2026-10-22 - Planning and Design Commission
Summary
Based on captions that may contain errors; names and numbers may be misheard.
- Six of nine commissioners present. One scheduled item (item 2) was continued to November 12. The director said November 12 will be the last meeting of the year, with five items.
- Arden Way Drive-Through Restaurants (P25-022): two drive-through restaurants and a retail building replacing a brutalist-style commercial building. A first vote fell one short of the required votes; after a commissioner changed their vote and a condition to save and display the murals was added, it passed.
- Trecento 29-Lot Subdivision on Center Road Appeal (Z25-091): an appeal of the denial of a 29-home infill subdivision was granted and the project approved. Commissioners said the review process was too slow and inconsistent and asked for clearer standards in the zoning code update, especially for narrow private streets and setbacks.
- No public comment on non-agenda items.
Agenda
Scheduled/held per city YouTube stream; agenda not retrieved.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:04I would like to make a quick
00:07announcement that this meeting
00:08is live on YouTube in Spanish
00:09and English. Please note that
00:11live captions and translations
00:12are AI generated and may
00:14contain errors. You may start
00:14the meeting.
00:15>> Thank you Clark. Good
00:17evening everyone. I'm now
00:19calling to order the regular
00:20meeting of the City of
00:21Sacramento Planning and Design
00:22Commission for Thursday,
00:24October 26th. October 22nd,
00:272026 at 5:30 p.m. Will the
00:29clerk please call the role to
00:31establish a quorum?
00:32>> Thank you. Chair
00:33commissioners, please unmute.
00:35Commissioner Lee. Commissioner.
00:37Commissioner Snell here.
00:39Commissioner Nebo here. Vice
00:40chair. Caden here. Commissioner
00:42Gause here. Commissioner Ortiz
00:44is absent. Commissioner risk is
00:47absent. And chair Chase here.
00:48Thank you. We have a quorum.
00:53>> A quick before I forget,
00:54item number two. If anyone is
00:56here for item number two. That
00:58item has been continued to
01:00November 12th, I believe, right?
01:03Yes. So it will just be hearing
01:06items number one and items
01:07number three tonight. If you
01:11wish to speak tonight on any
01:13other items, please submit a
01:15digital speaker slip before t
01:16item is called. You can do this
01:18by scanning the QR code on the
01:19back of the agenda, or at the
01:21back of the chambers, or by
01:23using the kiosk. Please note
01:24that no speaker slips will be
01:25accepted once an item begins.
01:28You will have three minutes to
01:29speak when called upon. Thank
01:30you. We'll now begin today's
01:32agenda with a land
01:35acknowledgment, followed by the
01:36Pledge of Allegiance. Please
01:37stand to. To the people, the
01:41original people of this land,
01:42the Nissan people, southern
01:44Maidu Valley and Plains. Miwok,
01:47Patwin Wintun peoples and the
01:49people of the Wilton Rancheria,
01:51Sacramento's only federally
01:52recognized tribe. May we
01:54acknowledge and honor the
01:55native people who came before
01:56us and still walk beside us
01:58today on these ancestral lands.
02:00By choosing to gather today
02:02together in the active practice
02:04of acknowledgment and
02:05appreciation for Sacramento's
02:06indigenous people's history,
02:08contributions, and lives.
02:10Please join me for the Pledge
02:11of Allegiance. I pledge
02:15allegiance to the flag. The
02:16United States of America, and
02:18to the Republic for which it
02:20stands. One nation under God,
02:23indivisible, with liberty and
02:24justice for all. Thank you. All
02:34right. Next on the agenda is
02:35the director's report. Greg.
02:41>> Thank you, chair. Just to
02:43note that November 12th, the
02:46next meeting will be our last
02:47meeting of the year. There will
02:49be no meetings in December, so
02:50there will be five items. You
02:52might want to have dinner
02:53before the meeting. But yeah,
02:56that's all.
02:57>> Always do just in case.
03:01Thank you. Next on the agenda
03:04is public Hearing calendar.
03:05I'll now open the public
03:07hearing item number one, Arden
03:09Way drive through restaurants
03:13P25-022. Before we begin
03:15staff's presentation, are there
03:16any disclosures or recusals
03:19from the commissioners? Seeing
03:22none. Zach, take it away. Oh.
03:26I'm sorry.
03:29>> Good evening commissioners.
03:30My name is Deja Harris,
03:32associate planner with the
03:33Community Development
03:34Department. I'm presenting the
03:35Arden Way drive through
03:36restaurant project. This item,
03:38P 25022, is a request to
03:41construct two drive through
03:43restaurants in a commercial
03:44retail building on 2.92 acres
03:47within an existing shopping
03:48center in the shopping center
03:50zone within the Point West.
03:52Planned unit development. The
03:55subject site is within the
03:57Point West Plaza Shopping
03:58Center south of Arden Fair Mall,
04:00and is located at the corner of
04:02Arden Way and Exposition
04:04Boulevard. It is currently
04:05developed with an existing
04:06commercial building and is
04:08surrounded by existing
04:09commercial and office
04:11development. The project
04:14requires the following
04:16entitlements a planned Unit
04:17development schematic plan
04:19amendment to Redesignate parcel
04:21A of the Point West PUD from
04:23financial institution and
04:25retail to commercial,
04:27residential and office uses
04:29conditional use permits to
04:31establish the two drive through
04:32restaurants and site plan
04:34design review for the
04:35demolition of the existing
04:36commercial building. The
04:38construction of the two drive
04:39through restaurants, the
04:40commercial building and
04:42associated site improvements.
04:44The subject site is a portion
04:46of parcel A and the Point West
04:49PUD, which is designated for
04:50financial institutions and
04:52retail uses. The PUD amendment
04:55would allow for commercial,
04:56office and residential uses on
04:58site, as well as facilitate the
05:00re-use of existing commercial
05:02buildings. The designation
05:04would allow uses that are
05:05consistent with the shopping
05:07center zone. The proposal
05:11includes the demolition of the
05:12existing 30,235 square foot
05:15commercial building on August
05:1827th, 2024, the City Council
05:20passed a motion to deny the
05:22listing of the subject site as
05:23a landmark. Thus, planning does
05:26not oppose the demolition of
05:27the structure. Access to the
05:30site will be from existing
05:32driveways on Arden Way and
05:34Exposition Boulevard.
