2026-10-22 - Planning and Design Commission

Summary

Based on captions that may contain errors; names and numbers may be misheard.

  • Six of nine commissioners present. One scheduled item (item 2) was continued to November 12. The director said November 12 will be the last meeting of the year, with five items.
  • Arden Way Drive-Through Restaurants (P25-022): two drive-through restaurants and a retail building replacing a brutalist-style commercial building. A first vote fell one short of the required votes; after a commissioner changed their vote and a condition to save and display the murals was added, it passed.
  • Trecento 29-Lot Subdivision on Center Road Appeal (Z25-091): an appeal of the denial of a 29-home infill subdivision was granted and the project approved. Commissioners said the review process was too slow and inconsistent and asked for clearer standards in the zoning code update, especially for narrow private streets and setbacks.
  • No public comment on non-agenda items.

Agenda

Scheduled/held per city YouTube stream; agenda not retrieved.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:04I would like to make a quick

00:07announcement that this meeting

00:08is live on YouTube in Spanish

00:09and English. Please note that

00:11live captions and translations

00:12are AI generated and may

00:14contain errors. You may start

00:14the meeting.

00:15>> Thank you Clark. Good

00:17evening everyone. I'm now

00:19calling to order the regular

00:20meeting of the City of

00:21Sacramento Planning and Design

00:22Commission for Thursday,

00:24October 26th. October 22nd,

00:272026 at 5:30 p.m. Will the

00:29clerk please call the role to

00:31establish a quorum?

00:32>> Thank you. Chair

00:33commissioners, please unmute.

00:35Commissioner Lee. Commissioner.

00:37Commissioner Snell here.

00:39Commissioner Nebo here. Vice

00:40chair. Caden here. Commissioner

00:42Gause here. Commissioner Ortiz

00:44is absent. Commissioner risk is

00:47absent. And chair Chase here.

00:48Thank you. We have a quorum.

00:53>> A quick before I forget,

00:54item number two. If anyone is

00:56here for item number two. That

00:58item has been continued to

01:00November 12th, I believe, right?

01:03Yes. So it will just be hearing

01:06items number one and items

01:07number three tonight. If you

01:11wish to speak tonight on any

01:13other items, please submit a

01:15digital speaker slip before t

01:16item is called. You can do this

01:18by scanning the QR code on the

01:19back of the agenda, or at the

01:21back of the chambers, or by

01:23using the kiosk. Please note

01:24that no speaker slips will be

01:25accepted once an item begins.

01:28You will have three minutes to

01:29speak when called upon. Thank

01:30you. We'll now begin today's

01:32agenda with a land

01:35acknowledgment, followed by the

01:36Pledge of Allegiance. Please

01:37stand to. To the people, the

01:41original people of this land,

01:42the Nissan people, southern

01:44Maidu Valley and Plains. Miwok,

01:47Patwin Wintun peoples and the

01:49people of the Wilton Rancheria,

01:51Sacramento's only federally

01:52recognized tribe. May we

01:54acknowledge and honor the

01:55native people who came before

01:56us and still walk beside us

01:58today on these ancestral lands.

02:00By choosing to gather today

02:02together in the active practice

02:04of acknowledgment and

02:05appreciation for Sacramento's

02:06indigenous people's history,

02:08contributions, and lives.

02:10Please join me for the Pledge

02:11of Allegiance. I pledge

02:15allegiance to the flag. The

02:16United States of America, and

02:18to the Republic for which it

02:20stands. One nation under God,

02:23indivisible, with liberty and

02:24justice for all. Thank you. All

02:34right. Next on the agenda is

02:35the director's report. Greg.

02:41>> Thank you, chair. Just to

02:43note that November 12th, the

02:46next meeting will be our last

02:47meeting of the year. There will

02:49be no meetings in December, so

02:50there will be five items. You

02:52might want to have dinner

02:53before the meeting. But yeah,

02:56that's all.

02:57>> Always do just in case.

03:01Thank you. Next on the agenda

03:04is public Hearing calendar.

03:05I'll now open the public

03:07hearing item number one, Arden

03:09Way drive through restaurants

03:13P25-022. Before we begin

03:15staff's presentation, are there

03:16any disclosures or recusals

03:19from the commissioners? Seeing

03:22none. Zach, take it away. Oh.

03:26I'm sorry.

03:29>> Good evening commissioners.

03:30My name is Deja Harris,

03:32associate planner with the

03:33Community Development

03:34Department. I'm presenting the

03:35Arden Way drive through

03:36restaurant project. This item,

03:38P 25022, is a request to

03:41construct two drive through

03:43restaurants in a commercial

03:44retail building on 2.92 acres

03:47within an existing shopping

03:48center in the shopping center

03:50zone within the Point West.

03:52Planned unit development. The

03:55subject site is within the

03:57Point West Plaza Shopping

03:58Center south of Arden Fair Mall,

04:00and is located at the corner of

04:02Arden Way and Exposition

04:04Boulevard. It is currently

04:05developed with an existing

04:06commercial building and is

04:08surrounded by existing

04:09commercial and office

04:11development. The project

04:14requires the following

04:16entitlements a planned Unit

04:17development schematic plan

04:19amendment to Redesignate parcel

04:21A of the Point West PUD from

04:23financial institution and

04:25retail to commercial,

04:27residential and office uses

04:29conditional use permits to

04:31establish the two drive through

04:32restaurants and site plan

04:34design review for the

04:35demolition of the existing

04:36commercial building. The

04:38construction of the two drive

04:39through restaurants, the

04:40commercial building and

04:42associated site improvements.

04:44The subject site is a portion

04:46of parcel A and the Point West

04:49PUD, which is designated for

04:50financial institutions and

04:52retail uses. The PUD amendment

04:55would allow for commercial,

04:56office and residential uses on

04:58site, as well as facilitate the

05:00re-use of existing commercial

05:02buildings. The designation

05:04would allow uses that are

05:05consistent with the shopping

05:07center zone. The proposal

05:11includes the demolition of the

05:12existing 30,235 square foot

05:15commercial building on August

05:1827th, 2024, the City Council

05:20passed a motion to deny the

05:22listing of the subject site as

05:23a landmark. Thus, planning does

05:26not oppose the demolition of

05:27the structure. Access to the

05:30site will be from existing

05:32driveways on Arden Way and

05:34Exposition Boulevard.

