  • Proclamation: November 2026 was proclaimed National Family Caregivers Month.
  • Joint meeting with the Airport Board, aircraft rescue and fire fighting (ARFF): the airport temporarily fell short on its ARFF index because of aging trucks, borrowed trucks including one from Palmer, and is back at full strength with new trucks; replacement planning shifts toward passenger facility charge funding (Airport Capital Reserve Appropriations).
  • Hertz building: Hertz has vacated; the discussion leaned toward selling the aging building and leasing the land, with the disposition of proceeds left to the Assembly.
  • Airline leases: the Alaska Airlines operating agreement dates from 2002 and Delta has been month-to-month since 2019; renegotiation will update the airport financial model.
  • FY26 review: investment earnings came in at about $10 million against a $6.7 million budget; personnel lapse was about $3.7 million; fleet replacement spending ran about 46% under its $13 million budget; the projected FY27 ending fund balance rose from $3.3 million to $12.1 million; the restricted budget reserve is about $17.6 million against a $24 million target.
  • Budget retreat prep: staff previewed asks for the November 21 retreat, and members requested historical data and projections versus actuals.
  • Telephone Hill RFQ: as drafted it seeks up to 155 units and weights experience and qualifications at 70 points against 30 for project vision; members pressed for room for partial-site and infill proposals (Telephone Hill Redevelopment).
  • GLOF Strike Team update 2 (informational): CBJ funds spent on glacial flood response are about $14 million, and staff estimated about $630,000 a year in new ongoing operating cost (Glacial Lake Outburst Flood Response).
  • Coast Guard housing: the resolution formalizing a partnership with Tlingit and Haida and the Regional Housing Authority on a Klawock Creek subdivision was forwarded to the full Assembly.
  • Resolution 4043 (more engagement in boards and committees) was forwarded to the full Assembly. The next Committee of the Whole is November 30, 2026.

Built from the posted agenda and the video captions; minutes are not yet posted. Auto-caption wording and figures may contain errors.

Agenda

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:00We will bring the Assembly Committee of

00:01Whole to order for November November

00:032nd, 2026.

00:06Um

00:07Ms. Akersin, would you say the land

00:09acknowledgement, please?

00:10>> Thank you, Madam Mayor. We would like to

00:12acknowledge that the City and Borough of

00:13Juneau is on Tlingit land and wish to

00:15honor the indigenous people of this

00:16land. For more than 10,000 years, Alaska

00:18Native people have been and continue to

00:20be integral to the well-being of our

00:22community. We are grateful to be in this

00:23place, a part of this community, and to

00:25honor the culture, traditions, and

00:27resilient Tlingit people. Gunalchéesh.

00:31>> Thank you, Ms. Akersin. Uh Madam Clerk,

00:33will you call roll of the Assembly and

00:36then roll of the Airport Board?

00:38>> Thank you, Madam Mayor.

00:39Deputy Mayor Smith?

00:41>> Here.

00:43>> Mr. Kelly?

00:45>> Here.

00:47>> Ms. Akersin?

00:48>> Here.

00:49>> Mr. Steininger?

00:51>> Here.

00:51>> Ms. Hall?

00:52>> Here.

00:53>> Mr. Brooks?

00:55>> Here.

00:56>> Ms. Cosgrove?

00:57>> Here.

00:58>> Ms. Neven?

00:59>> Here.

01:01>> Madam Mayor?

01:02>> Here.

01:07>> Ms. Sutiye?

01:08>> Here.

01:09>> Mr. Epstein?

01:11>> Here.

01:13>> Ms. Roddel?

01:20Ms. Roddel?

01:27Mr. Williams?

01:30>> Here.

01:31>> Mr. Nusel?

01:33>> Here.

01:34>> Mr. Kessler?

01:35>> Here.

01:36>> Mr. Gotkin?

01:38>> Present.

01:41>> And I am looking one more time for Ms.

01:43Roddel.

01:47We have Ms. Roddel in attendance. I'm

01:48just going to bring her over. We have

01:50quorum for both boards.

01:53>> Thank you, Madam Clerk. Um seeing no

01:55changes to the agenda, we will consider

01:57the agenda approved.

02:00Um approval of minutes, Mr. Kelly.

02:09>> I move that we approve the minutes for

02:12the September 21st, 2026 Committee of

02:15the Whole. And ask for unanimous

02:17consent.

02:18>> Any objections?

02:20Seeing none, that motion is approved.

02:23Next, we will go to our agenda topics

02:24and we'll start with the joint meeting

02:26with the Juno International Airport

02:28Board. And we'll start forward with

02:30introductions, so um

02:34Do you want to start?

02:36Let me introduce you to him.

02:37>> My name is Eva Soutiere, or E. Soutiere.

02:40>> Madam Mayor.

02:40>> Sorry. Sorry. Apologize.

02:45We have a special order.

02:47>> [laughter]

02:49>> Ms. Hall.

02:52>> Thank you, and I would like to invite

02:53Linda Krueger from

02:55the Juno chapter of AARP up for this.

02:59Can I get you to hold this?

03:00>> Absolutely.

03:01>> Okay.

03:02We have a proclamation for National

03:04Family Caregiver Month, which is

03:06November 2026.

03:08Whereas the City and Borough of Juno

03:10recognizes the many family caregivers

03:13across our community who are helping

03:15older parents, spouses, and other loved

03:18ones live independently in their homes

03:20and in their communities.

03:22And whereas millions of Americans,

03:24including countless individuals and

03:26families in our community,

03:29provide unpaid care and assistance to

03:31loved ones each year, giving significant

03:34significant time, effort, and personal

03:37resources to meet their needs. And

03:39whereas the contributions of family

03:41caregivers help sustain families,

03:44strengthen our communities, and

03:46alleviate demands on the long-term care

03:48system, providing substantial benefits

03:51to our state and its taxpayers. And

03:54whereas caregiving responsibilities

03:57often place significant financial,

03:59emotional, and physical demands on

04:02individuals who may assist loved ones

04:05with daily activities, medication

04:07management, transportation, and medical

04:10tasks, frequently with little or no

04:12formal training.

04:14And whereas many family caregivers incur

04:17out of substantial out-of-pocket

04:19expenses to meet their loved ones'

04:21needs, while others must reduce their

04:23work hours or leave the workforce

04:25entirely to provide care.

04:28And whereas family caregivers deserve

04:30our gratitude, recognition, and support

04:33that help ease the financial and

04:35personal burdens of caregiving.

04:38And whereas caregiving touches families

04:40throughout our community, whether

04:42through providing care, supporting a

04:44caregiver, or relying on a caregiver

04:47ourselves in the future.

04:49Now, therefore, I, on behalf of Mayor

04:52Beth Weldon, Mayor of the City and

04:55Borough of Juneau, on behalf of the City

04:57and Borough Juneau Assembly, do hereby

05:00proclaim November 2026

05:02as National Caregiver Family Caregivers

05:05Month.

05:07And um with that, I will ask uh

05:10>> I got it. Yeah. Yeah, thank you so much.

05:12I'm pleased to accept this um

05:14proclamation on behalf of Juneau AARP

05:17um Community Action Team and the Juneau

05:19Commission on Aging um and caregivers

05:22across the city. Um caregivers in Juneau

05:25are caring for parents, spouses,

05:27partners, special needs children, and

05:29grandchildren. Um thank you again. Um

05:33thank you for Miss Hall. That was quite

05:35a proclamation to be read, and this was

05:37practice. She'll read it again Wednesday

05:39morning to open our um AARP Caregivers

05:43Partners Summit and Resource Fair at

05:46Centennial Hall. And so anyone who's

05:48interested will be down there all day

05:50with a number of different speakers and

05:51caregivers from across sent caregivers

05:54and and seniors from across this the

05:56city, the community.

05:58Um uh I'd like to Well, I have the

06:00floor, I'd also like to take a minute to

06:02thank Mr. Kelly and um and Miss Hall for

06:05their leadership as assembly liaisons to

06:08the community the committee on aging.

06:10They were wonderful participants in our

06:12meetings and also Mr. Brooks for

06:14attending some of our commission

06:16meetings and Ms. Niven for coming to an

06:19AARP meeting. So they've shown an

06:21interest in seniors in our community and

06:24we really appreciate that a lot.

06:26We we look forward to working with the

06:27assembly on topics of interest and

06:29concern to Juno's older residents

06:32especially housing, transportation, and

06:34recreation. And so I thank you again for

06:36serving Juno and thinking of seniors and

06:38especially caregivers this month. Thanks

06:41so much.

06:46Thanks

06:47and and I will be seeing you on

06:48Wednesday.

06:50Thank you.

06:53>> Make her do the gauntlet.

06:54>> Oh, no.

06:57>> We won't make her do the gauntlet.

06:59Thank you for that and

07:01remember uh

07:03your keynote speaker I believe is at

07:041:30 or 1:00.

07:08Yeah, so

07:09good speaker.

07:11Yep, Claire Richardson good speaker. So

07:13if you have an opportunity to go down

07:14and say hello or just visit them anytime

07:16during the day.

07:18So thank you. We'll get back to our

07:19agenda. So we'll start with

07:21introductions and what we're looking for

07:22is just your name and how long you've

07:24been on what either body. So Chair

07:28Sutiye.

07:29>> Um Eve Sutiye, I've the airport board

07:32and chair and I've been on for oh gosh

07:35like 5 years or something.

07:37>> Here, and we'll just go down.

07:41>> I'm David Epstein. I served a full three

07:44terms plus on the airport board in the

07:482010s and uh

07:52was brought up out of

07:53retirement by Mayor Weldon last year and

07:57glad to be back on the board.

07:59>> We're glad to have you. Ms. Hall.

08:02>> Assembly member Hall and I'm in my third

08:05year of my first term.

08:09>> I'm Michael Musel, uh brand new to the

08:11airport board this summer.

08:13Just started and uh

08:15glad to be on it.

08:19>> I'm Nano Brooks. I'm an assembly member

08:21in my second year of my first term.

08:26>> I'm Charlie Williams and I'm either in

08:28my third or fourth year on the airport

08:30board.

08:33>> Neil Steininger on the Juno Assembly and

08:36I just started year three

08:38of my first term.

08:41>> Jerry Godkin, I've done

08:45one th-

08:46uh nine years, so nine years on the

08:48first term, then I had to take a year

08:50off, back

08:52again

08:54and then I timed out

08:57or I went off after two years and then I

08:59was asked by the assembly with some

09:01vacancies if I would consider returning

09:04and I have.

09:06I thank for

09:08inviting me back.

09:10Nice to feel welcome.

09:13>> Assembly member Cosgrove and I am one

09:17week in.

09:18>> [laughter]

09:19>> And already chaired a meeting.

09:21>> Oh.

09:23>> I'm Jordan Kessler on the airport board

09:25and I'm four months into my first term.

09:29>> I'm Mila Attwoodson on the assembly and

09:31I'm starting my fourth year.

09:33>> Thank you. Uh Mr. Kelly?

09:36>> Paul Kelly, I am just starting my second

09:39week of my second term.

09:41And I also want to take the opportunity

09:43to thank the airport board members

09:44who've come back out of retirement.

09:46Thank you for your service.

09:48>> Yep. Mr. Smith?

09:51>> Thank you. Greg Smith in my eighth year

09:53of the assembly.

09:56>> Thank you.

09:57Uh Ms. Roddell?

10:02>> Uh this is Angela Roddell and I was on

10:05the airport board for six years

10:08and then reappointed

10:12um

10:12last year to another 3-year term.

10:16>> Thank you, Ms. Niven.

10:20>> Joyce Niven on the assembly for 1 week.

10:24>> [laughter]

10:26>> You haven't quite shared yet. Mila's

10:27ahead of you. Or excuse me, Ms.

10:29Cosgrove's ahead of me. Um so I'm Beth

10:31Whelan if you don't know it and I'm on

10:32my third year, my third term.

10:35>> [laughter]

10:36>> Um so with that, we will go to

10:39uh item B.

10:41Madam Chair.

10:43>> Okay. Um

10:44item B is the aircraft rescue and

10:45firefighting uh replacement planning.

10:48>> Uh

10:48let's turn the microphone on, okay.

10:50And um I'll probably be leaning on Mr.

10:52Delgado pretty heavily on this, but as

10:55you may know, um we uh needed to upgrade

10:59badly.

11:00We uh lost our index for a short period

11:03of time. The reason the public didn't

11:05see it was because the heroic efforts of

11:07Mr. Delgado and his staff to um

11:11uh coordinate with Alaska Airlines to

11:13ensure that those planes could come in.

11:17I think you got this 737-700s

11:20in. Was that right instead of the 8 and

11:22900s?

11:23>> That is correct. Yes.

11:25>> Um so what we're hoping to do is plan

11:29for future replacements so we don't end

11:31up in this situation again.

11:34Um

11:35our our trucks are essentially timing

11:38out. They they get so expensive that we

11:40cannot maintain them. You can't find

11:42parts for them, etc. Um Mr. Delgado can

11:45speak a little bit more on this, but um

11:48just getting what we did for for

11:51lending, um we worked with the state, he

11:54did, worked with the state to get uh a

11:57truck from Gustavus to to maintain

12:00through through the summer and now we're

12:02at full strength. Mr. Delgado, would you

12:04um care to take any questions or explain

12:06any further?

12:07>> Um thank you, Madam Chair. Yes,

12:08absolutely. Um so our trucks as of last

12:12year had uh as Ms. Utsey said uh timed

12:15out. They were older. We just could not

12:16find parts for them. We had a Every time

12:18something went wrong with the truck, it

12:20was a nationwide search. Um

12:22parts ran out eventually. So, um

12:25it got to the point where uh

12:28one of the trucks suffered a

12:28catastrophic uh failure to the

12:30transmission. They don't make that

12:31transmission, so we had to put it out of

12:33service uh permanently.

12:35Um

12:36through a lot of coordination, thank

12:38goodness for uh Chief Bagwell over at

12:41uh CCFR, uh we were able to get a truck

12:44from Palmer

12:46for the low low price of $500 a month or

12:49quarter, and uh the other one through

12:51Gus Davis, and they were very uh

12:54very uh gracious to to lend us that

12:56truck um

12:58while they had no need for it. Uh we

13:00have now gotten a delivery of both

13:03trucks, uh so we are now back at full

13:05strength and anticipate no further

13:07issues for

13:09uh at least 10 years until it's time to

13:11look at replacement trucks again. So,

13:13uh I'll field any questions as well.

13:16>> And I think just to add on to that, just

13:17the um

13:19the fact that we know that we're going

13:20to be looking in 10 years, that's what

13:22we want to talk to the assembly about,

13:24how to get

13:26forward thinking in that funding. So,

13:28when 10 years elapses, we're not in the

13:30same position we were this summer.

13:34>> Does any um

13:36member of the board want to add on to

13:38miss Mr. Godau said before we get to

13:40questions or

13:44Go ahead, Mr. Godkin.

13:47>> Yeah, it was it was alarming to me

13:49coming from the fire service that

13:52we got into that situation.

13:54Um we owe a lot of thanks to

13:58this the city staff for helping us work

14:01through a very uh trying

14:04period. But, what was alarming to me was

14:07uh

14:08we have a new chief now, and all we can

14:10do is look forward, and I have told

14:14or asked

14:15our manager to be more involved with

14:18fire service

14:21to have a better understanding of what

14:24what's happening with this equipment. It

14:26would

14:27I felt blindsided as a board member

14:30and all of a sudden we've got a crisis

14:32and we couldn't get out of that crisis

14:35without a lot of help from

14:38uh downtown and uh the airport staff and

14:42you know, so they had to work through

14:43stuff. So, I have asked our airport

14:47manager to work with

14:50the current fire chief

14:52and maybe Ms. Kester who supervises him

14:55so that we've got a uh

15:00a good

15:01knowledge base of what's happening with

15:03it. I'm I'm alarmed that uh

15:0610 years is the is the number now cuz I

15:08came from an environment where it was 20

15:11years and uh

15:13I would encourage people that uh write

15:16specs that uh

15:18unless they take an exception to an a

15:20spec that uh

15:22they have to provide you know, you try

15:24to build these trucks and they're not

15:26just built with an somebody's

15:29one-time made transmission. I mean,

15:32they're made by Allison. They're made by

15:33people that are reputable and you should

15:37be able to get parts and I think that

15:39should be part of the spec. So, 10 years

15:42really seems like a big thing to chew

15:44off at at what the expense is

15:47for these uh apparatus.

15:50So, uh it's going to be good to be

15:52having this discussion. The unfortunate

15:54thing is we had to buy two in a row. So,

15:57now if you're saying 10 years, it'd be

16:00nice to have had

16:01staggered.

16:04So, that you just don't get this big

16:06boom at at 10 years from now that

16:09everybody's trying to figure out. So, we

16:12need to try to figure out how to to get

16:15some spacing in there if at all possible

16:18so that you can better plan down the

16:21road. So, anyway, thank you.

16:24>> Thank you, Mr. Williams.

16:26>> Well,

16:27the [clears throat] last time we sat

16:28here updating the assembly, um we were

16:30in crisis mode and I think we need to

16:33acknowledge and thank the assembly and

16:35and city staff for um stepping up and

16:38helping us through that. Um without some

16:40emergency funding, we couldn't have uh

16:42responded as well as we needed to and um

16:45we did shorten the

16:47you know, through that efforts, we

16:49shortened the late greatly um

16:51to be able to be able to maintain our

16:54index. So, I I do want to acknowledge

16:56and thank the assembly and the city

16:58for their help.

17:01>> Anything further from the board?

17:03Uh seeing nothing, any questions from

17:04the assembly?

17:09Mrs. Hall.

17:10>> Yeah, thank you. Um is it just two ARFF

17:13vehicles that that the airport needs or

17:16or do you have more?

17:18>> Thank you. Uh we have three ARFF trucks.

17:20Um two of them are brand new. The third

17:22one, which until recently was our newest

17:25one, uh has now been placed in reserve

17:26status. And so, it'll only deploy uh

17:29when absolutely needed. Um

17:33So, yeah.

17:35>> Go ahead.

17:36>> Um Mr. Delgado, can you explain the

17:37situation where it would be needed just

17:39so people understand?

17:41>> Absolutely. So, uh these trucks are

17:44designed and equipped to respond to the

17:47most catastrophic of um scenarios that

17:50we would encounter at the airport, which

17:53hopefully never happens. Um the FAA

17:56requires us to uh keep and maintain and

17:59operate these pieces of equipment um

18:01that are equipped specifically to combat

18:03fuel fires and and uh fires involving

18:05hazmat and large um

18:08quantities of

18:09fuel.

18:10Um

18:12So, um

18:13>> And how many do we need um to be running

18:15at any given time?

18:17>> At a bare minimum, two.

18:19Um however, we do have three because we

18:21cannot rely on anyone else um,

18:23in as quick as quickly as we would one

18:25would hope.

18:29>> All right, seeing Oh, now they all come.

18:32Uh, Mr. Brooks and then Mr. Epstein.

18:35>> Thank you, Madam Mayor.

18:36Uh, and this is kind of to Mr. Godkins

18:38uh, comments earlier. Uh,

18:41knowing how heavy equipment can be,

18:42there is some very reliable and

18:46serviceable heavy equipment. And I know

18:48that the more bells and whistles you put

18:50on something, the

18:51the harder that can be, but

18:53like if the most

18:56indestructible, highest cost ARFF truck

18:59was purchased that has, let's say, a

19:02service life of 50 years, would the FAA

19:04still require it be replaced in 10?

19:09>> It's not so much a requirement to be

19:11replaced in 10 years. Um, that's the

19:13typical life expectancy across um,

19:16other airports, many other airports. Um,

19:1910 years keeps us just below that point

19:21in time where the trucks begin to have

19:23issues.

19:24Um, at some point, and and mind you, the

19:27transmission issue was was just an

19:29example, but um,

19:31the pumps fail frequently, the seals uh,

19:35fail frequently. Um, gears fail

19:37frequently, and those parts are more

19:39hard to come by because it's not as as

19:40common a an item as a transmission would

19:42be. These are specialty items

19:45um, that are more difficult to source.

19:47Um,

19:48once the manufacturers stop

19:50manufacturing a truck and move on to the

19:51next generation, they stop manufacturing

19:53that part. And so, uh, with everyone

19:55else that's running a 2016 truck, um,

19:59they're buying up all the parts as as

20:01fast as they can get them.

20:03Um, and that's that's where we begin to

20:04run into the issues because the trucks

20:05may be reliable for quite a long time,

20:07and then come year 16, we run into that

20:10issue where that part

20:12is no longer available, we can't find

20:13it, and that's when we run into the real

20:15issues.

20:16Um,

20:17the trucks that

20:19we had replaced were well over 30 years

20:22old at this point. So, um we're very

20:24fortunate and very lucky

20:26that the trucks had run for this long,

20:28but we do want to avoid getting into

20:30this kind of situation again.

20:34>> Thank you. All right, Mr. Johnston and

20:35then Mr. Steiner.

20:37>> Thank you, Madam Mayor. Um

20:40Mr. Delgado, we we also got another

20:42piece of equipment that it might

20:44interest the assembly to hear about.

20:46Could you explain that, please?

20:48>> Absolutely. That would be the Marsh

20:50Master, the wetland rescue vehicle. And

20:52this one came about because the FAA

20:54required it. Um for any airport that's

20:57near a body of water, um we are required

21:00to have a water rescue plan.

21:02We are We have a lot of water. We also

21:04have a lot of mud and wetlands. Um

21:08our situation is is a little unique

21:10because these wetlands are very much

21:12tidal. Uh we needed something that could

21:14respond both in the mud and on the

21:16water. And uh I I invite any assembly

21:18member to uh come visit us at the

21:20airport and I'd be more than happy to to

21:22show it to you. It's It's very unique.

21:24It looks very much like a tank, it but

21:26it floats. It'll go on the mud. It'll go

21:29on the ice. It'll wade through just

21:32about any kind of water, so.

21:33Um again, hopefully we never have to use

21:35it, but if we ever do,

21:38I'll be glad that we have it.

21:40>> Mr. Steiner.

21:42>> Um thank you. And I I know there's some

21:44mention uh in the memo about trying to

21:47avoid the use of emergency funding in in

21:5010 years or maybe hopefully 15 or

21:52however long you can make these trucks

21:53last.

21:54Um I know one technique we use for city

21:57fleet is a replacement fund that we pay

21:59into.

22:00Um has there been consideration by the

22:02airport board of establishing a

22:04replacement fund for these trucks so it

22:06doesn't become an emergency funding

22:08request and take some of that, you know,

22:11stress off of that decision in 15, 10,

22:1415 years or whenever these get replaced.