05:35Pedestrian pathways are
05:37proposed on both street
05:38frontages. Bike parking is
05:40conveniently located near
05:42pedestrian paths and proposed
05:44buildings. Site landscaping
05:46includes additional trees
05:47planted along Arden Way and
05:49Exposition Boulevard, and the
05:51project complies with tree
05:53shading, setback and height
05:55requirements. On your screen is
05:58a rendering of the proposed
06:00Shake Shack, Pollo Campero and
06:02commercial retail building. The
06:04three buildings utilize common
06:06materials that provide a
06:07cohesive design and integrate
06:09well with existing uses in the
06:11shopping center. The
06:13architectural design is
06:14consistent with city design
06:16guidelines. Notification of the
06:19project in the hearing were
06:21provided to all neighborhood
06:23associations, residents and
06:24property owners within 500ft of
06:26the subject site. The site was
06:28also posted with the hearing
06:30information. Staff received
06:31comments from North Sacramento
06:33Chamber of Commerce, Civic
06:34Thread and nearby residents,
06:36which were included in the
06:37staff report. After publishing
06:40of the staff report, staff
06:41receives comments from
06:43Preservation Sacramento as well.
06:45Planning staff supports the
06:47project as it complies with the
06:49development standards of the
06:49shopping center zone and the
06:51PUD, and provides new
06:53pedestrian paths, enhanced
06:55landscaping and support
06:56surrounding uses. This
06:58concludes my presentation and
07:00staff and the applicant team
07:01are available should you have
07:02any questions.
07:03>> Thank you. Deja. Does the
07:06applicant have a presentation?
07:08Okay. Thank you. Before we move
07:10to public comment, can I ask
07:12I'd like to ask commissioners
07:13if there are any questions.
07:14Chair any questions of the
07:16staff?
07:16>> I think you would like to
07:18the applicant like to make a
07:19few words. That's all right.
07:20>> Okay.
07:21>> Sorry.
07:24>> Good evening. Charles Smyth,
07:25market Street development. 3017
07:27Douglas Boulevard in Roseville.
07:29I'm just here to thank. Staff
07:31did an excellent job. They've
07:33been great to work with and
07:34here to answer any questions
07:36any of you may have.
07:37>> Thank you. Thank you. So
07:39back to any any questions from
07:43commissioners, staff or
07:44applicant at this point? Okay.
07:50How come. Sorry Commissioner.
07:55How.
07:56>> Thank you. Chair chase. Just
07:59a couple questions. I was
08:00looking at the drive through
08:03and just I forgot to disclose
08:05earlier. I did have a meeting
08:06with staff prior to the meeting,
08:08just to update on the project
08:09within. I wanted to go over the
08:12the drive thrus and the
08:14concerns just for the
08:17mitigation with the applicant
08:19and staff so that, you know,
08:21the city is aware because I
08:23know that area, we we have a
08:25drive through not far from
08:28there is in and out to. And it
08:31goes on through the street, and
08:33then it goes on to Arden and
08:35then loops around and traffic
08:37is very bad there. And so I was
08:39just a little bit concerned if
08:41the city did look that the
08:43drive through and see if
08:45there's going to be impact onto
08:47if there's overflow will be
08:49into the street. And is there a
08:51mitigation plan for that?
08:54>> Thank you for that question.
08:56Yes. So as part of the
08:57application process, a traffic
08:59study was completed. The
09:01applicant team and the
09:02Department of Public Works
09:03worked closely together during
09:04that review process, and they
09:07revised the plans consistent
09:09with that traffic study to
09:11address any adequate queuing
09:14issues or spillage onto the
09:15right of way. The project is
09:17also conditioned to provide a
09:19queuing management plan to
09:21prevent vehicles from spilling
09:22into the public right of way.
09:29>> And yeah, that's all. And
09:31then I, I know there was the
09:33concerns about the mural of the
09:35project and so wanted to really
09:38make sure that, you know, we
09:40find a home for the murals and
09:42so that we can preserve it
09:43because it was a really
09:45important part of the site as
09:48well.
09:50>> Thank you. Commissioner. Any
09:51other commissioner questions? I
09:55think we'll move on to now any
09:57public comments on this project.
10:00>> Thank you. Chair. I have two
10:01speakers for this item. Our
10:03first speaker is Chris Evans.
10:10>> Good evening. My name is
10:12Chris Evans. I'm the executive
10:13director of the Antelope
10:14Property Business Improvement
10:16District. And while this
10:17project has absolutely nothing
10:18to do with antelope, we do have,
10:20as part of our district an
10:22award winning maintenance
10:23program where we take homeless
10:25individuals off the street and
10:27over a period of time, lead
10:28them back to from addiction to
10:30full time employment. We've won
10:31two national awards with that
10:33program. As part of that
10:35program, we provide services
10:37outside of the district. And I
10:38just wanted to come here
10:40tonight to tell you, I know one
10:41of the things as a planning
10:43commissioner you're always
10:44worried about is this project
10:45going to come through? Is a
10:46developer going to deliver?
10:47Well, last year they reached
10:49out to us and said, you know,
10:50this project, we'd love to get
10:52this project forward. We have
10:53no idea if it's going to go or
10:55if it's not, but we need to
10:57keep this thing clean. And for
10:58the last year, they've been
11:00bringing in our team and
11:01supporting our team. They've
11:02been allowing me to keep about
11:03eight people employed by coming
11:05down and doing regular
11:06maintenance on this project,
11:07long before they ever knew
11:09whether they were even going to
11:10have a project, they were
11:11investing in the property to
11:12make it look better and keep it
11:14cleaner. And I think if you
11:16look back and you think about
11:17it, you remember up until about
11:19April, that place looked pretty
11:20bad, and then all of a sudden
11:22everything got under control
11:23and we were in there and we
11:24were able to work with some of
11:26the homeless people that were
11:27there and actually provide them
11:29with some employment so they
11:30could help clean up the place.
11:31And we continue. We're going to
11:33continue doing that. As this
11:34project moves forward. We'll
11:35put in a bid to maintain the
11:37maintenance on this project.
11:38And not only will you have a
11:40project where you've got people
11:41and it's clean and orderly, but
11:42you're helping people come back
11:44from homelessness and addiction
11:46to full time employment. And
11:47that's really what, you know,
11:48gets me going, is I love to see
11:51the people go forward. And by
11:52the way, if you want more
11:54information on that program,
11:55which was started by the city
11:56of Sacramento, you can go to
11:58sacnas.org, sacnav.org, and
12:02you'll see a lot of information
12:03on that program. But this
12:04applicant has been a complete
12:05supporter of that program. He's
12:06brought people in to maintain
12:08this property. And again, at
12:09the time we started, they had
12:11no idea if this was even going
12:13to be a project. They just
12:14wanted to help people and clean
12:16up the area. So anyhow, I
12:17appreciate you. If you have any
12:19questions, I'd be happy to
12:20answer them. But basically I
12:21encourage you to support the
12:23project and give it a yes vote.
12:25>> Thank you.
12:27>> Thank you for your comment.