05:35Pedestrian pathways are

05:37proposed on both street

05:38frontages. Bike parking is

05:40conveniently located near

05:42pedestrian paths and proposed

05:44buildings. Site landscaping

05:46includes additional trees

05:47planted along Arden Way and

05:49Exposition Boulevard, and the

05:51project complies with tree

05:53shading, setback and height

05:55requirements. On your screen is

05:58a rendering of the proposed

06:00Shake Shack, Pollo Campero and

06:02commercial retail building. The

06:04three buildings utilize common

06:06materials that provide a

06:07cohesive design and integrate

06:09well with existing uses in the

06:11shopping center. The

06:13architectural design is

06:14consistent with city design

06:16guidelines. Notification of the

06:19project in the hearing were

06:21provided to all neighborhood

06:23associations, residents and

06:24property owners within 500ft of

06:26the subject site. The site was

06:28also posted with the hearing

06:30information. Staff received

06:31comments from North Sacramento

06:33Chamber of Commerce, Civic

06:34Thread and nearby residents,

06:36which were included in the

06:37staff report. After publishing

06:40of the staff report, staff

06:41receives comments from

06:43Preservation Sacramento as well.

06:45Planning staff supports the

06:47project as it complies with the

06:49development standards of the

06:49shopping center zone and the

06:51PUD, and provides new

06:53pedestrian paths, enhanced

06:55landscaping and support

06:56surrounding uses. This

06:58concludes my presentation and

07:00staff and the applicant team

07:01are available should you have

07:02any questions.

07:03>> Thank you. Deja. Does the

07:06applicant have a presentation?

07:08Okay. Thank you. Before we move

07:10to public comment, can I ask

07:12I'd like to ask commissioners

07:13if there are any questions.

07:14Chair any questions of the

07:16staff?

07:16>> I think you would like to

07:18the applicant like to make a

07:19few words. That's all right.

07:20>> Okay.

07:21>> Sorry.

07:24>> Good evening. Charles Smyth,

07:25market Street development. 3017

07:27Douglas Boulevard in Roseville.

07:29I'm just here to thank. Staff

07:31did an excellent job. They've

07:33been great to work with and

07:34here to answer any questions

07:36any of you may have.

07:37>> Thank you. Thank you. So

07:39back to any any questions from

07:43commissioners, staff or

07:44applicant at this point? Okay.

07:50How come. Sorry Commissioner.

07:55How.

07:56>> Thank you. Chair chase. Just

07:59a couple questions. I was

08:00looking at the drive through

08:03and just I forgot to disclose

08:05earlier. I did have a meeting

08:06with staff prior to the meeting,

08:08just to update on the project

08:09within. I wanted to go over the

08:12the drive thrus and the

08:14concerns just for the

08:17mitigation with the applicant

08:19and staff so that, you know,

08:21the city is aware because I

08:23know that area, we we have a

08:25drive through not far from

08:28there is in and out to. And it

08:31goes on through the street, and

08:33then it goes on to Arden and

08:35then loops around and traffic

08:37is very bad there. And so I was

08:39just a little bit concerned if

08:41the city did look that the

08:43drive through and see if

08:45there's going to be impact onto

08:47if there's overflow will be

08:49into the street. And is there a

08:51mitigation plan for that?

08:54>> Thank you for that question.

08:56Yes. So as part of the

08:57application process, a traffic

08:59study was completed. The

09:01applicant team and the

09:02Department of Public Works

09:03worked closely together during

09:04that review process, and they

09:07revised the plans consistent

09:09with that traffic study to

09:11address any adequate queuing

09:14issues or spillage onto the

09:15right of way. The project is

09:17also conditioned to provide a

09:19queuing management plan to

09:21prevent vehicles from spilling

09:22into the public right of way.

09:29>> And yeah, that's all. And

09:31then I, I know there was the

09:33concerns about the mural of the

09:35project and so wanted to really

09:38make sure that, you know, we

09:40find a home for the murals and

09:42so that we can preserve it

09:43because it was a really

09:45important part of the site as

09:48well.

09:50>> Thank you. Commissioner. Any

09:51other commissioner questions? I

09:55think we'll move on to now any

09:57public comments on this project.

10:00>> Thank you. Chair. I have two

10:01speakers for this item. Our

10:03first speaker is Chris Evans.

10:10>> Good evening. My name is

10:12Chris Evans. I'm the executive

10:13director of the Antelope

10:14Property Business Improvement

10:16District. And while this

10:17project has absolutely nothing

10:18to do with antelope, we do have,

10:20as part of our district an

10:22award winning maintenance

10:23program where we take homeless

10:25individuals off the street and

10:27over a period of time, lead

10:28them back to from addiction to

10:30full time employment. We've won

10:31two national awards with that

10:33program. As part of that

10:35program, we provide services

10:37outside of the district. And I

10:38just wanted to come here

10:40tonight to tell you, I know one

10:41of the things as a planning

10:43commissioner you're always

10:44worried about is this project

10:45going to come through? Is a

10:46developer going to deliver?

10:47Well, last year they reached

10:49out to us and said, you know,

10:50this project, we'd love to get

10:52this project forward. We have

10:53no idea if it's going to go or

10:55if it's not, but we need to

10:57keep this thing clean. And for

10:58the last year, they've been

11:00bringing in our team and

11:01supporting our team. They've

11:02been allowing me to keep about

11:03eight people employed by coming

11:05down and doing regular

11:06maintenance on this project,

11:07long before they ever knew

11:09whether they were even going to

11:10have a project, they were

11:11investing in the property to

11:12make it look better and keep it

11:14cleaner. And I think if you

11:16look back and you think about

11:17it, you remember up until about

11:19April, that place looked pretty

11:20bad, and then all of a sudden

11:22everything got under control

11:23and we were in there and we

11:24were able to work with some of

11:26the homeless people that were

11:27there and actually provide them

11:29with some employment so they

11:30could help clean up the place.

11:31And we continue. We're going to

11:33continue doing that. As this

11:34project moves forward. We'll

11:35put in a bid to maintain the

11:37maintenance on this project.

11:38And not only will you have a

11:40project where you've got people

11:41and it's clean and orderly, but

11:42you're helping people come back

11:44from homelessness and addiction

11:46to full time employment. And

11:47that's really what, you know,

11:48gets me going, is I love to see

11:51the people go forward. And by

11:52the way, if you want more

11:54information on that program,

11:55which was started by the city

11:56of Sacramento, you can go to

11:58sacnas.org, sacnav.org, and

12:02you'll see a lot of information

12:03on that program. But this

12:04applicant has been a complete

12:05supporter of that program. He's

12:06brought people in to maintain

12:08this property. And again, at

12:09the time we started, they had

12:11no idea if this was even going

12:13to be a project. They just

12:14wanted to help people and clean

12:16up the area. So anyhow, I

12:17appreciate you. If you have any

12:19questions, I'd be happy to

12:20answer them. But basically I

12:21encourage you to support the

12:23project and give it a yes vote.

12:25>> Thank you.

12:27>> Thank you for your comment.