22:16>> Mr. Steiner, you jumped the gun. We were

22:18just going to talk about that.

22:20>> [laughter]

22:21>> I'll send it to the Madam Chair first

22:23and then

22:24>> Um yes, we've we've actually been

22:27discussing that. Um, we've uh

22:30been working out with the finance

22:31committee. Um, Angela um, Rodela is on

22:34from the finance committee as is

22:36uh Mr. Williams. I don't know if they've

22:37been working on it cuz I haven't been

22:38able to go to a finance committee

22:40meeting, but Mr. Delgado, um, I don't

22:42know if you have more information as

22:44well, but I'm going to punt it to one of

22:46the finance committee members or Mr.

22:48Delgado.

22:50>> Mr. Williams, you're on the spot.

22:52>> I can start off. Um, so we're in the

22:55process of updating um, our our contract

22:59agreements with the um, part 135

23:01operators right now. And as we all know,

23:05you can't have a budget without money,

23:06so we have to figure out the money part

23:07of it first, but that um, we've had

23:10discussions about um, creating, you

23:13know, funds that will allow us to

23:15forward fund and and be prepared to

23:18replace these, but we have to we have to

23:21kind of work our through the ourself

23:23through the process, which is one of our

23:25agenda items here on the leases part on

23:28D. So, we have talked about it, um, but

23:31it's a little premature because until we

23:33have money, we can't create a budget for

23:35it, so.

23:37>> All right, Mr. Delgado, do you have

23:38anything to add to that?

23:39>> Uh, absolutely. Um, we had historically

23:42relied on FAA funding, uh specifically

23:44the airport improvement program. Uh,

23:46that comes those grants come with a lot

23:48of strings attached. Um,

23:50for example, we can't

23:52had we not requested [snorts] any help

23:55from the city or the assembly in this

23:57case, um, our next available

24:00our next window of opportunity to

24:01acquire a truck would have been in 2031.

24:04Um, the failure of of these trucks

24:06forced our hand essentially.

24:08Um,

24:10the AIP, the airport improvement program

24:12grants are are very very much

24:15very much tie our hands. And so, um, a

24:17more flexible

24:19way to fund these these piece of

24:21equipment are through PFCs, passenger

24:24facility charges. Uh, that's the $4.50

24:27that you see tacked on to your to your

24:29tickets

24:30Uh, and is considered a source of

24:32revenue for projects

24:34um

24:35at least historically it's been for

24:36projects but

24:38ARFF trucks are eligible for this for

24:40this

24:42source of revenue as well so um there's

24:44no time restrictions there's no

24:47restriction essentially no restrictions

24:49to the type of equipment we can get or

24:51sorry the the bells and whistles that we

24:52can get on this truck um and that means

24:55that the airport has the flexibility to

24:57acquire these trucks

24:59on the dot every 10 years

25:01um or as needed.

25:03>> Mr. Williams

25:05>> I I just like to add that um through the

25:08PFC 10 which is the the next cycle for

25:11collecting those funds that's how we're

25:13going to be

25:14>> Mr. Williams can I interrupt you can you

25:15say what PFC is since we have new

25:17members?

25:18>> What is that acronym? I only just know

25:20it as PFC.

25:21>> Sorry yes the passenger facility charge.

25:23>> Okay yes so that is how we're planning

25:26to repay the

25:28the money that was loaned to us from the

25:29city to to get this truck that that we

25:32needed quickly so.

25:34>> Okay perfect.

25:36Did that answer your question Mr.

25:37Steininger? Okay any further comment or

25:39question on this item?

25:43All right our next item is the sale of

25:45the Hertz building and I just know about

25:47this cuz I went to one of you guys'

25:48meetings cuz I knew your liaison was not

25:51going to be there. Ms. Cosgrove is your

25:53new liaison

25:54and we have asked the body this time

25:57that if someone is going to miss a

25:59meeting that they ask somebody else to

26:01fill in so hold us to the fire on that

26:03and if someone doesn't show up

26:05let me know and we'll take care of it.

26:08>> [laughter]

26:08>> Uh so with that um

26:10one of the reasons I wanted this brought

26:12up is I don't know that the assembly

26:14members realizes the airport property

26:16extends past the the fenced in area so

26:19that's why I brought it up. Madam Chair.

26:22>> Um and again I will probably be pointing

26:25a little bit to Mr. Delgado but first

26:27off um so

26:30we own this this piece of property. It's

26:31that that Hertz wash bay. Um I don't

26:34know if you guys have seen it. It's over

26:35by Alaska Airlines Cargo.

26:38Um

26:39it Hertz decided to to leave their

26:41lease. And so, we're trying to decide do

26:43we lease the building or do we put the

26:46building up for sale and lease the

26:48property? Meaning, they can buy a build

26:50a suit, etc. Um I think part of one

26:54Well, one of the reasons why uh

26:57it was a more of a discussion than it

27:00should have been was

27:01um

27:03because we're an enterprise fund, I

27:05think we're unsure about whether or not

27:08if we do sell the building, if we're

27:09going to be able to keep those funds

27:12uh because there's been some some things

27:13going on with the the assembly and other

27:15enterprise uh

27:18other enterprise boards.

27:20But, needless to say, we we've got to

27:22figure out what to do with that

27:23property. I think what we're going to be

27:24doing is is voting on it next next

27:28assembly or next uh board meeting, which

27:30is in in a week.

27:32Uh if you have any questions about the

27:34building itself, I'm not in a position

27:35to answer

27:36very well, but Mr. Delgado can answer.

27:40>> Um any questions for Mr. Delgado?

27:46Do you have anything Oh, Mr. Williams,

27:48go ahead.

27:49>> Not a question, just a comment.

27:51Um [clears throat] one of our concerns

27:52that we um discussed at our last board

27:54meeting or

27:56uh was it the board meeting? Yes, it was

27:57at the board meeting.

27:58Um is the disposition of funds if we

28:01were to decide to sell it. Um given the

28:03age of the building,

28:05it doesn't seem like it would be um

28:08very feasible for us to

28:10upgrade the building and, you know,

28:12bring it up to spec. And so, the the

28:15path um best and given given our

28:17constrained budget, the path we

28:20fee uh or at least the feedback that we

28:22had discussed at the board meeting is to

28:24sell the building. But, one of our

28:26concerns is will we as the airport board

28:29receive the funds for that? And, you

28:31know, given our tight budget, especially

28:33in the capital improvement and in the um

28:36um

28:37uh what's what's the fund that only has

28:38$59,000 in it?

28:40>> Uh capital uh reserve.

28:42>> The capital reserve, given our

28:43constraints there, we're hoping to

28:45convince the assembly to help us um

28:49bolster that [clears throat] fund

28:50through that through the proceeds of

28:52that sale. So

28:53>> And if I can add, um I think the biggest

28:56thing for the board is um

28:58when CBJ policy is going to affect

29:01airport property leases, revenue, etc.

29:04Uh I think the board would really

29:05welcome being brought in early, very

29:08early. Um so we can um

29:11tell the assembly how that would affect

29:13the airport.

29:20>> Go ahead, Mr. Steininger.

29:22>> Thank you. And and may just clarifying

29:24question so I can make sure I understand

29:27uh what you said, Ms. Sutray.

29:29Um

29:30so that

29:32Hertz [gasps]

29:33is ending their lease with Williams. So

29:37no So currently it's not occupied or

29:39it's

29:41If Okay, so if if held like they're

29:44another potential lessee that might be

29:46interested in leasing the building, you

29:49know, if you held that as an airport

29:50asset?

29:51>> Uh there are. Um

29:53the decision we have to make is do we

29:56kind of sell the the surface, the

29:58building itself, and then just lease

30:01the actual land, or do we maintain that

30:05building, which is old,

30:07um and would cost us money, and lease

30:09that building as is?

30:11>> Yeah.

30:12So I guess to

30:13follow up, um

30:15so there might be an interested party in

30:17the building as is, or probably not in

30:19the building as is?

30:21>> There might.

30:21>> There might.

30:22>> Uh but I think and Mr. Delgado can speak

30:24more on this. I think the concern that

30:26the airport board has, at least um a

30:29couple of the members have, is uh

30:31becoming a landlord to

30:33a um

30:35a building that's going to need a lot of

30:36work

30:37>> Mhm. and will cost us a lot.

30:41>> I apologize for the noise, but welcome

30:43to City Hall. That is our air handling

30:46unit going because it's not hot enough

30:47in here, so it thinks it needs to pump

30:49heat in.

30:50>> [laughter]

30:52>> So, um

30:53uh

30:54mayor and manager uh can correct me if

30:56I'm wrong, but typically this gets

30:58determined by documentations of whose

31:01building it was a long time ago or who

31:03put money in the building and for my

31:05understanding there has not been able to

31:06find that documentation, so according to

31:09our finance director um the funds would

31:11likely revert to the airport fund. So,

31:14Ms. Kester, do you want to

31:16say anything to that or

31:17>> I I think you you great gave a great

31:19summary much much like

31:21uh um capital projects when the original

31:23force source of funding is general fund,

31:25if there's any funding left over that

31:27reverts back to its original funding

31:28source, uh we would apply the same logic

31:31here. However, uh

31:33staff hasn't been able to find any

31:34documentation on kind of who paid for

31:36that original asset, uh and ultimately

31:39that'd be an uh assembly decision.

31:43>> Mr. Delgado has kindly sent out the

31:45process in his memo, so thank you for

31:47that. So, hopefully that answers your

31:49question.

31:51Mr. Gutkin.

31:54>> Uh thank you to the chairs. Um I just

31:56wanted to go backwards just a little

31:58bit. It's It's been a dilemma for the

32:00airport board over the years that when

32:05property

32:06came

32:07available on or around our proper of the

32:10airport uh that

32:14let's talk about the property from Fred

32:16cross from Fred Meyer's. When all of

32:18that acreage came up, that's the

32:20Bicknell property. Uh the airport really

32:23thought that they should move on that,

32:26but the airport is a not in a position

32:29to go out and buy land.

32:31And that's where I think

32:34we're in a new era with the assembly, I

32:37believe. We didn't have as much

32:41interaction.

32:43I don't believe that previous assemblies

32:45really

32:47cared, if that's the word, really what

32:50went on. They trusted us to run the

32:52airport.

32:53They did their thing downtown. They

32:55approved things that we needed, but

32:58uh I think it's important as we move

33:00forward that

33:02when

33:03properties

33:05in or around the airport that can be

33:08utilized for the airport

33:11as revenue-generating

33:14properties

33:15that are on there, like that would have

33:17been.

33:19And it there was discussion about that

33:21being in the flyaway, and and that the

33:23airport should have it anyway.

33:26And uh we weren't in the position to do

33:28it. Next thing we know, we turned around

33:30and it was gone. So,

33:31uh I I thank the current

33:34and some of the previous uh assembly for

33:38for taking more interest in

33:41the airport

33:42because it's not something that we have

33:44just alone as the our enterprise board.

33:47It's the whole city. You know, the

33:50assembly shares in this as well. So, the

33:52more informed you are

33:54um through through us and through your

33:59uh liaison, um I think we can

34:02start to develop and work through these

34:05things, like the ARFF truck

34:07land, and uh not be in adversarial

34:10positions

34:12uh about

34:13these things. It just We're working

34:16together. So, anyway, thank you.

34:19>> Uh thank you, Mr. Godkin. Anything else

34:21on this topic?

34:22>> It's somewhat related to the Oh, sorry.

34:25Um somewhat related to this topic. I I

34:27think that I would urge all the assembly

34:29members to be looking at the uh

34:30statewide transportation improvement

34:32program, as well.

34:33Um

34:34we're in an interesting position that

34:36the state does not own or manage the

34:38airport. And um I don't know that the

34:42state remembers that we're

34:45an important airport.

34:47We're important for freight. We're

34:49important as a hub for all the outlying

34:51villages and I think that the assembly

34:53should weigh in on the

34:56step as soon as possible cuz they're

34:58trying to finalize it.

35:06>> Yep, I'm just trying to

35:08We just sent something in on the step.

35:10Was it this meeting or next meeting?

35:12>> Thank you, Madam Mayor. The Public Works

35:14and Facilities Committee reviewed a CBJ

35:16comments to state DOT on the step and

35:20our comments are focused on the fact

35:22that step construction funding was

35:23excluded this year for Juneau-Douglas

35:25North Crossing, which is a high assembly

35:28priority. They have been included in

35:30previous years.

35:32>> Madam Chair, do you have something else

35:33that you want us to comment on?

35:36>> I know Mr. Epstein does, too, but I

35:38think the the assembly should also

35:40remember the flyway and coordinate with

35:43Juneau-Douglas Crossing with the airport

35:45because

35:46that could affect bus service.

35:49>> Thank you. Mr. Epstein and then there's

35:51Rodel.

35:52>> Thank you, Madam Mayor.

35:53Along with um

35:56the assembly, there's another player

35:58involved when we talk about

36:01possibly disposing of

36:04uh

36:06property that's

36:07on airport property that's FAA. So,

36:11um

36:13I would expect it if we go forward doing

36:16something with the Hertz building that

36:17we make sure that we're in compliance

36:19with our grant assurances.

36:23>> I'll leave that up to you guys.

36:24>> [laughter]

36:26>> Uh Ms. Rodel and then Mr. Kelly.

36:29>> Uh thank you, Madam Mayor. I just wanted

36:31to tack on to something that um Chair

36:34Suti said about the step. It's not just

36:37the step, but we also have I believe the

36:39comment period may still be open on the

36:41Southeast Alaska Transportation plan uh

36:44for DOT and I think it's really

36:47important to recognize that Juno Airport

36:50is the small hub for Southeast Alaska.

36:53And so, it is the hub that allows

36:57places like Yakutat and Petersburg and

37:00Sitka to have essential air service and

37:03for that to work for Alaska Airlines and

37:05they need that um

37:08they need that Juno Airport to be a

37:10viable option. And when the state

37:13stopped matching grants for us right

37:15around the time of COVID,

37:17um it set it set the state into a

37:20different direction.

37:22And when I think about the Hertz

37:24building, when I think about the our

37:26funding, and I think about the the this

37:31transportation plan,

37:33I think one of the things that I would

37:35love to come away from this meeting is a

37:38sense that we're as as Mr. Gotkin said,

37:42we are adjointed and we are together and

37:46we are aligned

37:47as to the importance of the airport and

37:51that funding the airport is not

37:54optional. It is the primary

37:58infrastructure that allows Juno to

38:01flourish. And I don't know if you all

38:03saw it, I was on the Columbia ferry last

38:06week. I was fortunate. I got I got on

38:09the ferry, I got off the ferry. That

38:11ferry's hung up in Ketchikan now for

38:15we don't know how long.

38:16And it has become very apparent that the

38:20airport is going to be the key piece of

38:22infrastructure

38:24to maintaining a transportation network

38:26for Southeast Alaska.

38:28And so, the whether it's

38:32being reassured that we get the funding

38:34from this if we sell the Hertz building,

38:37that we don't have to sit on pins and

38:39needles that the assembly may choose to

38:41do something else with that funding,

38:44or that we have grant funding matched,

38:48things like that. Um, it would just I

38:50think it's just really important to

38:52recognize

38:54just how key this piece of

38:56infrastructure is to Southeast Alaska.

38:59Thank you.

39:00>> Thank you and um,

39:02we will have um,

39:04Ms. Kester check or manager Kester check

39:07on the Southeast Alaska transportation

39:09plan and see if we can still comment on

39:11that. Um, Mr. Kelly?

39:14>> Thank you. I I guess um, I was kind of

39:17following up both on the comments about

39:19the step and now also about the

39:21transportation plan. Are there specific

39:23projects that you would uh, like the

39:25assembly to focus on in our comments?

39:28Or um,

39:29is there something maybe you can you

39:31could forward a list to to staff? Um,

39:34thank you.

39:35>> Uh, thank you for that but we're

39:36probably getting ahead of ourselves

39:37because that we are going to talk about

39:38projects here on I to meet.

39:40>> [laughter]

39:44>> Anything further on this topic?

39:47Seeing none, we'll go to leases and um,

39:50again this is just um,

39:53just talking to some of you guys, we had

39:56heard that uh,

39:58our previous manager uh, may not have

40:01codified some of the leases that we

40:03probably needed to have. So, we just

40:05wanted to check and make sure that was

40:06happening.

40:08>> Yes, and Mr. Delgado's been um, working

40:11very hard to get these

40:13done and finalized. I do want to

40:16basically turn that over to him because

40:18he's got the most up-to-date

40:19information. I know he's been talking to

40:21them at length.

40:23>> Mr. Delgado.

40:25>> Thank you, Madam Mayor.

40:26Um, so the last time that a use and

40:29lease agreement was or an operating

40:31agreement was negotiated with Alaska

40:32Airlines was back in 2002.

40:34Um, these leases

40:37these operating agreements do not

40:39necessarily expire. We simply convert to

40:40a month-to-month agreement thereafter

40:42and we have been with Alaska Airlines

40:44since 2007. Um, similarly with Delta

40:47Airlines, we have been month-to-month

40:49since 2019 when the last um

40:52uh agreement kind of rolled over. Um

40:55these agreements were negotiated um

40:59and use

41:02not so modern um

41:05terms, business terms.

41:07Uh the airport has evolved over time. Um

41:12Essentially, uh it's time to

41:14renegotiate, really.

41:16Um

41:17the

41:20current airport financial model has been

41:23um

41:23is closely tied to these operating

41:25agreements and has been

41:27uh

41:28structured the same way since about

41:312001, if not longer.

41:34Um

41:35renegotiating these contracts means also

41:38changing or updating

41:40the airport financial model.

41:43Um Over time,

41:45the airport has grown more complex.

41:47There have been uh revenue streams that

41:49we haven't uh

41:50seized upon.

41:52Um

41:53so there there has been some foregone

41:55revenue. To what amount I don't know.

42:00But uh the time to negotiate is now. Um

42:03And this was all uh this has all come

42:05about thanks to Alaska Airlines uh

42:07wanting to uh they they had reached out

42:09and wanted to renegotiate, so um we're

42:11more than happy to do so. Uh we have

42:13since gone out for a financial

42:15consultant uh to help us both negotiate

42:18with the airlines and uh work on the

42:20financial model.

42:21Uh the reason they are doing both of

42:23these items is because of how closely

42:25tied they are.

42:26And uh we're able to work on the

42:28financial model as the terms are being

42:30negotiated.

42:31Um

42:32uh

42:33the

42:35solicitation period has closed and we

42:36now have had only one respondent to it,

42:39and that is uh

42:41one that's familiar to us, and that

42:42contract is yet to be uh executed. Uh we

42:45expect that to happen uh I was hoping

42:47for today, but perhaps tomorrow would be

42:49a better day for this.

42:50So, uh as soon as contract is executed,

42:53we will work very, very quickly to

42:54provide them all the information they

42:55need and uh we will begin to have all of

42:59our uh finance committee meetings and

43:01uh negotiations with the airlines.

43:03So, I'm very much looking forward to

43:05that.

43:06>> Perfect. Any comment, Mr. Newsome? You

43:09sat up. Do you have something to say on

43:10this one?

43:11>> [laughter]

43:13>> Uh no, Madam Mayor, other than I think

43:15it's a long overdue as you can tell from

43:16the dates on the

43:18uh negotiated agreements that exist uh

43:21when we don't know the history of how

43:22we're collecting fees and revenues,

43:24which time to get that written and

43:25established and on paper.

43:28>> Certainly. Any other comments or

43:30questions on this topic?

43:32All right. That brings us to item E,

43:34project updates.

43:37You want to start with this, Madam

43:38Chair?

43:39>> I can. I'll just kind of

43:41do a quicker overview. Um

43:43I think

43:45bigger picture

43:47Sorry. The big picture that that we've

43:49been looking at um through the board is

43:52through the airport master plan

43:54um looking at growth and visitors.

43:57Um

43:58I know that there's there's there are

43:59ways and and Mr. Rodal can speak on this

44:02um that the assembly can assist

44:05um

44:06growth at the airport through small

44:09cruise ships, that kind of thing. Um

44:13uh

44:13and then also um sorry, it's been a long

44:17day.

44:18Um

44:20>> You can phone a friend.

44:21>> Yeah.

44:21>> [laughter]

44:23>> Um

44:26I I'll go ahead and just turn that over

44:28to Mr. Delgado and I'll figure out what

44:30my thought was.

44:31Sorry.

44:31>> No worries. Mr. Delgado.

44:33>> Thank you. Uh so, I have here our FY27

44:37airport capital projects. Um

44:39I had intended to also add FY28 and

44:41FY29, but that's way too far out. Uh we

44:44have a meeting with the FAA. They're

44:46coming to town uh to talk

44:49airport CIPs

44:51uh on Wednesday. So, this list may

44:53change.

44:55It depends what they have to say and

44:57whether I've got good ideas or bad ideas

44:59here.

45:00Um

45:02Our capital program is very much

45:06limited

45:07in terms of money. And that's not

45:10airport money. It's It's FAA grant

45:12money.

45:13Uh we have our yearly entitlements on

45:16the AIP side, the airport improvement

45:18program side, which amount to just over

45:19$3 million per year. And then there's

45:22our infrastructure investment and jobs

45:24act money or otherwise previously known

45:26as bill money, uh which is set to expire

45:29in

45:31FY 29.

45:32And that's roughly 3.2 million a year

45:35until [clears throat] FY 29. Uh so uh

45:38it's a race to the finish to spend

45:40finish spending that IIJA money

45:43and get some projects on the list. And I

45:46Again, I would have liked to add more,

45:48but um

45:49the further out I get on these projects,

45:51the hazier it becomes. We do have a

45:53fairly solid idea of what the next few

45:55years of CIP projects or CIP planning

45:58looks like, uh but with changing

46:00priorities and

46:02um

46:04nick

46:05in

46:06conversations with the FAA, those those

46:08projects may change yet uh from year to

46:10year. So, I figured it wasn't worth our

46:12time here today.

46:13Um

46:15I welcome any questions. I can go into

46:17anything here.

46:19So.

46:19>> All right. Any questions other than um

46:23we'll kind of go back to Mr. Kelly's. Is

46:24there any of these projects that we can

46:28help you on either with the STIP or the

46:30Alaska or Southeast Alaska

46:32transportation plan?

46:34Is there any

46:35advocacy you need from us with this?

46:37>> I think I think that's that's part of uh

46:41Sorry. I think that's part of what I was

46:43um intending to say was just um

46:46to ensure that that this hub remains a

46:50hub, but also the the CBJ can assist

46:54with transit planning um to and from the

46:57airport for both visitors and

47:00legislators, people who come. The taxi

47:03service, as as you all probably know, is

47:05is not great, um, especially in the

47:08winter trying to get out there.