12:28>> Yeah. I just want to say I
12:30appreciate your involvement,
12:31yours and the the applicant and
12:33making this such a visible
12:36location. It certainly pays off
12:37to keep it clean and done a
12:39great job. I live very close to
12:40there and go by there a lot. So.
12:42>> Absolutely. Well thank you.
12:44>> Thank you. Our next speaker
12:45is Rebecca Evans.
12:49>> Good evening. Hi, Sean. Yes.
12:52We're married. My name is
12:54Rebecca Evans. I am actually
12:56the executive director for the
12:58Greater Los Greater Los Angeles.
13:00Can you imagine? Greater
13:02Sacramento, North Sacramento
13:03Chamber of Commerce. Sorry
13:05about that. Good evening. I'm
13:08here on behalf of Charles Smyth
13:11and the Market Street
13:12Development team. Anyone who
13:14lives or works near Arden and
13:17Exposition knows this corner.
13:18It's a gateway into our
13:20community. For long it's been
13:22sent the wrong message. Neglect,
13:24blight, and a place where
13:25people hurry past instead of
13:26shopping. And our member is.
13:29That is the Arden Mall is just
13:31a phenomenal mall. Some of the
13:33malls are closing and this one
13:34just keeps expanding and
13:36growing. So we're very excited
13:38to support Mr. Smyth in
13:40proposing restaurants and
13:42neighborhood serving businesses.
13:43It's a place where families can
13:45gather employees. There's a lot
13:47of employees in that area. They
13:49can have grab their lunches and
13:52visit Cal Expo right after. So
13:54it means new jobs, new tax
13:57revenue, and a lot of reasons
13:59for the people to continue to
14:01spend money in this area. I am,
14:03and Chris as well is a we're a
14:06certified sep Ted practitioners.
14:08That's crime prevention through
14:10environmental design. And that
14:11is what we teach through Secnav.
14:13We teach everybody that works
14:14for them how it is well
14:18designed, well lit, well used
14:20space. And I know that planning
14:21department is has gone through
14:23some of this too, but we are
14:26very cognizant of, of, of crime
14:29prevention, busy stores and
14:31outdoor seating puts eyes on
14:33the street and it gives a
14:35community ownership. So you
14:37don't have to be afraid of it.
14:38You just have to get behind it
14:40and support it. This team
14:42already has shown commitment,
14:43like Chris just said, and it
14:44has been a delight to work with
14:47him. The president of the
14:48Chamber of Commerce, Andy
14:51Hernandez, has has totally
14:53supported this effort. And we
14:54want to just stand here on
14:56behalf of the chamber and say
14:58that we respectfully urge you
15:00to approve this project. So
15:02thank you.
15:05>> Thank you for your comment.
15:06Chair, I have no more speakers.
15:08>> All right. Thank you, chair.
15:11Seeing no further comments, I
15:12will now close the public
15:13hearing. Are there any
15:15commissioners who wish to speak
15:16on this project? Vice chair.
15:29>> I'll make a motion to
15:30approve the project. Approve
15:31the staff recommendation.
15:33>> I'll second, Mister chair.
15:36>> We have a. Motion by Vice
15:40Vice chair and a second by. Who
15:45is this? Oh, okay. Sorry. I
15:47thought the sound was coming
15:48from over there. Thank you. Yes.
15:51Okay, okay.
15:53>> We could give it to that
15:55Commissioner.
15:55>> All right.
15:57>> Thank you. We have a motion
16:00and a second. Are there any is
16:01there any other discussion on
16:04this item before we take a vote?
16:09I will offer some discussion. I
16:12live by this project. I go by
16:14it all the time. I think it's
16:16it's an incredible corner, very
16:18visible. I'm also an architect
16:21of many, many years. I won't
16:22say how many I experienced both
16:24in back East in Los Angeles and
16:27Sacramento, the building that
16:29is getting demolished is what's
16:31considered brutalism brutalist
16:34architecture, a movement that
16:35started in Europe, came to this
16:37country probably in the 60s or
16:3970s, and there are a number of
16:41buildings that are in that form.
16:43A lot of people don't like it,
16:45but it is a it is a historic
16:47form. Berkeley Museum of Art, I
16:50think, was a brutalist building.
16:52There are a number of others
16:53around, and for that reason, I.
16:59I think the project is well
17:01done, but I cannot personally
17:04support. Particularly when the
17:06preservation director
17:08recommended the City Council
17:10that it be listed on the
17:11Register and City Council did
17:13not do so. So I think I'm
17:17disagreeing with the City
17:18Council's position on that and
17:20agreeing with the original
17:21preservation director.
17:24Commissioner. I think the
17:25building is iconic and
17:27significant. I know it's
17:28difficult to find adaptive
17:31reuse for a building like that,
17:33but I personally cannot condone
17:35demolishing it. So I think I'm
17:37going to be outnumbered on that
17:39one. But I did need to say that.
17:41So with that, oh, I would like
17:43to add, I know one of the
17:45conditions with with the murals
17:46will be relocated or reused. My
17:49suggestion would be since they
17:50came from that building, if, if,
17:52if I'm overruled, which I
17:53suspect I will be, I would like
17:56to see those murals kept on
17:58site and perhaps mounted
17:59somehow. You know, we've seen
18:01the architecture, the rear,
18:04some of the comments about it
18:05being pedestrian friendly. I
18:06mean, we've got the backs of
18:08buildings and drive thrus
18:09facing the street. So that to
18:10me is not the most pedestrian
18:12friendly thing to do. I would
18:14suggest, though, I'd like to
18:15see those two murals mounted on,
18:18you know, substantial
18:20structures and perhaps mounted
18:21on the on the rear of the shop
18:22building on along expo and
18:24perhaps the, the drive through
18:26on, on Arden Way just to, just
18:30to again, keep it, keep it in
18:31the neighborhood and keep that,
18:33that remnant of the building
18:34that was there, assuming it
18:36gets demolished. With that, I
18:39have no other comments. Did
18:40anyone else have any. Seeing
18:42none. All right. Clerk, I think
18:45we've got a motion and a second
18:47we can take a vote.
18:48>> Thank you. Chair, I will do
18:50a voice vote. All those in
18:53favor, please say aye.
18:55>> Aye aye.
18:57>> Any opposed?
18:58>> Aye. Opposed?
19:01>> Any abstain? Thank you. The
19:03motion passes.
19:06>> Thank you very much.
19:08>> Question for the attorney.
19:11Do we need seven votes? There's
19:14for.
19:16>> Oh sorry. So we do need
19:20seven votes to pass this motion.
19:23And we only have six. So sorry
19:25this motion did not pass.
19:28>> Well this is going to go
19:30against my grain.
19:35>> So that means you have to
19:37keep going. The applicant gets
19:40an I vote or a no vote. So you
19:42need to keep going until this
19:44body makes a decision.
