an inspection

3:14:36as well.

3:14:37>> What are they going to find in that

3:14:38garage?

3:14:40>> So we got to get another permit.

3:14:42>> No, an inspection.

3:14:44>> They have to go.

3:14:46>> They have to go to the right now. the

3:14:48the the wall has to come down and he has

3:14:51to go and inspect to make sure that the

3:14:53structure is still safe. Okay. Okay.

3:14:56>> Once he gets that then uh then you can

3:14:59you'll get you have the permit that's

3:15:02good for six months and then you have

3:15:04six months to put that door in.

3:15:06>> Okay. So you can't come and inspect the

3:15:09thing until the wall comes down.

3:15:12>> Correct.

3:15:13>> That is correct. and the city would

3:15:15prefer for the garage door to be

3:15:17installed. Uh so that so so so that the

3:15:20building it's protected uh the minute

3:15:22you remove that wall now it's you have

3:15:24an unprotected opening. So um that's why

3:15:28I would strongly recommend for the once

3:15:31the wall is taken down for the garage

3:15:33door to be installed so you you have so

3:15:36that it's protected

3:15:39>> and they're right their permit is good

3:15:41for uh six months. So that permit is

3:15:44good for six months.

3:15:45>> When is that? You said the city prefers

3:15:47that or is that mandatory with the city?

3:15:50>> Technically, uh the violation is for the

3:15:54garage enclosure.

3:15:55>> Yeah.

3:15:56>> Uh so for the wall,

3:15:59it would create another violation.

3:16:02>> So So in essence, in essence, the wall

3:16:05should come down and next day the garage

3:16:06door go away in.

3:16:07>> Correct. Yeah. But I mean, if you're

3:16:08saying I mean I'm not doubting you.

3:16:09Those garage doors will be several

3:16:11thousand dollars. I mean, I'm starting

3:16:13the garage door it overhead door itself

3:16:15will be several thousand dollar at

3:16:17least.

3:16:18>> I mean, to be up to 2026 code, they're

3:16:20not cheap. So, I mean, that's the thing

3:16:21here. I kind of want to give them an

3:16:25extension, but if they don't have a

3:16:28solution to get it fixed in a timely

3:16:30fashion,

3:16:32>> I mean, if we could go if we could get

3:16:34we could get the doors, find some doors,

3:16:36that's not going to just

3:16:38>> Okay,

3:16:38>> why don't we give us Can we hold on? So

3:16:40what what is your suggestion? What is

3:16:42what are you

3:16:44>> what what are you talking about?

3:16:45>> What what do you think we should be

3:16:47doing?

3:16:49>> This just say respectfully respectfully

3:16:52defers that decision to the board today.

3:16:54>> I I think we got to get that we can take

3:16:58bill.

3:16:59>> No, but but maybe a few months I mean I

3:17:02agree not to take the wall down. It's

3:17:03just going to create more damage and

3:17:05more problem. So, what we need to do is

3:17:07give us some time to purchase a door.

3:17:11>> She could do both at the same time.

3:17:12>> Hold on. Wait, wait, wait. So, you So,

3:17:14the the the garage door permit has been

3:17:16basically issued, correct?

3:17:18>> That is correct.

3:17:18>> So, you actually have engineering behind

3:17:20a door that is going to be installed

3:17:22there, correct?

3:17:24>> Yeah, we install it.

3:17:24>> Okay. So, you know exactly the kind of

3:17:26door you need.

3:17:27>> Yeah, because we got a

3:17:28>> How much does that door cost? Do you

3:17:29know?

3:17:29>> We got the product.

3:17:32>> It's a door for the garage.

3:17:35They call DN. What do they call it?

3:17:37Whatever.

3:17:37>> How much? Oh, the question he's asking

3:17:39how much did you you got some pricing

3:17:41for the door, right? How much is the

3:17:43door?

3:17:44>> The door that cost

3:17:45>> for the garage door. Yes.

3:17:47>> Well, I don't know how much I stole the

3:17:50door, but I cut the wall. The same thing

3:17:53garage doors, but I don't know if these

3:17:55the right doors.

3:17:57>> Well, you have to hire you have to hire

3:18:00I mean, are you going to install the

3:18:02door? You going to hire

3:18:02>> install the door? Yeah. You got to

3:18:04install the door as on the permanent

3:18:06specific door.

3:18:06>> You've already seen the pricing of

3:18:08>> I saw five or six 10 20.

3:18:10>> Okay. I I price doors, right? For the

3:18:13standard garage door.

3:18:14>> Why they go the size of the wall to the

3:18:17wall, sir? Luigi, let me see here.

3:18:20>> The cheapest door that I found based on

3:18:23the way my garage doors was, it was a

3:18:26smaller garage than a larger garage. So,

3:18:28it's two different size in the doors,

3:18:30but I said standard. The cheapest one

3:18:32that I found online was like $3,500.

3:18:35One was $3,500

3:18:37and I'm assuming if I remember

3:18:39correctly, it was for the smaller

3:18:41>> door. Okay. And then for the big one

3:18:47is

3:18:47>> No, no, two. You needed two. Two.

3:18:49>> I know. I need two. That's what I just

3:18:50said. One smaller door and one larger

3:18:53door.

3:18:53>> No, no, you needed all the same size.

3:18:56All small the way it was. That's it.

3:18:59>> Packed big. is I'm cool with like 77

3:19:02days

3:19:02>> just to see where she is at that point.

3:19:05>> Yeah, I mean I'm cool with 77 if

3:19:08>> let's just give you some time to to try

3:19:10to see and pro have some progress talk,

3:19:12you know, see where you are. Let us know

3:19:14where you are with the purchase of the

3:19:15door.

3:19:15>> I got to come back at the end back here

3:19:17>> or you get a door installed in 77 days.

3:19:20>> 126

3:19:21>> 126

3:19:22>> 126 126.

3:19:23>> You know, you you per se don't have to

3:19:25come back. You can authorize Luigi to

3:19:27come back and give us a promise.

3:19:29>> He's not He's not gonna come back if I

3:19:32don't come back. He's not. [laughter]

3:19:34>> Oh, okay. Let's do Let's do 26.

3:19:37>> No, but

3:19:37>> uh I make a motion.

3:19:39>> He knows when they stole the door,

3:19:41right? I put the door

3:19:42>> exactly the way it was before, right?

3:19:44And he knows he confirmed.

3:19:47>> Come here, they say, "Hey, the door is

3:19:49done." The original one way it was. Why

3:19:52we need to come back all time and do

3:19:54this?

3:19:55>> Thank you. I I make a motion that we uh

3:19:57grant the respondent a 126 day extension

3:20:01on compliance

3:20:02>> and hold the fines

3:20:03>> and we uh Yeah, let's stop the fines.

3:20:04>> Yeah.

3:20:05>> And a mandatory reappearance at the

3:20:08January 26, 2027. I want to see you next

3:20:11year, Luigi.

3:20:12>> Next year. Next year.

3:20:13>> Can I get a second?

3:20:14>> Can I Whoa, whoa, whoa, whoa. Slow down.

3:20:16Slow down. Slow down. Let me finish,

3:20:18please. Thanks. No worries. Can I get a

3:20:20second, please?

3:20:21>> I'll second that.

3:20:22>> All those in favor say I.

3:20:24>> I. I

3:20:25>> any

3:20:27>> Wait a second now.

3:20:29>> Uh

3:20:31uh motion carries.

3:20:33>> All right. So, you have 126 days.

3:20:36>> That's until January 26 to uh take down

3:20:41the wall and put a new door on there.

3:20:44Okay, that should be enough time uh to

3:20:47hopefully get it together. If not, we'll

3:20:49see you then. And then we're going to

3:20:51lay the hammer down.

3:20:52>> Gino is going to get those wall get that

3:20:54wall down. We're going to get them doors

3:20:55and get them doors up. I don't want to

3:20:56come back here.

3:20:57>> Yeah. We're not I mean, we're right now

3:20:59we're not finding you. We we've we've um

3:21:01put a stop on the fine. So, there's no

3:21:03money being levied against the property.

3:21:05>> Already, though.

3:21:05>> Say again.

3:21:06>> How much I owe y'all already?

3:21:07>> We don't know. You don't owe us

3:21:09anything.

3:21:10>> Yeah, you're good.

3:21:12>> Wait, wait, wait, wait, wait, wait,

3:21:13wait. Don't don't

3:21:14>> No, no. There's There's $1,400 in fines

3:21:16acrewed at the moment. We haven't we

3:21:19haven't imposed the fines yet. So, so

3:21:21once this is completed, then we can

3:21:23determine how many how much money we

3:21:25need to impose at the end because

3:21:27>> that that's a separate

3:21:29>> get the job done.

3:21:30>> The sword is still hanging over your

3:21:31heads here.

3:21:32>> Okay, go. The door is over our heads.

3:21:34Get this done. Okay, we got Luigi, guys.

3:21:38>> Thank you.

3:21:42>> Merry Christmas.

3:21:45>> Y'all have a great day. God bless.

3:21:47>> Smile on your face. Our next case is on

3:21:50page 21. Senior Inspector Jorge

3:21:53Martinez.

3:21:55>> Property address 401 Southeast 25th AB

3:21:58305. Case number BE25040039.

3:22:03>> Always at the end.

3:22:04>> Owner Jamie L. Durando. Dylan L.

3:22:07Durando.

3:22:08Notice posted at the property on 9426.

3:22:11Posted at 1 Boulevard on 9826.

3:22:14This case was first heard on 52725.

3:22:17to comply by 92325.

3:22:20One section at $50 per day order

3:22:22recorded not comply. The city is

3:22:24requesting to impose fines in amount of

3:22:26$1,400

3:22:28which continues to acrue. There are five

3:22:30extensions noted.

3:22:33[clears throat]

3:22:33>> Inspector Martinez updating case on

3:22:35behalf of the city. Case number and

3:22:37address as read. This case is not in

3:22:40compliance. I'm going to let that

3:22:41respondent speak. showing.

3:22:44>> Hi, my my name is Michelle Benzaken and

3:22:46I'm the acting contractor right now on

3:22:49record.

3:22:51>> I saw you guys last month.

3:22:54>> I took your advice and submitted

3:22:56whatever corrections we have even though

3:22:58we were waiting for Broward County's

3:23:00approval. Um, it did take we did get

3:23:04their approval finally on Friday at like

3:23:074:45 p.m.

3:23:08>> Approval for what specifically?

3:23:10>> Asbesus.

3:23:11>> Okay. It took about five months because

3:23:13we started the process in April. So, we

3:23:16finally got a hold of of them. They had

3:23:19all the documentation they need.

3:23:20Unfortunately,

3:23:22you know, he admitted that they are

3:23:23underst staffed and it's taking them a

3:23:25while to get to everything, but we did

3:23:27officially get their approval. So, I

3:23:29have the certificate from them. Um, in

3:23:32the meantime, the city has reviewed,

3:23:35electrical approved it,

3:23:37plumbing approved it. I believe I have

3:23:40I'm waiting on building and flood and

3:23:42flood still to review, but obviously

3:23:44building we know is going to come back

3:23:45and say they're still as they they still

3:23:48need the certificate, but I will be

3:23:49prepared for that. Um I do have a couple

3:23:52of small items that the owner did want

3:23:55me to mention for him.

3:23:58In October of 2025, they did meet

3:24:00someone who they gave a deposit to to

3:24:03help with this. And unfortunately, from

3:24:05October to March, he didn't do anything.

3:24:08I came in in March. He wanted you guys

3:24:12to know that. And unfortunately, he's

3:24:14not here. He lives in New Jersey. But,

3:24:17you know, that

3:24:19happened to, you know, add on to the

3:24:21whole requesting for extensions, not

3:24:23having anything done because he was

3:24:25hoping that this person was going to do

3:24:26what they were supposed to. He also

3:24:29wanted me to mention that his son who is

3:24:32um who was the one who was living in the

3:24:34unit did get into he was in the Coast

3:24:38Guard reserves and he got uh called in

3:24:40back to active duty at the excuse me at

3:24:43the end of 2025.

3:24:45So he was trying to monitor the

3:24:48situation and then he got called back

3:24:50in. So his dad is now you know

3:24:54>> in charge.

3:24:55>> So now you're here to save the day. I'm

3:24:57trying to. I really am.

3:24:59>> I am um staying on top of it though. I I

3:25:02I truly am.

3:25:05>> And I do hope that within the next 30

3:25:07days, we should have all the corrections

3:25:10completed for the city and then we can

3:25:13have a permit issued. I do have all my

3:25:15contractors [clears throat]

3:25:16>> in in line as far as

3:25:19>> plumbing and electrical go.

3:25:20>> I should be in contact with you.