47:10Um,

47:11uh, air service is economic development,

47:13um, that's something Ms. Rodell has said

47:16and would say.

47:17Um,

47:18and then potentially with the visitor

47:20industry tax force task force working

47:23there, I know Mr. Delgado and the board

47:26have all been kicking around ideas. Mr.

47:28Delgado has ideas to bring revenue into

47:30the airport and we're trying to also

47:32figure out how to couple with the

47:34assembly in order to,

47:36um,

47:37increase that revenue stream even wider.

47:40>> Any questions, comments?

47:45Mr. Williams.

47:47>> Just a comment. [clears throat]

47:47>> You get called on.

47:49>> Just

47:49Just a comment. Um, so I want to thank

47:51the staff. Um, Andre and his staff have,

47:54um, recently, um, gotten a very

47:57fast-paced grant to replace the roof on

48:01the tower and, uh, long long overdue

48:04and, uh, without their their great

48:06efforts on that, we wouldn't be having

48:08that done. So, I just want to say thank

48:10you.

48:11>> Good job, Mr. Delgado.

48:13I was wondering about that. Can we get a

48:15tour of the tower anymore or is that Let

48:17me see.

48:18>> Absolutely. Yes.

48:19>> Okay.

48:20And someone, was it you, Ms. Cosgrove,

48:22that said you were going to

48:23have a tour pretty soon?

48:25>> I believe it's next week.

48:26>> All right. Do you Are you going to

48:28invite two friends with you?

48:30>> If you're really nice to me, maybe.

48:32>> [laughter]

48:34>> If anybody's interested, uh, get a hold

48:35of Ms. Cosgrove and see if that time

48:38slot works for

48:39you. So.

48:41Mr. Ms. Hall.

48:42>> Yeah, thank you. Um, I was just

48:44wondering, have there been pullbacks of

48:47federal funding in the last

48:49recent, uh,

48:51past?

48:52>> Only for the 2024 ARFF truck grant.

48:56>> Um,

48:56>> but none since.

48:57>> Okay.

48:58>> There's There's always the the risk if

49:00we don't get things in on time.

49:02>> Okay.

49:03Thank you.

49:07>> Madam Chair. Um I I just Mr. Delgado was

49:10able to turn What was that grant correct

49:13that you were able to kind of turn into

49:15a road grader snow removal?

49:17>> Yes.

49:18>> Yes. So, we didn't lose the grant

49:22completely.

49:23>> Yeah Yeah Yeah, I should I should have

49:25clarified. We repurposed that grant to

49:27uh be able to acquire a vacuum truck and

49:29a uh motor grader. Thank you for

49:32reminding me.

49:34>> Good job. You're clever.

49:36Um since some of your projects have to

49:38do with PFCs, I'm going to just go back

49:40to that. Can you explain to us a little

49:42bit of how that works other than we it's

49:44kind of similar for the main passenger

49:46fees for us, but again we have new

49:47members. So, if you would just kind of

49:49explain how that works when you're

49:50forward funding type.

49:52>> Absolutely. Um so,

49:54we typically forward fund So, let me

49:57backtrack some more. I'm already off

49:58track. Um the federal grants

50:02uh from the FAA typically cover 93

50:05almost 94% of the total project cost.

50:08Um we are therefore left to make up for

50:11the other 6.25% in local match, what we

50:14call

50:15airport fund balance or capital reserve

50:17or

50:18ideally PFCs. Um we would like airport

50:21fund balance or capital reserve to be

50:23the last dollar in.

50:24Uh that way we're able able to leverage

50:26every

50:27every cent we have.

50:29Um there's not very many other places

50:31where you can do that. Um for every

50:33dollar that we put in, we get almost $10

50:35back, really.

50:37Um

50:38so,

50:40PFCs allow us to submit an application.

50:43We negotiate with the airlines. They

50:44approve the projects. They say, "This

50:46looks great to us." And then they levy

50:48the $4.50

50:50um

50:50rate to passengers for outgoing legs up

50:53to I believe $18

50:55um depending on how many legs there are

50:57in their flights.

50:58Um the airport receives approximately $1

51:00million per year

51:02in PFC revenue. Uh and then we apply

51:05that to projects. Um

51:08now depending on the amount the quantity

51:11of projects that we add to our

51:12application, we add 10 projects that

51:14each demand a million dollars in in um

51:17in local match, then they would take us

51:2010 years to recoup that money. And then

51:22we would do another PFC application

51:23after those 10 years have lapsed.

51:25Um most PFC applications are roughly

51:27four to five to six years.

51:30Uh some airports out there have 30-year

51:32PFC applications, which is just

51:33ridiculous, but I digress.

51:35Um so

51:38the our ideal

51:39um

51:41situation to be in would be to use PFC

51:43money first.

51:44Um which is how we were able to recoup

51:47the money for the ARFF trucks, for

51:48example, uh along with other projects

51:50that we have uh sprinkled in there uh

51:52that would utilize that.

51:54Um I think that should answer your

51:56question unless I'm missing something.

51:58>> No, that's good. And like I said, I just

52:00wanted to have the uh assembly

52:02understand that. So

52:03>> I could go on all day.

52:05>> Mr. Godkin.

52:07>> And on to PFCs cuz this dates back, but

52:10the PFC number that he threw out is a

52:13very outdated number, the $4.50.

52:18And I would and and hope with the

52:21support of the assembly as well as us

52:23working with our uh

52:26legislative or delegation

52:29in Washington

52:31um and a few people meet with them,

52:33there's been a push nationwide year

52:35after year. It never gets enough

52:37traction, but it's well overdue for a

52:40cost increase. So it uh

52:44airports all over it just it hasn't

52:47gotten it, but those you know, you guys

52:50are looking for ways of more funding to

52:53do what you need to do to provide

52:55services and we're in the same thing. If

52:57we could get an increase in that PFC

53:00dollar

53:01would help us a long way.

53:04Anyway, thank you.

53:06>> So, ironically, you must know that Ms.

53:08Kester and I are leaving on the 17th to

53:10Washington, D.C.

53:12>> [laughter]

53:12>> So, you get us a white paper on

53:14something like that, we can talk to the

53:15delegation about that. That'd be great.

53:17So,

53:18Ms. Kester, I'm giving you all kinds of

53:20assignments today.

53:21I like seeing opposite. And then you're

53:23right in my target.

53:25>> [laughter]

53:26>> Any comments or questions before we

53:28adjourn this meeting?

53:30Madam Chair.

53:31>> Just one [clears throat] brief

53:32>> point. I don't know if Ms. Rodell, she

53:34had forwarded a couple things to me.

53:37So, she can chime in and raise her hand

53:39at any time if I get this wrong, but I

53:41think Mr. Delgado can also correct me,

53:44but I think the

53:45issue that we have is that Well, it's

53:47not an issue, it's actually a good thing

53:48that passenger numbers have increased.

53:51And what was it, about 5% a year this

53:54last year?

53:55>> That is correct, yes.

53:56>> Okay. And so, I mean, we've got that the

53:59regional outlook about how our

54:00population is declining, but visitorship

54:02is

54:02up. And so, that's something that can

54:04help drive the financing of the airport.

54:07Um and I think what the assembly should

54:11should really take away from this is the

54:13difference between the shrinking

54:14regional market and a growing visitor

54:16market is opportunity. And so, um

54:20we need the assembly's help to make that

54:22opportunity happen.

54:24>> All right. Um Ms. Rodell, did you have

54:27Did you want to add to that?

54:30>> I would I would just say that um one of

54:32the things, you know, and we sent

54:34comments to the Visitors Industry Task

54:36Force as well, but just recognizing, as

54:40I said before, the airport as an asset

54:43and to include us as you think about

54:46different

54:47um different issues, growing the visitor

54:50industry, how it works, um

54:53you know, surveys taken, where where

54:56people are traveling to, where residents

54:57in Juneau when they come to the airport,

55:00are they get Are they truly getting off

55:01in Seattle as the data would suggest, or

55:04is it that they're just doing a 24-hour

55:06layover and then they're headed

55:07somewhere else and how can we capture

55:11enough information about who's coming

55:14and where they're going to really help

55:17those Alaska Airlines, Delta Airlines,

55:19and any others who are interested in the

55:21airport think about route selection,

55:24think about plane selection, and growth

55:27um because the airport uh really could

55:29benefit uh from having that partnership

55:34uh

55:35with CBJ, with the visitors industry and

55:38as a as a way to continue to grow our

55:40revenue and be a viable enterprise.

55:45>> Uh thank you and um hopefully you guys

55:47know that the visitor industry task

55:48force is taking public testimony on

55:50Thursday.

55:52So, if you guys want one of you guys

55:53want to

55:54at the Valley Library. Thank you. It's

55:56not here, it's at the Valley Library, so

55:58I believe it's at 5:00 or 5:30. Which

56:00one?

56:00>> 5:30.

56:01>> 5:30, thank you for that.

56:03Ms. Atkinson is the chair, so

56:05um

56:07so, that would be nice to hear that

56:08comment

56:09cuz others think we should reduce our

56:11visitors. Um I do know that they are

56:14looking at uh

56:15Seattle-Portland uh run instead of I

56:19mean not a Seattle, a Juneau-Portland

56:20run, but I don't know how much traction

56:22that will get

56:23from Alaska Airlines. That was a

56:24discussion at the

56:26our last conference we had.

56:28So, any other comments or questions?

56:31We don't get to see each other often, so

56:34Mr. Kessler, I want to pick on you.

56:36Anything to add?

56:37>> Matt, you sure?

56:39>> I'll have to pick on him first and I'll

56:40come to you.

56:42>> [laughter]

56:43>> Nothing to add. It's uh been a pleasure

56:45um

56:46learning all all thing all things

56:48airport the past 4 months um uh thank

56:51you to Andre for all of his work and um

56:54really walking me through um everything

56:56that goes on at the airport.

56:58>> Uh Mr. Nessel.

57:00>> Thank you, Madam Mayor. Um you mentioned

57:02the Juneau to Portland route. I was

57:04fortunate enough to attend a meeting

57:06with uh Alaska Airlines representative,

57:08Mr. Delgado, and uh Rodel. Um

57:12and I was

57:13impressed with their

57:15um comment to us that we were not on the

57:17wrong track pursuing that that they were

57:19thinking along the same lines. That may

57:21be very beneficial. Uh there's still

57:23work to be done I think to um

57:26cement that and and prove that that

57:28would be a viable option. Uh but they

57:31didn't shoot it down. So, I think it's a

57:33viable alternative.

57:36>> Yep.

57:38Anybody haven't spoken that wants to

57:40speak?

57:41Okay.

57:41>> I just have one.

57:42>> Go ahead.

57:43>> Um just I invite the assembly and any of

57:46the members um with Mr. Delgado's

57:48permission if if you want more

57:50information about the airport, he has

57:52put together an incredible presentation.

57:55And um I think he'd be willing to to

57:57send it along. Thank you and welcome to

58:00Miss Cosgrove for our liaison. Thank

58:02you.

58:03>> And remind us when your board meetings

58:04are.

58:06November 12th?

58:08>> The second Tuesday second Thursday of

58:10the month. It'll be the nicest Thursday

58:11of the month. Without fail.

58:15At 6:00.

58:16>> Yep.

58:16>> At the airport.

58:17>> But it is a that that room is lovely

58:19that you get to see every year around.

58:21So, okay, seeing nothing further. Uh

58:24Miss Hall, go ahead.

58:25>> Take a moment to say thank you. This is

58:27always valuable to come together, meet,

58:29and hear hear each other's concerns. And

58:32yeah, so thank you and appreciate your

58:34leadership.

58:35>> It's a pleasure. Thank you.

58:36>> Thank you.

58:37>> Yep. Um and thank you to the ones uh Mr.

58:40Godkin and

58:41uh Mr. Epstein and Miss Rodel that uh

58:43you did your time and then you came

58:45back. So, we appreciate that. So, um

58:47>> [laughter]

58:47>> all of you we appreciate it. We know

58:49you're volunteers. So, we appreciate all

58:51your time. So,

58:52um like I said, but we're going to keep

58:55uh Miss Cosgrove's toes to the fire. So,

58:57she does not showing up, let me know.

58:59I don't think that will be a problem,

59:00though.

59:02We're adjourned.

59:05>> Just real quick, don't wait too long.

1:01:17>> Mhm.

1:03:20>> Mhm.

1:05:23>> Mhm.

1:07:25>> Mhm.

1:09:28>> Mhm.

1:11:30>> Mhm.

1:13:33>> Hey.

1:13:37>> We will bring the Assembly Committee of

1:13:38the Whole back to order. Thank you to

1:13:41the Airport Board. We had a nice meeting

1:13:43together.

1:13:44Um

1:13:46with that, we will go to

1:13:49item number two.

1:13:51Madam Clerk, or is that Madam Finance

1:13:53Director? Or is that Madam

1:13:57Yeah, who wants to Who raise your hand,

1:13:59whomever wants to be called on this one.

1:14:00>> Madam Mayor, I'm going to go ahead and

1:14:02kick us off and then quickly hand it

1:14:03over to the Finance Director while she

1:14:06pulls up or while the City Clerk pulls

1:14:08up the presentation. So, you might all

1:14:10be wondering um

1:14:12why you have a budget item on the agenda

1:14:15tonight. Uh tonight's item is a fiscal

1:14:19update on FY26. This is in preparation

1:14:22for your retreat. I unfortunately will

1:14:24not be here on Wednesday and so I'm

1:14:26making all of you suffer through this

1:14:28presentation today uh because I wanted

1:14:31to make sure I was here for it to hear

1:14:32all of your feedback. Um hopefully it

1:14:34will make your Wednesday meeting

1:14:35shorter. Um as I mentioned, this is a

1:14:39update on our

1:14:41year-end FY26. Um this is

1:14:44the information that you use to build

1:14:46the FY27 budget. We're in this this

1:14:49circumstance of always having to play

1:14:51catch-up, right? Trying to build a

1:14:52budget 9 months a year uh before we have

1:14:56any real data. So, a budget is a crystal

1:14:58ball and that means we will always be

1:15:01wrong. Um but this information, uh in

1:15:04addition to some 27 updates that we will

1:15:07bring to you at the retreat, will will

1:15:08kind of be the basis for that

1:15:10discussion. So, really mostly wanted to

1:15:11just give you some information,

1:15:13um

1:15:14give you a couple weeks to like sit on

1:15:16that and and chew on that and then take

1:15:18some a deeper dive

1:15:20uh on November 21st at our retreat. So,

1:15:22I'll hand it over to the Finance

1:15:23Director.

1:15:25>> All right, Finance Director, and I'll

1:15:26warn you that stop at every slide so we

1:15:28can ask questions cuz there's a lot of

1:15:30meat packed in these slides.

1:15:32>> Thank you, Madam Mayor. I'm happy to.

1:15:34And typically we would bring you the

1:15:36FY26 update and FY27, kind of where are

1:15:39we, and then a forward look to FY28 all

1:15:42in one meeting later in November, but

1:15:46we're just going to spread this out a

1:15:47little bit. So, tonight we're going to

1:15:49talk about 26. As the manager said, she

1:15:51wants to

1:15:52get you all um thinking about some

1:15:54things we're talking at the retreat.

1:15:56When we get to the retreat, we will have

1:15:58um like literally probably the Tuesday

1:16:01before the retreat we'll have our first

1:16:04quarter of FY27 sales tax data in. So,

1:16:07we'll be able to give you a better kind

1:16:09of this is we know more now and uh what

1:16:1227's looking like. We will we'll also

1:16:14have

1:16:15some very high-level FY28 data um to

1:16:18talk about at the retreat. So, tonight

1:16:20we're focusing on FY26.

1:16:23And so, we'll start on a slide that's um

1:16:25green at the top to help remind us that

1:16:27we're going to talk about revenue first.

1:16:30And it's hard to see that it's green on

1:16:32that, but it really is.

1:16:33Um so, when we talk about um the next

1:16:36couple of slides are all uh set up

1:16:38generally the same. So, let me just walk

1:16:40through how the slide is set up. So, um

1:16:43the first thing on the side we're

1:16:44talking about revenue um gives you your

1:16:46type of revenue. So, we've got charges

1:16:48for services, federal dollars, state

1:16:50dollars, etc.

1:16:52Um and then next you'll have the FY26

1:16:54budget.

1:16:56The next column is the FY26 actuals.

1:17:00And the following column is the

1:17:02difference between those two, right? So,

1:17:04um

1:17:06if the number's positive, that means we

1:17:08brought in more revenue than we

1:17:10budgeted. So, positive is a good thing.

1:17:13Now, um back to what Ms. Kester said, we

1:17:16forecasted and prepped FY26 where we

1:17:20thought we were going to end

1:17:22back in February so that we could get

1:17:25ourselves positioned to talk about the

1:17:26FY27 budget. So, when we talked about

1:17:30the FY27 budget, that next to the last

1:17:33column is the impact that we thought we

1:17:35would have

1:17:37from our FY26 revenue as we were looking

1:17:40into FY27. So, for example, on the

1:17:44federal line,

1:17:45um

1:17:46we had a budget of 3.9 million in total

1:17:50for federal. We brought in 4.7 million.

1:17:53That's $729,000

1:17:56of excess above our budget.

1:17:59Back in February, we thought we were

1:18:01going to have about $142,000

1:18:04more in federal.

1:18:06We actually ended up with the 729, and

1:18:08so that means the very last column is

1:18:10the new impact to our revenue. So, in

1:18:13this case, we had um $586,000

1:18:17more in federal revenue than we even

1:18:19thought we would back in February as we

1:18:22were planning for the FY um 27 budget.

1:18:25Does that make sense how those columns

1:18:26line up?

1:18:28Okay.

1:18:29So, now that we've walked through the

1:18:30format,

1:18:31we can talk a little bit about the

1:18:33content here.

1:18:34I think the things I want to draw your

1:18:36attention to are um in the state um

1:18:40revenue.

1:18:41Um

1:18:42we [clears throat] did have um

1:18:45a grant for child care through thread,

1:18:48um and that's the first line, the grants

1:18:50for $860,000.

1:18:52Um we actually uh

1:18:54received cash and ended up deferring

1:18:57that revenue um because of how expenses

1:19:00came in, and so we had a slight budget

1:19:01adjustment, but that was not in um in

1:19:05our plan. So, um we ended up um

1:19:09thinking we would have $860,000 more, um

1:19:13and actually the budget got adjusted, so

1:19:15we kind of wiped that extra 860,000 out

1:19:18of our prediction. So, that's why it's

1:19:19negative in the last column.

1:19:21Um investments, I feel like we talk

1:19:23about investments every year.

1:19:25Um so, in our investments world,

1:19:28our budget was, we'll call it 6.7

1:19:29million. We um actually earned 10

1:19:33million.

1:19:34When we So, $3.3 million

1:19:37is um our our variance to the good. When

1:19:40we built our budget, we thought we would

1:19:42have 3.6 million dollars to the good.

1:19:44So, we actually are are coming in a

1:19:47little bit under our expectation. And I

1:19:49just want to say a couple things about

1:19:50our investment earnings cuz I know it

1:19:52does um cause a lot of questions year

1:19:54over year.

1:19:55The way that our central treasury model

1:19:57works, all of our investments get pulled

1:20:00together. All of that investment earning

1:20:03that yield comes into the general fund,

1:20:05and then we pull out of the general fund

1:20:08to provide interest earnings to

1:20:10enterprise funds, to special revenue

1:20:12funds. Um with the enterprise funds,

1:20:15they they all have little capital um

1:20:17funds that go with them. And so, we

1:20:20allocate um interest earnings out, and

1:20:22so that basically leaves us with

1:20:25everything else being general fund

1:20:26revenue that you see represented here.

1:20:31>> [clears throat]

1:20:32>> Sales tax, we talked about a lot about

1:20:33sales tax at our last AFC meeting. Um

1:20:37we did really, really good on estimating

1:20:40our lost revenue due to the election

1:20:43last year. We were within a couple

1:20:45hundred thousand dollars, but what we

1:20:47did not predict in early February was

1:20:49that we would have a conflict in the

1:20:51Middle East that was going to drive

1:20:53particularly fuel prices, but inflation

1:20:55everywhere. And um really uh

1:20:59gave us a skyrocketed

1:21:01um last quarter numbers. So, um April,

1:21:04May, and June, as you recall, sales tax

1:21:07was phenomenally high. And so, whereas

1:21:09we expected to

1:21:12um have a shortage of revenue in sales

1:21:15tax by about 4 million,

1:21:16um I'm sorry. We expected about 9

1:21:19million in lost revenue. Uh we only had

1:21:234 million. And that difference is really

1:21:25what we saw in that last quarter of the

1:21:26fiscal year with the increased

1:21:28inflation.

1:21:29And then the last one we're going to

1:21:31talk about is in the other line. And I

1:21:33think Mr. Barr, you wanted us to talk

1:21:34about that one.

1:21:37>> Uh

1:21:37GHS.

1:21:391.7.

1:21:42>> Thank you, Ms. Flick. Um, thank you,

1:21:44Director Flick. So, this this is

1:21:46represents the $1.7 million

1:21:48that

1:21:49you appropriated for Gastineau Human

1:21:50Services as part of the FY27 budget

1:21:53process to make them whole from an

1:21:56anticipated loss of state revenue that

1:21:59as of my last communication with GHS,

1:22:01they have not yet realized, although

1:22:03they still anticipate realizing. Um, and

1:22:06there we have an open question about

1:22:08whether or not that will be a one-time

1:22:10or an ongoing

1:22:12uh loss in loss in state revenue, which

1:22:14we'll revisit if not um, if we don't

1:22:18have if if we have more information by

1:22:19the retreat, possibly then um, if not

1:22:22then certainly as part of your FY28

1:22:24Assembly Grants process.

1:22:29>> And per your request, Madam Mayor, that

1:22:31covers this slide.

1:22:32>> Okay, who has questions on this slide?

1:22:34Mr. Brooks.

1:22:36>> Thank you, Madam Mayor, and thank you,

1:22:39Ms. Flick, for the presentation on the

1:22:42uh property tax. I know that last year

1:22:45when um, those

1:22:46discussions were happening, it was that

1:22:49you know, the idea was that if the mill

1:22:52rate cap and the removal of this uh

1:22:55sales tax on utilities and groceries

1:22:58both passed, it would be something like

1:23:0012 million potential lost. And I'm just

1:23:04wondering what that

1:23:06what that planned impact was for the

1:23:08property tax cuz I see that we made a

1:23:10million more than last year, but that's

1:23:13what it's showing as the change from

1:23:15planned impact. And I thought I thought

1:23:16we were con-

1:23:18factoring for that in some sort of

1:23:20impact.