19:46>> Oh thank you.
19:48>> We six at this point. We
19:52have six votes at this point.
19:53All right. I will modify my
19:55vote and vote for it. Okay.
20:01Commissioner Nebo yes.
20:03>> Could I could I make a
20:05motion to for staff
20:08recommendation to move it
20:09forward with a condition that
20:13the the murals are saved and
20:19preserved, and to have them be
20:23displayed on site if possible.
20:27>> I would second that motion.
20:29>> Would that be reasonable?
20:30>> Yes, it would be okay.
20:32>> Okay. So that's a friendly
20:35amendment to Commissioner
20:36Caden's motion if you accept it
20:38and the second takes it, and
20:39then Sapphire, if we can do a
20:41roll call vote. Thank you.
20:44>> Accepted.
20:48>> All right.
20:49>> Commissioners, please unmute
20:51Commissioner Lee. I
20:53Commissioner I Commissioner
20:56Snell.
20:56>> I.
20:57>> Commissioner Nebo, vice
20:59chair. Kaden I. Commissioner
21:01Gause I. Commissioner Ortiz is
21:03absent. Commissioner risk is
21:05absent. And chair chase, I
21:06thank you. The motion passes.
21:11>> Thank you everyone. We will
21:15now move to grab my agenda back
21:17here. Item number three on the
21:22agenda. Do we have a staff
21:26report? Okay.
21:43>> Perfect. Good evening. Good
21:45evening, chair, or.
21:47>> I'm sorry. One second. Can
21:48we have disclosures.
21:50>> Oh I'm sorry. Yeah. Other
21:52disclosures on this project.
21:57Commission able.
21:59>> I'm. I met on site with the
22:04applicant and had the
22:09conversation followed the staff
22:10report. No no new information.
22:19>> Thank you Commissioner Lee.
22:20>> Yeah. I had a brief phone
22:22and email conversation with the
22:24applicant's representative
22:25consistent with the staff
22:27report.
22:28>> Thank you. Commissioner,
22:29vice Vice chair.
22:31>> I also met with the
22:32applicant, discuss the project
22:34and conversation was consistent
22:35with the staff report.
22:39>> Commissioner Snell.
22:40>> I also met with the
22:42applicant and the presentation
22:43was consistent with the
22:45materials of the staff report.
22:46>> Thank you. I'll get my name
22:49out there. I also had a
22:50telephone conversation with the
22:52applicant consistent with the
22:54staff report. Thank you. Any
22:59other disclosures? Go ahead.
23:02>> Thank you. Good. Good
23:03evening, chair, Vice Chair and
23:05members of the Commission. My
23:06name is Michael Cramton,
23:07assistant planner with the
23:08Community Development
23:09Department. The item before you
23:11tonight is the applicant appeal
23:12of Z25-091. The project site,
23:17shown in red on the screen, is
23:19located along Center Road in
23:21the R1. Single unit dwellings
23:23on the site is currently
23:25developed with a single unit
23:26dwelling and located within
23:27half a mile of the consumes
23:29River College light rail
23:30station. The applicant is
23:34seeking approval of a tentative
23:35map to subdivide 2.4 acres and
23:38229 parcels. Site plan and
23:40design review to review the
23:41tentative map layout,
23:43demolition of the single unit
23:44dwelling and construction of 29
23:46single unit dwellings with
23:48deviations to setbacks, lot
23:49size, lot depth, lot width and
23:52lot coverage standards, as well
23:53as a tree permit for the
23:55removal of one private
23:56protected tree. This project is
24:00subject to the Housing
24:01Accountability Act, which
24:02provides limitations for how
24:03local jurisdictions can act
24:05upon projects inconsistent with
24:07objective general plan, zoning,
24:09subdivision and design criteria,
24:11inconsistencies that are not
24:12identified and notified to
24:13applicants within timelines
24:15established by the Housing
24:16Accountability Act are deemed
24:18consistent. This project
24:20proposes nonstandard street
24:21section parcels with no street
24:23frontage and exceeds both
24:24control standards. But since
24:25those inconsistencies were not
24:28identified to the applicant in
24:29accordance to the Ha, the
24:31project is deemed consistent
24:32with these three standards. The
24:35project site is proposed to be
24:37subdivided into 29 parcels and
24:39includes street improvements of
24:41Jacinto Road and Arden's Way,
24:43an easement for a 20 foot wide
24:44private street provides access
24:46to parcels one through 12 and
24:4718 through 29, parcels 11
24:50through 13 directly front onto
24:52Arden Way, which will
24:53eventually connect to runway to
24:56the north. Construction of 29
25:00single unit dwellings is
25:02included in this project. The
25:03proposed homes include a
25:05combination of single and two
25:06story homes and single and two
25:07car garage configurations. The
25:10elevations offer a variety of
25:12contemporary and modern design
25:13elements, which staff finds
25:14consistent with applicable
25:15design guidelines. The project
25:17is requesting deviations to
25:19minimum lot size, depth and
25:20width standards, maximum lot
25:22coverage, and front street side
25:24and rear yard setback standards.
25:27These standards were identified
25:28as inconsistent, and staff
25:30notified the applicant within
25:32the timeline established by the
25:33Ha staff is supportive of these
25:36deviations. While the proposed
25:38setbacks and lot coverage
25:39reduces the individual open
25:40space for each home, the site's
25:42proximity to Jacinto Creek Park
25:44and Shasta Community Park
25:46provides several options for
25:47open space within walking and
25:49biking distance. The 2040
25:51General Plan identifies
25:52policies promoting a compact
25:54urban footprint and infill
25:56development in proximity to
25:57transit options. Staff
26:02recommends approving the motion
26:03to approve the requested
26:05entitlements. Draft facts of
26:07finding and conditions of
26:08approval can be found in the
26:09staff report starting on page
26:1119. Notice of the project site
26:13was mailed to property owners
26:14and residents within 500ft.
26:17Staff received one letter of
26:18opposition which can be found
26:19on attachment seven of the
26:21staff report. This concludes
26:23staff's presentation staff's
26:26available to answer any
26:27questions, and the applicant
26:29would like to give a brief
26:30presentation as well. Thank you.
26:35>> The Commission the applicant
26:37have a presentation. Yeah. Mr.
26:40chair, we do have a
26:42presentation.
26:42>> But I think we'll forego it.
26:44I think from our perspective,
26:46it's not without a degree of
26:48disappointment that, in fact,
26:49we have to be before this body.
