Willow Bend Arena Traffic Study

At a glance

Based on uploaded (human-made) captions; some stretches are fragmentary and dollar figures are uncertain.

  • What: a preliminary transportation analysis (about 130 pages) of how an arena and mixed-use site at Willow Bend would affect nearby roads, and what mitigation could work.
  • Where it stands: informational only on 2026-10-12; no action. Final report expected about October 31.
  • Next: phase two on event traffic management, wayfinding, neighborhood protections such as residential permit parking, and developer commitments.

Assumptions

  • Hockey game of about 18,000 people, concert of about 19,500; existing garages remain; access points unchanged; current transit only; site built out by about 2031.

Findings

  • Most intersection impacts can be restored to tolerable delay with turn-lane lengthening and added turn pockets; tunnels and flyovers were not studied.
  • Traffic leaving after an event is the hardest case; the study will look at event traffic management and neighborhood protection strategies.

Council questions

  • Total vehicle counts now and in the future, a traffic simulation, where parking would be placed, and mitigation cost; staff said some answers depend on a developer proposal and phase two.

Sources

Discussion time

About 23 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-10-12 - City Council 23

Log

  • 2026-10-12 - City Council - preliminary results presented by the consultants; council members asked for counts, a simulation and parking details.