1:23:21>> That's an excellent question, Mr.

1:23:22Brooks, and something that we're going

1:23:24to um, we're going to help each other

1:23:26through is those impacts impacted FY27,

1:23:30not FY26.

1:23:33So, the the property tax mill rate um,

1:23:36impacted FY27, so we lowered um,

1:23:42had the assessment stayed flat, we would

1:23:45have lowered our revenue by about a

1:23:47million dollars.

1:23:49Um, but with the increase in

1:23:50assessments, we didn't have to do that.

1:23:51But that was all for FY27. So in FY26,

1:23:55there wasn't an impact. Um, the sales

1:23:57tax was the 9.2 million that we thought

1:24:00we would lose since that ballot

1:24:02initiative took effect

1:24:04basically 30 days after certification.

1:24:06>> Thank you for the clarification.

1:24:07>> Yep.

1:24:09>> Any further questions?

1:24:12Um, Ms. Hall, and if you're on Zoom, I

1:24:14can't see hands, so just pipe up.

1:24:18>> Yeah, um,

1:24:19>> [clears throat]

1:24:20>> just I'm wondering if Deputy Manager

1:24:22Barr could restate what you had said

1:24:24about the GHS. Is that down in the other

1:24:26line? I'm a a little confused.

1:24:30Um,

1:24:31if that's where you were

1:24:33having that discussion.

1:24:34>> Yes, yes, Ms. Hall. You you are It is

1:24:36fair that you are confused because I was

1:24:38remembering a completely different GHS

1:24:40topic.

1:24:41Um, and the the GHS topic for this one

1:24:44was not actually part of your FY27 grant

1:24:47making process. It was part of a grant

1:24:49that you provided a GHS to construct

1:24:51what was going to be a housing project

1:24:54on GHS's property um for individuals who

1:24:57are in recovery and needed um substance

1:25:00use recovery housing while not um

1:25:04utilizing substances, right? So

1:25:06permanent supportive housing for that

1:25:08population. That project did not come to

1:25:10fruition because of the loss of federal

1:25:12money, not state money.

1:25:14Um,

1:25:14and there have been there has been some

1:25:16movement uh in that sector to try to re

1:25:20re revitalize that project, if you will.

1:25:23Um,

1:25:24hasn't borne fruit yet, but that is

1:25:25still something that that we and others

1:25:26are working on.

1:25:28>> Okay, follow up. Sir, and and so is our

1:25:31contribution just kind of on hold over

1:25:34there or or going to be repurposed?

1:25:36>> It has been returned to you.

1:25:39>> Okay.

1:25:41>> All right.

1:25:42See nothing further, go ahead.

1:25:44>> Excellent. So we'll go to the next

1:25:46slide.

1:25:47Which is um blue at the top um to help

1:25:50remind me that we're going to talk about

1:25:51expenses. Um so, these are broken out

1:25:55into um just a couple of categories. So,

1:25:57salary, wages, and benefits. And again,

1:25:59it's laid out the same way. FY26 budget

1:26:02was about 66 million. Our actual was

1:26:04about 62 million.

1:26:06And our budget to actual was 3.7

1:26:10act- realized. Um when we prepared the

1:26:13FY27

1:26:15budget,

1:26:17um we predicted about 3.5 million

1:26:19dollars in personnel savings. So, we

1:26:22were off about 151,000, which is

1:26:26really lucky.

1:26:28Um but fantastic Very skilled. Um as as

1:26:34the manager said, uh it's a crystal

1:26:35ball. Um I do want to just take a moment

1:26:38to note that through this process

1:26:41in FY26, right, before we got into kind

1:26:44of budget crisis mode, um we had already

1:26:47started looking at um salary vacancy

1:26:49savings and starting to kind of ratchet

1:26:52in where we saw um significant savings.

1:26:56But as you remember, when we built our

1:26:58FY27 budget, is where um the assembly

1:27:02directed the manager to really reduce

1:27:05the budget through um vacancy factor

1:27:07salary savings. And so, um we would

1:27:10expect this number

1:27:12in a few months when we talk about FY28,

1:27:14our expectation to be very low. But um

1:27:17we're we're pretty happy with how our um

1:27:20prediction came out with reality with

1:27:22respect to salaries and and wage

1:27:24savings.

1:27:25We are off about 2 million dollars with

1:27:27the rest of commodity and services,

1:27:29which is a 5% um off of 36 almost 37

1:27:33million dollars. So, that's That is um

1:27:36um pretty decent budgeting. I feel like

1:27:38um

1:27:39that's

1:27:40I'm I'm really comfortable with that

1:27:42kind of of level of forecasting. There's

1:27:45um we'll talk about it in just a second

1:27:48where we saw um some non-personnel kind

1:27:50of variances. You'll see our community

1:27:53and youth grants had a little bit of a

1:27:54variance and our capital outlays

1:27:57actually was

1:27:58>> [clears throat]

1:27:59>> pardon me, was a little bit more. Often

1:28:01times what we find is

1:28:04departments will budget under just

1:28:05regular commodities and services, but

1:28:07when the the purchase happens, it really

1:28:09should be classified as capital outlay.

1:28:12So, I wouldn't get too worried about

1:28:14that overage. It's it's a common

1:28:16thought process as you're budgeting and

1:28:18then

1:28:19when accountants get involved and apply

1:28:22some strict definitions, things slide

1:28:24around between those categories.

1:28:26So, I'm happy to take any questions on

1:28:28this view. We are going to look at the

1:28:29non-personnel services in more detail.

1:28:33>> Thank you. Mr. Kelly and then Mr.

1:28:35Brooks.

1:28:36>> Thank you. I was just

1:28:39maybe ask a little bit of clarification

1:28:41on the

1:28:42on the slide.

1:28:44So, the commodities and and services

1:28:47looks like this is supposed to be

1:28:49inclusive of all the items in blue that

1:28:51are below it.

1:28:53And this one

1:28:54in the second to last column the planned

1:28:57impact we have 178,400

1:29:02but in

1:29:03we don't see that reflected anywhere in

1:29:04any of the things that are in the blue

1:29:07that are below it. So, I was just

1:29:09wondering

1:29:10where that came from.

1:29:14>> Thank you, Mr. Kelly. That's a great

1:29:15question. Um when we prepared our

1:29:17budget, we didn't um

1:29:21we did look at all of the detailed to

1:29:23come up with 178,000. I didn't go back

1:29:26through all of those forecasting details

1:29:27to indicate which lines was which one.

1:29:31But it would be you are correct that

1:29:33commodities and services are made up of

1:29:34all of those lines in blue.

1:29:38>> Thank you. Mr. Mr. Brooks.

1:29:41>> Thank you, Madam Mayor.

1:29:43>> [clears throat]

1:29:44>> I'm just noticing

1:29:45I

1:29:48the travel and training was down to a

1:29:52number very similar to what I was

1:29:54proposing as a reduction

1:29:56in that in that fund. And I was just

1:29:59wondering if you guys can speak a little

1:30:01bit to

1:30:03was there opportunities enough to try

1:30:05and utilize that funding or was it a

1:30:07staffing issue or just why uh

1:30:10why so much wasn't utilized out of that?

1:30:14>> Yeah, I'll I'll take that and then chime

1:30:16in if anyone has more detail. We we

1:30:19generally come in under budget on travel

1:30:21and training because the way that we

1:30:22manage our travel and training is you

1:30:24have to have that

1:30:26you know, you have to know the

1:30:28conference you want to go to, what the

1:30:30hotels are going to cost, how many days

1:30:32you're going to be there when we build a

1:30:33budget. So each like named individual

1:30:36has that training budgeted. Inevitably

1:30:38there's turnover,

1:30:39uh vacations,

1:30:41they can't go go on those. So I think a

1:30:44lot of that lapse in travel training is

1:30:47is due to that which is which is also

1:30:49why we still you know,

1:30:52request that full amount. You'll see the

1:30:53same argument when we talk about

1:30:55commodities and services later. Like

1:30:57it's important to have that full

1:30:58authority even if we don't fully spend

1:31:00it because it allows that employee to

1:31:03you know, have that opportunity or that

1:31:05employee to have you know, the

1:31:06opportunity that like that department

1:31:08have the opportunity to to purchase

1:31:09something if it's a commodity

1:31:11with while maintaining our budget

1:31:13culture that's not like you have to

1:31:14spend every penny or have the authority

1:31:16the next year.

1:31:18Is do you have more detail on that

1:31:20Deputy Manager Burke?

1:31:21>> Yeah, thank you. I'll just add that it

1:31:23is it is very likely and Director Fluke

1:31:26can correct me if she thinks I'm wrong

1:31:28that the lion's share of this variance

1:31:31is public safety related.

1:31:33You'll see on a later slide that a great

1:31:35deal of our personnel savings is public

1:31:37safety related and when we budget travel

1:31:40training for

1:31:41public safety

1:31:43in addition to doing it how the manager

1:31:44described it, we also budget for travel

1:31:47training for positions that we hope to

1:31:49hire because we will need to train them

1:31:51if we are successful in hiring them.

1:31:56>> All right, thank you. Next slide.

1:31:58>> Excellent. So, um we're going to just

1:32:00stay on personnel for a moment and look

1:32:02at a pie chart of our personnel savings.

1:32:04So, um on the previous slide we saw we

1:32:06had $3.7 million

1:32:08of personnel lapse.

1:32:10And we often get the question, well, how

1:32:12where did that occur? Which departments?

1:32:14And so, this slide is really intended to

1:32:16um help you see that the lion's share as

1:32:19Deputy um Manager Barr just explained is

1:32:22in public safety with police and fire

1:32:23being um the biggest, um community

1:32:27development and parks and rec um being

1:32:29the next two largest after that. And

1:32:32again, um you know, our our expectation,

1:32:35our our forecast was really close to our

1:32:37our actual

1:32:39personnel lapse. And um I'll just say

1:32:41again, this was before we really

1:32:43ratcheted down on tightening the belt

1:32:46for '27. So, um I I would be surprised

1:32:50if we see a chart like this we have this

1:32:52conversation in a year.

1:32:54Any questions on this one? Um there is

1:32:56more personnel savings on the next slide

1:32:58that um

1:33:01>> Go ahead.

1:33:02>> Okay. So, we'll go to the next slide.

1:33:04Um this was [snorts] something that um

1:33:06we we did a couple years ago and updated

1:33:08last year. And this is really kind of

1:33:10looking at the biggest um departments

1:33:13that had personnel lapse. So, um closest

1:33:17to the department name you'll see the

1:33:19the FY26 um personnel savings

1:33:22and there in that department's total

1:33:24personnel budget and kind of the

1:33:25percentage

1:33:28that their lapse is of the total.

1:33:31Um

1:33:32but then in the next three columns

1:33:33you'll see the '25 numbers. So, what's

1:33:36interesting in this to me is is somehow

1:33:39um is partially how the departments

1:33:41change from '25 to '26, but then

1:33:44overall, if you look at the the

1:33:45percentage of lapse in '25 and compare

1:33:49it overall kind of to the departments in

1:33:51'26, you can start to see we were

1:33:53ramping down on um our our vacancy

1:33:57savings and and building that into our

1:33:59budgeted numbers.

1:34:01Um but you'll also um

1:34:03see that we are are gaining some success

1:34:06in hiring. So, there's a a combination

1:34:08of things in there. I do want to point

1:34:10out um

1:34:11the public works and engineering may be

1:34:13catching your eye going from 3.3 million

1:34:17down to 237,000. There's a couple of

1:34:21things going on there, so don't get too

1:34:23excited. Um our

1:34:26We had a practice in 20 FY25 and earlier

1:34:30where uh when project managers are

1:34:32working on a project, they charge their

1:34:34time to those projects. Um we would show

1:34:38that as lapse as savings.

1:34:41Um and we have cleaned that process up

1:34:45in FY26

1:34:47um so that there's not this huge

1:34:50apparent lapse when really in fact we're

1:34:52we're budgeting for those project

1:34:53managers to be allocating their time to

1:34:56projects, and so we want to see that

1:34:58happen in our actuals as well. So, um

1:35:01that is the biggest driver in that

1:35:03engineering and public works variance.

1:35:07Happy to take other questions on this.

1:35:11>> Mr. Steineger.

1:35:13>> Um thank you. My eyes kind of caught by

1:35:15that community development percent

1:35:18um

1:35:19and two years in a row where it's like

1:35:21one in seven, one in eight positions are

1:35:24vacant.

1:35:25Um I guess kind of how concerned like is

1:35:28that just a two-year trend or is that

1:35:29just a blip that's happening or that

1:35:32kind of a longer-term trend in that

1:35:33department? Kind of should we be

1:35:36concerned about our ability to recruit

1:35:38and retain there?

1:35:41>> Thank you for that question. Um it is

1:35:43difficult to recruit and retain those

1:35:46entry-level planners.

1:35:48Um however, I am pleased to say that we

1:35:50are almost fully staffed at CDD. We have

1:35:53one senior planner position vacant, but

1:35:54they are actually bumping up against

1:35:56that vacancy rate ceiling that was

1:35:57established uh year in the budget. Uh so

1:36:00we are holding off on hiring for that

1:36:02that final position and that might be

1:36:04part of a a mid-year adjustment that I

1:36:06bring to you. Um so real hiring

1:36:09challenges at CDD. Um however, we've

1:36:11made some some successes recently.

1:36:17>> Seeing nothing Oh, Ms. Cosgrove.

1:36:19>> Just a point of clarification. The

1:36:21percentages that we're talking about are

1:36:22as a percentage of budget, not

1:36:24necessarily a percentage of staff. And

1:36:26there's a loose correlation, but not an

1:36:28exact one. Is that a fair statement?

1:36:30>> That's a fair statement, yes.

1:36:31>> Thanks.

1:36:35Seeing nothing further, go ahead.

1:36:37>> Excellent. So, we'll move out of the

1:36:38personnel realm into the non-personnel

1:36:41lapse.

1:36:42The chart on this page is just the

1:36:45department or division um

1:36:47where

1:36:49the non-personnel lapse was 99,000 or

1:36:52more cuz there was just a great breaking

1:36:54point right there. I was trying to get

1:36:55to 100,000, but

1:36:57that last CDD just felt like it belonged

1:36:59in the on the chart. So, we went with um

1:37:03you know, those departments that are

1:37:05over

1:37:0799,000. Um we're going to just kind of

1:37:10walk through um

1:37:12a a few of the items with respect to um

1:37:15each of these, um not like beat them um

1:37:19beat them into uh submission.

1:37:22Uh so, we'll start with RecycleWorks. Um

1:37:24there's a couple things going on there.

1:37:27Um

1:37:27they they did have about $100,000 in

1:37:30invoices that they did not process

1:37:33timely in FY 26. So, those are going to

1:37:36roll into FY 27. So, that's um

1:37:38administratively um

1:37:41a little that that lapse looks bigger um

1:37:44than actual expenses. Um but we also had

1:37:47um about $162,000 in our junked vehicle

1:37:50program um that wasn't expended. Um

1:37:54we will probably talk about junk vehicle

1:37:56program um a bit because we are as in

1:38:00other areas seeing some pretty high

1:38:02escalation in costs there.

1:38:06Um

1:38:07I'm just going to run through these

1:38:08Manager Custer unless you like give me

1:38:10the high sign that you want me to that

1:38:12you want some of these.

1:38:13Um in transit the biggest um

1:38:15the biggest savings there um compared to

1:38:18budget um had to do with the paratransit

1:38:20contract um negotiated less than the

1:38:23previous. Um and they also had a bit of

1:38:25savings um in their bus maintenance

1:38:28parts. But they also saw higher than

1:38:31expected fuel costs. So a little bit of

1:38:33offsetting there.

1:38:35Um and I think Mr. Brooks to to your

1:38:37question earlier when we talk about um

1:38:39the police department, one of their

1:38:41a lot of their savings was just kind of

1:38:43sprinkled around not super interesting.

1:38:45But one that jumped out at me was um

1:38:47their uniform allowance had a a pretty

1:38:50um high lapse about $43,000

1:38:52um which is just indicative of the

1:38:55number of officers that they have. Um so

1:38:57that um personnel savings um kind of

1:39:00drives that.

1:39:01Um

1:39:02in the manager's [clears throat] office

1:39:03there were um a couple of things that

1:39:05drove that savings.

1:39:08One is the beautiful update to our audio

1:39:10visual in this room came in under

1:39:12budget. Um and also our conflict

1:39:14attorneys were significantly um less um

1:39:18than budgeted. We did um see some

1:39:20savings about um $50,000 related to our

1:39:23website redesign. And that's a one-time

1:39:26expense anyway and it's really um a

1:39:27timing. It's it got pushed to 27 um to

1:39:30continue and finish that work.

1:39:33Um in our IT world um we saw some

1:39:36significant savings with um

1:39:39uh just this subscription based um uh

1:39:43everything in software is subscription

1:39:45based. So in those maintenance fees and

1:39:47subscription fees. But we're also seeing

1:39:50um a significant spike in some of our

1:39:52data lines. Um so there's was kind of a

1:39:54mixed bag of ups and downs.

1:39:56Um the fire department

1:39:59again had um some sprinkling all over.

1:40:03Um general supplies um and medical and

1:40:06health services were both down by 73,000

1:40:09and almost 60,000. And again, um,

1:40:11looking back to their their personnel

1:40:13lapse, almost 38,000 in, um, training

1:40:16was unexpended.

1:40:18Um, in the clerk and elections area,

1:40:21um, printing was down, training was

1:40:23down, postage was down, um, all of

1:40:25those. And then, um,

1:40:27similarly as we talked about with

1:40:28personnel savings in community

1:40:30development, um, they had almost 50,000

1:40:33dollars worth of training that wasn't

1:40:34expended primarily due to vacancies in

1:40:36that department. Um, and then a few

1:40:39other things, um, that contributed. So,

1:40:41those are the big drivers, um, in the

1:40:43commodities, um, and services area.

1:40:46Um,

1:40:47for 26. Any questions?

1:40:50>> Is that it, Susan?

1:40:51>> Thank you, Madam Mayor. Uh, with the

1:40:53hundred some thousand invoices from

1:40:56RecycleWorks, was that like is that a

1:40:58common thing from them or was it like

1:41:00snowpocalypse holding them back,

1:41:02throwing things in at disarray? What

1:41:04what happened there?

1:41:06>> Uh, that's an excellent question. Um, I

1:41:09don't think it's a common thing. I think

1:41:11there were just some,

1:41:13um, a lot of things going on, um,

1:41:16with personnel in that area and they

1:41:18just

1:41:20one day opened a door and went

1:41:24That is a very technical explanation.

1:41:27Um,

1:41:28so, uh, I I would not expect to see that

1:41:31again.

1:41:34>> All right. Continue.

1:41:36>> All right, we'll go to the next slide.

1:41:40Yes.

1:41:41So, we've spent, um, most of our time

1:41:43talking about general fund, um,

1:41:45general funded departments and

1:41:47divisions. I think, um, you all know

1:41:49that you have responsibility for the

1:41:50entire city budget and so we wanted to,

1:41:53um, highlight some of how those others

1:41:56departments or funds,

1:41:57um, were faring,

1:41:59um,

1:42:01I don't know that I need to read all of

1:42:03these, but I know, um, fleet's going to

1:42:05catch your eye, fleet replacement, we're

1:42:07going to talk about that on the next

1:42:09slide. So, on that one, um, you can save

1:42:12questions. I will talk about risk

1:42:14management. That was, um, that one is

1:42:16showing over budget on here, and that

1:42:18was part of the supplemental, um,

1:42:21ordinance that was introduced on Monday.

1:42:25Last week Monday. Yes, a week ago. Um,

1:42:30wow. And that really does have to do

1:42:33with snow pop snow pop that big

1:42:35snowstorm we had in December last year.

1:42:37Sorry, I can't say that word today.

1:42:39Um, and we do anticipate that, um, we

1:42:41will be reimbursed through our

1:42:43insurance, through the state, um, for

1:42:46those costs. But, um, you know, there

1:42:48was plenty of of damage, lots of

1:42:50assessments, and and so all of that's

1:42:52just going to live in the risk fund, um,

1:42:55and we'll adjust the, um, the budget for

1:42:57that.

1:42:59I'm happy to

1:43:00answer questions on any of these.

1:43:05>> Hospital?

1:43:07>> Yeah.

1:43:10Hospital is over budget.

1:43:13Um, this is in addition to the

1:43:15supplemental that was done,

1:43:17uh, maybe in June, July. I can't

1:43:19remember exactly what month it came to

1:43:21you.

1:43:24We are working with the hospital to try

1:43:25to better understand what that overage

1:43:28looks like. Um,

1:43:31they are one of, um, they're the only

1:43:34department of the city who, um, does not

1:43:37use, uh, the city's accounting software.

1:43:40And so, the information that we have is

1:43:44really about cash that's that goes out

1:43:46the door, and then we true that up to

1:43:48their financial statements as their

1:43:50financial statements are collected.

1:43:52Um, we have done a preliminary true up

1:43:55of their expenses, and also, um,

1:43:58expenses that would

1:44:01come out of a budget world and really

1:44:04end up in a balance sheet. We can have a

1:44:06great accounting discussion later, but,

1:44:08um, we've accounted for that,

1:44:10um, it does leave them with about $7.4

1:44:13million of cash out the door that's

1:44:15sitting as an expense um, pending their

1:44:19final financial statements if anything

1:44:21comes through in that um, that would

1:44:23have us, um, do adjustments, but at this

1:44:25point um, it does look like those are

1:44:28are actual expenditures and and that

1:44:31um, department was also included in the

1:44:32supplemental that was introduced last

1:44:34week.

1:44:38>> Okay, I'll ask the follow-up question.

1:44:41Are they on a different software system

1:44:42because

1:44:44the hospital has

1:44:46weird things that happening at the

1:44:48hospital? Why are they on a different

1:44:49system, I guess, is my question.

1:44:52>> Madam Mayor, that's a fantastic

1:44:53question. Um, the the hospital

1:44:57is a department of the city and they do

1:44:59have, um,

1:45:01they have several operations that are

1:45:03run distinctly outside of the regular,

1:45:07um, city. Um, I I believe it's

1:45:09absolutely appropriate for them to have

1:45:11a point of sale system. Their business,

1:45:13just like Parks' business, is unique.