26:51You know, you have an applicant
26:52in this case, next generation
26:55capital, which is probably the
26:56most active single family
27:00detached home builder in the
27:01city of Sacramento, who is
27:03specialized in finds in finding
27:05underutilized sites to propose
27:07projects, much like the
27:08Trecento project. It's not the
27:10first one we've done of this
27:12nature. I think fundamentally
27:14it comes down to a couple of
27:18things. I think. I think right
27:20now we're in a period of
27:21transition relative to the new
27:23zoning code, the number of
27:25deviations, you know, was an
27:27issue at the design director
27:29level. Certainly we need to
27:33maintain, I think, flexibility
27:34for projects. And there isn't a
27:36standard out there for the
27:37minimum number of deviations
27:38that are requested. And then
27:40certainly the Street standard
27:43discussion has been a source of
27:46much. A lot of gnashing of
27:48teeth will say, fortunately, in
27:50our case, the street section
27:53issue was addressed in the SB
27:56330 pre-application finding. I
27:58think what you'll notice from
28:00the the director level hearing
28:02transcript is a lot of
28:04struggling to get around the
28:06fact that SB 330 precluded
28:09consideration of the Street
28:10cross section to deny the
28:13project, which was very
28:15frustrating for us, but also
28:17set a bad precedent, I think,
28:19and especially for next
28:20generation capital, being
28:22active as they are, in fact,
28:23has dropped purchase options
28:25for two properties immediately
28:27adjacent to a trecento, and
28:29those lands have been vacant
28:30for a long time. And if someone
28:32like Next gen doesn't develop
28:34those properties, they're going
28:35to be vacant for a long, long
28:37time. And it's really
28:38attributable to this street
28:39section question. And it really
28:40comes down to maintaining
28:42flexibility. What I would
28:43encourage this body is
28:44obviously to support and grant
28:45our appeal, but also engage in
28:48a robust discussion about the
28:50number of deviations that are
28:52acceptable. And more
28:54importantly, the street section
28:55question the the code provides
28:59the opportunity to provide
29:00private streets and private
29:02drives. That necessarily means
29:03they don't meet the private I
29:05mean, the public roadway
29:07standard. We can't do that. We
29:08need to maintain flexibility to
29:10address site specific
29:12constraints and needs for
29:13projects. So with that, our
29:14design team is here, as well as
29:17representative from Next Gen
29:18capital. Happy to answer any
29:19questions, but thank you for
29:20your time today.
29:22>> Thank you. Thank you very
29:23much for your presentation. Are
29:25there any questions of staff or
29:26the applicant from
29:29commissioners? Okay. Seeing
29:35none, are there any members of
29:37the public that would wish to
29:39speak on this item?
29:40>> Thank you. Chair. I have no
29:41speakers for this item.
29:42>> All right. Thank you. With
29:45that, then, seeing no further
29:47public comment, I'll close the
29:48public hearing. Are there any
29:49commissioners who wish to speak
29:50on this item? Commissioner Abel?
29:58>> Chair chase, do you can
29:59would you mind if I ask some
30:02questions of staff real quick?
30:03>> No, not at all.
30:04>> Can we can you discuss why
30:07this is in front of us? The.
30:11The tentative map was approved,
30:12but it wasn't approved at the
30:15design director level. Can we
30:17talk about that inconsistency
30:19or why that why that happened
30:21and why we're here with staff
30:24recommendation.
30:25>> As you mentioned, the
30:27tentative map was approved at
30:28director hearing. What was
30:30denied at the hearing was the
30:32site plan and design review
30:33entitlement. And so the appeal
30:36in front of us today is the
30:38appeal of the denial for site
30:40plan and design review.
30:44>> Is, is there is there is
30:46there actually a tentative map
30:47right now? Are we're approving
30:49the tentative map or is it
30:51already been approved?
30:54>> May I?
30:56>> Yeah.
30:56>> You'll you'll look at the
30:58whole project, look at the
30:59entire project. So the
31:00tentative map has been approved.
31:01But you're considering the
31:02whole thing. It's out. It's the
31:04project's considered de novo.
31:06So you're looking at all the
31:08entitlements.
31:10>> Okay. Is that does that
31:16happen very frequently? You
31:17know, we don't see projects
31:19very often that are approved at
31:21staff level. Does this kind of
31:24conflict does that happen very
31:25often? Is this something that's
31:26going to. Is that a fair
31:30question?
31:30>> Even if you were about to
31:33finish that sentence, I said, I
31:35hope it's not something that's
31:36going to happen more and more.
31:38But no, it's rare that it
31:39happens. I've been here since
31:402018, and one reason was why is
31:43a lot more things go to
31:44director, whereas before it
31:45went to the Planning Commission.
31:47So that's the Planning Design
31:48Commission. So that's one
31:49reason. But even with that, I
31:50can't think of a situation
31:52where that has happened, where
31:54staff and the director and was
31:56appealed to PDC.
31:58>> Is there some type of
31:59standard for. Is there and
32:03forgive me, this is probably
32:03not a fair question, but is
32:05there a. For private streets,
32:08is there a. I say because we
32:13deal with codes, we deal with
32:14actual laws in here. But is
32:16there like some unstated number
32:19of deviations you can have or
32:22something where you can only do
32:23so much on a private street and
32:27still it be like, why? I don't
32:30understand why this wasn't
32:31approved at the design director
32:32level.
32:35>> So the answer there's no,
32:37Nick was right that there's no
32:40minimum or maximum amount of
32:41deviations that you can request
32:43for on a private street or even
32:45on, even if it was just for
32:47housing, as far as I would say,
32:49though, that when Public Works
32:51reviews the private streets,
32:52that they do look at factors
32:53such as circulation, safety,
32:56and then, as Michael mentioned,
32:57we have solid waste, determine
32:59whether they can still service
33:01the project. Same thing with
33:03utilities. So fire. Yeah. Fire
33:05Smud as far as their easements.
33:06Yeah.
33:07>> But that's not really the
33:08design though is that is that
33:11design, is that the
33:12functionality of it regarding
33:14the design or is it the actual
33:16esthetics of the design.
33:20>> Yeah, I, I guess it's hard
33:23to say whether you'd consider
33:24that design when you, I would,
33:26I would probably just direct
33:27back to the staff report and
33:29how the design director, what,
33:31how they felt, you know, that
33:32it was within their within
33:35their purview. And then the
33:36zoning administrator, how he
33:38just stuck to the, the
33:41tentative map situation and
33:42findings.
33:43>> Thanks. Thank you so much.
33:45>> Thank you Commissioner.
33:49>> Any I don't know if this is
33:52helpful.