3:25:21>> No,

3:25:22>> you haven't. I remember we the same

3:25:24exact thing last month

3:25:25>> and I was nervous you were exact to me.

3:25:28>> I emailed um twice with updates and

3:25:33>> sometimes I from my I get like the fire

3:25:36blocking situation and you I have to

3:25:38like email tech tech and then like

3:25:40technical they have to go in and allow

3:25:43my emails to go through.

3:25:45>> Wait wait wait. So what what's left to

3:25:47be done here to get this in under under

3:25:50compliance? So, I need the f I need the

3:25:53review back from building and flood

3:25:56>> so the portal can open and I can submit

3:25:58the Broward County and whatever other

3:26:00corrections might be needed, but I'm

3:26:02hoping there won't be much of any.

3:26:05>> Okay. So,

3:26:07>> there are corrections from 9:17, so last

3:26:10week. And the corrections are from

3:26:13building,

3:26:14flood, mechanical, and plumbing.

3:26:17So the only one that that has been

3:26:19approved is electrical.

3:26:21>> So

3:26:22>> but it's recent.

3:26:23>> So there's work on your end now. Now now

3:26:24the ball's back in your court

3:26:26>> almost. Building and flood have been

3:26:28assigned one to I think Mario and the

3:26:30other plan review but they haven't

3:26:32looked at it yet. There

3:26:33>> he just he just told you that they have

3:26:35reviewed it and there were comments as

3:26:37of last week. That's what he just said.

3:26:39>> I just checked it this morning. Well,

3:26:43>> from why I have 917,

3:26:47there are corrections needed.

3:26:50>> But for this, they were granted five

3:26:52extensions already. I think we should

3:26:55support

3:26:56>> inspector. When did this case originate

3:26:57and revisit this when it comes to the

3:27:00complian May of 25?

3:27:03>> Okay, it's 254. So,

3:27:06April 2025.

3:27:11year and a half.

3:27:13>> We got to do the fines. Impose the fines

3:27:16and and and uh let her come back to us

3:27:20and and show us what what she's done,

3:27:22you know.

3:27:22>> No, she's not coming back.

3:27:24>> Would you impose?

3:27:26>> Yeah. Well, that's last. We'll see.

3:27:28>> I think maybe we should also increase

3:27:30daily fund amount. Don't increase it.

3:27:33You don't think so?

3:27:34>> No.

3:27:36>> You sure?

3:27:38I make I move that we find the

3:27:41violations was not complied with by the

3:27:44date ordered and therefore we impose a

3:27:46fine in the amount of $1,400

3:27:49per section/violation as stated in the

3:27:51first order.

3:27:52>> Alex Schneider second.

3:27:54>> All those in favor say I.

3:27:56>> I.

3:27:56>> Any opposed?

3:27:58>> Fines are imposed.

3:28:01>> Okay. So that's $1,400 in fines

3:28:04>> with continuing to acrew. But you you

3:28:07still have to get this.

3:28:08>> No, of course I'm not stopping. I just

3:28:10think it's up. I would never do that.

3:28:12I've been on it the whole time. So it's

3:28:131,400 in fines that

3:28:16>> as of right now.

3:28:17>> As of right now.

3:28:18>> Correct.

3:28:19>> And what's the Is there an acrewing

3:28:21until they get issued?

3:28:23>> So it's permits are issued.

3:28:25>> It is. No, I don't

3:28:28>> $50 a day.

3:28:31The fines

3:28:32>> because the we're not increasing. Okay.

3:28:35>> Okay.

3:28:36Okay,

3:28:36>> my good.

3:28:38>> You are dismissed.

3:28:39>> Thank you.

3:28:39>> Thank you. Thank you.

3:28:40>> Our next case is on page eight. Senior

3:28:43Inspector Andrew Gabia. Property address

3:28:4625507 Sugarloaf Lane. Case number

3:28:49BE26030026.

3:28:52Owner Glenny and Marouch Fchinski.

3:28:56Notice posted at the property on 9326.

3:28:59Posted at 1 East Bar Boulevard 9826.

3:29:03This case was first heard on 62326 to

3:29:06comply by 9226

3:29:08one section at $50 per day. Order

3:29:10recorded not complied.

3:29:16Andrew Gbia, building inspector for the

3:29:18city, presenting case and address is

3:29:19read. This case is not complied. The

3:29:22respondent is here to speak.

3:29:24>> Yes. First um good morning or good

3:29:26afternoon. Sorry.

3:29:28>> Um it's possible to

3:29:29>> your name. Your name?

3:29:30>> My name is Conrad Mendes. I represent

3:29:32the company is is working in the project

3:29:35for leg legalization of the relation.

3:29:38>> It's possible the service translator is

3:29:40better for me.

3:29:41>> Yes.

3:29:42>> Yes. Can we get a translator please?

3:29:44>> Translator.

3:29:46>> Stat.

3:29:51>> Do we have to pay a picture for that?

3:30:00>> Alex.

3:30:01Do you swear an to tell the truth will

3:30:03translate from English to Spanish and

3:30:05Spanish to English?

3:30:14>> He understand what the

3:30:33It's okay.

3:30:48children. Yes.

3:31:09demolition.

3:31:12Okay. So, he's here uh on behalf of the

3:31:15contractor. He's um been he's um been

3:31:20hired to try to remedy the situation and

3:31:24uh

3:31:27he says the plans are ready uh to

3:31:31for

3:31:41[clears throat]

3:31:42Okay. So they're they're ready to be

3:31:44submitted. They have not been submitted.

3:31:47>> The tik barition

3:31:49for the bar

3:31:50>> and they intend to remove the tik bars

3:31:56demolition because you know temporary

3:31:58glass.

3:32:00>> Uh they intend to remove the sauna

3:32:09>> and all the rest is uh uh they're going

3:32:12to legalize it.

3:32:15Okay.

3:32:15>> So, they're they're getting rid of the

3:32:17sauna, the what? The tiki hut,

3:32:19>> new kitchen with interior remodel. They

3:32:21have they're going to legalize

3:32:23>> structural, electrical, plumbing,

3:32:24mechanical. They're going to legalize uh

3:32:27in inspector uh have they been in touch

3:32:30with you?

3:32:32>> This uh the the owner of this property,

3:32:35he he's uh he's gone through a couple

3:32:37contractors already. I mean the last

3:32:39time we here was somebody else speaking

3:32:40on his behalf and then I guess that fell

3:32:43through. So now this gentleman is is

3:32:45speaking for the owner as well. Now I

3:32:47have spoken to the owner of the property

3:32:49before. I did speak to the contractor

3:32:51last week. Um he said he was going to

3:32:55try to avoid all the permits and then uh

3:32:58resubmit them with new plans. But now

3:33:00this is another curveball because if

3:33:02they remove the sauna and they remove

3:33:04the tiki hut, the majority of this case

3:33:06is is uh complied.

3:33:32Um, they remove the

3:33:46in compliance.

3:33:49idea is

3:34:06okay. Um, so basically what he's saying

3:34:09that they'll they're going to apply for

3:34:12a pergola. Um, but they'll remove this

3:34:14one and they'll apply a permit for a for

3:34:17>> what what about the kitchen? The outdoor

3:34:19kitchen.

3:34:22>> They're going to keep the outdoor

3:34:23kitchen.

3:34:24>> All right. So that's what they're going

3:34:25to permit the outdoor kitchen and remove

3:34:27the tiki hut.

3:34:30>> So how much time does he think he needs

3:34:32to rem to remove these items? The sauna.

3:34:34This owner is in a a whole a whole room.

3:34:38They're going to remove that

3:34:39>> in this moment. The plan is ready for

3:34:41submit.

3:34:42>> Okay.

3:34:42>> Um I think so. Two months for working,

3:34:46you know, one months for for

3:34:48legalization for for the permit and two

3:34:51months for working in the project.

3:34:53That's it.

3:34:55>> So you you're saying one month?

3:34:58>> One month for you know idea is submit

3:35:01right now the permit. I don't know. See

3:35:03the proof is in one month.

3:35:05>> How how long do you think it's going to

3:35:06take you to remove the sauna?

3:35:18>> Once the permit is approved,

3:35:22why would that be a big deal?

3:35:25>> Uh so are you saying that you could use

3:35:29an extension of 77 days because that's

3:35:31the calendar?

3:35:45hearing.

3:35:46>> Okay. Possible possible first three

3:35:49months

3:35:52if three months are not possible. I'll

3:35:55support 77 day extension but no more

3:35:57after that.

3:36:06Okay.

3:36:08>> All right. I move for a 77day extension.

3:36:11>> Alex second.

3:36:12>> All those in favor say I.

3:36:14>> Any opposed? 77 days.

3:36:17Okay.

3:36:18>> And keep the inspector keep the

3:36:19inspector updated on what's going on.

3:36:21Like he needs to know what's going on.

3:36:25that I

3:36:28>> Our next case is on page five. Property

3:36:32address 1239

3:36:34Southwest 29 Terrace. Owner V LL LLC.

3:36:39Case number BE260190.

3:36:43Notice posted at the property on 9326.

3:36:46Posted at Wiseboro Boulevard on 9826.

3:36:52>> Good morning. Andrew Gvy, a building

3:36:54inspector for the city, presenting case

3:36:56and address is read. This property was

3:36:58cited for violation under Florida

3:37:00building code 2023 105.1. Work illegally

3:37:04performed without obtaining the required

3:37:06permits in the following manner but not

3:37:07limited to uh windows, doors, roof,

3:37:12stucco, interior renovations, demo,

3:37:14structural, electrical, and plumbing.

3:37:15This case was opened on 518 2026. The

3:37:18inspection report was mailed on 64 2026.

3:37:22Code board was scheduled on 84 2026.

3:37:25Before arriving at this property, I

3:37:27checked records to see if there were any

3:37:28permits issued for any construction. As

3:37:30I ar as I arrived, I observed the new

3:37:33roof, windows, door, some new stucco. I

3:37:36met a worker walking to his van. I

3:37:38explained to him why I was there. He

3:37:41said he was just cleaning up. So, he

3:37:44left. I posted a stop work order. I took

3:37:46photos of what I could see. Uh the

3:37:49windows were covered up except for one

3:37:51where I got to look inside. Um there has

3:37:54been some work to the inside that I

3:37:56could see some demo framing electrical

3:37:58and plumbing. Uh since then they have

3:38:02obtained the permit for the windows,

3:38:04door and roof. That's all. Uh the window

3:38:07permit is issued and the roof is

3:38:09completed. So nothing there's nothing

3:38:11for the inside yet. [snorts]

3:38:14The city is requesting the code board to

3:38:15find that these violations do exist and

3:38:18to grant the property owner 126 days to

3:38:21come into compliance or $50 a day

3:38:23thereafter. The respondent is is here to

3:38:25speak.

3:38:28>> My name is Hi. Um my name is Helen. I'm

3:38:30a rep. My uncle owns a property.

3:38:34I'm just confused because speaking to

3:38:36the microphone.

3:38:37>> So for the stuckco is does the stucco

3:38:39that requires a permit

3:38:42>> if there's wire l Yes. Okay. Um, so what

3:38:46if it was just around the when the

3:38:48windows were replaced? Does that require

3:38:50a permit?

3:38:51>> We'd have to re reinspect that.

3:38:53>> Okay. So I would have to get an

3:38:56inspection.

3:38:57>> Yeah. But as far as everything else, the

3:38:59main things, the the stuckco was a

3:39:01little minor on this part, but the main

3:39:03thing is the interior. There's, you

3:39:04know, there's a lot of work that looks

3:39:05done in

3:39:06>> and I'm looking at the pictures and

3:39:08there's framing that's not decode just

3:39:09by looking at it. So you you need to get

3:39:12a master permit for this whole

3:39:14>> for the whole all the whole renovation.

3:39:16You need a master permit that's

3:39:18inclusive of all the other sub permits.

3:39:21>> Like what possessed your uncle to like

3:39:23replace an entire roof and windows

3:39:25without pulling permits.

3:39:26>> Well, it was leaking. The roof was

3:39:28leaking. And

3:39:29>> this was a complete re-roof, right?

3:39:31>> Right. Well,

3:39:32>> that's a big job.

3:39:33>> He hired a a Miami contractor.

3:39:37got those out

3:39:38>> and he started doing work without

3:39:41permits apparently

3:39:43and he gave him like a huge deposit and

3:39:45he didn't do things correctly

3:39:48apparently.

3:39:50>> Well, that that's unfortunate but for

3:39:52moving forward you need to get a master

3:39:54permit

3:39:55>> for the whole thing because I say just

3:39:57[clears throat] looking at it there's

3:39:58things that are not done up to code and

3:40:00I can see it in the pictures. So, um,

3:40:03you need to get a hired a general

3:40:04contractor, get a master permit, and

3:40:07that they will guide you for all the sub

3:40:09permits and all the the ancillary things

3:40:12that need to get done.