12:28>> Yeah. I just want to say I

12:30appreciate your involvement,

12:31yours and the the applicant and

12:33making this such a visible

12:36location. It certainly pays off

12:37to keep it clean and done a

12:39great job. I live very close to

12:40there and go by there a lot. So.

12:42>> Absolutely. Well thank you.

12:44>> Thank you. Our next speaker

12:45is Rebecca Evans.

12:49>> Good evening. Hi, Sean. Yes.

12:52We're married. My name is

12:54Rebecca Evans. I am actually

12:56the executive director for the

12:58Greater Los Greater Los Angeles.

13:00Can you imagine? Greater

13:02Sacramento, North Sacramento

13:03Chamber of Commerce. Sorry

13:05about that. Good evening. I'm

13:08here on behalf of Charles Smyth

13:11and the Market Street

13:12Development team. Anyone who

13:14lives or works near Arden and

13:17Exposition knows this corner.

13:18It's a gateway into our

13:20community. For long it's been

13:22sent the wrong message. Neglect,

13:24blight, and a place where

13:25people hurry past instead of

13:26shopping. And our member is.

13:29That is the Arden Mall is just

13:31a phenomenal mall. Some of the

13:33malls are closing and this one

13:34just keeps expanding and

13:36growing. So we're very excited

13:38to support Mr. Smyth in

13:40proposing restaurants and

13:42neighborhood serving businesses.

13:43It's a place where families can

13:45gather employees. There's a lot

13:47of employees in that area. They

13:49can have grab their lunches and

13:52visit Cal Expo right after. So

13:54it means new jobs, new tax

13:57revenue, and a lot of reasons

13:59for the people to continue to

14:01spend money in this area. I am,

14:03and Chris as well is a we're a

14:06certified sep Ted practitioners.

14:08That's crime prevention through

14:10environmental design. And that

14:11is what we teach through Secnav.

14:13We teach everybody that works

14:14for them how it is well

14:18designed, well lit, well used

14:20space. And I know that planning

14:21department is has gone through

14:23some of this too, but we are

14:26very cognizant of, of, of crime

14:29prevention, busy stores and

14:31outdoor seating puts eyes on

14:33the street and it gives a

14:35community ownership. So you

14:37don't have to be afraid of it.

14:38You just have to get behind it

14:40and support it. This team

14:42already has shown commitment,

14:43like Chris just said, and it

14:44has been a delight to work with

14:47him. The president of the

14:48Chamber of Commerce, Andy

14:51Hernandez, has has totally

14:53supported this effort. And we

14:54want to just stand here on

14:56behalf of the chamber and say

14:58that we respectfully urge you

15:00to approve this project. So

15:02thank you.

15:05>> Thank you for your comment.

15:06Chair, I have no more speakers.

15:08>> All right. Thank you, chair.

15:11Seeing no further comments, I

15:12will now close the public

15:13hearing. Are there any

15:15commissioners who wish to speak

15:16on this project? Vice chair.

15:29>> I'll make a motion to

15:30approve the project. Approve

15:31the staff recommendation.

15:33>> I'll second, Mister chair.

15:36>> We have a. Motion by Vice

15:40Vice chair and a second by. Who

15:45is this? Oh, okay. Sorry. I

15:47thought the sound was coming

15:48from over there. Thank you. Yes.

15:51Okay, okay.

15:53>> We could give it to that

15:55Commissioner.

15:55>> All right.

15:57>> Thank you. We have a motion

16:00and a second. Are there any is

16:01there any other discussion on

16:04this item before we take a vote?

16:09I will offer some discussion. I

16:12live by this project. I go by

16:14it all the time. I think it's

16:16it's an incredible corner, very

16:18visible. I'm also an architect

16:21of many, many years. I won't

16:22say how many I experienced both

16:24in back East in Los Angeles and

16:27Sacramento, the building that

16:29is getting demolished is what's

16:31considered brutalism brutalist

16:34architecture, a movement that

16:35started in Europe, came to this

16:37country probably in the 60s or

16:3970s, and there are a number of

16:41buildings that are in that form.

16:43A lot of people don't like it,

16:45but it is a it is a historic

16:47form. Berkeley Museum of Art, I

16:50think, was a brutalist building.

16:52There are a number of others

16:53around, and for that reason, I.

16:59I think the project is well

17:01done, but I cannot personally

17:04support. Particularly when the

17:06preservation director

17:08recommended the City Council

17:10that it be listed on the

17:11Register and City Council did

17:13not do so. So I think I'm

17:17disagreeing with the City

17:18Council's position on that and

17:20agreeing with the original

17:21preservation director.

17:24Commissioner. I think the

17:25building is iconic and

17:27significant. I know it's

17:28difficult to find adaptive

17:31reuse for a building like that,

17:33but I personally cannot condone

17:35demolishing it. So I think I'm

17:37going to be outnumbered on that

17:39one. But I did need to say that.

17:41So with that, oh, I would like

17:43to add, I know one of the

17:45conditions with with the murals

17:46will be relocated or reused. My

17:49suggestion would be since they

17:50came from that building, if, if,

17:52if I'm overruled, which I

17:53suspect I will be, I would like

17:56to see those murals kept on

17:58site and perhaps mounted

17:59somehow. You know, we've seen

18:01the architecture, the rear,

18:04some of the comments about it

18:05being pedestrian friendly. I

18:06mean, we've got the backs of

18:08buildings and drive thrus

18:09facing the street. So that to

18:10me is not the most pedestrian

18:12friendly thing to do. I would

18:14suggest, though, I'd like to

18:15see those two murals mounted on,

18:18you know, substantial

18:20structures and perhaps mounted

18:21on the on the rear of the shop

18:22building on along expo and

18:24perhaps the, the drive through

18:26on, on Arden Way just to, just

18:30to again, keep it, keep it in

18:31the neighborhood and keep that,

18:33that remnant of the building

18:34that was there, assuming it

18:36gets demolished. With that, I

18:39have no other comments. Did

18:40anyone else have any. Seeing

18:42none. All right. Clerk, I think

18:45we've got a motion and a second

18:47we can take a vote.

18:48>> Thank you. Chair, I will do

18:50a voice vote. All those in

18:53favor, please say aye.

18:55>> Aye aye.

18:57>> Any opposed?

18:58>> Aye. Opposed?

19:01>> Any abstain? Thank you. The

19:03motion passes.

19:06>> Thank you very much.

19:08>> Question for the attorney.

19:11Do we need seven votes? There's

19:14for.

19:16>> Oh sorry. So we do need

19:20seven votes to pass this motion.

19:23And we only have six. So sorry

19:25this motion did not pass.

19:28>> Well this is going to go

19:30against my grain.

19:35>> So that means you have to

19:37keep going. The applicant gets

19:40an I vote or a no vote. So you

19:42need to keep going until this

19:44body makes a decision.