33:53>> If this is helpful, but so
33:55there's you had the zoning
33:57administrator and the design
33:59director looking at this
34:00decision, the zoning
34:02administrator, administrator,
34:03and the map, all of the street
34:05standards were associated with
34:07the map. And while potentially
34:10abnormal, the zoning
34:11administrator concluded that
34:13the city could not deny those,
34:15could not deny those based on
34:17the Housing Accountability Act,
34:18because the city did not flag
34:20those ahead of time, and the
34:22zoning administrator found
34:23there's no basis to make those
34:25findings in the Housing
34:26Accountability Act, and staff
34:28concurs. So that's one the
34:31design director found. These
34:33other standards, the deviations
34:35for lot size with setback that
34:40the project did not meet the
34:42standards for granting those
34:45deviations. Those standards do
34:48not have the same protection in
34:50the Housing Accountability Act,
34:52because under those, you get
34:54that protection under the
34:55Housing Accountability Act, if
34:56your project complies with all
34:58objective standards. So this
35:00project does not comply with
35:01those standards, right? That's
35:03why the requesting deviations
35:04and the staff notified them
35:07ahead of time. So there's no
35:09housing ability Housing
35:11Accountability Act constraint
35:12on the site plan and design
35:15review piece of that. That said,
35:17staff has included findings in
35:21the staff report. They believe
35:22you can that there's a basis
35:25for granting those deviations.
35:26The design director felt
35:28differently, but there's
35:31information in your staff
35:32report.
35:35>> Thank you. Thank you, vice
35:36chair. Can.
35:39>> Yeah thank you chair. And I
35:42have a little bit to say on
35:44this. So so bear with me. I
35:46think first of all, you know, I
35:48think the project should be
35:50approved tonight. So I'll
35:51gladly just put a motion on the
35:52table early just to approve the
35:54staff recommendation. You know,
35:55this this is a good project.
35:57You know, we're I don't I don't
35:59know really why it's so
36:02controversial. I think we're
36:03creating 29 fairly modest sized
36:06homes on a mostly vacant lot,
36:07you know, creating
36:09opportunities for homeownership
36:10for families. I know a lot of
36:12the conversations that we've
36:13had on the missing middle
36:14ordinance have been, you know,
36:16maybe a little bit. Obviously
36:18it includes more than this, but
36:19like, the conversation was more
36:20focused, I think, on the like
36:22rental attached products side
36:23of things. But I think this is
36:25still a really important
36:27product to continue building.
36:28And, you know, we're in a
36:31fairly difficult economic
36:32environment for, for building
36:33housing right now. This is what
36:35pencils for this type of site
36:36in this part of the city. So
36:39seems seems pretty clearly in
36:40line to me with, with the
36:42general plan policies as, as
36:44staff has sort of corroborated
36:45in the staff report and just
36:47generally what we're trying to
36:48do as a city on housing, I want
36:51to just, you know, set that
36:53aside for a second. And
36:55actually it was set up well by
36:56by, you know, the speaker to
37:00sort of, I think, have more of
37:02a bigger conversation and just
37:04kind of reflect on generally
37:06the experience of this project
37:07and the kind of the larger
37:08scheme of, of, you know, the
37:10zoning code update that we're
37:11doing. And, you know, to be
37:14honest, I'm a little bit
37:15alarmed at, at the process that
37:17this project went through to,
37:19to get here. It is it is very
37:21unusual, you know, for a small
37:23lot subdivision of this size,
37:25right? I don't think it should
37:27be taking a, a year of back and
37:29forth with staff to get to a
37:31place of agreement and a staff
37:34recommendation, you know, of
37:36approval only to be denied at
37:38the director's level hearing,
37:39to then have to appeal up to
37:41this body and then still get a
37:42staff recommendation for
37:44approval. It's it's very
37:45unusual. And I think I'm, I'm
37:46pretty sympathetic to, you know,
37:49some of the concerns that the
37:51applicant raised in, in the in
37:52the letter about not getting,
37:57let's call it consistent
37:59guidance about what would be
38:00necessary to actually get an
38:02approval and whether or not
38:03these these objections that I
38:06think were raised at that
38:07director level hearing could
38:08have been identified in that
38:10last year and resolved much,
38:12much earlier. So I just think
38:15that's it's not a it's not a
38:17great look to be. So I think
38:19fragmented as a city. And I
38:21think it erodes the trust that
38:22people who want to do business
38:24here have in the feedback that
38:26they're getting from city staff,
38:27because they're getting
38:29conflicting feedback and
38:30judgments from different people.
38:31And they don't know, you know,
38:33whether or not the feedback
38:34that they're getting is
38:35representative of the person
38:36that they're talking to. Is it
38:37the department? Is it the city
38:39as a whole? Is it what's going
38:41to be, you know, talked about
38:42in the director level hearing?
38:43Right. I just think we want to
38:45be creating like a much more.
38:48Well, creating a regulatory
38:50environment, but also like a, a
38:51review process. That's, that's
38:53predictable that, that lays out
38:55the objective standards up
38:56front. You know, when you're
38:57talking about deviations, which
38:59we are here to those rules,
39:00there are clear policies and
39:02clear, I think, interpretations
39:03of the policies for how you're
39:05actually going to be evaluating
39:06those deviations. I think that
39:07that was missing here. And so I
39:09think we just need to do a
39:11better job than we did on this
39:13project to, to kind of reach
39:14that so that we can just be a
39:16good place to do business and,
39:18and to invest in and to build
39:20the needed housing that that we
39:21desperately, desperately need
39:22here. So, you know, I think I
39:26recognize that some of the
39:28friction that was happening
39:29with this project is partly
39:32because of this, this weird
39:33kind of like timing window that
39:35we're in this pocket of time
39:36where it's like, we have a new
39:38general plan, we're updating
39:39the zoning code, but the zoning
39:41code is not updated yet. And so
39:43we have these deviations, many
39:44of which would actually be
39:46consistent with the new zoning
39:47code if it was in place, if
39:49this were next year, but
39:51they're not in place yet with
39:52the new code, I think. So
39:53that's that's, I think part of
39:55what's happening here. And so I
39:56think there's some
39:57understandable like, you know,
39:58delay in that. I think there's
40:00several standards that were
40:02included or were asked for as
40:04part of this project that I
40:06want to continue to, to, to
40:07explore as we start to continue
40:09to like have this conversation
40:10on the, on the zoning code
40:12ordinance. So first, you know,
40:14I, it was hit on by the
40:15applicant pretty strongly. I
40:16think it, it sounds like there
40:18needs to be a little bit more
40:19of a formal flexibility put in
40:24place on the infill street
40:25design standards. And I think
40:27it was a little bit hard to,
40:28for me at least, to kind of
40:30understand the, the and parse
40:32the back and forth that was
40:33happening between staff and the
40:34developer in this year on the
40:36street with conversation,
40:37because there was, I think,
40:39this request, I guess, that I
40:42was reading for this north
40:44south private drive to be a
40:46wider street. But then there's
40:48also this like big emphasis on
40:50pedestrian connectivity and,
40:51and urban heat island effect.
