Where it stands: On the November 3 agenda: Port Acres wastewater plant renovation services (Tompkins, $141,500), a lift station master plan (LightPoint, $219,950), a valve assessment (Hydromax, $437,105.80), an emergency force main repair at 74th St and 9th Ave ($177,000), and a storm sewer manhole project closeout with a change order that lowers the total from $1,118,000 to $1,034,909.80. The Lewis Drive lift station design was on the October 20 agenda. Outcomes unknown.
Next: Minutes of the November 3 meeting.
Details
Sources are agendas only; an agenda is not an outcome, and no votes are known.