3:40:14>> Okay. So, right now, do we have any

3:40:16fines?

3:40:16>> Well, what have you been doing uh for

3:40:18the interior? Like, have you actually

3:40:19got a uh

3:40:20>> We have all We have the electrical and

3:40:22the plumbing plans.

3:40:24>> Plans?

3:40:25>> Yeah.

3:40:25>> Okay.

3:40:25>> Inspector, have they been in contact

3:40:26with your office?

3:40:27>> No.

3:40:28>> At all?

3:40:29>> No. We spoke over the phone and you

3:40:31>> Oh, except for her, but I haven't talked

3:40:32to the owner.

3:40:33>> I mean, I mean that contact,

3:40:35>> you know, no representative, no

3:40:36contractor, nobody. No. No.

3:40:38>> Okay. Okay.

3:40:38>> Well, that's Yeah, we need to get the

3:40:39contractor in touch or at least someone

3:40:41giving him updates. Um, so 126. Do we

3:40:44need to speed this up a little bit?

3:40:47>> I besides the the time frame, I think we

3:40:49need to increase the fine amount to

3:40:51let's say 250.

3:40:52>> I was going,

3:40:53>> but we got two permits already. Why? Why

3:40:55do we

3:40:56>> No, this is only only if you don't get

3:40:58it and done done.

3:40:59>> Yeah, we have plans already. We're going

3:41:00to submit next week.

3:41:02>> If it's going to be done,

3:41:04>> you'll be fine then. Yep. Keep working.

3:41:06>> So, you're saying increase it after the

3:41:08127?

3:41:08>> No. Yeah. So, yeah. What's the penalty?

3:41:10>> So, once once uh 126 days, if it's not

3:41:13done by January 27th, you'd have to come

3:41:16in for another hearing. And at that

3:41:18hearing, we would decide whether to give

3:41:19you an extension or to start to acrew

3:41:21fines.

3:41:22>> Okay. And we don't need a stuckco

3:41:23permit.

3:41:25that's going to be included in the

3:41:26master.

3:41:27>> That'll be included

3:41:30on the date or the amount yet. We still

3:41:32have to figure that out.

3:41:34>> But for 126 days, I think that's a

3:41:36sufficient amount of time for you to

3:41:38achieve,

3:41:39you know, getting everything submitted

3:41:41and and issued. And once the permits are

3:41:43issued, this will get closed up. But as

3:41:45far as uh like the gentleman said over

3:41:47here, the that that the picture of that

3:41:49window, that's not the code.

3:41:51>> And the frame here frame.

3:41:52>> Yeah. the way it's framed. It's not

3:41:54>> interior framing. You have studs that

3:41:55are spliced that

3:41:56>> spiced together.

3:41:59>> Not right.

3:42:00>> Even I know that.

3:42:03>> So, just keep in mind.

3:42:04>> Okay.

3:42:04>> So, I'm in for 77 at 200 or 126 at 250.

3:42:09>> 77.

3:42:10>> No, I'm saying I'm asking I'm asking the

3:42:12board what they're

3:42:14>> I mean 126 and 250.

3:42:16>> Okay, fine. So, uh, I move that we find

3:42:18for the city and the violation exists as

3:42:19allegedly we order the property owners

3:42:20to come into compliance by January 26,

3:42:232027 or a fine of $250 per day per

3:42:26violation will be imposed and recorded

3:42:28>> and a mandatory appearance at the

3:42:30January 26th.

3:42:31>> I'll second that.

3:42:32>> All those in favor say I.

3:42:34>> Any opposed?

3:42:36>> 126 days it is.

3:42:38>> Thank you.

3:42:38>> All right.

3:42:38>> You're welcome.

3:42:40>> Thank you, board. At this time, that

3:42:42concludes all of our respondents.

3:42:44>> We have one person here. here. Observe.

3:42:48>> He's just observing.

3:42:49>> Okay.

3:42:49>> You're spying on us.

3:42:50>> Yeah, I did my due diligence.

3:42:52>> Um

3:42:53>> observing.

3:42:54>> We're going to take a brief recess. You

3:42:56guys can use the restroom and grab some

3:42:57food from the back. And when we come

3:43:00back, we're going to have a presentation

3:43:02uh training from our deputy city

3:43:04attorney, D. Wayne Spence, before we

3:43:07finish out the agenda.

3:52:34and uh deputy city attorney. Um thank

3:52:37you for inviting me to your lunchon.

3:52:39[laughter]

3:52:44[laughter]

3:52:46>> Um so our office is making their rounds

3:52:48to all of the boards and uh committees

3:52:51of the city. um to provide a

3:52:53presentation

3:52:55on the basic um

3:52:58uh basic purpose of each board uh the

3:53:03sunshine law, voting requirements,

3:53:05public records law, and a little

3:53:08legislative update including the new DEI

3:53:10law. Um, we provide a we provide a more

3:53:16extensive training, a three-hour

3:53:18training uh twice a year in conjunction

3:53:20with the city clerk's office. Uh, this

3:53:23is tailored directly for your board and

3:53:26we'll just be briefly touching on those

3:53:28subjects. So, we'll be about 15 minutes.

3:53:31Okay.

3:53:32All right. Wonderful. So, this board is

3:53:35uh authorized under Florida statute

3:53:38162.05.

3:53:41um local governing bodies may appoint

3:53:44one or more code enforcement boards or

3:53:47and legal counsel for those code

3:53:49enforcement boards. And that statute

3:53:52provides that these boards have the

3:53:54function of adopting rules for the

3:53:56conduct of its hearings. It can subpoena

3:53:59alleged violators and witnesses to its

3:54:01hearings. It may subpoena evidence at

3:54:03those hearings and may take testimony

3:54:05under oath and issue orders having the

3:54:08force of law to command whatever steps

3:54:10are necessary to bring the violators

3:54:12into compliance. We've ina um the city

3:54:16of Fort L'Oreal adopted in a set up or

3:54:20established this board in uh 2008 under

3:54:24ordinance C 0836

3:54:29establishing a code enforcement system

3:54:31that established this board along with

3:54:33the special magistrate system and our

3:54:35general code enforcement system.

3:54:38The jurisdiction

3:54:40of this board is to hear and decide

3:54:42cases

3:54:44um that violate any provision of the

3:54:47code that is alleged. And I won't go

3:54:50into any more in depth um in terms of

3:54:53your board's uh function or

3:54:55responsibilities. that you have a

3:54:57council that is um that guides you well

3:55:01and and much of the presentation also

3:55:03because you're so structured in the way

3:55:05that your board operates uh is may be a

3:55:09little bit more applicable to other

3:55:10boards but it is still important that

3:55:13you hear them because you are still

3:55:15subject to some of these requirements.

3:55:17So the voting requirement under Florida

3:55:20law uh section 286.012 012.

3:55:26A member of a municipal government

3:55:28board, commissioner, agency who is

3:55:31present at a meeting of such a body at

3:55:33which official decisions, rulings, or

3:55:35other official actions are taken or

3:55:37adopted may not abstain from a vote

3:55:40unless there is a conflict of interest,

3:55:42unless that individual has conflict of

3:55:44interest. So, we'll discuss what a

3:55:46conflict of interest means, but this is

3:55:48a concept. If you work in a private

3:55:51sector board, it's kind of hard to

3:55:53understand that you cannot abstain. If

3:55:56you are here and present, you cannot

3:55:58abstain from voting. Uh the attorney

3:56:02general in an opinion in 2002

3:56:06decided that this law did not just apply

3:56:10to uh the commissioners, but it also

3:56:12applied to uh board members as well.

3:56:16So the only way that you can abstain for

3:56:20general practice for boards is if

3:56:23there's a conflict of interest and there

3:56:24is a form 8B that needs to be filed if a

3:56:29conflict of interest is determined to um

3:56:32be present. Now, a conflict of interest

3:56:35means or the the prohibition against

3:56:38voting is that no county, municipal or

3:56:42public officer shall vote on any in

3:56:44their official capacity upon any measure

3:56:47which would enure to his or her per uh

3:56:50special private gain or loss which she

3:56:52or she knows would inure to the special

3:56:55private gain or loss of the principal

3:56:57whom they are retained or a parent

3:56:59organization or subsidiary of that

3:57:01principal or which he or she uh knows

3:57:05would enure to special gain or loss of a

3:57:07relative or business association

3:57:10business associate of that public

3:57:12officer. For the purposes of the

3:57:14statute, re relative means father,

3:57:17mother, son, daughter, husband, wife,

3:57:19brother, sister, father-in-law,

3:57:21mother-in-law, son-in-law, and

3:57:23daughter-in-law. These are the only

3:57:25categories of relatives. if uh your vote

3:57:28on the matter um would enure to their

3:57:31special gain or loss that you cannot

3:57:33vote in. And in your context that would

3:57:36be if any of these uh categories of

3:57:39relatives came before this body with a

3:57:42case you would not be able to

3:57:44participate. you would have to state

3:57:45your conflict before the um before the

3:57:50matter comes up and file a form 8B and

3:57:55that will be made a part of the record.

3:57:57It is a state form that um your board

3:58:00layers on can provide for you.

3:58:04Um in terms of determining whether

3:58:06there's a conflict of interest and

3:58:08whether there's a special private gain

3:58:10or loss, you look at the size of the

3:58:11people affected. The example I like to

3:58:13give all the time is uh utilities uh a

3:58:18utility pipe. If it's a overall

3:58:21renovation of the entire city, obviously

3:58:24the class is large enough, there's no

3:58:26special benefit or gain to me if I voted

3:58:29on something that involves that. But if

3:58:32say they were going to install a single

3:58:34pipe down my street, uh that benefits a

3:58:38smaller class and could be viewed as a

3:58:40special gain to those individuals on

3:58:43that street. Remote or speculative,

3:58:47uh when you look at the decision, it it

3:58:49shouldn't be whether or not it could

3:58:52possibly affect you. You need to be more

3:58:54definitive in order for it to be

3:58:56considered a special private gain or

3:58:59loss. procedural and preliminary issues

3:59:04um to a later action that result in a a

3:59:09actual private gain or loss is not a

3:59:11voting conflict either. So if you're

3:59:14just addressing preliminary questions

3:59:16that is not the case there either. As

3:59:19you know for your board you have a

3:59:20quorum of four members and alternative

3:59:23members are considered a part can count

3:59:27or do count towards that quorum.

3:59:32Now the sunshine law is a law that

3:59:34applies to any gathering whether formal

3:59:36or casual between two or more members of

3:59:38the same board or committee to discuss

3:59:41some matter which will force where which

3:59:44foreseeable action will be taken by that

3:59:46public board or committee. It does not

3:59:49have to be in order to be considered a

3:59:52meeting under the sunshine law. All it

3:59:54needs to be is two members of the same

3:59:57board talking about something that would

3:59:59foreseeably come before that board for

4:00:02consideration. There hasn't there's no

4:00:05need for any formal meeting um in order

4:00:09for that to be classified as such.

4:00:12As such, uh, for a meeting to be in the

4:00:16sunshine, whenever this board meets in

4:00:19the sunshine, those meetings need to be

4:00:21open to the public. There needs to be

4:00:23reasonable notice given to the public

4:00:26and written minutes needs to be taken

4:00:28and promptly recorded.

4:00:31The quorum is directly related to the

4:00:34sunshine law in the sense that it makes

4:00:37sure that the meeting is open. So, uh,

4:00:40Mr. chair. It is your responsibility to

4:00:42maintain the quorum and uphold the

4:00:44sunshine law in that respects.

4:00:47Uh public records law.

4:00:51Every person in the state is a

4:00:53constitutional right, a Florida

4:00:55constitutional right um to inspect and

4:00:58copy public me public records made or

4:01:00received in connection with the official

4:01:02business of the city. This right is

4:01:05further annunciated in chapter 119 of

4:01:08the Florida statute.

4:01:12Public records are defined broadly to

4:01:14include any document, paper, map, book,

4:01:17tape, uh, photographs, film, sound

4:01:20recording, data processing software, or

4:01:22other material regardless of physical

4:01:24form, characteristic, or means of

4:01:26transmission made or received pursuant

4:01:29to law or ordinance in connection with

4:01:31the transaction of official business.

4:01:34The Florida Supreme Court has further uh

4:01:37interpreted that definition to encompass

4:01:39all materials rece materials made or

4:01:42received by the agencies used to

4:01:44perpetuate, communicate or formalize

4:01:48knowledge. So any

4:01:51information that you uh share that is

4:01:54intended or used to perpetuate,

4:01:57communicate or formalized knowledge is

4:02:00considered a public record and should be

4:02:03open to public inspection or copying.

