What: Performance of the GTL wastewater plant and deep-well system in wet weather, and odor control around the plant.
Where it stands: no discharges since the last report; the redundant 60-inch force main reaches all five injection wells; four boundary hydrogen sulfide monitors show no hits.
Next: final force main connection at the plant in December, needing a two-day bypass.