40:54And I don't know, I mean, more
40:56more pavement wider, you know,
40:57vehicle travel. Those are not,
40:59in my opinion, like a better,
41:01better for pedestrians or
41:03better for urban heat island.
41:04Right. I think we just need to
41:06evaluate the policy outcome
41:07that we want there, you know,
41:09slower vehicle speeds, you know,
41:11pedestrian safety, less asphalt.
41:13These are, you know,
41:14contributing to urban heat
41:15island. These are like the
41:16outcomes we want. And I think
41:18we just need to allow compact
41:19street designs that achieve
41:20those outcomes. Like, I don't
41:21know what 50ft is doing to
41:23achieve those outcomes on a
41:24street width. And then, I mean,
41:27obviously very relevant to the
41:28applicant. Like more
41:29importantly, the wider street
41:30width is going to crowd out the
41:31housing, right? And you might
41:33not actually be able to have
41:34housing on either side of the
41:36street. And I think that's like
41:37kind of the point of the
41:39project here, right? So I don't
41:40think we, we necessarily want
41:41to do that either. So I'm just
41:43like, I'll say I'm totally
41:45comfortable with, you know,
41:46these small lot subdivisions
41:47like this, having these much
41:49more narrow private streets and
41:52would support formalizing, I
41:54think that flexibility into the
41:55code to like make it very clear
41:57when you have small parcels
41:59like this and maybe there's a
42:00threshold, I don't know, maybe
42:01it's a smaller parcel, like a
42:03five acre size or I don't know,
42:05something like that or
42:07dimensions, maybe it's skinnier
42:08parcels, but to have some
42:10flexibility on like you don't
42:10need to do 50ft wide on, on
42:12these really skinny small
42:13parcels, you can have these
42:14narrower streets and it's okay.
42:18The other thing on the
42:19standards I want to continue to
42:20touch on is the setbacks. You
42:22know, we talked a lot about
42:23this in in the missing middle
42:25stuff. So 20 foot front
42:26setbacks for a project like
42:27this to me is really
42:29unnecessary. That's really
42:31quite, quite large. There's
42:33only so much feet of width on a
42:36parcel like this. So if you're,
42:38if we're asking for as a city,
42:3950ft of street and then 20ft of
42:41setbacks on either side, and
42:43we're trying to do a project
42:44like this, you know, that's
42:4690ft, you know, that like
42:48that's more than half of the
42:49parcel in this case, and
42:51probably much more so in other
42:53parcels. So I think that that
42:56really starts to really crowd
42:57out the point of the whole idea
42:59here, which is, which is
43:01housing. I had a chance to, to
43:04see the Cotton Lane project
43:05that this applicant has, has
43:07done that was similar to this.
43:09That's a project that had four
43:10foot front setbacks. It was
43:13totally fine. You know, I, I'd
43:15like to see more projects that
43:16that kind of facilitate that
43:18sort of front setback, you know,
43:20not not pushing as a city to
43:22get to that 20 and be more
43:24flexible to get to that. Four
43:25because again, it's like the
43:26point is like more homes, it's
43:28not more more driveways, right?
43:30I'd also want to continue to
43:32ask for more flexibility on the
43:34street side yard setback. So we,
43:35we talked about this again in
43:37the missing middle. We, we had
43:38the 12.5ft. And then, you know,
43:40the reasoning for why we need
43:42the 12.5ft is like, well, the,
43:43you know, Smud and the
43:45utilities, they, they need that.
43:46That's a requirement. Well, we
43:47have an applicant that worked
43:48with Smud. They got a slightly,
43:50you know, lower setback on that.
43:51Clearly there's some
43:52flexibility there. I'd like for
43:54us in our code to have similar
43:55levels of flexibility. And then
43:57the rear yard setback. It
43:59sounds like the current
43:59standard is 15. If the lot is
44:01over 60ft deep. I think some
44:06flexibility there might make
44:07sense. I think especially in
44:08situations like this where, you
44:10know, the the lot, you know,
44:12because of the subdivision, you
44:13know, there's not a public
44:14street. So the the lot starts
44:16at the center line of the of
44:18the private drive. And so it's
44:19like, yeah, it's, it's quite
44:20long when you think about it
44:22like that. But, you know, maybe,
44:23maybe some, I don't know, we've
44:25seen ten foot rear setbacks and
44:27it's been totally okay. And,
44:28you know, I think there's a
44:29revealed preference in this
44:30city for people who are
44:32prioritizing affordability over,
44:33you know, having a much larger
44:35backyard. And then, okay, I
44:38also just want to voice, I
44:39think my just general concern
44:41about what feels to me a little
44:43bit like a, a fairly subjective
44:45denial that happened at the
44:46director hearing based on a
44:50interpretation of the general
44:51plan that clearly runs counter
44:52to the current staff
44:54recommendation and the
44:55interpretation of the general
44:56plan that you have in this
44:58recommendation. And this was a
45:00concern, I think, that I you
45:01know, I've been consistent on
45:03I've brought up as we went
45:04through the missing middle
45:06process, where we decided
45:07through that process, instead
45:10of using our, our existing buy
45:12right process, our, you know,
45:13our ministerial processes, any
45:16project that goes through
45:17missing middle, that goes
45:18through site plan design review.
45:20And that means that the moment
45:21that you need a single
45:24deviation, it goes to director
45:26where it can be denied because
45:27of interpretation of the
45:28general plan that runs counter
45:29to staff. That's the that's the
45:32experience of this project,
45:33right? So let's just say, right,
45:35like you have a missing middle
45:36project and, you know, it's
45:38wealthy neighborhood, you have
45:3920 foot setbacks on either side.
45:41You want to go to 15, you're
45:43suddenly kicked up to, to
45:44director level. And I just
45:47think we need like really clear
45:48criteria for evaluating that
45:50deviation. And I think like
45:52avoiding this situation where
45:53we're like reopening questions
45:55that that probably were settled
45:57before that hearing through the,
45:58the back and forth with staff.
46:01And actually, as I understand
46:02it, missing middle projects
46:03that that are totally compliant,
46:05that don't have a deviation
46:06through a reconsideration
46:07process can also get kicked up
46:10to director. So I just worry a
46:11little bit about how subjective
46:14that all feels when, you know,
46:16I know the intent was to kind
46:18of keep the process quasi by
46:19right and just kind of ensure
46:20that there's this opportunity
46:22for staff to like work back and
46:24forth, you know, with the
46:27developer on some of these
46:28design principles, it clearly
46:29feels like there's something
46:31beyond that happening here. And
46:34so, you know, I think that's,
46:37that's all fine again, but I
46:38just, I just, I think that we
46:40need to kind of be a little bit
46:42more clear about what the
46:43expectations are there. And I
46:45think long term, I'd love for
46:46us to just, again, reconsider
46:48what our approval path is for
46:50some of these missing middle
46:51projects and projects like this,
46:52so that there's a lot more
46:54clarity for like, exactly what
46:55the approval path is, what the
46:57expectations are, what do you
46:59need to actually get approved
47:00and create some of that, that,
47:02you know, reduce the
47:03uncertainty and create that
47:04predictability. So I know I've
47:05been talking a bunch, but I
47:07appreciate you hearing me. And
47:08then I'll, again, I'm making a
47:10motion to, to move the staff
47:12recommendation.