19:46>> Oh thank you.

19:48>> We six at this point. We

19:52have six votes at this point.

19:53All right. I will modify my

19:55vote and vote for it. Okay.

20:01Commissioner Nebo yes.

20:03>> Could I could I make a

20:05motion to for staff

20:08recommendation to move it

20:09forward with a condition that

20:13the the murals are saved and

20:19preserved, and to have them be

20:23displayed on site if possible.

20:27>> I would second that motion.

20:29>> Would that be reasonable?

20:30>> Yes, it would be okay.

20:32>> Okay. So that's a friendly

20:35amendment to Commissioner

20:36Caden's motion if you accept it

20:38and the second takes it, and

20:39then Sapphire, if we can do a

20:41roll call vote. Thank you.

20:44>> Accepted.

20:48>> All right.

20:49>> Commissioners, please unmute

20:51Commissioner Lee. I

20:53Commissioner I Commissioner

20:56Snell.

20:56>> I.

20:57>> Commissioner Nebo, vice

20:59chair. Kaden I. Commissioner

21:01Gause I. Commissioner Ortiz is

21:03absent. Commissioner risk is

21:05absent. And chair chase, I

21:06thank you. The motion passes.

21:11>> Thank you everyone. We will

21:15now move to grab my agenda back

21:17here. Item number three on the

21:22agenda. Do we have a staff

21:26report? Okay.

21:43>> Perfect. Good evening. Good

21:45evening, chair, or.

21:47>> I'm sorry. One second. Can

21:48we have disclosures.

21:50>> Oh I'm sorry. Yeah. Other

21:52disclosures on this project.

21:57Commission able.

21:59>> I'm. I met on site with the

22:04applicant and had the

22:09conversation followed the staff

22:10report. No no new information.

22:19>> Thank you Commissioner Lee.

22:20>> Yeah. I had a brief phone

22:22and email conversation with the

22:24applicant's representative

22:25consistent with the staff

22:27report.

22:28>> Thank you. Commissioner,

22:29vice Vice chair.

22:31>> I also met with the

22:32applicant, discuss the project

22:34and conversation was consistent

22:35with the staff report.

22:39>> Commissioner Snell.

22:40>> I also met with the

22:42applicant and the presentation

22:43was consistent with the

22:45materials of the staff report.

22:46>> Thank you. I'll get my name

22:49out there. I also had a

22:50telephone conversation with the

22:52applicant consistent with the

22:54staff report. Thank you. Any

22:59other disclosures? Go ahead.

23:02>> Thank you. Good. Good

23:03evening, chair, Vice Chair and

23:05members of the Commission. My

23:06name is Michael Cramton,

23:07assistant planner with the

23:08Community Development

23:09Department. The item before you

23:11tonight is the applicant appeal

23:12of Z25-091. The project site,

23:17shown in red on the screen, is

23:19located along Center Road in

23:21the R1. Single unit dwellings

23:23on the site is currently

23:25developed with a single unit

23:26dwelling and located within

23:27half a mile of the consumes

23:29River College light rail

23:30station. The applicant is

23:34seeking approval of a tentative

23:35map to subdivide 2.4 acres and

23:38229 parcels. Site plan and

23:40design review to review the

23:41tentative map layout,

23:43demolition of the single unit

23:44dwelling and construction of 29

23:46single unit dwellings with

23:48deviations to setbacks, lot

23:49size, lot depth, lot width and

23:52lot coverage standards, as well

23:53as a tree permit for the

23:55removal of one private

23:56protected tree. This project is

24:00subject to the Housing

24:01Accountability Act, which

24:02provides limitations for how

24:03local jurisdictions can act

24:05upon projects inconsistent with

24:07objective general plan, zoning,

24:09subdivision and design criteria,

24:11inconsistencies that are not

24:12identified and notified to

24:13applicants within timelines

24:15established by the Housing

24:16Accountability Act are deemed

24:18consistent. This project

24:20proposes nonstandard street

24:21section parcels with no street

24:23frontage and exceeds both

24:24control standards. But since

24:25those inconsistencies were not

24:28identified to the applicant in

24:29accordance to the Ha, the

24:31project is deemed consistent

24:32with these three standards. The

24:35project site is proposed to be

24:37subdivided into 29 parcels and

24:39includes street improvements of

24:41Jacinto Road and Arden's Way,

24:43an easement for a 20 foot wide

24:44private street provides access

24:46to parcels one through 12 and

24:4718 through 29, parcels 11

24:50through 13 directly front onto

24:52Arden Way, which will

24:53eventually connect to runway to

24:56the north. Construction of 29

25:00single unit dwellings is

25:02included in this project. The

25:03proposed homes include a

25:05combination of single and two

25:06story homes and single and two

25:07car garage configurations. The

25:10elevations offer a variety of

25:12contemporary and modern design

25:13elements, which staff finds

25:14consistent with applicable

25:15design guidelines. The project

25:17is requesting deviations to

25:19minimum lot size, depth and

25:20width standards, maximum lot

25:22coverage, and front street side

25:24and rear yard setback standards.

25:27These standards were identified

25:28as inconsistent, and staff

25:30notified the applicant within

25:32the timeline established by the

25:33Ha staff is supportive of these

25:36deviations. While the proposed

25:38setbacks and lot coverage

25:39reduces the individual open

25:40space for each home, the site's

25:42proximity to Jacinto Creek Park

25:44and Shasta Community Park

25:46provides several options for

25:47open space within walking and

25:49biking distance. The 2040

25:51General Plan identifies

25:52policies promoting a compact

25:54urban footprint and infill

25:56development in proximity to

25:57transit options. Staff

26:02recommends approving the motion

26:03to approve the requested

26:05entitlements. Draft facts of

26:07finding and conditions of

26:08approval can be found in the

26:09staff report starting on page

26:1119. Notice of the project site

26:13was mailed to property owners

26:14and residents within 500ft.

26:17Staff received one letter of

26:18opposition which can be found

26:19on attachment seven of the

26:21staff report. This concludes

26:23staff's presentation staff's

26:26available to answer any

26:27questions, and the applicant

26:29would like to give a brief

26:30presentation as well. Thank you.

26:35>> The Commission the applicant

26:37have a presentation. Yeah. Mr.

26:40chair, we do have a

26:42presentation.

26:42>> But I think we'll forego it.

26:44I think from our perspective,

26:46it's not without a degree of

26:48disappointment that, in fact,

26:49we have to be before this body.