1:45:16And so, how they manage their billings

1:45:18and their insurance processes and their

1:45:20patient billings

1:45:22all of that's, um, you know, definitely

1:45:25unique to the hospital and I would

1:45:26expect them to have their own system for

1:45:28that.

1:45:29Why their accounting software is

1:45:31separate from the city is an interesting

1:45:34question, um, and I don't I don't have

1:45:36any history for why that is. Um, I don't

1:45:40you know, just sitting here today

1:45:41without doing a ton of research, I can't

1:45:43tell you that they need to be separate.

1:45:45Um, but they are.

1:45:49>> All right, Mr. Brooks.

1:45:51>> Thank you, Madam Mayor. Do you know if

1:45:52they're making a 5% or more revenue?

1:45:56In addition to being over budget, do you

1:45:58know if they're bringing in more money?

1:45:59>> Uh, they're actually, uh, in the in the

1:46:03trial, um, balance sheet and income

1:46:05statement that I received mid-September,

1:46:08they actually are posting an operating

1:46:09loss. So, their revenue does not cover

1:46:12their expenses.

1:46:16And that's not finalized. That was

1:46:18preliminary. Just I'll say that again.

1:46:20>> Um Ms. Hall.

1:46:22Yeah, and is this related to the federal

1:46:25funds that typically come through that

1:46:28that haven't?

1:46:30>> Um I would not expect their expenditures

1:46:33to be related to the federal funds.

1:46:35Perhaps the revenue.

1:46:37Um I understand that if that that

1:46:39revenue

1:46:40is approved through

1:46:44um

1:46:45the body that it's sitting in that it

1:46:47contains language that would allow for

1:46:49retro

1:46:50um payments and so they would expect to

1:46:53get revenue associated with FY 26. So

1:46:56that could change their their revenue

1:46:59versus expenses, but their expenses over

1:47:01budget um would not be impacted by that.

1:47:06>> Madam Manager, December is when our

1:47:08joint meeting is?

1:47:11>> December 2nd.

1:47:13>> Well, thank you for that. This might be

1:47:14a topic for our agenda.

1:47:16Uh seeing nothing further, go ahead.

1:47:20>> Okay, let's uh move on to talk about

1:47:22fleet and the fleet reserve.

1:47:26Excellent. Um

1:47:28as as the previous slide showed um the

1:47:31fleet replacement was about 46%.

1:47:34Um under budget uh budgeted for 13

1:47:37million only expended seven.

1:47:40And um so here's a list of the

1:47:42departments and their over under budget.

1:47:47And to get to that variance, um I will

1:47:49point out that fire, transit, and

1:47:51wastewater make up 80% of the variance.

1:47:54Um also of note, those three departments

1:47:58have the highest single item value

1:48:03equipment across the entire fleet. So um

1:48:07we're talking about fire trucks and

1:48:09ambulances and uh super specialized

1:48:12trucks to do cool wastewater things. And

1:48:16um a vac truck and uh buses. I mean

1:48:19there there are the expensive equipment.

1:48:21And um another thing to realize is that

1:48:25a lapse in this does not mean that

1:48:27there's not a need. This is really about

1:48:30timing. And particularly when we're

1:48:32talking about these big expensive unique

1:48:35pieces of equipment,

1:48:37we um require the appropriation to

1:48:40happen before we put a a purchase order

1:48:43in for them, but it may take us well

1:48:46over 12 year 12 year or 12 months, maybe

1:48:4924 months before we get that apparatus

1:48:52in and it really gets expensed. So um

1:48:55you know, in the case of uh fire, you

1:48:57know, ambulances, fire trucks are are

1:48:59just really spendy and they take a year

1:49:01to 2 years to get. So we we certainly

1:49:04don't want to

1:49:06um equate this lapse with a lack of

1:49:08need. This is this is all about timing.

1:49:14>> Ms. Atkinson.

1:49:17>> Um with these timelines being so long

1:49:19for these very specialized um

1:49:22pieces of equipment, are, you know,

1:49:24wastewater and fire looking at extending

1:49:26their

1:49:28uh

1:49:28replacement schedules to account for

1:49:31that or are we just going to keep kind

1:49:33of being behind?

1:49:40>> Happy to take that one. Thank you, Ms.

1:49:41Atkinson.

1:49:43Um so yes, uh

1:49:45departments absolutely are taking that

1:49:46into account. It is only recently, at

1:49:49least in the fire world, Manager Custer

1:49:50probably knows more about wastewater

1:49:51than I do, but um at least in the fire

1:49:53world that um

1:49:55the industry, particularly on the engine

1:49:58side, but also on the ambulance side,

1:50:00has has frankly become quite

1:50:03monopolized, that there are very few

1:50:05vendors that are providing um these

1:50:07these uh large pieces of equipment

1:50:09anymore, and their backlogs have gotten

1:50:11longer and longer as time goes on. So

1:50:12fire is taking that into account in

1:50:14their fleet replacement schedules. It is

1:50:16not uncommon for the, you know, quoted

1:50:20time frame to be in the 3 to 5 year

1:50:21range, which 5 years ago was in the like

1:50:241 to 2 year range.

1:50:26Um

1:50:27and just looking at these numbers, I

1:50:29know for sure that fire has about $2.8

1:50:32million committed in a prepaid account

1:50:34for equipment that is on order. So, you

1:50:36you could you could reasonably view that

1:50:38line as flat, not as 93% under budget

1:50:41for that reason.

1:50:45>> Anything further?

1:50:47Madam Manager?

1:50:48>> Thank you. I just want to add the last

1:50:50two budget cycles we have more closely

1:50:53scrutinized that fleet contribution.

1:50:56Um and so we will continue to do that as

1:50:58as we progress. You know, sometimes

1:50:59maybe you don't need a new truck after 7

1:51:01years,

1:51:02you can you can extend that. So, that

1:51:04analysis happens um

1:51:06on a department by department basis.

1:51:11>> Okay, seeing nothing further. Go ahead.

1:51:14>> Excellent. Well, we will move on to what

1:51:16I know you're most curious about, which

1:51:17is your fund balance in the general

1:51:19fund.

1:51:20Um so

1:51:24I'm going to just going to walk through

1:51:25some timelines here and how things

1:51:27changed. So, um

1:51:29I'll just ask you to humor me as we do

1:51:31this.

1:51:33So, again, way back in March

1:51:37we um

1:51:38uh prepared the manager's proposed

1:51:40budget and with that we did some

1:51:42forecasting.

1:51:44Um the assembly had taken actions on

1:51:46things in FY26

1:51:48and we anticipated the ending fund

1:51:51balance

1:51:52um of FY26

1:51:55to be 20.7 million.

1:51:59And then April and May happened and we

1:52:02could go to the next slide if that's

1:52:03okay, Madam Mayor.

1:52:05>> Yep.

1:52:06>> And by the time we got to our adopted

1:52:08budget

1:52:09so in July of 2026, our 2026 budget went

1:52:15from 20 million to 10 million.

1:52:18Why, you might ask?

1:52:21There was a small little ordinance in

1:52:23there to resolve a revenue sharing

1:52:25agreement that was about 9.5 million

1:52:28dollars in the general fund.

1:52:31Is the bulk of that.

1:52:33So, as we were just like

1:52:36closing closing the door on time um in

1:52:40July that um

1:52:42FY26

1:52:45fund balance had dropped from 20 to 10.

1:52:48Okay, going to the next slide. Um this

1:52:50I've two slides

1:52:52that are the

1:52:54um kind of fund balance summary related

1:52:56to FY26. So, um and I did this in two

1:53:00slides so that there was a at least a

1:53:02small chance you could read this tiny

1:53:04writing.

1:53:05Um

1:53:06but some of this um

1:53:09on this first slide this is all of the

1:53:11appropriations

1:53:12that impacted FY26.

1:53:16And then on the next slide

1:53:19are

1:53:20the um anticipated

1:53:24and realized variances.

1:53:27So,

1:53:28um

1:53:30you know, through

1:53:32uh you'll notice

1:53:33Sorry, let me see if I can get this

1:53:35right.

1:53:36We went from March having 12 million to

1:53:39July having 10 million

1:53:42and now because we've experienced

1:53:45everything in FY26

1:53:48we're up to 18 million. So, we've got an

1:53:50increase almost 19 million. An increase

1:53:54of 8.6 million from the adopted budget.

1:53:57We can go back to

1:53:59um 2 million dollars in um commodities

1:54:03and services that added and your revenue

1:54:07that added to the fund balance as well.

1:54:10So, those are the big big drivers um

1:54:12that took you to

1:54:15um that ending balance in FY26.

1:54:21And we can talk about FY26 or I can

1:54:23answer the question of well, what does

1:54:24that make FY27?

1:54:26Cuz I'm sure that's

1:54:28also the burning question.

1:54:30>> Let's go with the burning question.

1:54:32>> Okay, so we'll go to the next slide. So,

1:54:35um

1:54:36this again, I'm going to take you back

1:54:38in time in June as you were adopting the

1:54:40budget,

1:54:42uh we gave you a summary of your fund

1:54:44balance.

1:54:45And at the end of FY27 after all of the

1:54:49budget decisions were made,

1:54:51and

1:54:53um [clears throat]

1:54:54with anticipated FY26 legislation, you

1:54:57were going to be at um $3.3 million,

1:55:01and with potential foregone revenue

1:55:04items that were in the queue, it's going

1:55:06to get you to $3.7 million.

1:55:09So, again, back in June,

1:55:12that's where we thought we were going to

1:55:13be.

1:55:14And then we can go to the next slide.

1:55:16With that change in our ending FY26

1:55:20fund balance,

1:55:22it pushes your expected FY27 ending fund

1:55:26balance

1:55:27from $3.3 million up to $12.1 million.

1:55:31And again, we'll point back to those big

1:55:33revenue drivers. That sales tax that was

1:55:35really driven by that um conflict in the

1:55:37Middle East. Um we had almost $2 million

1:55:41from um Gastineau Human Services that we

1:55:44um hadn't anticipated the return of the

1:55:46grant.

1:55:47And then that additional $2 million in

1:55:49commodity and services lapse from 26.

1:55:53And that's the real driver um

1:55:57to get you to that 27 fund balance. So,

1:55:59if you ask me, what's my fund balance

1:56:01today? The answer is $12.1 million.

1:56:03>> And remember, it's today, just watching

1:56:05all the different things happen.

1:56:09Ms. Cosgrove.

1:56:11>> You you may not be able to answer this,

1:56:13but I'm curious. We we talk about the

1:56:15increase in sales tax revenue driven by

1:56:18um the conflict in the Middle East.

1:56:20Surely some of those same things

1:56:22impacted our expenses, and I'm curious

1:56:24if you've seen that on the

1:56:26other side. And I know there was a lapse

1:56:28in some of those pieces, so I recognize

1:56:29that, but I'm just curious how that same

1:56:31thing is impacting the city.

1:56:32>> That That's a really great question. I I

1:56:36don't have hard data to to to share with

1:56:39you, but the last couple of years our

1:56:41non-personnel lapse has been 3 4 5

1:56:45million, and it was only 2 million this

1:56:47year. So, I think that some of that um

1:56:51cost that impacts the the city's ability

1:56:53to give services

1:56:55is seen in that lapse being just 2

1:56:57million.

1:56:59Um as we looked through um the various

1:57:03ways that we can slice and dice sales

1:57:05tax data,

1:57:07um the biggest driver was anything that

1:57:10used fuel. So, anything that needed a

1:57:13barge to come up here, anything that

1:57:15needed a plane to come up here, whether

1:57:17that was a thing or a person, um you

1:57:20know, those um those were so clear as um

1:57:24differences from a year ago.

1:57:26Um and and

1:57:28you all know when you

1:57:30drive by anywhere that's got the fuel

1:57:31price, diesel at

1:57:34over six is um mind-blowing.

1:57:40>> And before we get too excited about the

1:57:4212 million, we still have the GLAC

1:57:44conversation.

1:57:46Um

1:57:47seeing no further questions, um I'll ask

1:57:50a question. So, the restricted budget um

1:57:53reserve, we pulled some money out of

1:57:55that without replacing it. Can you give

1:57:58me a ballpark figure of that?

1:58:00And uh just remind my assembly members

1:58:02that we are supposed to replace this

1:58:04when we pull it out.

1:58:06>> Thank you, Madam Mayor. Um I'll give you

1:58:07a couple of facts about your um

1:58:10restricted budget reserve.

1:58:12Um you've got 17.

1:58:17Looks like 17.6 million in there right

1:58:19now.

1:58:20Um you should have 24.

1:58:22Um 3 and 1/2 million dollars

1:58:26um was pulled out for GLAHF-related

1:58:30expenses. Um,

1:58:33there was a small amount that came back,

1:58:37um, about $300,000, where FEMA,

1:58:40um, funding came through, and so that

1:58:43restored, um, some of the restricted

1:58:45budget reserve. So, $3.2 million of the

1:58:48restricted budget reserve is, uh, was

1:58:51pulled out for GLAHF. You also have, um,

1:58:55just about $2.5 million um, set aside

1:58:58for the Eagle Crest deficit, which I

1:59:00know is,

1:59:01um, something we can, um, is on the

1:59:04agenda to talk about on Wednesday.

1:59:06Um, [snorts] but those two things

1:59:07together is, are, you know, almost $6

1:59:09million, $5.7 million.

1:59:14>> Ms. Atkinson.

1:59:16>> Uh, thank you, Madam Mayor. Just a

1:59:17clarifying question. With that, uh,

1:59:19$17.5 million, is that exclusive of the

1:59:23$2.5 for Eagle Crest, or are we

1:59:24factoring that in as if we have it?

1:59:29>> If you were to,

1:59:31um,

1:59:33direct us to resolve the Eagle Crest

1:59:36fund deficit through regular

1:59:38unrestricted general funds, it would

1:59:40take you from $17 million up to $2.5

1:59:43million, $19.5 million. Thank you.

1:59:50>> All right. Any further questions on

1:59:52that?

1:59:54Okay. Carry on.

1:59:55>> Excellent. So, the last slide is what

1:59:58Manager Custer really wants to talk

1:59:59about.

2:00:01>> Thank you. Uh, yes, this is a a teaser

2:00:04slide for, uh, questions that, uh, I

2:00:07would, uh, direction that staff would

2:00:09like to get at the November 21st, um,

2:00:12budget retreat, so that we can take that

2:00:14direction and build you a budget. Uh,

2:00:17so, one of the things that we're going

2:00:19to be talking about is it's time to

2:00:20assemble a temporary 1%. And, um,

2:00:23looking for some guidance on assembling

2:00:27that list for you. My recommendation

2:00:29that we, of course, will go into greater

2:00:31detail of like example projects and

2:00:32needs would be a real theme of taking

2:00:35care of what we have. And there's a

2:00:37policy decision to be made there because

2:00:39often the 1% in the past has kind of

2:00:41been where you fund some of those more

2:00:44um

2:00:45pet projects for lack of a better word,

2:00:47but you know, where constituencies are

2:00:48really looking

2:00:50certain constituencies are really

2:00:51looking forward to, you know, different

2:00:53things,

2:00:55new services. And so that would be

2:00:59that would be a policy conversation for

2:01:00you to have. The other policy

2:01:04conversation is we have, you know, new

2:01:06revenue and how do you want to budget

2:01:09for recreation? My my recommendation is

2:01:11a status quo budget. We currently spend

2:01:14between capital and operating almost $20

2:01:16million a year on recreation-related

2:01:19items. We will detail that all for you

2:01:20in the retreat, but that will of course

2:01:22be,

2:01:23you know, how the assembly is

2:01:26wanting to kind of spend the those new

2:01:28dollars that the voters very

2:01:29intentionally

2:01:31intended to be meant for preserving

2:01:33recreation

2:01:35while leaving that discretion with the

2:01:37the governing body.

2:01:39Also will be asking for guidance on on

2:01:43budget, right? Every year you say, you

2:01:45know, last year you said cut, tighten,

2:01:48trim,

2:01:49and find new revenue.

2:01:51So we are we are looking for direction

2:01:54on both kind of

2:01:57status quo budget, cut budget, you know,

2:02:01what what you all want to see, but also

2:02:03will be asking you advising that we

2:02:06would present a balanced budget. So

2:02:07we've had a couple of years of fund

2:02:10balance spent in order to

2:02:13balance the budget. And this really

2:02:15isn't best practices.

2:02:16There were really good reasons that, you

2:02:18know,

2:02:19as evidence by today's presentation,

2:02:21right? The the good reasons why you did

2:02:23not make wholesale cuts to a lot of

2:02:25programming.

2:02:26Those have borne fruit. But it's kind of

2:02:28time to probably get back to

2:02:31balanced budget. But that of course is a

2:02:33policy decision for for you to give. Um

2:02:35also some policy uh guidance on our CIP

2:02:38appropriations. We have trimmed back um

2:02:42CIP spend because our CIP spend is um

2:02:47uh a lot of our CIP piece is sales tax

2:02:49driven and we just have a different

2:02:52sales tax number. So um we are in the

2:02:54last year of 1% and every year we've

2:02:57kind of um sacrificed a a project that

2:03:00might have been on the 1% list in order

2:03:01to make that budget goal. So kind of

2:03:03checking in with you on that. Um and

2:03:06then the the last item that I think will

2:03:08be really interesting to talk through

2:03:10from a policy perspective is

2:03:13how um aggressive we are on forecasting.

2:03:16And I know we've had this conversation

2:03:17before. I mean my first year as city

2:03:19manager we had the whole how aggressive

2:03:21do we do we forecast. Um but but uh

2:03:25acknowledging that we've experienced

2:03:27this um inflation in in

2:03:31you know, transportation costs which has

2:03:34meant we have more funding um but it

2:03:37also is incredibly volatile, right? We

2:03:39we don't know what's going to happen.

2:03:41And so we want to get guidance from the

2:03:43body on a way to structure our budget um

2:03:46and I'm thinking capital budget

2:03:48specifically uh where you can still make

2:03:52some of those really kind of bold um uh

2:03:55assumptions on revenue, maybe more bold

2:03:57than even the finance director would

2:03:59recommend uh but but bifurcate your CIP

2:04:01appropriation in a way that if we don't

2:04:04make those returns,

2:04:06um

2:04:07we're not, you know, um overspending.

2:04:10And so just talking through that that is

2:04:12a policy decision. So I I mostly wanted

2:04:14to make sure that you had time to kind

2:04:16of chew on those, that we can uh chat

2:04:18about them.

2:04:20And um let you know what we plan on

2:04:23asking of you in uh no on that November

2:04:2621st date.

2:04:28>> Any questions on the ask or any

2:04:30questions that you want to

2:04:32prepare staff for for our retreat.

2:04:37>> Is all

2:04:38Yeah,

2:04:39would at the retreat will we be provided

2:04:42with, you know, what was cut last year

2:04:43so we can take a look at that as well as

2:04:46if we want to do any adding back?

2:04:50>> Absolutely.

2:04:54>> Um my question will be magic finance

2:04:57manager.

2:04:59Um

2:05:01my question would be I'm not going to

2:05:02ask you for night just to put in your

2:05:04head and I don't even know if it's going

2:05:05to Can you peel out inflation on your

2:05:08sales tax and give us how close you

2:05:10would have been without sale without

2:05:12inflation? But yeah, I'm not asking you

2:05:14to give me that number, but is it

2:05:15possible to do that?

2:05:17>> Um it may be possible. One of the things

2:05:19we absolutely tracked was um the amount

2:05:23we of sales tax we thought we would lose

2:05:26due to

2:05:28the uh food exemption and the

2:05:32residential utility exemption.

2:05:34And we were within a couple hundred

2:05:35thousand dollars of that. Um so as so

2:05:39that makes me believe had there not been

2:05:42inflation, our overall sales tax number

2:05:45would have come in

2:05:47um fairly close to our our

2:05:50reduced with the election result um

2:05:54forecast.

2:05:55>> That's pretty tight.

2:05:57So, anyway, if you could bring those

2:05:59that those numbers, that would be great.

2:06:01Anything further, Mr. Brooks?

2:06:05>> Thank you, Madam Mayor. Is there any way

2:06:08to

2:06:10get, you know, like um

2:06:13a view over the last handful of years of

2:06:18parcels that have gone off of the

2:06:20property rolls or that the property tax

2:06:23rolls?

2:06:24Just, you know,

2:06:26not necessarily housing stock, but just,

2:06:30you know, commercial properties, too,

2:06:32things like that. Just so we can

2:06:35kind of have like that comprehensive

2:06:37view of

2:06:40what we have compared to what we had

2:06:43just, you know, years prior.

2:06:46>> So, Mr. Brooks, just to make sure I'm

2:06:48clear, are you saying a piece of

2:06:50property was paying sales or property

2:06:52tax and now it's not? Okay, thank you.

2:06:57>> Uh that's a good question. Um we

2:07:01certainly can

2:07:03um

2:07:05Y- The answer is yes.

2:07:08The the the thing that I don't know

2:07:11sitting right here is if I can do it in

2:07:14minutes, days, weeks, or months. Um

2:07:18because certainly we can get a list from

2:07:21any year

2:07:23and

2:07:25put another list next to it and put

2:07:27another list next to it, and it's a very

2:07:29manual process. Um we we talked a few

2:07:33months ago about um

2:07:35looking to replace our enterprise

2:07:37systems, and one of the reasons why

2:07:40we're looking to replace them is um the

2:07:42reporting out of it is just

2:07:45not excellent. And um our parcel data um

2:07:51is is part of that group that's just

2:07:54really hard to to be able to answer a

2:07:56question like that.

2:07:57Um that being said, we can do just kind

2:08:00of initial cursory review and see see

2:08:03what we think it would take, and I can I

2:08:04can work with Manager Custard to figure

2:08:06that out.

2:08:08>> I I do, and correct me if I'm wrong,

2:08:10Director Flick, but uh

2:08:11getting the value of

2:08:14um

2:08:15uh the assessed I mean, we could we can

2:08:18we can get like moment in time uh well,

2:08:21it's one it's one year at a time uh

2:08:24value for

2:08:26property that is taxable and

2:08:28non-taxable, correct? So, so like that

2:08:31high-level data is easier to get uh and

2:08:34the parcel-specific information is more

2:08:36difficult. Am I understanding that?

2:08:40>> We have aggregate um

2:08:43valuation numbers, absolutely at a high

2:08:46level. Um there are some properties that

2:08:49um there's some parcels that just don't

2:08:52get values assigned to them because of

2:08:54the type of parcel they have. They are.

2:08:56So, um

2:09:01like I said, I'll I'll do a cursory

2:09:03review to see what we think we can pull

2:09:05together.

