What: Water, wastewater and stormwater work: the Long-Term Control Plan, treatment operations at Big Springs and SCADA maintenance.
Where it stands: appeared on 2 meeting agendas, most recently 2026-10-08. Outcomes and votes are not captured because minutes were not read in full.
Next: check posted minutes for outcomes.
Details
2026-08-13: a Long-Term Control Plan task order and SCADA maintenance contracts (about $69,600 water and $63,300 wastewater).
2026-10-08: operation and maintenance of a granular activated carbon treatment system at Big Springs with the Air National Guard; an engineering contract extension to 2028.
Engineering contract extension to 2028 (CEC); operation and maintenance of the Big Springs granular activated carbon treatment system with the Air National Guard.