4:02:07All right? And it doesn't doesn't matter

4:02:10who's in possession. If you are in

4:02:12possession and you share a document that

4:02:15you intend to communicate something with

4:02:17regards to public business, it makes it

4:02:19a public record. It can be on your

4:02:21private device, can be on a public

4:02:23device. It in it is a public record.

4:02:27Draft notes, note that there is no

4:02:29unfinished business um exception. So

4:02:33drafts that are shared with other people

4:02:35are public record. Uh but drafts that

4:02:38you keep for yourself and notes that you

4:02:39keep for yourself that you do not share,

4:02:42they are not public record. Emails that

4:02:45are sent and received in connection,

4:02:47those are public record. Social media

4:02:49posts are public record as well.

4:02:54It's important to note uh before we move

4:02:56on to the legislative update, I just

4:02:59wanted to talk about the separations of

4:03:01powers that the city has in terms of uh

4:03:04our man city manager council form of

4:03:07government. Uh our city charter splits

4:03:11the government into two spheres. So you

4:03:15have the legislative sphere that the

4:03:16city commission controls and you have

4:03:19the city manager who controls the

4:03:21administrative sphere of things. Our

4:03:25charter specifically provides that the

4:03:29city commission may not direct uh the

4:03:33city manager in terms of um in terms of

4:03:37the employees and that the city

4:03:40commission may not direct city employees

4:03:42at all.

4:03:44Your boards and all advisory boards

4:03:48are functioning under a delegated

4:03:52authority of the city commission. You

4:03:54are a arm of the city commission. You

4:03:56are operating

4:03:57under the sovereign you are exercising

4:04:00sovereign powers of the city commission.

4:04:03In in your particular case, you have

4:04:07final decision makingaking authority.

4:04:10All right. So you the city commission in

4:04:12essence have placed this responsibility

4:04:15with you all. You are thereby also

4:04:19limited in terms of the city charter in

4:04:21terms of how you direct staff. You can

4:04:25direct staff. Um so what you can do is

4:04:28similar to the commission. The

4:04:29commission can direct the city manager

4:04:31and other charter officers. You can

4:04:33communicate if there is a desire to have

4:04:36staff do anything that is beyond the

4:04:39normal scope of their work here as

4:04:41leaison or inspectors or whatever the

4:04:43case may be. You can send a

4:04:45communication to the city commission

4:04:47requesting for additional work. And and

4:04:49we can understand this in terms of the

4:04:51the tax dollars that are in play. uh

4:04:54that the city manager is responsible for

4:04:56making sure that the dollars are spent

4:04:58and and allocated appropriately and the

4:05:02allocation of city resources.

4:05:05Lastly in our presentation is our

4:05:07legislative update. So, there have been

4:05:10a number of bills that we've heard that

4:05:12the legislature considered over the

4:05:14session, but one that has um very strong

4:05:19implications here at the city is known

4:05:22as the DEI bill, the bill that deals

4:05:25with diversity, equity, and inclusion.

4:05:29So that bill um and the impact here uh

4:05:35may be limited but I think it should be

4:05:37important for you all to understand the

4:05:39impact of the bill on city operations.

4:05:42So it defines DEI as any effort to

4:05:46manipulate or otherwise influence the

4:05:48composition of employees with reference

4:05:50to race, color, sex, ethnicity, gender

4:05:54identity, or sexual orientation other

4:05:56than to ensure the hiring is conducted

4:05:59in accordance with state and federal

4:06:00anti-discrimination laws. Secondly, it's

4:06:03defined as the to promote or provide pre

4:06:07preferential treatment to or special

4:06:09benefit to a person or group. based on

4:06:12that person's race, color, sex,

4:06:14ethnicity, gender identity, or sexual

4:06:16orientation. And lastly, to promote or

4:06:21adopt training, programming, or

4:06:22activities designed or implemented with

4:06:25reference to race, color, sex,

4:06:29ethnicity, gender identity, or sexual

4:06:32orientation. This is what this statute

4:06:35defines as DEI.

4:06:39What can't the city do in reference to

4:06:41DEI? If the activity is classified or

4:06:44the effort is classified as DEI, the

4:06:46city may not promote fund

4:06:49direct directly or indirectly or take

4:06:51any official action as it relates to

4:06:54DEI. It may not expend funds regardless

4:06:57of source to establish, sustain, support

4:07:00or staff a DEI office or employee,

4:07:03contract or otherwise engage a person to

4:07:06serve as a DEI officer. And lastly, it

4:07:09can they the city cannot provide or

4:07:11authorize its funds to be used by

4:07:14employees, contractors, vendors or

4:07:16agencies to promote DEI. So these cannot

4:07:20fund or promote official action related

4:07:23to DEI. cannot expend funds with regards

4:07:26to staffing a DEI office or or contract

4:07:30services or and cannot authorize funds

4:07:34to be used by others to do so.

4:07:39The prohibition there is also a

4:07:41prohibition to members of the governing

4:07:43body of the municipality and other

4:07:45municipal officials. You are municipal

4:07:48officials acting in official capacity.

4:07:50Those who violate this law um commit a

4:07:54malfeasance or a misfeasence in office.

4:07:58Um and that's punishable in terms of our

4:08:02elected officials in terms of removal.

4:08:05The section however does not apply to

4:08:08the actions of bodies composed by

4:08:10non-elected volunteers

4:08:13or basic administrative support to the

4:08:15such bodies. Um, so if you're exempt

4:08:20from it, why am I sharing that with you?

4:08:22It's because

4:08:24it the way it's written, it does not

4:08:26exempt the city from not taking these

4:08:30actions and following those

4:08:31prohibitions. So many of our boards who

4:08:34have the um ability to recommend funding

4:08:37and so forth and so on. Although the

4:08:39individual uh actions of the board

4:08:42members are do not make them

4:08:45individually liable for violating this

4:08:48law, the actions of the city would be

4:08:50prohibited by this law. And that

4:08:52distinction is something I want to make

4:08:54sure we're clear on in terms of that

4:08:58that distinction.

4:09:00And that with that I conclude uh my

4:09:04keynote lecture

4:09:08and and I've attend I've attended a lot

4:09:09of keynote lectures and people are

4:09:11asleep by this time. So I'm I'm glad you

4:09:13stayed awake. are.

4:09:17So, are there um any questions uh that

4:09:21you may have?

4:09:24All right, great. And thank you for

4:09:25indulging me. I was sorry to impose, but

4:09:28I appreciate your time. All right.

4:09:33>> Thank you.

4:09:47Page one,

4:09:50Senior Inspector Jorge Martinez.

4:09:53Property address 1325 Northeast Second

4:09:56A. Case number BE26040075.

4:10:01Owner Raymond Costello, Carol Costello,

4:10:04and all others. Notice posted at the

4:10:06property on 82426.

4:10:09Posted at One Grow Boulevard on 9826.

4:10:13Inspector Martinez, on behalf of the

4:10:14city, presenting case as read, this

4:10:17property was cited for violation of the

4:10:19FBC 2023 105.1 work without permits for

4:10:23a wood fence. The city will request 126

4:10:26days to comply or a final $50 a day

4:10:29thereafter.

4:10:30>> Inspector, where are these people at,

4:10:32man?

4:10:32>> I don't know.

4:10:33>> Have they contacted you at all?

4:10:35>> Yes. The owner called me on 86

4:10:38>> that he was going to get the permit.

4:10:40>> That's it. Have has the permit been

4:10:42applied for?

4:10:43>> No.

4:10:44>> Nothing. Nothing since then?

4:10:45>> No.

4:10:47>> How much time you recommended?

4:10:48>> 126

4:10:49>> for a fence about 77.

4:10:53>> Since they haven't contacted you, how

4:10:55much fine?

4:10:56>> 100 bucks.

4:10:58>> $50.

4:10:59>> It's a fence.

4:11:00>> Okay.

4:11:00>> $50. Come on. It's just a fence. Uh, I

4:11:03move that we find for the city invite

4:11:05violations exists as alleged and we

4:11:07order the property owners to come into

4:11:08compliance by December 8th, 2026 or a

4:11:13fine in the amount of $50 per day per

4:11:15violation would be imposed and recorded.

4:11:17Mandatory appearance at the uh December

4:11:208th board meeting.

4:11:21>> Alex Schneider second.

4:11:22>> All those in favor say I.

4:11:24>> I.

4:11:24>> Any opposed?

4:11:26Why? Next,

4:11:29>> senior [clears throat] inspector

4:11:30Alexander Boris. Property address 4250

4:11:33G Ocean Drive. Case number BE260550169.

4:11:38Owner G Towers Condo Association, Inc.

4:11:42Notice delivered via personal service to

4:11:44Millie Whitehead, assistant property

4:11:46manager on 82826

4:11:48at 119 p.m. Notice posted at One

4:11:51Boulevard on 9826.

4:11:55Page one. Still,

4:11:58>> Alexander Larz, building inspector for

4:12:00the city, presenting case number and

4:12:02address is read. The property was cited

4:12:04for violation of Florida building code

4:12:062023, section 105.1 to work without

4:12:09permit, including a a wood stair

4:12:12structure at the rear east side of the

4:12:15building. Case was open on May 9, 2026.

4:12:18>> Has to go in the ground. Inspection

4:12:20report mailed to the property owner

4:12:24515206.

4:12:25We're asking that the board find the

4:12:27violation exists and grant the property

4:12:29owner 126 days to come into compliance

4:12:32or a final of $50 per day thereafter.

4:12:34>> Inspector, where are these people at?

4:12:37>> I this morning I found an email um it

4:12:41explained that they are uh working with

4:12:45uh with an engineer and they would they

4:12:48are going to be applying for a permit.

4:12:49They have not applied for the permit

4:12:51yet.

4:12:52>> Yeah, they need some hurricane clips on

4:12:53that thing.

4:12:54>> I think maybe

4:12:55>> it's closed off right now. The uh this

4:12:57Yeah, they need a few things on.

4:13:00>> Yeah, they need [laughter] a few things.

4:13:01>> Oh, it's closed off.

4:13:03>> Yes.

4:13:03>> Are you sure about that?

4:13:04>> Um according to the photographs I got.

4:13:06Yes. [clears throat]

4:13:07>> Okay.

4:13:08>> Those are It looks like a set of stairs

4:13:10that leads from the pool deck to the

4:13:12beach.

4:13:13>> Yeah,

4:13:14>> that's still quite quite a large fall.

4:13:17>> Oh, yeah. For sure. put you in a

4:13:19wheelchair.

4:13:23>> Uh I make a how much I move that we find

4:13:26for the city violation exists alleged to

4:13:28order property owners come to compliance

4:13:29by December 8th, 2026 for a fine amount

4:13:32of $50 per day per violation be imposed

4:13:34and recorded.

4:13:36>> Huh?

4:13:37>> 77.

4:13:38>> No. Yeah. 77 days.

4:13:39>> He said he offered at 126.

4:13:42>> We can't do 77.

4:13:43>> We can do whatever you want.

4:13:44>> Oh, yeah. Through 77.

4:13:46>> All right.

4:13:46>> That's not even going to pass. I mean,

4:13:48look, they put blocks on underneath the

4:13:50>> That's why we should expedite this.

4:13:52>> We know this matter.

4:13:54>> Yeah, they're gonna have to

4:13:55>> Yeah,

4:13:55>> they got blocks

4:13:57>> or the fine amount of uh

4:14:00>> Let's do $100 a day per violation would

4:14:02be imposed and recorded. Mandatory

4:14:03appearance at the December 8th, 2026

4:14:06board meeting.

4:14:08>> Second. Go ahead, Alex.

4:14:09>> Yeah, go ahead. Alex Schneider second.

4:14:11>> All those in favor say I.

4:14:13>> I.

4:14:13>> Okay, passes.

4:14:16Page three

4:14:19at the top. Senior Inspector Preston

4:14:21Mark,

4:14:22property address 120 Southwest 29th A.

4:14:26Case number BE26030169.

4:14:29Owner Christopher and Stacy P. Griffin.

4:14:33Notice posted at the property on 9326.

4:14:36Posted at Wies Boulevard on 9826.

4:14:39>> You okay over that, Mark?

4:14:44There's instructions on the bottom of

4:14:45the chair. [laughter]

4:14:51[snorts]

4:14:55>> Here we go. Okay. Roof cover.

4:14:57>> President M. Bill inspector for the city

4:14:59presenting case and address is read.

4:15:00This property was cited for violation

4:15:02under Florida building code 105.11. work

4:15:05illegally performed without obtaining

4:15:08the required permits in the following

4:15:09manner, but not limited to

4:15:12[clears throat] the installation of a

4:15:13roof uh covering over an existing patio

4:15:17slab and the installation of aluminum

4:15:19fence with gates. Uh please note the

4:15:22aluminum fence and gates have been

4:15:24complied with as they have received a

4:15:25permit number BLF26050083.