2:09:06>> And yeah, to follow up on that, what uh

2:09:08the manager was saying, yeah, that uh

2:09:11that larger view of like what is taxable

2:09:14on the rolls and what is isn't, you

2:09:17know, that for a handful years would

2:09:20would be just just as good as space.

2:09:23>> Okay.

2:09:25That where you think you got what you

2:09:26needed then, Ms. Cosgrove?

2:09:29>> Let me see if I can frame this in a way

2:09:31that makes sense. If we're going to look

2:09:33at aggressive revenue forecasting, can I

2:09:35assume that you all are going to bring

2:09:37back some

2:09:38uh projections versus actuals so we can

2:09:41kind of look at trend over time of what

2:09:44that looks like and maybe also

2:09:45consideration of what are those big

2:09:48unknown things that happen and pop up,

2:09:50which they frequently do, inflation

2:09:53being one of those things. Does that Is

2:09:55my ask clear?

2:09:57>> Thank you for that question. Um we are

2:09:59planning to bring you um several years

2:10:03of, for instance, sales tax data by

2:10:05year, um what was budgeted, what was the

2:10:08actual um sales tax for that given year.

2:10:12Um and then also

2:10:15um

2:10:16by

2:10:18November 21st, we'll have had

2:10:21July, August, September quarter of sales

2:10:23tax data

2:10:24um [snorts] was due today.

2:10:27Um so we'll we'll have, you know, some

2:10:30more current numbers, and we hope to

2:10:33have a at least a first blush of what we

2:10:35think 28's going to look like. Um so,

2:10:39hopefully through all of that that trend

2:10:41data will pop.

2:10:43Thank you.

2:10:45>> Um Ms. Niven.

2:10:49>> Going back to the fleet reserve

2:10:52spreadsheet, is it possible to get the

2:10:55encumbered

2:10:57amounts and add a column in there so we

2:10:59get more of real time where we stand?

2:11:04>> Uh thank you for that question. Yes, we

2:11:06can.

2:11:07>> Thank you.

2:11:11>> Okay, seeing nothing further,

2:11:13um let's go ahead and take 9 minutes.

2:11:21So, bring us to 8:20.

2:14:51>> Mhm.

2:16:54>> Mhm.

2:18:56>> Mhm.

2:19:39>> I can the session.

2:19:42Save us quickly from that discussion.

2:19:46Uh

2:19:48Telephone Hill request for

2:19:49qualifications, Madam Manager.

2:19:52>> Thank you, Madam Mayor. On page 28 of

2:19:54your packet, you have a cover memo from

2:19:57me that's kind of outlining this topic.

2:20:00Um

2:20:02This RFQ is the culmination of about 3

2:20:05years of Assembly work that, you know,

2:20:08began with public meetings, um

2:20:10developed into the place guide uh that's

2:20:13posted on the website, um evolved into

2:20:16many, many different decisions that the

2:20:18Assembly made. Um eventually, the

2:20:20Assembly decided to

2:20:23uh pause on planned demolition of

2:20:25Telephone Hill and issue this request

2:20:27for qualifications to kind of see what

2:20:30uh developments are out there. So, uh

2:20:32nor- normally, a process like this, and

2:20:34I say normally, but uh acknowledging

2:20:36that this is definitely not a normal

2:20:37process, and there's nothing about uh

2:20:40redeveloping a core part of downtown uh

2:20:44that that is normal, right? So, part of

2:20:45why you were here and you put so much

2:20:47effort into this is it is a unique and

2:20:49transformative opportunity. Uh but, we

2:20:52do RFQs and RFPs all the time, and staff

2:20:55has the authority to issue those um

2:20:58after the assembly has um

2:21:01appropriated those funds and given that

2:21:02direction. In this instance, just

2:21:04because it's such an important project,

2:21:06there's new assembly members, we really

2:21:08wanted to bring the topic back to you

2:21:10and just have a

2:21:11a touch base.

2:21:13Um

2:21:16Sorry, I got distracted.

2:21:18We just wanted to come back and and

2:21:19touch base with you on uh the RFQ, the

2:21:23RFQ process, and most importantly, the

2:21:26evaluation criteria. The evaluation

2:21:29criteria is on page 50 of your packet.

2:21:32The the memo says page 15, that's

2:21:34because when I drafted the memo, I was

2:21:35working off of a uh RFQ that got

2:21:38repaginated when it got stitched into

2:21:40the packet. So So again, uh focus of

2:21:43that is on page 50. You also have in

2:21:45your packet a nice timeline that staff

2:21:48put together just kind of detailing the

2:21:50steps and the major decision points as a

2:21:53uh

2:21:54as a matter of background on this topic.

2:21:56Uh so the purpose for this conversation

2:21:58today is to really focus on

2:22:02um

2:22:03the the that uh

2:22:05evaluation criteria. We will issue this

2:22:08RFQ uh pretty much as soon as you give

2:22:11us that direction to do so. We'll We'll

2:22:13hold it open for about 60 days. We'll

2:22:15have pre-bid meetings. Uh you know,

2:22:17we'll go through all of that process.

2:22:19And then staff will come together and

2:22:22have a a scoring committee. So we will

2:22:25take that evaluation

2:22:26uh criteria that's in the RFQ. It will

2:22:28be um it will be a rubric, right? And

2:22:31and staff will use that rubric to score

2:22:34all of the applications and all of the

2:22:36proposals, and we will develop a

2:22:38recommendation um that is

2:22:41most aligned with the evaluation

2:22:44criteria. And you'll you'll notice again

2:22:46that's on page 50 of your packet. Uh

2:22:48that includes the the project vision,

2:22:51which is an important part. It's kind of

2:22:52like what we've been talking about for

2:22:54the last 3 years. But really the major

2:22:57part of that

2:22:59uh that criteria is based on a firm's

2:23:02ability to to do the work and their

2:23:04history doing the work. This is why it's

2:23:06a request for qualifications and not a

2:23:08request for proposals. So

2:23:11so staff will it'll be open for you know

2:23:13at least a 60-day period.

2:23:16Um we will come together and we will we

2:23:18will score those

2:23:20proposals and then we will bring those

2:23:23proposals to the assembly with a

2:23:24recommendation. So we would say we

2:23:27recommend proposal

2:23:29B because it is

2:23:32most aligned with assembly vision and

2:23:35most experienced team project team and

2:23:39the

2:23:40developer has

2:23:42experience developing affordable housing

2:23:44in urban environments similar to Juno

2:23:48and you know for all of these reasons we

2:23:49recommend this

2:23:51this you know proposal proposal proposal

2:23:54number B

2:23:56then if you you know accepted that

2:23:58recommendation

2:24:00you would just like you do with all of

2:24:02our land

2:24:03development transaction. So think of

2:24:0612th Street in in Franklin for example,

2:24:10you would

2:24:11um

2:24:13authorize the city manager to enter into

2:24:14negotiations with that developer to

2:24:18flesh out details of that project,

2:24:20right? So there's still one thing I want

2:24:22you to take away from today's process is

2:24:25there are still many touch points for

2:24:27assembly approval. If you get to that

2:24:29you know we've had the 60 days staff

2:24:32gives you a recommendation and you say I

2:24:34don't like staff's recommendation

2:24:36because I don't think they adequately

2:24:38assessed

2:24:40you know our vision

2:24:42as established in the RFQ I recommend

2:24:44proposal C. You can do that. I just

2:24:48would encourage you to have it justified

2:24:50in the evaluation criteria and the

2:24:52project vision that you're establishing

2:24:54in the RFQ process today, right? Because

2:24:56it's important that all those

2:24:57respondents know what you're going to be

2:24:59valuing when you when you score those

2:25:02and when the staff scores those but

2:25:04ultimately when the assembly reviews

2:25:06those. So,

2:25:08there is I think a degree of flexibility

2:25:10built into this process and touchpoints

2:25:12built into this process, right? You will

2:25:16authorize the manager to enter into

2:25:17negotiations and then the manager will

2:25:20hammer out details of you know

2:25:23feasibility and and all the like all the

2:25:26details that really matter through this

2:25:28process because

2:25:31a proposer is going to have to invest

2:25:33six significant amount of money into

2:25:35developing all of those details and then

2:25:37you would have you know another

2:25:38opportunity to approve any project or

2:25:41any transfer of property.

2:25:44So, not as you know not as probably

2:25:46crystal ball as we would like to have to

2:25:48know exactly what we're going to do but

2:25:50I think it lays out a process that keeps

2:25:53us moving forward on Telephone Hill

2:25:55while maintaining the assembly's

2:25:57discretion to you know provide that

2:25:59direction. Happy to answer any

2:26:01questions.

2:26:03>> All right, who has questions?

2:26:08Well, I'll start with mine then since

2:26:09everybody's being shy. Okay,

2:26:12I have said from all along we should do

2:26:14this a little bit differently but that's

2:26:15okay.

2:26:16I can go with the will of the body but

2:26:18I'm just want to make sure that this is

2:26:19open enough. You say up to 150

2:26:22155 units but let's pretend that I'm a

2:26:26developer I want to do 30 high-end

2:26:27condos. Can I still answer the RFQ?

2:26:32>> Yes, and you could answer the RFQ

2:26:35to not develop the entire site. You

2:26:37could

2:26:38let's say you wanted those 30 high-end

2:26:39condos on the the the forward lot.

2:26:43You could just respond for for that um

2:26:48that piece.

2:26:50>> So, I'll just keep going. What if I just

2:26:52want to do infill? Keep a couple of the

2:26:53houses and put a fourplex or something

2:26:56there. Can I still respond?

2:26:57>> Yes, you can respond and it would be

2:26:59scored according to the criteria that's

2:27:02established in this RFQ.

2:27:04>> Well, Mr. Brooks.

2:27:06See, I

2:27:07got you guys started, so now you'll

2:27:08start thinking. Mr. Brooks.

2:27:10>> Um

2:27:11I just want to know like

2:27:15the things that we should iron out for

2:27:17the understanding of us on the body here

2:27:19is like exactly [clears throat] how many

2:27:21units do we want, what level of subsidy

2:27:24do we want to provide on the taxpayers'

2:27:26dime, and you know, what do we want to

2:27:29see out of this RFQ because right now

2:27:31it's

2:27:32for you know, up to 155 units, but all

2:27:35the language is still very much full

2:27:37demo, high-rise, high density, and I

2:27:40think we need to go around the table and

2:27:43see if that's actually what we want, and

2:27:45kind of iron out some of those details

2:27:47now so we don't push this through and

2:27:49then get

2:27:50less than desirable responses and then

2:27:53have to get something new issued down

2:27:55the road. Let's I want to be efficient

2:27:57here.

2:27:57>> Well, Mr. Brooks, I hear what you're

2:27:59saying, but that's why I just asked my

2:28:00questions is it's anywhere up to 150

2:28:03units, so I don't think we want to take

2:28:06anything off the table, but we'll let

2:28:09the body think about that for a minute.

2:28:10I'll go to Mr. Kelly.

2:28:14>> Uh thank you.

2:28:16Um

2:28:19So, I'm looking at the timeline that you

2:28:21have here on page 31 of the packet.

2:28:26And I'm

2:28:28thinking I I've I've been looking

2:28:30through this as much as I can over this

2:28:32weekend, and I might have some ideas for

2:28:35amendments, but there's some things I

2:28:37might want to hash out if we ended up

2:28:39taking another meeting to in order to do

2:28:42this.

2:28:43Uh would how would that impact the

2:28:45timeline?

2:28:49>> Madam Manager.

2:28:52>> Um

2:28:53it would delay the timeline by uh

2:28:56at least

2:28:58to at least another month, right? We're

2:29:00in November 2nd, our next Committee of

2:29:02the Whole is November 30th.

2:29:05>> All right, Mr. Kelly, start asking your

2:29:06questions.

2:29:08Um Ms. Hall.

2:29:10>> Another uh I'm I'm looking at the

2:29:12available incentives and the low-income

2:29:15housing tax credits, which um that

2:29:17program they usually expire in 30 years.

2:29:21So then that would make those vulnerable

2:29:24to becoming market-rate. Um

2:29:26so I'm just wondering are are we would

2:29:28this allow developers to consider other

2:29:32uh such as say limited equity co-op

2:29:36housing?

2:29:37Um yeah, I I want to make sure

2:29:40we throw out several different potential

2:29:43um

2:29:44models that they might take a look at.

2:29:48>> Madam Chair.

2:29:51>> Yes, one of the reasons why we are so

2:29:53heavily focused on the qualifications of

2:29:56the developer is cuz we want to attract

2:29:59a developer that has experience in some

2:30:01of these

2:30:02um unique financing mechanisms, but also

2:30:05uh programs for affordable housing,

2:30:07programs for for financing. So um we

2:30:10would be leaning on on that experience.

2:30:12We would be hoping to have that

2:30:14experience in uh the the proposers who

2:30:17respond.

2:30:20>> Mr. Kelly.

2:30:24>> Uh thank you. I um

2:30:27also looking at the time. I just had a a

2:30:30question about uh what the definition

2:30:32for So you So I guess um

2:30:35LCG, which I think uh is Leland

2:30:37Consulting Group, would be contacting

2:30:41regional developers. So So what would

2:30:43that mean? Would that mean uh people

2:30:46What What defines region? Is it like

2:30:48Southeast Alaska? Is it

2:30:51um region like the this region of the

2:30:53United States? Um

2:30:56what are we talking about, Stephanie?

2:30:57>> Madam Chair.

2:30:58>> It is Pacific Northwest, and there is

2:31:01linked in the uh memo

2:31:03um

2:31:04the his- historical memo, there is a

2:31:06link to that initial developer outreach.

2:31:08I believe nine different developers, you

2:31:10know, in this was months ago

2:31:13from the Pacific Northwest. There might

2:31:16have been some from

2:31:17the the middle of the country as well.

2:31:20But really

2:31:22we've been advised that the kind of most

2:31:25attractive, you know, developers that

2:31:27would find this attractive would be in

2:31:29our geographic region. So we would focus

2:31:32our outreach there.

2:31:34>> Thank you.

2:31:34>> I'm going to follow up to Mr. Kelly. So

2:31:37I know we can't say Alaska-based

2:31:39developers cuz that's illegal, but can

2:31:41we say anything about who build in

2:31:44wet snowy climates or

2:31:47anything like that?

2:31:50>> I think

2:31:50>> Question for the attorney.

2:31:51>> Yeah, well, I think that the that would

2:31:53go under

2:31:55the qualification section where they

2:31:58have demonstrated experience in similar

2:32:00projects.

2:32:01>> Thank you, Mr. Smith.

2:32:08>> Thank you, Madam Mayor. I'm kind of on

2:32:10that same vein

2:32:12just in terms of, you know, people

2:32:14building in northern climates or Alaska

2:32:17or I mean

2:32:19respect.

2:32:20I guess is it is it is that important to

2:32:24include or or not? I mean I guess it

2:32:27isn't included now. It's like similar

2:32:29projects, but it's not like similar

2:32:31climates or

2:32:34things.

2:32:36>> [clears throat]

2:32:36>> Madam Mayor.

2:32:38>> We can certainly make sure that there's

2:32:40a

2:32:41reference in our criteria under quality

2:32:45and success of previous projects that is

2:32:48specific to

2:32:50not just similar land uses to those

2:32:52provided or scale of projects, but

2:32:57building in

2:32:59northern climates.

2:33:01Northern southeastern climates.

2:33:03>> Yeah.

2:33:04>> And I know Madam Mayor.

2:33:05>> Go go ahead, Mr. Smith.

2:33:07>> I was just going to say like only if

2:33:10only if that actually makes sense. I

2:33:11mean saying like in Alaska I could see

2:33:13not making sense because there's, you

2:33:15know, interior permafrost and then, you

2:33:18know, southeast clay soils. So, like,

2:33:21anyway, I I I just wanted to

2:33:23flag that as

2:33:25if it makes sense to include some type

2:33:26of

2:33:27it that anyway, just

2:33:29then go forward. I'm not saying it has

2:33:31to. Thanks.

2:33:35>> And I know we don't have to

2:33:38we're looking at specific projects, but

2:33:40can we get any idea

2:33:42from this what the cost per square foot

2:33:45would be?

2:33:46Um

2:33:48or was that

2:33:50as we get closer to a project?

2:33:53>> Yeah, I think that level of feasibility

2:33:55uh just

2:33:56uh would be uh you know, would require

2:33:59significant investment on the proposer's

2:34:01part. So, I would see that level of

2:34:03feasibility hammered out after entering

2:34:06into negotiations.

2:34:07However, we have asked under the project

2:34:10vision um that uh projects requiring

2:34:14less assembly incentives will be graded

2:34:15higher because the reality is we don't

2:34:17care how much it costs per square foot.

2:34:19We care how much uh taxpayer dollars are

2:34:23needed to make the investment

2:34:25successful. So, we're really trying to

2:34:27focus on that piece.

2:34:29>> Good job. You answered my other

2:34:30question. I was going to say can we rate

2:34:32how much subsidy is needed, but that

2:34:34answered my question. Ms. Niven.

2:34:38>> I was just going to comment on what Mr.

2:34:41Smith said and and I do like adding the

2:34:44environmental experience in our climate

2:34:48um to make sure that's clear.

2:34:53>> All right.

2:34:54Anything further?

2:34:57Mr. Smith.

2:34:59>> Thank you. I I hear and I you know, what

2:35:01is I read the words that construct up to

2:35:04155 units. I you know, I I I see how

2:35:09I I see how this it is it is open there.

2:35:12I guess I just

2:35:14just a point of consideration is

2:35:17do should we use

2:35:20should we provide examples or you know

2:35:23say things so it is crystal clear like

2:35:27submissions do

2:35:29anyway like submissions do not need to

2:35:32redevelop all

2:35:35um parcels or you know just

2:35:39just to make it like very clear that

2:35:41though that the other options are are

2:35:43allowable. Um I see how it is but again

2:35:47I don't I don't know if like so anyway

2:35:50I'm not sure if a developer reading this

2:35:51would say oh hey I want to develop one

2:35:53parcel

2:35:54and I'd feel good submitting that. Um

2:36:00>> Yeah, thank you for that question. I

2:36:02think that we can make sure that we're

2:36:04clear that um it's not an all-or-nothing

2:36:07uh RFQ and there are other places that

2:36:09that speak to that. I think it is

2:36:12difficult

2:36:14uh

2:36:14to

2:36:16you know if if you guys are like I

2:36:18really want to prioritize something

2:36:20low density over high density. That

2:36:23would be direction to give at this time,

2:36:26right? Because you have you you don't

2:36:27want the highest density. You made that

2:36:29decision when you when you discussed the

2:36:31place guide, when you discussed

2:36:32statement of objectives. But if you're

2:36:34like I really think a lower density

2:36:37number would be preferable

2:36:39notwithstanding all other variables than

2:36:43155 units, then that is direction you

2:36:45you should give because the direction

2:36:48that we have gotten up to this point is

2:36:51um

2:36:51that you know higher density is

2:36:53preferred. Now

2:36:55you can see how the scoring criteria is

2:36:57weighted.

2:36:58Your quality and success of previous

2:37:01projects and your experience delivering

2:37:03projects is weighted far greater than

2:37:05project vision which encompasses all of

2:37:08those things. So you have you have uh 70

2:37:10points for basically can they do the job

2:37:14uh and then only 30 points for what's

2:37:16their vision of of the job. So,

2:37:19um

2:37:19I I think there's

2:37:21uh a lot of room for that. But, if if

2:37:23really you don't want to entertain 155

2:37:26units, that is direction you should give

2:37:29today.

2:37:30>> Thank you for that, and I hadn't

2:37:31forgotten Mr. Brooks. I just was taking

2:37:33questions first before we had that.

2:37:37Mr. Steininger, you look perplexed.

2:37:42>> Uh

2:37:43less perplexed. I'm just thinking about

2:37:44the statement that uh that Mr. Smith

2:37:47made and kind of

2:37:48I I'm

2:37:49trying to consider that with comments of

2:37:53of Manager Kester. Um I'm I'm do kind of

2:37:56lean towards the

2:37:59towards what Mr. Smith just said of

2:38:01maybe having some kind of statement in

2:38:03there. Finding a way to include some

2:38:05kind of statement that makes it clear

2:38:06that

2:38:07a or a

2:38:09a not proposal cuz these aren't

2:38:10proposals, but a a response that

2:38:14that did not look like there's this

2:38:17diagram on the the place guide page 47

2:38:20where it shows the nine

2:38:22different um

2:38:24design guidelines. In every one of those

2:38:26pictures, all the current buildings are

2:38:29gone and replaced with new structures,

2:38:32which I think would further lead a

2:38:34respondent to maybe think that response

2:38:38is required all the structures

2:38:40demolished because they're not going to

2:38:41watch this hearing and go back and read

2:38:43our minutes. So, maybe a statement that

2:38:45makes it very clear that

2:38:49they're not required to demolish all

2:38:51structures, but that you know, the

2:38:54addition or the

2:38:57there be a favorable score to responses

2:39:00that

2:39:01increase the number of units

2:39:04on the hill or something. I'm not

2:39:06getting That's why I look perplexed. I

2:39:07couldn't phrase what I wanted to say in

2:39:09my head.

2:39:10>> [laughter]

2:39:11>> Mr. Brooks.

2:39:13>> Thank you, Madam Mayor. Uh

2:39:15do you think an appropriate way to

2:39:18encompass what uh Assemblymember Smith

2:39:21and Steininger are saying is something

2:39:23like and and I'm not going to use the

2:39:25155 units because I don't think it's

2:39:28nearly as feasible, but could you say

2:39:30something like 30 to 80 units

2:39:33including existing structures and then

2:39:37that way it could encompass what's

2:39:39already there in addition cuz I mean of

2:39:41course we want more uh housing. So, the

2:39:4530 or 35 is double what's already there,

2:39:49but what's already there could be

2:39:51contributed to it and then doing that

2:39:53range 30 to 80, you know,

2:39:56it sets that clear definition is like we

2:39:58have to do at least this much and then

2:40:00up to up to this point.

2:40:05>> Um so, I I want to go back to

2:40:07Assemblymember Steininger's comment. On

2:40:09page 50 it says a statement of the

2:40:11respondent's vision for Telephone Hill

2:40:13including whether they propose to

2:40:14develop the entire site or only a

2:40:16portion, proposed uses and open spaces

2:40:18and considerations for affordable

2:40:20housing. So, um

2:40:22uh it is mentioned in there.