26:51You know, you have an applicant

26:52in this case, next generation

26:55capital, which is probably the

26:56most active single family

27:00detached home builder in the

27:01city of Sacramento, who is

27:03specialized in finds in finding

27:05underutilized sites to propose

27:07projects, much like the

27:08Trecento project. It's not the

27:10first one we've done of this

27:12nature. I think fundamentally

27:14it comes down to a couple of

27:18things. I think. I think right

27:20now we're in a period of

27:21transition relative to the new

27:23zoning code, the number of

27:25deviations, you know, was an

27:27issue at the design director

27:29level. Certainly we need to

27:33maintain, I think, flexibility

27:34for projects. And there isn't a

27:36standard out there for the

27:37minimum number of deviations

27:38that are requested. And then

27:40certainly the Street standard

27:43discussion has been a source of

27:46much. A lot of gnashing of

27:48teeth will say, fortunately, in

27:50our case, the street section

27:53issue was addressed in the SB

27:56330 pre-application finding. I

27:58think what you'll notice from

28:00the the director level hearing

28:02transcript is a lot of

28:04struggling to get around the

28:06fact that SB 330 precluded

28:09consideration of the Street

28:10cross section to deny the

28:13project, which was very

28:15frustrating for us, but also

28:17set a bad precedent, I think,

28:19and especially for next

28:20generation capital, being

28:22active as they are, in fact,

28:23has dropped purchase options

28:25for two properties immediately

28:27adjacent to a trecento, and

28:29those lands have been vacant

28:30for a long time. And if someone

28:32like Next gen doesn't develop

28:34those properties, they're going

28:35to be vacant for a long, long

28:37time. And it's really

28:38attributable to this street

28:39section question. And it really

28:40comes down to maintaining

28:42flexibility. What I would

28:43encourage this body is

28:44obviously to support and grant

28:45our appeal, but also engage in

28:48a robust discussion about the

28:50number of deviations that are

28:52acceptable. And more

28:54importantly, the street section

28:55question the the code provides

28:59the opportunity to provide

29:00private streets and private

29:02drives. That necessarily means

29:03they don't meet the private I

29:05mean, the public roadway

29:07standard. We can't do that. We

29:08need to maintain flexibility to

29:10address site specific

29:12constraints and needs for

29:13projects. So with that, our

29:14design team is here, as well as

29:17representative from Next Gen

29:18capital. Happy to answer any

29:19questions, but thank you for

29:20your time today.

29:22>> Thank you. Thank you very

29:23much for your presentation. Are

29:25there any questions of staff or

29:26the applicant from

29:29commissioners? Okay. Seeing

29:35none, are there any members of

29:37the public that would wish to

29:39speak on this item?

29:40>> Thank you. Chair. I have no

29:41speakers for this item.

29:42>> All right. Thank you. With

29:45that, then, seeing no further

29:47public comment, I'll close the

29:48public hearing. Are there any

29:49commissioners who wish to speak

29:50on this item? Commissioner Abel?

29:58>> Chair chase, do you can

29:59would you mind if I ask some

30:02questions of staff real quick?

30:03>> No, not at all.

30:04>> Can we can you discuss why

30:07this is in front of us? The.

30:11The tentative map was approved,

30:12but it wasn't approved at the

30:15design director level. Can we

30:17talk about that inconsistency

30:19or why that why that happened

30:21and why we're here with staff

30:24recommendation.

30:25>> As you mentioned, the

30:27tentative map was approved at

30:28director hearing. What was

30:30denied at the hearing was the

30:32site plan and design review

30:33entitlement. And so the appeal

30:36in front of us today is the

30:38appeal of the denial for site

30:40plan and design review.

30:44>> Is, is there is there is

30:46there actually a tentative map

30:47right now? Are we're approving

30:49the tentative map or is it

30:51already been approved?

30:54>> May I?

30:56>> Yeah.

30:56>> You'll you'll look at the

30:58whole project, look at the

30:59entire project. So the

31:00tentative map has been approved.

31:01But you're considering the

31:02whole thing. It's out. It's the

31:04project's considered de novo.

31:06So you're looking at all the

31:08entitlements.

31:10>> Okay. Is that does that

31:16happen very frequently? You

31:17know, we don't see projects

31:19very often that are approved at

31:21staff level. Does this kind of

31:24conflict does that happen very

31:25often? Is this something that's

31:26going to. Is that a fair

31:30question?

31:30>> Even if you were about to

31:33finish that sentence, I said, I

31:35hope it's not something that's

31:36going to happen more and more.

31:38But no, it's rare that it

31:39happens. I've been here since

31:402018, and one reason was why is

31:43a lot more things go to

31:44director, whereas before it

31:45went to the Planning Commission.

31:47So that's the Planning Design

31:48Commission. So that's one

31:49reason. But even with that, I

31:50can't think of a situation

31:52where that has happened, where

31:54staff and the director and was

31:56appealed to PDC.

31:58>> Is there some type of

31:59standard for. Is there and

32:03forgive me, this is probably

32:03not a fair question, but is

32:05there a. For private streets,

32:08is there a. I say because we

32:13deal with codes, we deal with

32:14actual laws in here. But is

32:16there like some unstated number

32:19of deviations you can have or

32:22something where you can only do

32:23so much on a private street and

32:27still it be like, why? I don't

32:30understand why this wasn't

32:31approved at the design director

32:32level.

32:35>> So the answer there's no,

32:37Nick was right that there's no

32:40minimum or maximum amount of

32:41deviations that you can request

32:43for on a private street or even

32:45on, even if it was just for

32:47housing, as far as I would say,

32:49though, that when Public Works

32:51reviews the private streets,

32:52that they do look at factors

32:53such as circulation, safety,

32:56and then, as Michael mentioned,

32:57we have solid waste, determine

32:59whether they can still service

33:01the project. Same thing with

33:03utilities. So fire. Yeah. Fire

33:05Smud as far as their easements.

33:06Yeah.

33:07>> But that's not really the

33:08design though is that is that

33:11design, is that the

33:12functionality of it regarding

33:14the design or is it the actual

33:16esthetics of the design.

33:20>> Yeah, I, I guess it's hard

33:23to say whether you'd consider

33:24that design when you, I would,

33:26I would probably just direct

33:27back to the staff report and

33:29how the design director, what,

33:31how they felt, you know, that

33:32it was within their within

33:35their purview. And then the

33:36zoning administrator, how he

33:38just stuck to the, the

33:41tentative map situation and

33:42findings.

33:43>> Thanks. Thank you so much.

33:45>> Thank you Commissioner.

33:49>> Any I don't know if this is

33:52helpful.