4:15:31The case was open 3:24 2026.

4:15:35Inspection report mailed 326 2026

4:15:39and code board notice mailed 83206.

4:15:43I visited this property to investigate

4:15:45the possibility of work without permits.

4:15:48Uh this uh complaint came from a

4:15:50neighbor met with the owner, Mr. Chris

4:15:53Griffin, who indicated that uh due to uh

4:15:58conflicts with the neighbor, he had to

4:16:01get the fence up and uh was in also

4:16:06added a shaded structure at the back um

4:16:09which he was not aware that he needed

4:16:11permits for. I've been in regular

4:16:13contact with him and he has had uh

4:16:16issues with the engineering and

4:16:19contractor getting the permitting for

4:16:22the uh shared structure and then

4:16:26initially submitted a permit for

4:16:29>> [clears throat]

4:16:29>> uh building permit for the work but did

4:16:31not uh submit a permit for the roofing.

4:16:35I I explained this to them. They are in

4:16:37the process of getting this done. Uh, so

4:16:39at present, the city's requesting that

4:16:41the board find that the violations exist

4:16:42and grant the property owner [snorts]

4:16:45126 days to come in compliance or find a

4:16:47$50 a day thereafter.

4:16:49>> Sounds like they've been in contact. Do

4:16:51you foresee any issues?

4:16:52>> Yeah, I don't foresee any issues. I

4:16:54spoke with him. He did say he was going

4:16:56to show up, but I'm not sure why

4:16:59>> he didn't show.

4:17:00>> All right. I move that we find for the

4:17:01city [clears throat] and the violation

4:17:02exists as alleged that you order the

4:17:03property owners to come into compliance

4:17:04by January 26, 2027 or fine of $50 per

4:17:07day per violation. will be opposed and

4:17:09recorded at a mandatory appearance at

4:17:11the January 26th hearing.

4:17:12>> Everybody or is it?

4:17:15>> Who second?

4:17:16>> I'll I'll second

4:17:16>> everybody.

4:17:17>> All those in favor say I.

4:17:19[clears throat]

4:17:20>> Okay, it passes.

4:17:22>> Next page four, property address 163,

4:17:25Fiesta Way, case number B26050039.

4:17:30Owner Marwin Hideair. [clears throat]

4:17:32Notice posted at property on 82726.

4:17:36posted at 1 East Boulevard on 9826.

4:17:41>> Searianesco building inspected for the

4:17:43city presenting the case and addresses

4:17:45read. This property was cited as a

4:17:47violation of the Florida building code

4:17:49105.1. [clears throat]

4:17:50This building has been illegally

4:17:52altering construction work illegally

4:17:53performed without obtaining the required

4:17:55permits in the following manner, but not

4:17:57limited to boat lift and dock. This case

4:17:59was open on May 6, 2026. Codeboard

4:18:02hearing was scheduled on August 3, 2026.

4:18:05Following my site inspection, I observed

4:18:07workers actively engaging in the

4:18:08erection of a new boat lift and dock at

4:18:10the reference property. I made contact

4:18:13with the property owner through the ring

4:18:15camera system and explained that a

4:18:16permit is required for this type of

4:18:18work. A stop work order was issued on

4:18:20site. The city is requesting the code

4:18:22board to find the violation exist and to

4:18:24grant the property owner 126 days to

4:18:26come into compliance or a fine of $50

4:18:29per day thereafter.

4:18:30>> Inspector, was the uh homeowner

4:18:32difficult with you?

4:18:33>> No, it wasn't. But that was the first

4:18:36and last time I heard from him.

4:18:37>> That was back in May, correct?

4:18:39>> Yes. [clears throat]

4:18:40>> Um, what's the time frame on that?

4:18:43>> 126.

4:18:43>> We do 77.

4:18:45>> Mhm.

4:18:46>> All right. And I'm going to jack fine up

4:18:47to 300 bucks.

4:18:49>> Since this is Los Solus, this is Los

4:18:51Solus money, man.

4:18:52>> Yeah. Sounds great.

4:18:53>> I like the way you think. I move that we

4:18:55find for the city and the violation

4:18:57exists alleged to order property owners

4:18:59come to compliance by December 8th, 2026

4:19:03or a fine amount of $300 per day per

4:19:05violation be opposed and recorded.

4:19:07Mandatory appearance at the December

4:19:098th, 2026 meeting

4:19:12>> December 8th 77 days. You're doing

4:19:14>> 77 days.

4:19:15>> All right, I'll second that.

4:19:16>> All those in favor say I.

4:19:17>> I.

4:19:18>> It passes. Just so you know that does

4:19:21that fall under the DEI? uh without

4:19:24definition to [clears throat] color.

4:19:27>> Okay. All right. Just checking

4:19:29>> at the bottom of page four. Property

4:19:31address 1801 Southeast First A case

4:19:33number BE2604

4:19:360102. Owner um P. Kana and Uma Kana.

4:19:42>> Notice posted at the property on 82126.

4:19:45Posted at 1 Boulevard on 9826. as TC

4:19:52>> sees building inspector for the city

4:19:54presented the case and addresses read.

4:19:56This property was cited as a violation

4:19:57of the Florida building code 105.1.

4:20:00This building has been illegally altered

4:20:02and construction work illegally

4:20:03performed without obtaining the required

4:20:04permits in the following manner but not

4:20:06limited to front entrance door. This

4:20:08case was [clears throat] open on April

4:20:0913, 2026. Inspection report was mailed

4:20:12on April 23rd, 2026. without

4:20:15>> code board hearing was scheduled in

4:20:16August 10, 2026. Following my site

4:20:19inspection, I observed that the front

4:20:20entrance door was replaced with a new

4:20:22unit. Research done on record show no

4:20:24permits for this installation. Violation

4:20:26was [clears throat] found. The city's

4:20:27requesting the board to find the

4:20:29violation existing to grant the property

4:20:30owner 126 days to come into compliance

4:20:33or a fine of $50 per day thereafter.

4:20:35They do have a permit application on

4:20:37file

4:20:37>> once they submitted a permit.

4:20:39>> Yes, they was done. Uh actually I think

4:20:41I helped them um if it wasn't last week,

4:20:44the week before that uh because they had

4:20:46the they had the application in but they

4:20:48never uh pushed I guess submit. Okay.

4:20:51>> And it got stuck in the system. So they

4:20:54should they should have it pretty pretty

4:20:55>> So was it so 35 days should be more than

4:20:57enough time for a door permit. Correct.

4:20:58>> Yeah. But yeah, it's it's up to you. But

4:21:01um

4:21:01>> let's do 35 days.

4:21:05If they submitted all the NOAs and

4:21:08everything correctly, they should get it

4:21:10right away

4:21:10>> without comments. Yeah. [clears throat]

4:21:13>> Have they been in touch with you?

4:21:15>> Yes, they did.

4:21:16>> I move that we find I move that we find

4:21:18for the city the violation existed

4:21:19alleging that we order the property

4:21:20owners to come to compliance by December

4:21:228th, 2026 or a fine of $50 per day per

4:21:25violation would be opposed and recorded.

4:21:28>> I'll second the motion.

4:21:29>> All those in favor say I.

4:21:31>> I.

4:21:34Tasha,

4:21:35>> yes.

4:21:35>> Do do you read these names at home aloud

4:21:38in the mirror or something so you know

4:21:39how to annunciate?

4:21:40>> So, uh, sometimes, but not all the time.

4:21:43>> Okay. [clears throat] Cuz you you

4:21:45usually go through it.

4:21:46>> Well, not in the mirror. I just say it.

4:21:47Yeah.

4:21:48>> Okay. Fairly easy.

4:21:50>> Okay. Page five. Terry, are you

4:21:52>> She reads the phone book, too. I would

4:21:54wait till 15.

4:21:55>> Okay. Okay.

4:21:57>> Page five.

4:21:59>> Oh, Searian's up there. Okay. Property

4:22:01address 5300 Northeast 24 Terrace 428C.

4:22:05Case number BE26040228.

4:22:08Owner Roy P. Masolini.

4:22:10[clears throat and cough] Notice posted

4:22:11at the property on 82726. Posted at one

4:22:14boulevard on 9826.

4:22:18>> The worker sees building inspector of

4:22:20the city presenting the case and address

4:22:21as read. This property was cited as a

4:22:23violation of the Florida building code

4:22:25105.1.

4:22:27>> This building has been illegally

4:22:28altered. construction work illegally

4:22:30performed without obtaining acquired

4:22:31permits in the following manner

4:22:32[clears throat] but not limited to sound

4:22:34attenuation membrane. This case was open

4:22:36on April 27, 2026. Inspection reports on

4:22:39mail on April 29, 2026. Codeboard

4:22:42hearing was scheduled on August 3rd,

4:22:442026. Visiting this property in response

4:22:47to to a noise complaint. I observe a

4:22:49flooring contractor actively working

4:22:51inside the unit. The contractor said

4:22:53they are installing an epoxy floor.

4:22:55Since the apartment is located on the

4:22:57fourth floor, a permit is required for

4:22:59the installation of sound attenuation

4:23:00membrane. A stop work order was issue

4:23:03advised the contractor and uh

4:23:05responsible parties that they must

4:23:06obtain the required permits from the

4:23:08building department as well as approval

4:23:11from the building association before

4:23:13continue any work. The city is

4:23:14requesting to find the violation exist

4:23:16and to grant the property owner 126 day

4:23:19to come into compliance or a fine of $50

4:23:21per day thereafter.

4:23:22>> Where's Mr. Mausolini at?

4:23:25I have no idea.

4:23:27>> Have you talked to them at all?

4:23:28>> Uh, if I remember correctly, yeah, like

4:23:31a month back, but um, their permit, it's

4:23:35nowhere to be found.

4:23:36>> So, let me ask you this here. When did

4:23:37when did Mr. Mausini first notice he was

4:23:40when was he given notice that he had a

4:23:42problem with the building department?

4:23:44>> April 29th.

4:23:45>> Yeah. The the April 29th, we we mailed

4:23:48[clears throat] the inspection report.

4:23:50>> So, it's been like what, six months now?

4:23:51Seven months.

4:23:52>> Yes. Yes.

4:23:52>> So, this should have been done seven

4:23:54months ago. This is a floor.

4:23:56>> Yes. I Well, they were doing epoxy. So,

4:24:00they're trying to do like epoxy on top

4:24:03of bare concrete. So, I don't know what

4:24:06what's their remediation because they

4:24:08got to do soundproofing. So, they have

4:24:11to

4:24:12>> Are they in a second floor?

4:24:14>> Fourth floor.

4:24:14>> Fourth floor. Okay.

4:24:15>> So, no permits, no applications,

4:24:17[clears throat]

4:24:17nothing of the like.

4:24:20>> Oh. Uh, I don't have that information

4:24:24here, but I don't think they applied for

4:24:26now.

4:24:27>> All right. I am uh [sighs and gasps] I'm

4:24:29going to be finding for the city

4:24:30violations alleged order of property

4:24:33owners come into compliance. I'm going

4:24:34to do 35 days. Um, come to compliance by

4:24:38October 27th, 2026 for a fine amount of

4:24:40$150 per day per opposed and recorded in

4:24:44a mandatory appearance at the uh October

4:24:4727th, 2026 board meeting.

4:24:51Second.

4:24:53>> Second.

4:24:54>> There we go.

4:24:55>> All those in favor say I.

4:24:56>> I.

4:24:57>> It passes. [clears throat]

4:25:00>> I I don't think we should be giving

4:25:02these people extraordinary lengths of

4:25:04time if they've already known about this

4:25:05for seven months. So that's my thing

4:25:07here.

4:25:07>> And they haven't pulled a permit.

4:25:08>> Exactly. So I mean

4:25:10>> if you know you did something wrong and

4:25:12you're trying to comply it, you'll try

4:25:14to comply before you even come in front

4:25:15of the board to begin with. So I mean I

4:25:18think that giving them 120 even 77 days

4:25:21on top of that is just unnecessary.

4:25:24>> Simon Mcgree has spoken.

4:25:29>> Property address uh inspector senior

4:25:31inspector Andrew Gabia. Property address

4:25:331611 Northeast 50th Court. Owner Barbosa

4:25:38Investment Group Inc. case number

4:25:39BE260550292.

4:25:42Notice posted at the property on 82726.

4:25:46posted at one east blue on 9826.