2:40:25I I also want to note that when you um

2:40:29when you pause demolition, you paused

2:40:31demolition. You did not cancel

2:40:33demolition, you did not say you were not

2:40:35going to to demo those houses or pay for

2:40:37demoing those houses. So, that is one of

2:40:39the potential Assembly incentives that

2:40:41is still on the table for uh development

2:40:45of this project. And then to address

2:40:47Assemblymember Brooks' question, um

2:40:51I think that you absolutely could amend

2:40:53this RFQ and say we want to prioritize

2:40:57infill over new development and we want

2:41:00to prioritize a lower density of of

2:41:02housing. I think that would be a very

2:41:04hard pivot from all the work that has

2:41:07been done to this this moment and um

2:41:11might, though I'm not sure, necessitate

2:41:13a little bit more just thought work

2:41:15because it is because we've kind of been

2:41:16going on this like this path, right? The

2:41:19the place guide is very

2:41:20is very clear. Like I think we would

2:41:22want to like go back to the place guide

2:41:24and look at some of the other options

2:41:25and maybe spend just a little bit more

2:41:27time if we're going to prioritize. So,

2:41:30it's not that that option's not on the

2:41:32table, right? It's not that if someone

2:41:34submitted a proposal and said, "I want

2:41:36to do 30 units and I want to do infill."

2:41:38That this simply wouldn't that that you

2:41:40wouldn't it wouldn't be considered. It's

2:41:43just that it would be scored lower than

2:41:45a project that is proposing a higher

2:41:47density project

2:41:51all other things equal, right?

2:41:52Remembering that we're actually valuing

2:41:55the ability of the team to do the work

2:41:56more than anything else, which still

2:41:58leaves a lot of a lot of room, right,

2:42:00for those negotiations on exactly what

2:42:03that project would look like.

2:42:05So, I I guess if we want to go back um

2:42:09you may want to consider kind of just

2:42:11sitting on this for a little bit longer

2:42:13and and rethinking that if that's the

2:42:14direction you want to choose. I

2:42:16an idea.

2:42:18>> Uh follow up on the Ms. Uh

2:42:20>> Thank you, sir.

2:42:21>> Thank you.

2:42:22I you know, I I was just asking if a

2:42:24proposal like what I had suggested would

2:42:26encompass what Mr. Smith was asking. And

2:42:29that was, you know, the the clear

2:42:33statement whoever might be responding

2:42:36that hey,

2:42:38it can be a combination of some existing

2:42:40things and then also given that clear

2:42:44definition of exactly what we're looking

2:42:46at for a range, not just up to one large

2:42:49number. So, would you know, that

2:42:52direction of 30 to 80 units that which

2:42:55can include existing structures

2:42:57encompass

2:42:59what Assembly Member Smith was kind of

2:43:02asking for in a sense?

2:43:11>> I'm sorry. Um

2:43:13I might have be lost as to what Assembly

2:43:15Member Smith was asking for.

2:43:18Can Assembly Member Smith, can you

2:43:19restate that?

2:43:20>> Mr. Smith.

2:43:22>> Thank you.

2:43:23I don't think I was suggesting putting

2:43:26in another set of numbers.

2:43:28I think I just wanted to

2:43:32I wanted to

2:43:34have some language potentially in there

2:43:36that just

2:43:37made it clear that

2:43:41you know, I mean you you brought up

2:43:43about letting out developing parcels.

2:43:45Anyway, I guess just language in there

2:43:46to to make it clear to proposers

2:43:50that

2:43:51it doesn't have to only be 155 units in

2:43:54developing the entire site.

2:43:56I'm not totally sure how exactly to

2:43:59phrase that, Madam Manager, but that

2:44:01that is more of what I I want that's

2:44:03that was more of my intention. Does that

2:44:05help?

2:44:07>> The

2:44:07um thank you, Mr. Smith. She's nodding

2:44:10yes.

2:44:11Ms. Cosgrove.

2:44:13I don't know if this helps.

2:44:16Um but on page 45 of the packet,

2:44:21there's [clears throat] a uh under

2:44:22goals, site plan and design,

2:44:24there's a um

2:44:27diagram of the Telephone Hill area with

2:44:30the four primary lots drawn in. And

2:44:33under goals, it says construct up to 155

2:44:36housing units, blah blah blah. Now,

2:44:38obviously you're not going to get 155

2:44:40units if you only say, well, maybe we're

2:44:42going to

2:44:43do one

2:44:45parcel. You're not going to get 155

2:44:47units on one parcel. And so maybe in

2:44:49that area, that's a place to just

2:44:51rearticulate

2:44:53that um proposals for less than all four

2:44:57lots will be considered or something

2:44:59along that line. I'm not phrasing that

2:45:00very well.

2:45:02Um but maybe that gets to Mr. Smith's

2:45:04concern. I do recognize

2:45:07um

2:45:08what you said, Manager Custer, about

2:45:09that being included elsewhere.

2:45:12I just think we want to be clear that we

2:45:13are not um

2:45:15communicating

2:45:19We're not creating dissonance in what

2:45:20we're in what we're communicating, if

2:45:22that makes sense.

2:45:25>> I think everybody has kind of said the

2:45:27same thing. I think we just want to make

2:45:29it clear that we will look at any

2:45:31project. But here's our grading

2:45:33criteria, but we'll look at any project.

2:45:35So, we just want to make that clear in

2:45:37it somewhere. And if it's that's the

2:45:39place or up in the front, just I think

2:45:41some statement that says we're

2:45:43interested in any project that increases

2:45:46increases

2:45:48housing units or something.

2:45:50>> [clears throat]

2:45:51>> Thank you, Madam Mayor. I think just to

2:45:53kind of

2:45:54uh summarize that, I think um Assembly

2:45:56member Crosier, that's an excellent

2:45:57addition and we can definitely add that

2:45:59bullet point. I also think that there's

2:46:01probably somewhere in a preamble

2:46:03uh to summarize this conversation. And

2:46:08um I I would I think I can I think I can

2:46:10take that direction right to like the

2:46:13Assembly will consider all options. We

2:46:15we've done our best to lay out a vision

2:46:18that's consistent with community values

2:46:19and public process. However, we

2:46:21understand that there are many factors

2:46:23that would influence, you know,

2:46:24feasibility and developers uh you know,

2:46:27um

2:46:28ability to bring this project to

2:46:30fruition. Something

2:46:33something like that. And keep in mind,

2:46:34we will also have pre-bid meetings with

2:46:36uh

2:46:37developers um where they can

2:46:41ask a lot of these questions, too.

2:46:43>> Good. So, I'm just looking, does that

2:46:45satisfy you, Mr. Brooks? Something like

2:46:48that.

2:46:50Okay. You can say more. Um Mr. Smith,

2:46:52does that satisfy you? Or are you

2:46:55looking for something different?

2:46:57>> That that works for me.

2:47:00>> Okay, Mr. Brooks, what would you have it

2:47:01say more?

2:47:04I see Mr. Kelly, but we're having a

2:47:05conversation.

2:47:06>> Thank you, Madam Mayor. I just

2:47:08you know, want to emphasize that I think

2:47:12being willing to allocate

2:47:15millions for demo

2:47:18like there's two fronts on it, you know,

2:47:20the reason I said the 80 is because of

2:47:24the dual access. We go over 100 and it

2:47:26changes the complexity of you know,

2:47:31having two modes of entrance and access

2:47:34for

2:47:35emergency response and

2:47:37you know, we're looking at doing

2:47:40offering potential utility work, but not

2:47:43offering the road reconstruction and

2:47:46that puts it to where only very few

2:47:48people can respond or do work like that.

2:47:52But also,

2:47:54you know, the

2:47:57the

2:48:03And

2:48:04so,

2:48:06for that reason is like doing that 80,

2:48:08it kind of alleviates the need to have

2:48:10that potential for such large amounts of

2:48:13demolition and

2:48:16it just

2:48:20spending millions and millions of

2:48:22dollars should produce something, a

2:48:24foundation, a skeleton of some sort of

2:48:27housing.

2:48:29I can't imagine spending that kind of

2:48:31money

2:48:33with our financial situation to produce

2:48:37no housing at all.

2:48:39And it's something that, you know,

2:48:42in in better standings and, you know,

2:48:47better financial positions or more

2:48:49buildable areas would might be a little

2:48:52easier to digest, but I just

2:48:54currently cannot imagine, like I said,

2:48:57millions being spent, especially since a

2:49:00large portion of that is a shipping cost

2:49:03to just make our hazardous material

2:49:05someone else's problem.

2:49:07And so, I would really like a focus to

2:49:10be is like, "Hey, you know, let's get

2:49:14as much

2:49:15additional housing as we can in the

2:49:17area, but we can't subsidize it with

2:49:19millions of dollars of taxpayer funds

2:49:21just to make a blank slate. We have to

2:49:24use money like that to actually create

2:49:25housing."

2:49:27>> Yep.

2:49:28>> And I think that will be a further

2:49:29discussion because I I

2:49:31that's where

2:49:33we would differ as a body as all of us

2:49:35want increased housing, but how much we

2:49:38have to spend as a city is probably up

2:49:41for discussion, but I think there'll be

2:49:43a future discussion. Mr. Kelly, did we

2:49:46Did you have anything to add?

2:49:49>> Um I was going to move the discussion in

2:49:52in other areas. I was going to go over

2:49:56the incentives a little bit, um

2:49:58but

2:49:59>> Uh could you pause for 1 second? Miss

2:50:01Adkins raised her hand.

2:50:04Are you ready to chat now, Miss Adkins?

2:50:06Or let Mr. Kelly Go ahead, Mr. Kelly.

2:50:11>> Um I I was just kind of I was looking at

2:50:14the available incentive and I was also

2:50:15kind of looking at the at the overall

2:50:18project

2:50:19scope, you know, being up to 155 units

2:50:23uh with with 30 of them being

2:50:25affordable. Um I think that actually

2:50:29um

2:50:30I mean, so if somebody did want to build

2:50:32the maximum of 155

2:50:35and do the 30 units, that would not

2:50:37technically be 20% um affordable units.

2:50:40That'd be just shy of that.

2:50:42Um so I think I would want to specify

2:50:45like if you are searching for that

2:50:48incentive

2:50:49um that you still must meet the

2:50:53requirements of that incentive. We're

2:50:54not going to give you special treatment

2:50:57because you're doing this project.

2:50:59Um that was That was one point I wanted

2:51:02to make. I think there might be another,

2:51:04but I'll let Miss Adkins go first.

2:51:07>> Um Madam Manager,

2:51:09uh that might be a tough one, Mr. Kelly,

2:51:12because I think the rest of ours are

2:51:14going

2:51:15we don't want to put too many sidebars

2:51:17on any projects. So,

2:51:19I would certainly entertain them

2:51:20speaking for myself totally 30 unit

2:51:24condos.

2:51:25So, if nobody else comes through, yes,

2:51:28we want to find

2:51:29more housing and we'd love to do

2:51:31affordable housing, but if no one's

2:51:33going going on that, then I don't want

2:51:35to stop anybody from putting a project

2:51:37forward that we could consider.

2:51:40Is that it, Gissen? You want to jump in

2:51:41there?

2:51:42>> Uh yeah, Madam Mayor, I guess I'll just

2:51:44have kind of a a broad thing, which is

2:51:46uh we can definitely go through this

2:51:48whole RFQ and pick apart and really try

2:51:52to be so specific about what we're

2:51:54looking for, but I actually think that's

2:51:55the wrong approach. I I like the

2:51:57questions you asked in the beginning,

2:51:59um trying to be as flexible as possible

2:52:02while still making our intent clear, cuz

2:52:04I I don't know about the rest of the

2:52:05body, but I want to see any feasible

2:52:07project that people can come up with.

2:52:10So, uh we've made it clear what we're

2:52:13looking for, but I'm not really

2:52:15interested in adding a lot of side bars

2:52:17that would prevent a person from being

2:52:19responsive and submitting a project.

2:52:22>> Mr. Kelly and Mr. Smith and Mrs. Niven,

2:52:25you can't see it, but people are nodding

2:52:26their heads on the assembly.

2:52:32Okay, who else has

2:52:34Mr. Kelly.

2:52:36>> I guess my pushback to that is that

2:52:38we're going to put this out

2:52:40and then we're going to create this

2:52:42expectation that this is this is what we

2:52:44want. If you give us if you give us

2:52:47we're saying that these are what this is

2:52:48what we're looking for. And if somebody

2:52:51puts back a proposal and then it ends up

2:52:52being something that none of us actually

2:52:55like or maybe a majority of us don't

2:52:57actually like,

2:52:59then um

2:53:00then we're actually kind of damaging our

2:53:02credibility a little bit. And so, I

2:53:03think it actually would be important to

2:53:06actually be specific on what we're

2:53:09reaching out to the developer community

2:53:12and asking for.

2:53:16>> I'll go to Madam Manager on that one. Do

2:53:18we have enough criteria to rate people

2:53:21on that we could say no to a project

2:53:23that we didn't like

2:53:25if it didn't meet some of our

2:53:28>> Yeah, I I think where Assembly Member

2:53:30Keller Kelly is getting is

2:53:33is this line that you guys need to draw

2:53:37and the body

2:53:38Needs to draw between

2:53:40um being specific enough to articulate

2:53:42what you want so that there's a fair

2:53:44process and so that the developers are,

2:53:47you know, positioning themselves to it

2:53:50to

2:53:51um

2:53:52build something that you that you want

2:53:55and that's going to be judged based on

2:53:56pre-established criteria, not based on

2:53:58the whim of like

2:54:00the whim of the day. And the the the

2:54:04flip side of that is to make sure

2:54:05there's enough flexibility so you can um

2:54:09be attractive to all kinds of different

2:54:11developers because you don't know what's

2:54:14out there and you don't know the the the

2:54:16what is possible. And I think this RFQ

2:54:18really tries to thread that needle.

2:54:21I also think that there is room in here

2:54:23for you to give different directions. So

2:54:25if your

2:54:26uh you know, direction is less density,

2:54:28you should give that. If your direction

2:54:30is more affordability, you should do

2:54:32that. If your direction is we absolutely

2:54:34don't want to spend any money on

2:54:36demolition, you should give that

2:54:38direction. Does Does that help? I I know

2:54:40that um

2:54:42I mean I I And I don't want you to get

2:54:45so wrapped around the axle on all these

2:54:46details because in the end, really

2:54:48doesn't matter how long we talk about uh

2:54:5080 homes, 31 units affordable, 30 units

2:54:54affordable. What matters is what people

2:54:56are willing to build.

2:54:58>> Mr. Steiniger and then um Ms. Nevin.

2:55:04>> I I'm good. I'm good for now. Yeah.

2:55:06>> Ms. Nevin.

2:55:11>> I think

2:55:13maybe we need a more little more

2:55:15flexibility in the points under vision

2:55:17and maybe that will help.

2:55:20I feel like

2:55:21um

2:55:23if people propose building a larger

2:55:27number of units, they're going to

2:55:28require more incentives

2:55:30and the points that we score them at are

2:55:34going to offset each other.

2:55:37But only if we have the flexibility

2:55:40to do that with the the way the points

2:55:43are so that

2:55:45our vision for what we want to see

2:55:47outweigh not necessarily outweighs but

2:55:50gives more weight than the experience

2:55:54of the

2:55:55the contractors the developers that

2:55:57propose it. I think it's I think it

2:56:00sounds to me like everybody wants to

2:56:02make sure we get what we want and I

2:56:05think with having 30 to versus 70 points

2:56:10it's going to be harder to

2:56:12to meet our vision than just making sure

2:56:15we have a really good contractor.

2:56:19If that made sense.

2:56:22>> Uh thank you for that Mr. Steineger you

2:56:23want to add to that or

2:56:24>> Um yeah I guess that that is inspiring

2:56:27me to chime in a little bit cuz I

2:56:28actually kind of think about this sort

2:56:30of the opposite. Um

2:56:34I I like that

2:56:36success and experience prior success and

2:56:38experience it are

2:56:42because to me yeah there's a lot of

2:56:43things that I might want to see on

2:56:45Telephone Hill there might be

2:56:47you know

2:56:49a greater level of density. I think you

2:56:51know having seen a lot of density lost

2:56:53in downtown over the last decade or so

2:56:56but

2:56:58achievability of a project is a lot more

2:57:02important I think than

2:57:05you know my aesthetic desires for what

2:57:07the buildings look like or the exact

2:57:11number of units or how it's done

2:57:14and that's why I really want to make

2:57:15sure that we're

2:57:17you know like my comments earlier about

2:57:18making sure that's very clear we're not

2:57:20going to throw away our application if

2:57:22it doesn't look exactly like this 155

2:57:24units. If you're only you know if you're

2:57:26leaving these homes and you're building

2:57:28you know 30 new units net total

2:57:32yeah it's not the 155 but if you're an

2:57:34applicant that

2:57:36has experience can get it done that's

2:57:38more important I think than these

2:57:41kind of dream and visions and so I I

2:57:44kind of like that scoring criteria and I

2:57:47I hope maybe that statement answers some

2:57:49of the questions Miss Kester asked

2:57:52about, oh, do you want to change

2:57:55specific terms? I don't think so. I

2:57:58think what's in here is good cuz it

2:58:00highlights wants, but it doesn't bind us

2:58:04to them at the end.

2:58:07>> So, thank you for that statement, Mr.

2:58:08Steiniger. So, we will just I think you

2:58:11led us to where we're to the statement

2:58:13thing. So, um

2:58:19Katie doesn't get to talk.

2:58:21Go ahead, Madam Manager, cuz I think

2:58:23we're to the point where we might say

2:58:25what we were thinking and cuz I'm

2:58:27hearing that we're pretty open to ideas,

2:58:29but I want people to state if that's the

2:58:32case, so I'm not misspeaking for them.

2:58:35Go ahead, Madam Manager.

2:58:36>> I just want to remind the body that

2:58:38um

2:58:38this is a request for qualifications for

2:58:40a reason and we heard that from the

2:58:42developer community. They were like,

2:58:44this should be a different request for

2:58:45qualifications, not proposals. And that

2:58:48there will be additional opportunity to

2:58:50negotiate what that transaction looks

2:58:52like once you select the most qualified

2:58:56developer.

2:58:57And and that is really where you're

2:58:58going to hammer out like

2:59:00some of these uh

2:59:03the more of the details.

2:59:06>> Uh thank you for that. So,

2:59:08um

2:59:09Mr. Smith, we'll start with you.

2:59:11Give us your statement. What do you want

2:59:12to see?

2:59:17>> Um

2:59:19I

2:59:21I'm fine with the two kind of at least

2:59:24with the counting two changes that we

2:59:25have before just

2:59:28creating some space or opening, you

2:59:30know, that

2:59:32to make it clear we'll accept proposals

2:59:34that are not, you know, 255 units on all

2:59:37four parcels. Um

2:59:38anyway,

2:59:39I think we've already covered that.

2:59:42With the things we've already discussed

2:59:43and the way it is now, I'm I'm actually

2:59:47fine with it.

2:59:49With those with those changes.

2:59:52>> All right. Thank you, Mr. Kelly.

2:59:56>> Um thank you. I I think I am, too. I

2:59:58just I don't know. Do we need some sort

3:00:00of

3:00:01is the is the manager at this point kind

3:00:03of taking

3:00:08I I yeah. Um is the is the manager at

3:00:10this point kind of um

3:00:12going to make edits based off of our

3:00:14conversation or do we need a motion to

3:00:17make edits and make things clearer?

3:00:20>> We're going to wait and see what we

3:00:22after everybody talks if she thinks it's

3:00:24clear enough for her.

3:00:26So.

3:00:30>> Okay. Um

3:00:31>> your two cents?

3:00:33>> No, I I think um well, I guess I'll just

3:00:35uh add add two cents. Like I I just um

3:00:38I'll just reiterate that I think if we

3:00:40are going to offer any sort of

3:00:41incentives uh that involves certain

3:00:43program requirements that um

3:00:46those would be conditional on on meeting

3:00:49those program requirements. So, if it's

3:00:51you know, something they're they're

3:00:53looking for the affordable housing

3:00:55fund support, they should still

3:00:58um meet the requirements that any other

3:01:01contractor would have to meet in order

3:01:03to do that to qualify.

3:01:06>> Okay. I think you said it a little bit

3:01:07better than Mr. Kelly. So, um if they

3:01:10meet the affordable if they want to use

3:01:12the affordable housing fund, then they

3:01:14have to meet the criteria that to use

3:01:15it. So, that's what I got out of what

3:01:17you said. Is that correct?

3:01:20>> Yeah, and I was being more broad. I

3:01:21think that's the only one that has I

3:01:22think that's the one that has the

3:01:23strictest requirements. So, yeah.

3:01:25That works.

3:01:26>> Thank Thank you for that. Um Ms.

3:01:28Atkinson.

3:01:30>> Thank you, Madam Mayor. I I'm in a

3:01:31similar boat to Mr. Smith. I I'm fine

3:01:34with the way it is currently with, you

3:01:35know, I think the language about um

3:01:38working in a similar climate and kind of

3:01:39giving them more flexibility that Mr.

3:01:41Shininger was mentioning. Uh so, I'll

3:01:44spend my time talking about what I am

3:01:45opposed to. I am opposed to changing the

3:01:49top number of units we have in here. I

3:01:50think it should remain at 155.

3:01:53I like the way it is currently. I don't

3:01:56want to change direction on

3:01:59whether we do density or infill.

3:02:01This is the

3:02:03direction we've been working towards for

3:02:04the last 3 years and it's a direction I

3:02:06remain committed to.

3:02:09>> Thank you, Ms. Atkinson. Mr. Steininger,

3:02:11do you have anything to add to your

3:02:12statement?

3:02:14>> No, I'm good.

3:02:15>> Ms. Hall.

3:02:17>> Yeah, and I I'm also good with what's

3:02:20here. I I think that up to 155 is clear

3:02:24enough and um

3:02:26and

3:02:27nothing here precludes that someone

3:02:29couldn't propose infill, so

3:02:32and yeah, I'm not

3:02:35in favor of a big direction change at

3:02:37this point and

3:02:39if um

3:02:41no one's planning infill and we decide

3:02:43to incentivize clearing some of the

3:02:46properties,

3:02:47I'm okay with that as well.

3:02:50>> Thank you, Mr. Brooks.

3:02:53>> Thank you, Madam Mayor.

3:02:55I still think that it should go below

3:02:58100 just because that I believe will

3:03:01elicit more responses because the type

3:03:03of development with less than 100 units

3:03:06in that area is easier to do than over

3:03:09100 units or right at 100 units.

3:03:12And I would like to see

3:03:14no offer site demolition. We can do tax

3:03:18abatement or other ways, but

3:03:21spending the taxpayer's money to destroy

3:03:23existing livable structures is

3:03:26I don't think in their best interest.