47:14>> Thank you, Vice Chair. As
47:15always, I know I appreciate
47:17your input and your comments.
47:19Very thorough. Commissioner
47:22Snell.
47:23>> I'll keep it kind of short.
47:25I like this project. I like
47:26that it gets people into homes
47:29and reasonably affordable way.
47:32I have to agree that I, I don't
47:35like the sort of administrative.
47:39I think staff did a great job
47:40on their report and their
47:43evaluation and their assessment
47:44of this project. I just I'm
47:46really uncomfortable with the
47:48how many hoops the applicant
47:50had to jump through to make
47:51this happen when we were trying
47:53to get houses built and get
47:55people in homes. So it just it
47:58did not it, it did feel
48:00subjective on on reading
48:01through the report, I had a
48:04very hard time parsing out on
48:06that denial, sort of what was,
48:09what was an objective piece of
48:12that denial. So anyway, that's
48:14what I've got.
48:15>> Thank you Commissioner,
48:17Commissioner.
48:23>> I just wanted to support
48:25everything. Vice Chair Caden
48:26said. I was going to say maybe
48:2930% of that. So I was going to
48:32say everything you said. You
48:33beat me to it like maybe 30%,
48:35but you had like way more than
48:37I. I feel that very well said.
48:40And I hope that we can maybe
48:44institute that going forward.
48:47Those, those guidelines. I
48:48thought they were really good
48:49guidelines to for future
48:50consideration. So thank you.
48:51Thank you so much for the
48:53thoughtfulness on that.
48:54>> Thank you. Commissioner. Any
48:56other comments before I toss
48:58mine out there? I want to, I
49:01think, essentially echo the
49:03comments of Vice Chair Caden. I
49:07think it's an excellent project,
49:08a great infill project, I think.
49:12And with all due respect to
49:14director Monahan, who I've
49:16known for many, many years and
49:18I respect thoroughly as an
49:19architect, I think there's an
49:21issue in there. You go back to
49:22some of the process things and
49:24perhaps council can can speak
49:25to this. When I was building
49:27official here at the city, when
49:29building codes came out, they
49:30changed. Every three years a
49:31new code comes out. It's
49:33printed on, I think, January
49:361st, available for the public
49:38review July 1st, and then it
49:41takes effect the following
49:42January. Within that window,
49:43between July and January,
49:46applicants have the option of
49:47either using the current code
49:49or the incoming code, knowing
49:50that that code is going to be,
49:52you know, in place. I think the
49:54same thing kind of applies here.
49:55I think some of the comments
49:57that Director Monahan made, yes,
50:00based on perhaps things that
50:01are in the current code might
50:04not be allowed. But I think if
50:05we had the option of looking at
50:07knowing full well that that new
50:10new ordinances are going to be
50:12coming down the pike very, very
50:13soon, we should be able to, I
50:15think, to allow them, if they
50:16benefit the project, to to go
50:18through. After this discussion,
50:20I went back to check on some
50:22projects that I. I lived in a
50:24project called Metro Square
50:26many, many years ago, one of
50:27the first infill projects in
50:29Midtown. Extremely narrow
50:31driveways through there.
50:32Somehow I made it, you know, I
50:34survived it. It's a great
50:36project, really a great infill.
50:37And I would hate to have seen
50:39that compromised or sacrificed
50:40because of the driveway widths.
50:43Another project one block down
50:45the street. I forget the name
50:46of it. Mogavero did again, very
50:49narrow driveways going through
50:50there. They're really only wide
50:52enough for one way traffic, but
50:53they're not signed for one way.
50:55So technically somebody could
50:56be coming both ways. They won't
50:58fit. But I think given the fact
51:01that the streets are going to
51:05have no parking on the sides,
51:06they're going to be 20 foot
51:08pavement width, which is what
51:09the fire department and the
51:10trash department would require.
51:11So it's going to satisfy that.
51:13I live in an area in Woodlake
51:14where the streets are below
51:16standard. They'll never be
51:17changed, but parking is allowed
51:18on both sides of the street.
51:20Draft trash trucks often cannot
51:21get down the street. They have
51:22to turn around and come back
51:24and back down from the other
51:25street to pick up people's
51:27trash. So that's not going to
51:28be an issue on this project
51:30here at Metro Square. Some of
51:31the other projects did not have
51:33any pedestrian capability
51:36throughout the project. This
51:38does have a four foot walkway,
51:39concrete walkway, parallel
51:42granite as part of the 20 foot.
51:43That's fine. It's not going to
51:44be a busy thoroughfare. So
51:47given all that, I think it's
51:48actually an excellent project
51:50and a great infill project, I
51:52would not want to see it
51:53sacrificed because of some, you
51:54know, deviations that perhaps,
51:56you know, legally, perhaps
51:58can't be met. We need the
52:00flexibility, I think, to, you
52:01know, to, to move beyond those.
52:03So I know it's been the motion
52:05has been made and seconded, but
52:06I'll third the motion. So any
52:10other comments. Commissioner
52:14Snell.
52:15>> I'll second.
52:17>> I think it was already was.
52:18Second, we have a motion and a
52:21second. Claire, can you take a
52:22vote?
52:24>> Thank you. Chair.
52:25Commissioners, please unmute.
52:26Commissioner Lee, high
52:28Commissioner to High
52:30Commissioner Snell, High
52:31Commissioner Nebo, Vice Chair
52:34Kaden.
52:34>> I.
52:35>> Commissioner Gore. High
52:37Commissioner Ortiz is absent,
52:38Commissioner absent. And chair
52:40Chase. I thank you. The motion
52:42passes.
52:43>> Thank you everyone. Let's
52:47build more housing. Okay. Let's
52:52see. Come on. Next item on the
53:00agenda is Commissioner comments,
53:01ideas and questions. Anybody
53:04have any. Besides changing some
53:09of the conditions that we work
53:10under. Seeing no Commissioner
53:15comments. Are there any public
53:16comments for matters not on the
53:18agenda. Doesn't look like it.
53:19>> Thank you chair. I have no
53:21speakers for this item.
53:22>> Sorry, I didn't mean to jump
53:24ahead of you. Given that this
53:26concludes all the items on