4:25:59Andrew Gabia, building inspector for the

4:26:00city, presenting case and address is

4:26:02read. This property was cited for

4:26:04violation under Florida building code 20

4:26:06[clears throat]

4:26:0723 2023 105.1. work illegally performed

4:26:11without obtaining the required permits

4:26:13in the following manner, but not limited

4:26:14to uh mechanical wood fence and uh some

4:26:20exterior nonstructural panels at the

4:26:22entrance, like kind of like a siding.

4:26:24[snorts] Um this case was opened on 527

4:26:282026. The inspection report was mailed

4:26:30on 622 2026. Codeboard was scheduled on

4:26:3484 2026. I visited this property. Um

4:26:38they have a closed out window permit,

4:26:40but I observed a new AC unit installed

4:26:44and some new uh structural co cosmetic

4:26:46siding work done on the side of the

4:26:48property. Uh the last photos I have from

4:26:51BCBA does not show that this work was

4:26:53done. There is also a new gate and a

4:26:55small section of fence installed on the

4:26:57west side of the property. No permits on

4:26:59record for anything but the windows. I

4:27:02left a courtesy note on the front door

4:27:04and uh I have not heard from anybody

4:27:06anything. This is a a rental a two

4:27:09family dwelling. Um I left a message on

4:27:12the complaintant's voicemail

4:27:15and uh I haven't heard from her either.

4:27:17So uh the city's requesting the code

4:27:20board find that the violations exist and

4:27:22to grant the property owner 77 days to

4:27:24come into compliance or $100 a day

4:27:26thereafter. Was the window permit uh was

4:27:29that done before or after it came this

4:27:32property got on your radar

4:27:33>> before?

4:27:34>> So that so the permit the window permit

4:27:36wasn't uh an act of trying to come into

4:27:39compliance or

4:27:40>> No, I would say not.

4:27:41>> So So there it's a rental unit.

4:27:43>> Yeah.

4:27:44>> So the note we don't know if that note

4:27:46ever got to the property owner,

4:27:49>> you know, perhaps I would I I mean solid

4:27:52chance not.

4:27:53>> How was that our problem? I mean, you go

4:27:55by what's on BCPA, your hands are clean.

4:27:59>> Well, it's not my problem. I'm just

4:28:00saying that.

4:28:01>> But I'm just saying I mean, who like the

4:28:04Did the rental people do this work or

4:28:06did the home

4:28:07>> No, the rental people did

4:28:09>> any contact with Has there has the owner

4:28:11contacted you?

4:28:13>> I have not had an ounce of contact from

4:28:15the owner of this property whatsoever.

4:28:20>> Chief Inspector.

4:28:21>> Chief Inspector.

4:28:24You could It's a sunshine. You have to

4:28:26say it on the mic there. Yeah. You

4:28:28can't.

4:28:28>> Yeah. Come on. You're trying to get us

4:28:30in trouble with it. We We We just heard

4:28:32about it.

4:28:34>> Where Where were you? We We just heard

4:28:36about it.

4:28:38>> Yeah. You could go ahead and state

4:28:39whatever you

4:28:40>> Okay. Leo Martinez. Uh I'm the chief of

4:28:42construction enforcement. I just want to

4:28:43explain to you why we given 120 day, 126

4:28:47days. uh at the first time that we

4:28:50present the case inspector are given

4:28:51that much time because the inspector are

4:28:54packed with cases at least they give a

4:28:56reasonable amount of time so when they

4:28:58come back they don't have too much

4:29:00reason that why they didn't uh address

4:29:03the valation so that's the reason why

4:29:05initially when we present for the first

4:29:08time the case we're offering 126 or we

4:29:11ask for 126 day extension or 120day

4:29:14extension you understand now Okay,

4:29:17[snorts]

4:29:18>> I just want to explain that.

4:29:19>> Appreciate it.

4:29:20>> Simon agree understands.

4:29:21>> Thank you.

4:29:22>> On that note,

4:29:23>> on that note, I think this case would

4:29:25probably give them less because they're

4:29:26not here and they also [laughter]

4:29:29>> There you go. So, I mean,

4:29:30>> come on, Simon. Go.

4:29:31>> Oh, wait. So, they have not contacted

4:29:33you at all. Have not done anything at

4:29:35all.

4:29:36>> No permit.

4:29:36>> This has been active since May, you

4:29:38said, correct?

4:29:39>> Uh, yeah. This case was opened on uh on

4:29:42Yeah. End of May. May May 27th. Well,

4:29:45there [snorts] was Memorial Day, so give

4:29:47them a reason.

4:29:48>> Please note that Chairman Nolan is

4:29:50leaving.

4:29:52>> Yes.

4:29:52>> Okay. Thank you.

4:29:54>> Yes. I've got to go.

4:29:55>> Do noted.

4:29:56>> Thank you.

4:29:57>> Duly noted.

4:29:58>> Duly noted.

4:30:00>> All right. For the record, I have the

4:30:01gavl.

4:30:01>> Yes.

4:30:03>> I can't make motions anymore. So

4:30:05>> agree is in charge. Oh.

4:30:08I move that we file for the city the

4:30:09violation exists alleged that we order

4:30:10the property governance to come into

4:30:12compliance by December 8th, 2026 or a

4:30:14fine of $100 per day per violation will

4:30:16be imposed and recorded and a mandatory

4:30:18appearance at the December 8th hearing.

4:30:19>> Can I get a second?

4:30:20>> I'll second.

4:30:21>> All right, we have a motion to table

4:30:22with the second. All in favor say I.

4:30:24>> Opposed?

4:30:25>> Passes unanimously.

4:30:28>> At the bottom of page six, property

4:30:30address 1642 Northwest 14th Street. Case

4:30:34number BE2607

4:30:360047. Owner GNH Real Estate USA LLC.

4:30:42>> Notice posted at the property on 82726

4:30:46>> posted at Wisboro Boulevard on 9826.

4:30:51>> Yeah, I'm not sure.

4:30:52>> Okay, so that means we could do whatever

4:30:54we want [laughter] now.

4:30:57>> Go ahead, Andrew.

4:30:57>> All right. Andrew Gabby, a building

4:30:58inspector for the city, presenting case

4:31:01and address as read. This property was

4:31:03cited for violation of the Florida

4:31:04Building Code 2023 105.1. Work illegally

4:31:08performed without obtaining the required

4:31:09permits in the following manner, but not

4:31:11limited to an additional bathroom. This

4:31:14case was opened up on 77206.

4:31:18The inspection report was mailed on 7:22

4:31:202026. Codeboard was scheduled on 842026.

4:31:25>> [sighs]

4:31:25>> on uh 7:21-2026,

4:31:28I was able to meet with the tenant of

4:31:29the property

4:31:31uh with the assistance of Inspector

4:31:33Russell Castile. We were invited inside

4:31:35the property. There is an ongoing case

4:31:37for an infestation of vermin and insects

4:31:40on this property. She showed us the

4:31:43primary bathroom which had a clogged

4:31:45sink in it and shower problems. the uh

4:31:47the owners of the property had uh

4:31:50they did something to uh like a

4:31:52tourniquet for the hot water. So they

4:31:54only had so much hot water in this in

4:31:56this house. It it was like timed or

4:31:58something.

4:31:59>> So she showed us holes everywhere and

4:32:01this and that which really has nothing

4:32:03to do with the building code case. So uh

4:32:06at the end while conducting our

4:32:07inspection, you know, there was expo

4:32:10exposed wires in the back and uh and a

4:32:13meter pan box that was exposed, but he

4:32:15had corrected that. He fixed that. So,

4:32:17that's no longer a uh a violation. So,

4:32:22you know, he's got the additional

4:32:23bathroom that wasn't permanent. This

4:32:25this house only had one bathroom in it

4:32:28and then he put another bathroom in it.

4:32:30And uh I spoke to the owner a couple

4:32:32times. You know, he says he's going to

4:32:35submit application for permit. He hasn't

4:32:37yet. Uh there's another code enforcement

4:32:40case for all the rest of the vermin and

4:32:42the insects which is nothing to do with

4:32:44us but that's the status of this. Uh the

4:32:46city's requesting a code board to find

4:32:48the violations exist. Grant the property

4:32:50owner uh 126 days to come into

4:32:53compliance or $100 a day thereafter.

4:32:55>> Let me ask this here. Has this landlord

4:32:57been on your radar before?

4:32:59>> Not mine. If the city's radar uh I would

4:33:02have to say yes.

4:33:02>> So okay. So he's a he's a repeat

4:33:05offender. Correct.

4:33:06>> Yeah.

4:33:06>> Okay.

4:33:07That's why

4:33:08>> you know there's a

4:33:11>> And when was this first? Uh this was

4:33:13April or May?

4:33:14>> This was um

4:33:16>> No, this was July. This is a fast one.

4:33:19This is July 7th. I was first. Yeah.

4:33:21>> Okay. I move that we find for the city

4:33:22the violation exists alleged and we

4:33:24order the property owners to come to

4:33:25compliance by December 8th, 2026 or a

4:33:27fine of $200 per day per violation will

4:33:29be imposed and record or actually a fine

4:33:32of 250 per day per violation will be

4:33:34opposed and recorded and a mandatory

4:33:36appearance at the December 8th hearing.

4:33:38>> Can I get a second?

4:33:40>> All right, I got a second on the motion

4:33:41with the second on the table. All in

4:33:43favor say I. I opposed. Passes

4:33:45unanimously.

4:33:46>> That was $250, right?

4:33:48>> 250 big ones.

4:33:50Thank you. Moving on to page

4:34:01>> 10.

4:34:03Senior [clears throat] Inspector Preston

4:34:04Mark. Property address 1104 North Rio

4:34:07Vista Boulevard. Owner Lori and Matthew

4:34:10Hatcher. Case number

4:34:12BE25110110110110110174.

4:34:14Notice posted at the property on 81426.

4:34:18Notice posted at one broad boulevard on

4:34:209826.

4:34:21This case was first heard on 32426 to

4:34:24comply by 72826.

4:34:27One section at $50 per day. Order

4:34:29recorded not comply. There is one

4:34:31extension noted.

4:34:33>> Press mark bill inspector for the city

4:34:35presenting case and address as read.

4:34:37This case is not in compliance. There

4:34:39are permits in process uh which include

4:34:42the mechanical

4:34:45uh the electrical and plumbing. Uh also

4:34:49there's a building permit. Uh the issue

4:34:52with this was that he initially um

4:34:57wanted to do an addition and then

4:35:01realized that this could not work. So he

4:35:05reverted back to the original plan of

4:35:10alteration and had to void the permits

4:35:12that he originally submitted. So he's in

4:35:16process of getting these uh done. Um the

4:35:18city will uh will not be opposed to

4:35:22supporting a 77day extension.

4:35:25>> Is there a reason they're not here

4:35:26today?

4:35:27Um I spoke to him

4:35:31two weeks ago based on my notes and not

4:35:35sure why he didn't show.

4:35:36>> So how just this case is progressing

4:35:38towards the compl comp

4:35:43>> compliance.

4:35:43>> Yeah. Yeah. To compliance. I'm sorry. I

4:35:45had a brain.

4:35:46>> Yes. Yes. I I I I believe he he uh he's

4:35:49he's getting there.

4:35:50>> Okay. Okay. So, I'll I'll uh move I'll

4:35:52go with the city's recommendation and

4:35:54move for a 77day extension and a

4:35:56mandatory appearance at the December 8th

4:35:58hearing.

4:35:58>> Mandatory. Yes.

4:35:59>> Yeah.

4:36:00>> I'll second.

4:36:06>> Oh, what? Oh, I'm sorry. Like I said, uh

4:36:09>> got a motion on the table.

4:36:11>> Got a motion on the table. All in favor

4:36:13say I.

4:36:13>> I.

4:36:14>> Opposed.

4:36:16Remember you have the g

4:36:18>> you have the you have the gav

4:36:19>> seven days correct.

4:36:20>> Yes. Yes.

4:36:21>> Thank you.

4:36:23>> Sorry.

4:36:23>> Property address

4:36:25[clears throat]

4:36:27723 Southwest 14 Terrace. Case number

4:36:30BE260229.

4:36:33Owner Daniel M. And Cindy Graphman.

4:36:36Notice posted at the property on 9226.

4:36:38Posted at Wies Boulevard on 9826.

4:36:42This case was first heard on 82526 to

4:36:44comply by 9226.

4:36:46One section at $1,000 per day. Order

4:36:49recorded not complied.

4:36:51>> Press mark. Bill inspector presenting

4:36:53case and address is read. This case is

4:36:55not in compliance.

4:36:57>> Based on our information, the owner has

4:37:01hired a private provider to complete

4:37:03this work. As a result, the city is

4:37:05requesting that this case be scheduled

4:37:07for Massie.

4:37:09>> Let me ask this here. evident anything

4:37:11to come into compliance at all?

4:37:13>> Um, he did. Well, obviously the private

4:37:17provider firm has approved some of the

4:37:21permits and they're now in review with

4:37:24uh with the city.