33:53>> If this is helpful, but so

33:55there's you had the zoning

33:57administrator and the design

33:59director looking at this

34:00decision, the zoning

34:02administrator, administrator,

34:03and the map, all of the street

34:05standards were associated with

34:07the map. And while potentially

34:10abnormal, the zoning

34:11administrator concluded that

34:13the city could not deny those,

34:15could not deny those based on

34:17the Housing Accountability Act,

34:18because the city did not flag

34:20those ahead of time, and the

34:22zoning administrator found

34:23there's no basis to make those

34:25findings in the Housing

34:26Accountability Act, and staff

34:28concurs. So that's one the

34:31design director found. These

34:33other standards, the deviations

34:35for lot size with setback that

34:40the project did not meet the

34:42standards for granting those

34:45deviations. Those standards do

34:48not have the same protection in

34:50the Housing Accountability Act,

34:52because under those, you get

34:54that protection under the

34:55Housing Accountability Act, if

34:56your project complies with all

34:58objective standards. So this

35:00project does not comply with

35:01those standards, right? That's

35:03why the requesting deviations

35:04and the staff notified them

35:07ahead of time. So there's no

35:09housing ability Housing

35:11Accountability Act constraint

35:12on the site plan and design

35:15review piece of that. That said,

35:17staff has included findings in

35:21the staff report. They believe

35:22you can that there's a basis

35:25for granting those deviations.

35:26The design director felt

35:28differently, but there's

35:31information in your staff

35:32report.

35:35>> Thank you. Thank you, vice

35:36chair. Can.

35:39>> Yeah thank you chair. And I

35:42have a little bit to say on

35:44this. So so bear with me. I

35:46think first of all, you know, I

35:48think the project should be

35:50approved tonight. So I'll

35:51gladly just put a motion on the

35:52table early just to approve the

35:54staff recommendation. You know,

35:55this this is a good project.

35:57You know, we're I don't I don't

35:59know really why it's so

36:02controversial. I think we're

36:03creating 29 fairly modest sized

36:06homes on a mostly vacant lot,

36:07you know, creating

36:09opportunities for homeownership

36:10for families. I know a lot of

36:12the conversations that we've

36:13had on the missing middle

36:14ordinance have been, you know,

36:16maybe a little bit. Obviously

36:18it includes more than this, but

36:19like, the conversation was more

36:20focused, I think, on the like

36:22rental attached products side

36:23of things. But I think this is

36:25still a really important

36:27product to continue building.

36:28And, you know, we're in a

36:31fairly difficult economic

36:32environment for, for building

36:33housing right now. This is what

36:35pencils for this type of site

36:36in this part of the city. So

36:39seems seems pretty clearly in

36:40line to me with, with the

36:42general plan policies as, as

36:44staff has sort of corroborated

36:45in the staff report and just

36:47generally what we're trying to

36:48do as a city on housing, I want

36:51to just, you know, set that

36:53aside for a second. And

36:55actually it was set up well by

36:56by, you know, the speaker to

37:00sort of, I think, have more of

37:02a bigger conversation and just

37:04kind of reflect on generally

37:06the experience of this project

37:07and the kind of the larger

37:08scheme of, of, you know, the

37:10zoning code update that we're

37:11doing. And, you know, to be

37:14honest, I'm a little bit

37:15alarmed at, at the process that

37:17this project went through to,

37:19to get here. It is it is very

37:21unusual, you know, for a small

37:23lot subdivision of this size,

37:25right? I don't think it should

37:27be taking a, a year of back and

37:29forth with staff to get to a

37:31place of agreement and a staff

37:34recommendation, you know, of

37:36approval only to be denied at

37:38the director's level hearing,

37:39to then have to appeal up to

37:41this body and then still get a

37:42staff recommendation for

37:44approval. It's it's very

37:45unusual. And I think I'm, I'm

37:46pretty sympathetic to, you know,

37:49some of the concerns that the

37:51applicant raised in, in the in

37:52the letter about not getting,

37:57let's call it consistent

37:59guidance about what would be

38:00necessary to actually get an

38:02approval and whether or not

38:03these these objections that I

38:06think were raised at that

38:07director level hearing could

38:08have been identified in that

38:10last year and resolved much,

38:12much earlier. So I just think

38:15that's it's not a it's not a

38:17great look to be. So I think

38:19fragmented as a city. And I

38:21think it erodes the trust that

38:22people who want to do business

38:24here have in the feedback that

38:26they're getting from city staff,

38:27because they're getting

38:29conflicting feedback and

38:30judgments from different people.

38:31And they don't know, you know,

38:33whether or not the feedback

38:34that they're getting is

38:35representative of the person

38:36that they're talking to. Is it

38:37the department? Is it the city

38:39as a whole? Is it what's going

38:41to be, you know, talked about

38:42in the director level hearing?

38:43Right. I just think we want to

38:45be creating like a much more.

38:48Well, creating a regulatory

38:50environment, but also like a, a

38:51review process. That's, that's

38:53predictable that, that lays out

38:55the objective standards up

38:56front. You know, when you're

38:57talking about deviations, which

38:59we are here to those rules,

39:00there are clear policies and

39:02clear, I think, interpretations

39:03of the policies for how you're

39:05actually going to be evaluating

39:06those deviations. I think that

39:07that was missing here. And so I

39:09think we just need to do a

39:11better job than we did on this

39:13project to, to kind of reach

39:14that so that we can just be a

39:16good place to do business and,

39:18and to invest in and to build

39:20the needed housing that that we

39:21desperately, desperately need

39:22here. So, you know, I think I

39:26recognize that some of the

39:28friction that was happening

39:29with this project is partly

39:32because of this, this weird

39:33kind of like timing window that

39:35we're in this pocket of time

39:36where it's like, we have a new

39:38general plan, we're updating

39:39the zoning code, but the zoning

39:41code is not updated yet. And so

39:43we have these deviations, many

39:44of which would actually be

39:46consistent with the new zoning

39:47code if it was in place, if

39:49this were next year, but

39:51they're not in place yet with

39:52the new code, I think. So

39:53that's that's, I think part of

39:55what's happening here. And so I

39:56think there's some

39:57understandable like, you know,

39:58delay in that. I think there's

40:00several standards that were

40:02included or were asked for as

40:04part of this project that I

40:06want to continue to, to, to

40:07explore as we start to continue

40:09to like have this conversation

40:10on the, on the zoning code

40:12ordinance. So first, you know,

40:14I, it was hit on by the

40:15applicant pretty strongly. I

40:16think it, it sounds like there

40:18needs to be a little bit more

40:19of a formal flexibility put in

40:24place on the infill street

40:25design standards. And I think

40:27it was a little bit hard to,

40:28for me at least, to kind of

40:30understand the, the and parse

40:32the back and forth that was

40:33happening between staff and the

40:34developer in this year on the

40:36street with conversation,

40:37because there was, I think,

40:39this request, I guess, that I

40:42was reading for this north

40:44south private drive to be a

40:46wider street. But then there's

40:48also this like big emphasis on

40:50pedestrian connectivity and,

40:51and urban heat island effect.