3:03:28Thank you.

3:03:29>> Thank you, Mr. Brooks.

3:03:33Ms. Cosgrove.

3:03:37>> Thank you.

3:03:38I am comfortable given the conversation

3:03:40that we've had today about maybe putting

3:03:42in a couple places that people can

3:03:44propose less than the full four.

3:03:47I think we just need to move forward and

3:03:49we need to figure out if there's anybody

3:03:51out there and what that looks like at

3:03:52this point and I think rightly so there

3:03:55are a lot of people with a lot of

3:03:57questions that we simply can't answer

3:04:00right now until we have more information

3:04:02and for that reason I I think we just

3:04:04need to move forward and um trust that

3:04:08we've created a process that will allow

3:04:10us to look at the options and uh

3:04:13navigate towards the best solution for

3:04:14the community.

3:04:17>> Thank you, Ms. Cosgrove. Uh Ms. Niven.

3:04:23>> After the conversation we've had and

3:04:25with the recent um

3:04:28what Ms. Cosgrove said and

3:04:31um

3:04:33the city manager said, I think I agree.

3:04:36I think I'm ready

3:04:38to go with the way it is with the

3:04:40changes that we've we've suggested.

3:04:50>> Thank you, Ms. Niven. Um now if you

3:04:52notice this is one time I went by

3:04:53seniority. I usually don't do that but

3:04:56the senior people have dealt with this

3:04:57for a lot longer so I figured they could

3:04:59get first stab at it. Um my take would

3:05:02be I think we've made it quite clear um

3:05:05that it could be less than 150 units.

3:05:08I've said all along I thought 150 units

3:05:10was uh

3:05:11way too high. Sorry, Ms. Adkins, but I

3:05:13agree with Ms. Cosgrove and I think we

3:05:15just need to move forward and just

3:05:17basically see who's interested in what

3:05:19they're interested in doing. So I'm okay

3:05:21with moving forward with

3:05:23um hopefully a little bit wording just

3:05:25to let people understand fully that

3:05:28we're looking at all options. So now

3:05:30it's your turn, Madam Manager. Do you

3:05:32have enough direction, do you think?

3:05:34>> If you will indulge me, I'm going to

3:05:36summarize the edits that we will make to

3:05:38this RFQ.

3:05:39>> You have 30 seconds.

3:05:40>> Thank you. Uh

3:05:42when we talk about the affordable

3:05:44affordable housing fund as a potential

3:05:47tool, we will mention that the project

3:05:49needs to meet requirements of that fund.

3:05:51We will mention in our scoring rubric

3:05:54that there will a climate experience in

3:05:57similar climates will be weighted. We

3:06:01will

3:06:02um

3:06:03um Oh lord, we will add a preamble that

3:06:08expresses the

3:06:10desire for kind of any option to be on

3:06:12the table notwithstanding you see our

3:06:14vision, but we we want you know

3:06:18um to to to know that

3:06:21uh uh

3:06:22proposals that are outside of that

3:06:24vision may be scored may not be scored

3:06:26as high. However, they will still be

3:06:28considered. So, working on a preamble

3:06:30and then adding a bullet point to our

3:06:33goals that says we

3:06:35um

3:06:36will also entertain proposals that only

3:06:40propose to develop a portion of the the

3:06:42lot.

3:06:45>> Can everybody live with that or do we

3:06:46need to take a formal vote?

3:06:52Thank you, Mr. Burke, for your uh

3:06:54flexibility on that. So,

3:06:56um I think we're good to go. So, okay,

3:06:59next item.

3:07:04Gloff strike team update two.

3:07:09And like I said, this is where any fund

3:07:11balance just disappears.

3:07:14>> um

3:07:17Thank you Thank you, Mayor Weldon.

3:07:19Um this memo is informational only. It's

3:07:23really meant to summarize the work of

3:07:25the Gloff strike team. Um

3:07:26as I mentioned, this group gets

3:07:29together, hammers through some of these

3:07:30details, and then we report it out to

3:07:32you. No final decisions are made. So,

3:07:35this is informational. There are just a

3:07:37couple of of of impactful numbers

3:07:40included in this memo. One of them is

3:07:43the combined spend either

3:07:46committed, appropriated, or spent. So,

3:07:48keep in mind that this this number of

3:07:50$86 million on your first page does

3:07:53include funds that haven't been spent

3:07:55yet. But it just gives you a really good

3:07:57order of magnitude idea of this problem

3:08:00that we have honestly the week I was

3:08:03appointed city manager or started

3:08:04experiencing. So, that's been 3 very

3:08:06long years. Um has consumed a lot of the

3:08:10resources and the energy and the

3:08:12opportunity cost for our community and

3:08:16uh and and our agency partners, too. And

3:08:18this list does not include uh DOT, Click

3:08:20and Haida, Coast Guard, or DMVA. So,

3:08:23there there are numbers not articulated

3:08:25on here. It's it's mostly just like a a

3:08:28a good

3:08:29snapshot. Um we all

3:08:32>> Before we move on, could since everybody

3:08:34can't see this chart, could you just say

3:08:36how much CB CBJ funds we've expended?

3:08:40>> Yes, it's it's 14 million.

3:08:45>> Okay, carry on.

3:08:47>> So, so then the memo kind of um breaks

3:08:49up the um

3:08:52all things flood into three different

3:08:54categories. Event response, that's the

3:08:57very specific standing up the EOC,

3:09:01uh manning the pumps, manning the

3:09:03hotline, doing evacuations. Really, it's

3:09:06the moment that the EOC is activated.

3:09:08The EOC is activated by the city

3:09:10manager. So, um there's a lot of work

3:09:12that happens before the moment that is

3:09:14activated, but when the EOC is

3:09:16activated, it's all hands on deck,

3:09:17right? So, we are pulling people from

3:09:19the library, from the Parks and Rec

3:09:20Department. All other city business kind

3:09:22of comes to a grinding halt at that

3:09:24moment. Uh then we have flood fighting

3:09:27as a program, and that includes all

3:09:30things HESCO, but also our our public

3:09:33education and our outreach, and you

3:09:35know, all the things that we do

3:09:37year-round that are really specific to

3:09:40flood fighting. So, um

3:09:42uh

3:09:43lots of of HESCO maintenance, lots of

3:09:46communication with homeowners, and and

3:09:48that type of thing. And then we have

3:09:50long-term solution, and that is really

3:09:52working with the Army Corps of Engineers

3:09:54on an emergency water conveyance

3:09:56prototype. So, that includes uh lobbying

3:09:59efforts, that includes um

3:10:02a lot of engineering coordination. We

3:10:05are responsible for, you know, a lot of

3:10:07the uh interagency um

3:10:10like like permitting and things like

3:10:12that. So, it just takes a tremendous

3:10:14amount of of effort. So, those are the

3:10:15the three buckets. And if you look at on

3:10:18page 58 of the packet, um we have tried

3:10:21to think of these uh three buckets,

3:10:24event response, flood fighting, and

3:10:25solution work in um different

3:10:29categories.

3:10:31And um

3:10:32the the category of new funds needed is

3:10:36money that we don't have currently

3:10:38appropriated in the budget or money that

3:10:41we've been spending CIP uh funds on, but

3:10:44we really need to start opera-

3:10:45operationalizing it. So, when you look

3:10:47at the first line, event response, we

3:10:49have a small um

3:10:52a small line item of new fund new funds

3:10:55needed of $21,000.

3:10:57Uh event response is largely funded by

3:10:59on by um

3:11:01uh the um ongoing budgets, right?

3:11:05Because we're all getting paid every

3:11:06day, and then when we pivot to event

3:11:08response, we're still we're still

3:11:09getting paid. That increase really

3:11:11represents um some training. We want to

3:11:15do more um coordinated training uh for

3:11:18um

3:11:19for response, so that if we have a Hesco

3:11:22breach, we're we're a lot more prepared.

3:11:24Um then we've got the opportunity cost

3:11:26piece, and that is um I

3:11:30I sorry, I misspoke. The training would

3:11:31actually go into flood fighting because

3:11:32that is outside the actual event. So, I

3:11:34apologize for that. Keeping the But the

3:11:37the opportunity cost is mostly streets

3:11:39time when they are working on EOC

3:11:42response and not streets. So, again,

3:11:44that's a a a

3:11:46a cost that gets absorbed. Um and then

3:11:48it's the other line item is um

3:11:52emergency programs budget. Um and that

3:11:54is again money that we we appropriate

3:11:56for emergency response and and seems

3:11:58fine to live there. So, event response,

3:12:01you know, you could say it cost $125,000

3:12:04to

3:12:06uh spool up that EOC and respond to that

3:12:09event in you know, a couple week time

3:12:10period in a normal event. We're We're

3:12:12kind of We don't We've never really had

3:12:14a normal event, but this last year was

3:12:15kind of as normal as it can be, right?

3:12:17It was still very impactful, still very

3:12:19exciting, but we didn't have a lot of

3:12:21rescues or or or, you know, damage or

3:12:24things like that.

3:12:26Flood fighting operating

3:12:28um includes

3:12:30uh the new fund item would be things

3:12:32that have been funded in the past

3:12:34through CIP spend. So, a lot of that is

3:12:36your project manager time coordinating

3:12:39with property owners. It's your Hesco

3:12:42maintenance and and like I said, that is

3:12:43where our our training would live. Um

3:12:46flood fighting operating opportunity

3:12:48cost is again a lot of those labors and

3:12:51street workers that, you know, are not

3:12:53filling potholes because instead they're

3:12:54working on uh on flood fighting. Uh and

3:12:57then there's a big portion of the

3:12:58emergency programs budget. Um flood

3:13:00fighting operating also includes a lot

3:13:03of um

3:13:04communications because it's a very

3:13:06communications heavy effort to to do um

3:13:10uh do this work. And if you recall, we

3:13:11had planned on funding about 20% of the

3:13:13communications engagement budget with

3:13:15CIP projects. We have not been able to

3:13:17meet that metric because we've been

3:13:19spending so much time on um

3:13:23uh flood related projects. And when we

3:13:25can, we charge that time to flood

3:13:26related CIPs. But again, as we we

3:13:29operationalize

3:13:31uh this this event, uh it's more

3:13:33appropriate for that to live in an

3:13:35operating budget. Um and then solution

3:13:37work, we uh we would use um

3:13:42that funding to fund um a new position

3:13:46that would really be like chief engineer

3:13:48for um coordination with uh Army Corps

3:13:52of Engineers. And and there's some other

3:13:54communication staff time like, you know,

3:13:56making us presentations and and uh you

3:13:58know, communicating

3:14:00uh I'm I'm us. I'm saying Mayor Wheeler

3:14:02and because we we're headed to DC to do

3:14:04a lot of this communicating work. Um and

3:14:06that is work that you cannot fund with

3:14:08any You need to make sure you're not

3:14:09funding that with any um federal funds

3:14:11because of the nature of that work. So,

3:14:13we've we've broken it up into those

3:14:15categories and kind of um

3:14:18determined that the new operational cost

3:14:21is about $630,000

3:14:24a

3:14:25uh

3:14:25um year. The opportunity cost of the the

3:14:28the

3:14:29things we're not spending money on is

3:14:31about $130,000.

3:14:33And then it's a significant portion of

3:14:35the emergency programs budget, which

3:14:36we've already budgeted for and and that

3:14:38money is already appropriated. So, um

3:14:41when we met with the strike team, we

3:14:43talked about how we want to um approach

3:14:45these uh

3:14:47you know

3:14:48this new cost center, right? And so, the

3:14:50the group kind of decided, yes, we

3:14:52should be accounting for this in a cost

3:14:54center. So, even though emergency

3:14:55programs is already got budget for

3:14:58emergency management, we should be

3:15:00making sure we're tracking what they're

3:15:01spending for GLOSS because there's also

3:15:03other emergencies. Same with like our

3:15:05street sweepers and our our equipment

3:15:07operators, right? Like like we don't

3:15:09necessarily need to backfill that with

3:15:10new positions. We're going to

3:15:12acknowledge that opportunity cost.

3:15:14Um and then there's the the new funds

3:15:16that we've we've been able to lean on

3:15:19this CIP, right? Because we've been

3:15:20doing all of this HESCO construction

3:15:22work. So, the HESCO construction work

3:15:24has funded the project managers and a

3:15:26lot of that that work. And moving

3:15:28forward, we would need to operationalize

3:15:30that. So, so the the team

3:15:33liked that idea of um absorbing what we

3:15:37can within the opportunity cost and um

3:15:40looking at a new cost center that's

3:15:42about a million dollars a year in um

3:15:46GLOSS uh

3:15:48all things flood GLOSS response um and

3:15:52no acknowledging that we need to come up

3:15:54with about $630,000 of of new ongoing

3:15:58revenue. The other piece um that we

3:16:02pulled out of operating costs was HESCO

3:16:06maintenance. So, there still will be

3:16:07some ongoing HESCO maintenance. We

3:16:09really don't know what that is. The

3:16:11estimate this year is is $1.2 million.

3:16:14You know, keeping in mind the Army Corps

3:16:15of Engineers said they're going to

3:16:18they're going to fund any damage to

3:16:19HESCO barriers that happened during this

3:16:21event. They're working through what that

3:16:23looks like. Engineering and Public Works

3:16:24has has worked with them on a a damage

3:16:26assessment. Um but there's still going

3:16:29to be a role for us to play in all of

3:16:31that and we wanted to carve that out as

3:16:34a CIP because

3:16:36above and beyond the like normal

3:16:37communication with property owners,

3:16:39serving the HESCO barriers, you know,

3:16:41those types of operational costs. We

3:16:42really don't know what that is. And so,

3:16:44the recommendation that the team made

3:16:46was to

3:16:47use a portion of the

3:16:50funds that were appropriated for the

3:16:52general investigation study way back in

3:16:542024. If you recall, you had an

3:16:55emergency appropriation to to

3:16:58appropriate $3 million as a match for

3:17:00our general investigation study to get

3:17:01started on a long-term solution. Very

3:17:04valuable to have it in our back pocket

3:17:05as we went to Washington, D.C. and

3:17:07demonstrated the community support, but

3:17:10really because that has morphed into a

3:17:11different funding mechanism for our

3:17:14long-term solution.

3:17:17Applying it to these funding sources, we

3:17:19think would be reasonable. So, we would

3:17:20want to come forward with a transfer to

3:17:22spend a portion of that $3 million that

3:17:25was appropriated on on this HESCO

3:17:28maintenance and then the remainder as

3:17:29match to our $3.2 million

3:17:31congressionally directed spending

3:17:32request that Congressman Begich got us

3:17:35and

3:17:36would really focus on long-term

3:17:38solution, geotech, engineering,

3:17:41and all of those types of things. So,

3:17:42those were the recommendations that the

3:17:44team made

3:17:45um

3:17:46uh and and the idea is to update you on

3:17:49those here, but to incorporate those

3:17:51actual decisions as part of the budget

3:17:54process. So, you will see, you know,

3:17:56these decisions um and be able to make

3:17:58those decisions as a body. Just wanted

3:18:00to walk through the thought process.

3:18:04Did I miss anything, team?

3:18:07>> And we will look forward to see this in

3:18:09the future. Any questions on this right

3:18:11now?

3:18:13Ms. Cosgrove.

3:18:14>> I just wanted to thank you for pulling

3:18:15this together. I think it's really

3:18:17helpful, um, not only for the assembly

3:18:19as a as a body in making decisions, but

3:18:21I also think for the general public to

3:18:23understand the impact moving forward.

3:18:26So, thank you. It's really well done and

3:18:29it's quite possible

3:18:30>> that wasn't a question, but thank you

3:18:31for saying that.

3:18:34We'll train you yet.

3:18:35>> [laughter]

3:18:36>> Any questions?

3:18:39Uh, seeing none, again, we will see this

3:18:42We'll make more decisions on this at a

3:18:43future date. Information only, so.

3:18:47That brings us to

3:18:49>> Madam Mayor, can I get a 2-minute at

3:18:50ease?

3:18:51>> Absolutely.

3:18:53>> Thank you.

3:18:53>> 2 minutes.

3:20:36>> All right, item number five.

3:20:39Madam Clerk, we'll have you read the

3:20:41resolution title.

3:20:45We want you to participate.

3:20:49>> Thank you, Madam Mayor. A resolution

3:20:51supporting a partnership with the

3:20:52Central Council of the Tlingit and Haida

3:20:55Indian Tribes of Alaska and Tlingit

3:20:57Haida Regional Housing Authority to

3:20:59advance housing opportunities and

3:21:01coordinated infrastructure development

3:21:03in support of United States Coast Guard

3:21:05expansion in Juneau.

3:21:07>> Thank you, Madam Clerk. Madam Manager.

3:21:10>> Thank you.

3:21:12The purpose of this draft resolution

3:21:14before you today is really just to

3:21:16further formalize an existing

3:21:18partnership that these three entities

3:21:21have specifically on developing a

3:21:24Klawock Creek subdivision.

3:21:26We jointly applied for a Thriving

3:21:29Communities grant that provides

3:21:31technical assistance to

3:21:34to that project for removing obstacles

3:21:37to development. And the reason why

3:21:39that's the the three partners are

3:21:41engaging in that is the

3:21:44Tlingit Haida, the Housing Authority,

3:21:46and CBJ all are landowners of that

3:21:48subdivision in total approximately 50

3:21:50acres of land in that area. That's in a

3:21:52in that area is right across the the

3:21:54bridge.

3:21:55Tlingit Haida Regional Housing Authority

3:21:58is the most um

3:22:00accessible land. They've they've already

3:22:02begun some site development, so that is

3:22:04the most

3:22:06developable land.

3:22:07But but more than that, we really wanted

3:22:10to just provide um

3:22:13our partnership in aggressively pursuing

3:22:16Coast Guard housing. Um, the Coast Guard

3:22:19issued the request for information for

3:22:21Coast Guard housing uh, proposals in uh,

3:22:25January and we haven't heard uh, heard

3:22:28much since then. There have been some

3:22:30public meetings and some updates. I did

3:22:32reach out to Senator Sullivan's office

3:22:34and of course uh, Senator Sullivan has

3:22:36been a champion in the of the bringing

3:22:37the icebreaker to um,

3:22:40uh, Juneau and is uh, you know, helpful

3:22:42in in trying to move that forward move

3:22:44the housing piece forward as well. Um,

3:22:47so uh,

3:22:49we I as a as a group I think and I um,

3:22:54imagine the assembly shares this and

3:22:56this is an opportunity for you to

3:22:57articulate sharing that. We've really

3:22:59been told we need to be aggressive in

3:23:02solving some of the obstacles for home

3:23:04porting the Storace in Juneau and I do

3:23:07uh, have an opinion in this memo that

3:23:09says without adequate housing the

3:23:11Storace will not make Juneau its home

3:23:13port and I think I should qualify that

3:23:15because that is just the city manager's

3:23:16opinion. Um, there is an option for the

3:23:20uh, Storace to home port in in

3:23:25Juneau. It has been commissioned in

3:23:26Juneau and has been uh, you know, it is

3:23:28a Juneau vessel with um, in

3:23:31geographically separated status. So, if

3:23:34they don't have housing they could um,

3:23:38have just the service members living

3:23:40aboard the vessel and the the family

3:23:42staying back at home. That is not I

3:23:44think what we think about when we think

3:23:46of having the Coast Guard uh, as our

3:23:48friends and neighbors and but when you

3:23:50look at their um, environmental

3:23:52assessment statement for the project

3:23:54they do site that geographically

3:23:56separated status would be uh, um, uh,

3:23:58a possibility.

3:24:01So, just wanting to keep pushing, you

3:24:03know, pushing the ball forward on doing

3:24:06everything we can to advocate, to

3:24:08coordinate, uh, to work with not only

3:24:11our government partners but also you

3:24:12know, Southeast Conference and JEDC, um,

3:24:16uh,

3:24:17and the Navy League. The the Navy League

3:24:18has been an amazing champion in in

3:24:20making uh Juno a hospitable home for

3:24:23Coast Guard. So, um, I don't know that

3:24:26uh

3:24:27this resolution does much than restate

3:24:28all the work that we have been doing,

3:24:31um, but I do think that the opportunity

3:24:33to further formalize it is is good. Um,

3:24:36you may ask, "What does that partnership

3:24:38look like, Katie?" Well, for example, we

3:24:40need to bring utilities into that

3:24:41subdivision. And if we bring utilities

3:24:43in in a coordinated way, we have the

3:24:45potential to open up a lot more land for

3:24:47development. So, that's the type of

3:24:48coordination that I would be talking

3:24:50about. And anything that goes beyond,

3:24:53um,

3:24:54coordination would require assembly

3:24:56approval and assembly resources. So, you

3:24:58know, this would

3:25:00uh

3:25:00this would be kind of the the first step

3:25:02in, um, in many more touchpoints. Happy

3:25:06to answer any questions.

3:25:08>> Thank you, Madam Manager. Any questions?

3:25:12Seeing none, Ms. Aggeson, can I get a

3:25:14motion?

3:25:15>> Thank you, Madam Mayor. I move that we

3:25:18forward to the full assembly the

3:25:19resolution or a supporting of

3:25:20partnership with Klukwan Haida in

3:25:22regards to Coast Guard housing, and I

3:25:24ask for unanimous consent.

3:25:25>> Any objection?

3:25:27Seeing none, that motion passes. Item

3:25:30six, Madam Clerk.

3:25:36>> Thank you, Madam Mayor. Resolution 4043,

3:25:39a resolution encouraging increased

3:25:41engagement in City and Borough of Juneau

3:25:43Boards, Commissions, and Committees.

3:25:47>> Uh thank you, Madam Clerk. Um, this is

3:25:49kind of self-explanatory, unless you

3:25:50want to say something, Madam Manager.

3:25:53Seeing uh

3:25:55No, we'll just bring it to the assembly.

3:25:57Uh Ms. Aggeson.

3:25:58>> Thank you, Madam Mayor. I move

3:25:59resolution 4043 to the full assembly and

3:26:02ask for unanimous consent.

3:26:03>> Any objection?

3:26:06Seeing none, that motion passes. So, um

3:26:09no staff reports, next meeting date

3:26:12November 30th, 2026. And I hope that Mr.

3:26:15Smith is will be back to do an awesome

3:26:17job. I blundered through today,

3:26:19but uh

3:26:20we made it. Um

3:26:24I thought you raised your hand madam

3:26:26clerk. Don't raise your hand. All right,

3:26:27seeing nothing further we are adjourned.

3:26:32Thank you for the guys to be here