4:37:26>> Has he been in contact with your office

4:37:27at all?

4:37:28>> Yes, he has.

4:37:28>> Are they playing ball?

4:37:31[sighs and gasps]

4:37:31>> Well, they hired a private provider.

4:37:33>> Yeah, so they're moving forward with

4:37:35their work,

4:37:36>> right?

4:37:36>> Yeah.

4:37:37>> Okay. pretty the the private provider

4:37:39will do the plan review and inspection.

4:37:42So it's a PX2

4:37:43>> PX2

4:37:44>> board just in I don't know if anyone

4:37:46needs clarification what a private

4:37:48provider is of basically um there's new

4:37:51legislation come out um which enhanced

4:37:55the um option for property owners to

4:37:59hire a their own private inspection

4:38:02service uh which includes the service of

4:38:05reviewing plans and inspections in lie

4:38:08of the city. um that only applies to the

4:38:11building, electrical, plumbing, and

4:38:13mechanical um disciplines. Uh but they

4:38:16still have to go through full review for

4:38:19zoning and flood and engineering. So if

4:38:22we receive an application and it's

4:38:24approved by a private provider, it's

4:38:27only approving those four disciplines.

4:38:29Um so I'm not I'm not I hope that

4:38:32clarifies what

4:38:33>> But let me ask you a question. with the

4:38:34private provider. You still have the

4:38:36option, the building department still

4:38:37has the option to inspect even though

4:38:39the private provider is inspecting,

4:38:41right?

4:38:41>> No, we we can't duplicate our efforts.

4:38:43We are

4:38:44>> So, you can't go and review the the

4:38:45property.

4:38:46>> We can audit we can do an audit only at

4:38:49four times a year. Um whether it's four

4:38:52times on the same job or four times on

4:38:55different jobs. Uh but current

4:38:57>> but currently we aren't in historically

4:39:00we have not done that. Um, again, it's

4:39:03new legislation recently come out. Um,

4:39:07you know, we'll we'll see how smooth

4:39:08that goes, but um, we can audit. Uh, we

4:39:11can't duplicate our inspection efforts.

4:39:14>> So, can that private provider authorize

4:39:16the CO or do you still have to go?

4:39:18>> No, we we would review their uh

4:39:21inspection reports.

4:39:22>> Okay.

4:39:23>> Um, and we would issue the the CO

4:39:26>> without ever seeing the site.

4:39:28>> Correct.

4:39:28>> That's crazy.

4:39:29>> Yep. Well, again, it it without the four

4:39:32disciplines seeing the site, it still

4:39:34would have to get zoning, engineering,

4:39:36and flood approval.

4:39:38>> Okay.

4:39:39>> All right.

4:39:40>> And zoning.

4:39:40>> All right. So, unless we have a motion

4:39:42on the table, we're going to bring it

4:39:42back as a mask.

4:39:43>> Yeah. Just a mandatory appearance at the

4:39:45October 27th hearing.

4:39:46>> Second.

4:39:48>> I got a motion. All in favor say I.

4:39:50>> I. With a mandatory appearance.

4:39:52>> We have a new respondent here to speak.

4:39:57>> Okay. Moving on to at the bottom of page

4:39:5912. Senior Inspector Jorge Martinez,

4:40:02property address 795 East Sunrise

4:40:04Boulevard. Owner Broward Design Center,

4:40:07Inc., case number BE26010181.

4:40:11>> Notice posted at the property on 8

4:40:15>> in the rain.

4:40:17>> Jacket out of here like

4:40:19>> Okay, we'll have to recall.

4:40:21>> You just wanted to be closer to us.

4:40:23>> No, my back is bothering me.

4:40:24>> Oh, sorry.

4:40:26Um,

4:40:28page

4:40:31>> 16. Yes, page 16. Senior Inspector Jose

4:40:35Sagusti. Property address 846 Northwest

4:40:384th A. Owner Real Property Buyers LLC.

4:40:41Case number BE260200061.

4:40:46Notice posted at the property on 83126.

4:40:49Notice posted at Wisboro Boulevard on

4:40:509826. This case was first heard on 72826

4:40:55to comply by 9226

4:40:57one section at $100 per day. Order

4:40:59recorded not complied.

4:41:02>> Jose Sarah, senior building inspector

4:41:04for the city updating the case number as

4:41:07read. The case is not compliation

4:41:13in progress

4:41:14uh with new windows. Um no permitting

4:41:18process, no contact with a customer. the

4:41:21case we will uh return as a massing.

4:41:27>> Maybe we should increase the daily fine

4:41:29amount.

4:41:30>> Uh you can do it.

4:41:31>> Yeah. I move that we uh increase the

4:41:33daily fine amount from $100 a day to

4:41:36$300 a day.

4:41:37>> Can I get a second?

4:41:38>> And a mandatory appearance at the

4:41:40October 27th hearing.

4:41:41>> Can I get a second?

4:41:42>> Mandatory. Want

4:41:43>> to second it?

4:41:44>> Second.

4:41:44>> All right. I got a motion on the table

4:41:45and a second. All in favor say I.

4:41:47>> I.

4:41:47>> Opposed.

4:41:49>> All right. That was a mandatory.

4:41:50[clears throat]

4:41:52>> Yes, ma'am.

4:41:52>> Yeah.

4:41:53>> It's a mass. Yeah. Massie.

4:41:58>> 300 big ones.

4:42:00>> Nice.

4:42:01>> How many days?

4:42:03>> Uh, it's it's a Massie.

4:42:04>> Oh, it's a Massie.

4:42:05>> It's a Massie.

4:42:05>> It's a Massie.

4:42:06>> It's a Massie.

4:42:09>> Moving on to page 17. Property address

4:42:112121 East Commercial Boulevard. Owner

4:42:14East Commercial Oaks. [clears throat]

4:42:15Prop Code LLC. Case number BE25110026.

4:42:20Notice posted at the property on 82726.

4:42:23Posted at Wisboro Boulevard on 9826.

4:42:26This case was first heard on 22426 to

4:42:29comply by 62326.

4:42:32One section at $100 per day. Order

4:42:34recorded not comply. There are two

4:42:36extensions noted.

4:42:38>> Seri, senior building inspector for the

4:42:40city of the case number as read. The

4:42:43case is not comply. the case should

4:42:46board back as a massi

4:42:48>> any any response any kind

4:42:50>> yes I've been in contact with them it's

4:42:52a also

4:42:55a permit in process but they are not

4:42:58taking care so much of the the this

4:43:02violation

4:43:03>> is awaiting permit issuance since August

4:43:0820th for that

4:43:10>> not the case should be brought back as a

4:43:14massive

4:43:15increase.

4:43:16>> Go for it. You want to?

4:43:18>> Yeah. I move that we increase the fines

4:43:20to from $100 a day to $200 a day and a

4:43:24mandatory appearance at the Massie here

4:43:27in October 27th, 2026. [clears throat]

4:43:29>> I got the second

4:43:30>> second. All right.

4:43:31>> Sorry.

4:43:33>> You got Who's got it? August.

4:43:34>> August.

4:43:35>> You got it, ma'am. All right. All in

4:43:36favor say I. I.

4:43:38>> Opposed. Pass unanimously.

4:43:41>> Property address 6300 Northwest 9th A.

4:43:44owner 6300 Powerline Shopping LLC. Case

4:43:48number BE26010130.

4:43:51Notice posted at the property on 82826.

4:43:54Posted at Winnie Boulevard on 9826. This

4:43:57case was first heard on 52626 to comply

4:44:00by 9226.

4:44:02One section at $50 per day. Order

4:44:04recorded not complied.

4:44:07>> Josei, senior building inspector for the

4:44:09city, updating the case number. The case

4:44:12is not comply.

4:44:16There is uh there are permit building

4:44:18and electrical permit but is missing

4:44:21plumbing permit. For that the case

4:44:24should brought back as a massi.

4:44:26>> Any communication?

4:44:28>> Yes, I've been in contact with them

4:44:31but there are no per nor there are not

4:44:34plumbing permit.

4:44:36>> Any reason that they're not here or

4:44:37>> I don't know.

4:44:40>> All right. I move that we increase the

4:44:41daily fine from $50 to 150 a day and a

4:44:45mandatory appearance at the October 27th

4:44:47hearing.

4:44:48>> Okay, I got a second.

4:44:49>> I'll second.

4:44:50>> All right. All in favor say I.

4:44:52>> I.

4:44:52>> I. Opposed. Pass unanimously.

4:44:58>> Correct.

4:44:58>> Correct.

4:45:00>> Okay. At this time, we're going to go

4:45:01back to page 12.

4:45:04>> You joining us? Is Frank Martinez?

4:45:06>> Let me finish.

4:45:09>> You're done. No, in page 18.

4:45:12>> No, I'm I'm not doing the masses right

4:45:13now. I'm going to go finish page 12.

4:45:16Thank you.

4:45:19[laughter]

4:45:20>> Page 12. Property address 795 East

4:45:22Sunrise Boulevard. Case number

4:45:25BE26010181.

4:45:27Owner Broward Design Center, Inc. Notice

4:45:30posted at the property on 82826.

4:45:32Posted at 1 Boulevard on 9826. This case

4:45:36was first heard on 52626 to comply by

4:45:3992226

4:45:40one section at $50 per day. Order

4:45:42recorded not complied. Uh I would like

4:45:45the board to know that we did receive an

4:45:47email this morning stating that the

4:45:50owner had a medical issue and that she

4:45:54and they had not given uh power of

4:45:56attorney to anyone else. They wanted to

4:45:59reschedu but it was too late to reschedu

4:46:02it. So, I just wanted board to know that

4:46:04email was received.

4:46:06>> When was that when was that email sent?

4:46:09>> It was sent around nine before 9:00 this

4:46:12morning.

4:46:13>> It's last minute then.

4:46:14>> Yeah.

4:46:14>> Well,

4:46:16>> but she said it was a medical issue. So,

4:46:19>> want to just uh

4:46:22move it 35 days.

4:46:24>> Well, we were waiting for the inspector

4:46:26to present the case.

4:46:28[laughter]

4:46:29>> We should have we should have went to

4:46:30page 18.

4:46:31>> Yeah. Maybe we should have

4:46:33>> the extensions on here. They don't seem

4:46:35accurate, by the way. Also, a lot of

4:46:37them say like extended to 9:22.

4:46:41>> That's today.

4:46:42>> Yeah.

4:46:42>> No. So, there's Oh, I meant on the

4:46:44Massie ones. Sorry. I'll wait till we

4:46:46get to those.

4:46:56>> Is it about pictures? We don't need

4:46:58pictures for this case.

4:46:58>> No, no. I was He was trying to look for

4:47:02>> Take your time.

4:47:06>> Yeah, right. Can't go anywhere anyway.

4:47:08I'm not walking that much.

4:47:12>> I thought they were going to build a

4:47:13parking garage above us so we don't have

4:47:15to work outside.

4:47:18>> It's the corner of the

4:47:22>> Okay.

4:47:23>> Okay. Building Martinez

4:47:27updating case on behalf of the city.

4:47:28case number and address as read. This

4:47:31case is not in compliance.

4:47:35I need to

4:47:38check again on the case. So I will

4:47:40request a 35day extension.

4:47:42>> Move for a 35day extension.

4:47:44>> Second.

4:47:45>> All in favor say I.

4:47:46>> I.

4:47:47>> Opposed?

4:47:48>> Pass unanimously.

4:47:50>> Back to 18.

4:47:52[laughter]

4:47:53>> Thank you. [clears throat]

4:47:54>> Back up.

4:47:55>> Moving on to page 18.

4:47:57>> Get back up. Come on.

4:47:58>> Where are [clears throat] you?

4:47:59>> Inspector Searian Anescu.

4:48:02>> Property address 4820 Northeast 23rd A

4:48:06B-107.

4:48:08Owner Eric W. Reed Jr. Case number

4:48:11BE26010193.

4:48:13Notice posted at the property on 83126.

4:48:16Posted at Wy'sboro Boulevard on 9826.

4:48:20This case was first heard on 72826 to

4:48:22comply by 82526.

4:48:25One section amended from $200 per day to

4:48:28$300 per day. Order recorded not comply.

4:48:31City is requesting to impose fines in

4:48:33the amount of $8,100

4:48:35which continues to acrue.

4:48:37>> Several bill inspector for the city

4:48:40presenting the case and address as read.

4:48:42This case has not complied. The city is

4:48:44requesting the board to impose.

4:48:47>> Have you heard from Mr. Reed at all?

4:48:48>> No contact. No communication. No

4:48:51permits.

4:48:52>> Nothing at all.

4:48:53>> Nothing at Is that a peep?