40:54And I don't know, I mean, more

40:56more pavement wider, you know,

40:57vehicle travel. Those are not,

40:59in my opinion, like a better,

41:01better for pedestrians or

41:03better for urban heat island.

41:04Right. I think we just need to

41:06evaluate the policy outcome

41:07that we want there, you know,

41:09slower vehicle speeds, you know,

41:11pedestrian safety, less asphalt.

41:13These are, you know,

41:14contributing to urban heat

41:15island. These are like the

41:16outcomes we want. And I think

41:18we just need to allow compact

41:19street designs that achieve

41:20those outcomes. Like, I don't

41:21know what 50ft is doing to

41:23achieve those outcomes on a

41:24street width. And then, I mean,

41:27obviously very relevant to the

41:28applicant. Like more

41:29importantly, the wider street

41:30width is going to crowd out the

41:31housing, right? And you might

41:33not actually be able to have

41:34housing on either side of the

41:36street. And I think that's like

41:37kind of the point of the

41:39project here, right? So I don't

41:40think we, we necessarily want

41:41to do that either. So I'm just

41:43like, I'll say I'm totally

41:45comfortable with, you know,

41:46these small lot subdivisions

41:47like this, having these much

41:49more narrow private streets and

41:52would support formalizing, I

41:54think that flexibility into the

41:55code to like make it very clear

41:57when you have small parcels

41:59like this and maybe there's a

42:00threshold, I don't know, maybe

42:01it's a smaller parcel, like a

42:03five acre size or I don't know,

42:05something like that or

42:07dimensions, maybe it's skinnier

42:08parcels, but to have some

42:10flexibility on like you don't

42:10need to do 50ft wide on, on

42:12these really skinny small

42:13parcels, you can have these

42:14narrower streets and it's okay.

42:18The other thing on the

42:19standards I want to continue to

42:20touch on is the setbacks. You

42:22know, we talked a lot about

42:23this in in the missing middle

42:25stuff. So 20 foot front

42:26setbacks for a project like

42:27this to me is really

42:29unnecessary. That's really

42:31quite, quite large. There's

42:33only so much feet of width on a

42:36parcel like this. So if you're,

42:38if we're asking for as a city,

42:3950ft of street and then 20ft of

42:41setbacks on either side, and

42:43we're trying to do a project

42:44like this, you know, that's

42:4690ft, you know, that like

42:48that's more than half of the

42:49parcel in this case, and

42:51probably much more so in other

42:53parcels. So I think that that

42:56really starts to really crowd

42:57out the point of the whole idea

42:59here, which is, which is

43:01housing. I had a chance to, to

43:04see the Cotton Lane project

43:05that this applicant has, has

43:07done that was similar to this.

43:09That's a project that had four

43:10foot front setbacks. It was

43:13totally fine. You know, I, I'd

43:15like to see more projects that

43:16that kind of facilitate that

43:18sort of front setback, you know,

43:20not not pushing as a city to

43:22get to that 20 and be more

43:24flexible to get to that. Four

43:25because again, it's like the

43:26point is like more homes, it's

43:28not more more driveways, right?

43:30I'd also want to continue to

43:32ask for more flexibility on the

43:34street side yard setback. So we,

43:35we talked about this again in

43:37the missing middle. We, we had

43:38the 12.5ft. And then, you know,

43:40the reasoning for why we need

43:42the 12.5ft is like, well, the,

43:43you know, Smud and the

43:45utilities, they, they need that.

43:46That's a requirement. Well, we

43:47have an applicant that worked

43:48with Smud. They got a slightly,

43:50you know, lower setback on that.

43:51Clearly there's some

43:52flexibility there. I'd like for

43:54us in our code to have similar

43:55levels of flexibility. And then

43:57the rear yard setback. It

43:59sounds like the current

43:59standard is 15. If the lot is

44:01over 60ft deep. I think some

44:06flexibility there might make

44:07sense. I think especially in

44:08situations like this where, you

44:10know, the the lot, you know,

44:12because of the subdivision, you

44:13know, there's not a public

44:14street. So the the lot starts

44:16at the center line of the of

44:18the private drive. And so it's

44:19like, yeah, it's, it's quite

44:20long when you think about it

44:22like that. But, you know, maybe,

44:23maybe some, I don't know, we've

44:25seen ten foot rear setbacks and

44:27it's been totally okay. And,

44:28you know, I think there's a

44:29revealed preference in this

44:30city for people who are

44:32prioritizing affordability over,

44:33you know, having a much larger

44:35backyard. And then, okay, I

44:38also just want to voice, I

44:39think my just general concern

44:41about what feels to me a little

44:43bit like a, a fairly subjective

44:45denial that happened at the

44:46director hearing based on a

44:50interpretation of the general

44:51plan that clearly runs counter

44:52to the current staff

44:54recommendation and the

44:55interpretation of the general

44:56plan that you have in this

44:58recommendation. And this was a

45:00concern, I think, that I you

45:01know, I've been consistent on

45:03I've brought up as we went

45:04through the missing middle

45:06process, where we decided

45:07through that process, instead

45:10of using our, our existing buy

45:12right process, our, you know,

45:13our ministerial processes, any

45:16project that goes through

45:17missing middle, that goes

45:18through site plan design review.

45:20And that means that the moment

45:21that you need a single

45:24deviation, it goes to director

45:26where it can be denied because

45:27of interpretation of the

45:28general plan that runs counter

45:29to staff. That's the that's the

45:32experience of this project,

45:33right? So let's just say, right,

45:35like you have a missing middle

45:36project and, you know, it's

45:38wealthy neighborhood, you have

45:3920 foot setbacks on either side.

45:41You want to go to 15, you're

45:43suddenly kicked up to, to

45:44director level. And I just

45:47think we need like really clear

45:48criteria for evaluating that

45:50deviation. And I think like

45:52avoiding this situation where

45:53we're like reopening questions

45:55that that probably were settled

45:57before that hearing through the,

45:58the back and forth with staff.

46:01And actually, as I understand

46:02it, missing middle projects

46:03that that are totally compliant,

46:05that don't have a deviation

46:06through a reconsideration

46:07process can also get kicked up

46:10to director. So I just worry a

46:11little bit about how subjective

46:14that all feels when, you know,

46:16I know the intent was to kind

46:18of keep the process quasi by

46:19right and just kind of ensure

46:20that there's this opportunity

46:22for staff to like work back and

46:24forth, you know, with the

46:27developer on some of these

46:28design principles, it clearly

46:29feels like there's something

46:31beyond that happening here. And

46:34so, you know, I think that's,

46:37that's all fine again, but I

46:38just, I just, I think that we

46:40need to kind of be a little bit

46:42more clear about what the

46:43expectations are there. And I

46:45think long term, I'd love for

46:46us to just, again, reconsider

46:48what our approval path is for

46:50some of these missing middle

46:51projects and projects like this,

46:52so that there's a lot more

46:54clarity for like, exactly what

46:55the approval path is, what the

46:57expectations are, what do you

46:59need to actually get approved

47:00and create some of that, that,

47:02you know, reduce the

47:03uncertainty and create that

47:04predictability. So I know I've

47:05been talking a bunch, but I

47:07appreciate you hearing me. And

47:08then I'll, again, I'm making a

47:10motion to, to move the staff

47:12recommendation.

47:14>> Thank you, Vice Chair. As

47:15always, I know I appreciate

47:17your input and your comments.

47:19Very thorough. Commissioner

47:22Snell.

47:23>> I'll keep it kind of short.

47:25I like this project. I like

47:26that it gets people into homes

47:29and reasonably affordable way.

47:32I have to agree that I, I don't

47:35like the sort of administrative.

47:39I think staff did a great job

47:40on their report and their

47:43evaluation and their assessment

47:44of this project. I just I'm

47:46really uncomfortable with the

47:48how many hoops the applicant

47:50had to jump through to make

47:51this happen when we were trying

47:53to get houses built and get

47:55people in homes. So it just it

47:58did not it, it did feel

48:00subjective on on reading

48:01through the report, I had a

48:04very hard time parsing out on

48:06that denial, sort of what was,

48:09what was an objective piece of

48:12that denial. So anyway, that's

48:14what I've got.

48:15>> Thank you Commissioner,

48:17Commissioner.

48:23>> I just wanted to support

48:25everything. Vice Chair Caden

48:26said. I was going to say maybe

48:2930% of that. So I was going to

48:32say everything you said. You

48:33beat me to it like maybe 30%,

48:35but you had like way more than

48:37I. I feel that very well said.

48:40And I hope that we can maybe

48:44institute that going forward.

48:47Those, those guidelines. I

48:48thought they were really good

48:49guidelines to for future

48:50consideration. So thank you.

48:51Thank you so much for the

48:53thoughtfulness on that.

48:54>> Thank you. Commissioner. Any

48:56other comments before I toss

48:58mine out there? I want to, I

49:01think, essentially echo the

49:03comments of Vice Chair Caden. I

49:07think it's an excellent project,

49:08a great infill project, I think.

49:12And with all due respect to

49:14director Monahan, who I've

49:16known for many, many years and

49:18I respect thoroughly as an

49:19architect, I think there's an

49:21issue in there. You go back to

49:22some of the process things and

49:24perhaps council can can speak

49:25to this. When I was building

49:27official here at the city, when

49:29building codes came out, they

49:30changed. Every three years a

49:31new code comes out. It's

49:33printed on, I think, January

49:361st, available for the public

49:38review July 1st, and then it

49:41takes effect the following

49:42January. Within that window,

49:43between July and January,

49:46applicants have the option of

49:47either using the current code

49:49or the incoming code, knowing

49:50that that code is going to be,

49:52you know, in place. I think the

49:54same thing kind of applies here.

49:55I think some of the comments

49:57that Director Monahan made, yes,

50:00based on perhaps things that

50:01are in the current code might

50:04not be allowed. But I think if

50:05we had the option of looking at

50:07knowing full well that that new

50:10new ordinances are going to be

50:12coming down the pike very, very

50:13soon, we should be able to, I

50:15think, to allow them, if they

50:16benefit the project, to to go

50:18through. After this discussion,

50:20I went back to check on some

50:22projects that I. I lived in a

50:24project called Metro Square

50:26many, many years ago, one of

50:27the first infill projects in

50:29Midtown. Extremely narrow

50:31driveways through there.

50:32Somehow I made it, you know, I

50:34survived it. It's a great

50:36project, really a great infill.

50:37And I would hate to have seen

50:39that compromised or sacrificed

50:40because of the driveway widths.

50:43Another project one block down

50:45the street. I forget the name

50:46of it. Mogavero did again, very

50:49narrow driveways going through

50:50there. They're really only wide

50:52enough for one way traffic, but

50:53they're not signed for one way.

50:55So technically somebody could

50:56be coming both ways. They won't

50:58fit. But I think given the fact

51:01that the streets are going to

51:05have no parking on the sides,

51:06they're going to be 20 foot

51:08pavement width, which is what

51:09the fire department and the

51:10trash department would require.

51:11So it's going to satisfy that.

51:13I live in an area in Woodlake

51:14where the streets are below

51:16standard. They'll never be

51:17changed, but parking is allowed

51:18on both sides of the street.

51:20Draft trash trucks often cannot

51:21get down the street. They have

51:22to turn around and come back

51:24and back down from the other

51:25street to pick up people's

51:27trash. So that's not going to

51:28be an issue on this project

51:30here at Metro Square. Some of

51:31the other projects did not have

51:33any pedestrian capability

51:36throughout the project. This

51:38does have a four foot walkway,

51:39concrete walkway, parallel

51:42granite as part of the 20 foot.

51:43That's fine. It's not going to

51:44be a busy thoroughfare. So

51:47given all that, I think it's

51:48actually an excellent project

51:50and a great infill project, I

51:52would not want to see it

51:53sacrificed because of some, you

51:54know, deviations that perhaps,

51:56you know, legally, perhaps

51:58can't be met. We need the

52:00flexibility, I think, to, you

52:01know, to, to move beyond those.

52:03So I know it's been the motion

52:05has been made and seconded, but

52:06I'll third the motion. So any

52:10other comments. Commissioner

52:14Snell.

52:15>> I'll second.

52:17>> I think it was already was.

52:18Second, we have a motion and a

52:21second. Claire, can you take a

52:22vote?

52:24>> Thank you. Chair.

52:25Commissioners, please unmute.

52:26Commissioner Lee, high

52:28Commissioner to High

52:30Commissioner Snell, High

52:31Commissioner Nebo, Vice Chair

52:34Kaden.

52:34>> I.

52:35>> Commissioner Gore. High

52:37Commissioner Ortiz is absent,

52:38Commissioner absent. And chair

52:40Chase. I thank you. The motion

52:42passes.

52:43>> Thank you everyone. Let's

52:47build more housing. Okay. Let's

52:52see. Come on. Next item on the

53:00agenda is Commissioner comments,

53:01ideas and questions. Anybody

53:04have any. Besides changing some

53:09of the conditions that we work

53:10under. Seeing no Commissioner

53:15comments. Are there any public

53:16comments for matters not on the

53:18agenda. Doesn't look like it.

53:19>> Thank you chair. I have no

53:21speakers for this item.

53:22>> Sorry, I didn't mean to jump

53:24ahead of you. Given that this

53:26concludes all the items on