4:48:55>> This was a case where the association

4:48:58actually had to force an entry into

4:48:59apartment. So

4:49:00>> yeah,

4:49:01>> the guy is not cooperating.

4:49:04>> All right.

4:49:04>> Is he mentally stable or

4:49:08>> you can't ask?

4:49:09>> I I I don't know.

4:49:11>> No, I mean if if the CS had to force

4:49:13their way in there, is it a guy with a

4:49:14bunch of boxes stacked to the ceiling?

4:49:16>> Correct.

4:49:17>> So I mean he's not mentally stable. Uh,

4:49:19from what they said, he's dependent on

4:49:22some kind of drugs or something else.

4:49:25>> Deem it.

4:49:27>> I move that we find the violation was

4:49:29not complied with by the date of order

4:49:30and therefore we impose a fine of $8,100

4:49:33as stated in the first or $300 per

4:49:36section per vi violation as stated in

4:49:38the first order. Is that the correct

4:49:40one?

4:49:41>> Sean,

4:49:46I'd say ask our board attorney

4:49:54by the date order and therefore we

4:49:55impose the fine of $8 $8 $8 $8 $8 $8

4:49:55$8100 as stated for

4:49:58>> Can I get a second?

4:50:01>> I'll second.

4:50:03>> All right. All in favor say I.

4:50:05>> I opposed.

4:50:08>> Page 19. Senior Inspector Jose

4:50:11Saragusti. Property address 2330

4:50:14Southwest 19th A1-2. Owner Nicole Noble.

4:50:18Case number BE25060068.

4:50:22Notice posted at the property on 9126.

4:50:25Posted at 1 East Brow Boulevard 9826.

4:50:28This case was first heard on 111325 to

4:50:31comply by 32426.

4:50:34Two sections amended from $50 per day to

4:50:37$250 per day per violation. Order

4:50:40recorded not comply. The city is

4:50:42requesting to impose fines in the amount

4:50:43of $13,500

4:50:46which continues to occur. There are two

4:50:48extensions noted.

4:50:49>> Josei, building inspector for the city

4:50:52presenting the case number red. The case

4:50:55is not complied, non-cont, no permitting

4:50:58process. For that, the city does not

4:51:02support any further extension and impose

4:51:06the fines.

4:51:07>> Holland, have you talked when the last

4:51:08time you spoke with her?

4:51:10Sorry.

4:51:11>> When is the last time they actually

4:51:12spoke with the

4:51:13>> We don't have any contact with them

4:51:15>> period since November.

4:51:18>> Okay.

4:51:18>> All right. [clears throat]

4:51:20>> Maybe we should increase the daily fine

4:51:21amount.

4:51:22>> Well, I think that makes sense.

4:51:24>> This is massy.

4:51:25>> It is massive.

4:51:26>> I'm talking going forward. I mean,

4:51:30>> man, there's no generators in this

4:51:32place.

4:51:33>> Yeah, that's probably what just kicked

4:51:34on.

4:51:37>> Well, we're almost to the end.

4:51:38>> Yeah. Um, are we still on YouTube and

4:51:41everything? [snorts and clears throat]

4:51:43[laughter]

4:51:44>> I move that we find that the violation

4:51:46was not complied with or were not

4:51:48complied with by the date ordered and

4:51:50therefore we impose a fine

4:51:52>> of $13,500

4:51:54uh which is 250day per section per

4:51:56violation as stated in the first order.

4:51:58>> Second.

4:51:59>> All right. All in favor say I. I

4:52:02>> opposed. Passes unanimously.

4:52:04>> Thank you. Senior Inspector Alexander

4:52:08Bores. Property address 1132 Northeast

4:52:1015th A. Case number BE26030088.

4:52:14Owner Rick C. Presley.

4:52:17Notice posted at the property on 83126.

4:52:19Notice posted at One Boulevard on 9826.

4:52:23This case was first heard on 72826 to

4:52:26comply by 82526.

4:52:28One section amended from $150 per day to

4:52:32$350 per day. Order recorded not comply.

4:52:35City is requested to impose fines in the

4:52:37amount of $9,450

4:52:39which continues to acrue.

4:52:42>> Alexandra Boris, building inspector for

4:52:43the city, updating your case number and

4:52:45address is read. The property was cited

4:52:47for violation of Florida building code

4:52:482023 section 105.1. Work with apartment

4:52:52for addition at the rear of the

4:52:53building. Uh the building was extended

4:52:56to the rear. Uh last communication with

4:52:58the owner was 552026

4:53:01824. I left the owner a voice message.

4:53:04Haven't heard from the owner. City is

4:53:06requesting to impose the fines.

4:53:09>> Well, I mean this this we seem like we

4:53:12fasttrack this to uh to uh to a Massie

4:53:16here. Was

4:53:17>> there's no contact maybe?

4:53:19>> I haven't heard back from the owner. I

4:53:21[clears throat] left him messages

4:53:22>> at all. Period.

4:53:23>> I'm sorry.

4:53:24>> He even heard from the owner at all.

4:53:25Period.

4:53:26>> Oh, no. I last communication I had I

4:53:28heard he called me once. Um,

4:53:31and so the last communication was on May

4:53:345th, 2026.

4:53:36He did it in addition towards going

4:53:38towards the back of the property, the

4:53:41rear of the building.

4:53:42>> Any permanent

4:53:44application? Nothing.

4:53:46>> All right.

4:53:47We find that the violation

4:53:50uh was not complied with by the date

4:53:51order and therefore we impose the fine

4:53:53of

4:53:55>> 9450 which is uh uh 150 per day per

4:53:59section per violation of state

4:54:01>> 350 sorry and the fine of 350 per day

4:54:05per section for violation of state in

4:54:06the first order.

4:54:07>> Second.

4:54:08>> Oh never say I wait

4:54:11>> mandatory this is out of our hands now.

4:54:13This is we'll never see these people

4:54:14again. Yeah, it's opposed.

4:54:16>> All right. All in favor say I.

4:54:19>> I opposed.

4:54:20>> Pass unanimously.

4:54:23>> Address 1136 Wyoming Avenue. Case number

4:54:27BE2404

4:54:290109.

4:54:30Owner Angel L. Lugo. Notice posted at

4:54:33the property on 9326. Posted at Wy'sboro

4:54:36Boulevard on 9826. This case was first

4:54:38heard on

4:54:4012825 to comply by 32525.

4:54:44one section at $100 per day or recorded

4:54:46not comply. The city is requesting to

4:54:48impose fines in the amount of $3,500

4:54:52which continues to acrue. There are five

4:54:53extensions noted.

4:54:55>> Alexander Labor building inspector of

4:54:57the city updating your case number and

4:54:59address is read. Property was cited for

4:55:01violation of Florida building code 2023

4:55:03section 105.1. Work without permit for

4:55:05interior alteration including but not

4:55:07limited to kitchen and bathrooms. All

4:55:08windows and doors replacement new

4:55:10concrete driveway at the front of the

4:55:12property. New concrete deck at the rear

4:55:14of the property and new accessory

4:55:16structural SL pergola at the rear west

4:55:19side of the property. Violation remains

4:55:21at this at this time. Um windows uh

4:55:24permit was issued. It's complete. Uh

4:55:29the permit for the pergola

4:55:32status is awaiting client's replies as

4:55:34of the 15th of this month.

4:55:38And um and the paving permit has also

4:55:41been applied for and the master permit

4:55:44for the kitchen remodel. It's been

4:55:45applied for uh and awaiting clients

4:55:49reply. The the respondent I spoke with

4:55:53him this morning. Um he did uh mention

4:55:57that he was not going to be able to make

4:55:58it because he cannot miss another day of

4:56:01work and

4:56:04that basically he needs the money to um

4:56:10you know continue with with with the

4:56:12process. So that's the reason why he say

4:56:15he was in here. I told him you know uh

4:56:18it was highly recommended to come.

4:56:20>> Um

4:56:21>> what do you recommend? Well, he he

4:56:23bought this property as is, right?

4:56:24>> That is correct. Yes. So, there we have

4:56:26enough evidence that he he did purchase

4:56:29the property. Comparing the when you

4:56:32know the

4:56:34uh listing photos and when the there was

4:56:37a property transfer. Yes. Enough

4:56:40evidence that he purchased the property

4:56:41like this. So, he's been trying um I

4:56:44mean I can say that but it's been a very

4:56:46long time. So, uh respectfully again the

4:56:50board's decision. What mean what has he

4:56:52done since July?

4:56:53>> Since July. Um, so right now uh we're

4:56:57waiting the the the review department uh

4:57:00some of the stuff that's concealed

4:57:02requires inspection letters. Um and

4:57:05that's and he was telling me that that

4:57:07you know that's also an additional fee

4:57:09he's now has to pay. So, um, that's

4:57:13what's holding up plumbing permit and

4:57:15and

4:57:17do you believe do you personally believe

4:57:19your professional opinion that he's

4:57:20trying to make his best effort on

4:57:22obtaining compliance?

4:57:24>> I can't given circumstances his

4:57:26circumstances.

4:57:26>> I can't say that. Um, I don't know if

4:57:29he's putting in his best effort, but

4:57:32he's putting in effort

4:57:34>> if that helps

4:57:36>> within his financial means,

4:57:38>> right?

4:57:38>> I mean, that's what I I know he's he's

4:57:40strapped for cash, but is he sandbagging

4:57:42you or is he actually making an effort?

4:57:44>> There's been progress.

4:57:45>> So, it's not on it's not on the back

4:57:47burner for him.

4:57:49>> Why Why don't we give him 7 to 70 days

4:57:51and stop the fines?

4:57:53>> Have you have Have you been in contact

4:57:54with them?

4:57:56>> All the time.

4:57:57>> Yeah.

4:57:59>> I move I move that we give a 77day

4:58:02extension and stop the fines at this

4:58:03point.

4:58:04>> Alex Schneider, I'll second.

4:58:06>> All right. Motion table. All in favor

4:58:07say I. I opposed. Can you reach out to

4:58:10Mr. Lo and let him know what happened

4:58:12today's meeting?

4:58:13>> I will tell him.

4:58:14>> I told him I was going I I spoke this

4:58:17with him this morning

4:58:18>> and um and I'll call him again and and

4:58:20let him know.

4:58:21>> Okay. As long as he makes progress, I

4:58:23don't think we have a problem.

4:58:25>> Understood. I will.

4:58:26>> Thank you.

4:58:27>> Is there a way we can get those nice

4:58:29blue raincoats for us to [clears throat]

4:58:35[laughter]

4:58:36>> Yes.

4:58:38At this time, we would like to have all

4:58:40the cases list on page 24 into the

4:58:42record as we do drawing.

4:58:44>> Page 22 top.

4:58:45>> Yeah, we did.

4:58:46>> Yeah, we did.

4:58:47>> Yeah.

4:58:47>> Okay.

4:58:48>> I'm sorry.

4:58:49>> It's okay.

4:58:51>> Motion to read all the uh cases on page

4:58:5424 into the record as closed or

4:58:55withdrawn.

4:58:55>> Can I get a second?

4:58:56>> Second.

4:58:57>> All in favor say I.

4:58:58>> I opposed.

4:59:00>> And we will we have the minutes from the

4:59:03August hearing. Motion to approve the

4:59:05minutes from the August hearing.

4:59:06>> Can I get a second?

4:59:07>> Second.

4:59:08>> All in favor say I.

4:59:10>> I.

4:59:10>> Opposed. Pass unanimously.

4:59:12>> And any business for the city?

4:59:15>> Just one thing I want.

4:59:15>> Yeah. Blue jackets.

4:59:17>> Oh yeah.

4:59:18>> When uh when the city's like

4:59:20recommending to have uh reduced admin

4:59:22fees. I think it might be helpful to

4:59:24like actually see those admin fees. I

4:59:27was just telling

4:59:28>> Okay.

4:59:28>> Yeah. Just make sure. I mean, is there

4:59:31like a formula you guys use to set the

4:59:33daily fine amounts, the suggested daily

4:59:35fine amounts?

4:59:36>> Uh,

4:59:37>> but the daily fine is set by you,

4:59:39>> but the admin fees, we do have a cost

4:59:40sheet.

4:59:41>> No, no, I'm saying that some of these

4:59:42some of these fine amounts are just a

4:59:44little bit too low out of the gate.

4:59:46>> Is there Can we raise the bar up a

4:59:48little bit?

4:59:49>> Well, well, the the the inspectors

4:59:51normally start at 50, but you guys have

4:59:53the authority.

4:59:54>> Yeah, that I think that's us. That's us.

4:59:57and you guys have the authority to

4:59:58increase as as needed. Okay. And that

5:00:02concludes our September 22nd, 2026 code

5:00:05enforcement board hearing. Thank you.