2026-09-17 - Urban Design Commission

Summary

Summarized from the auto-generated captions; street and district names are garbled in places, so spellings below are best readings. The video begins partway through the first case, and the commission noted an audio problem at the start of the meeting. All three cases were voted 9-0.

  • First case (site not named in the captions): a multifamily development along a TxDOT access road asked for a waiver of the 25% tree preservation requirement. The only two existing trees (both about 7 inches) sit in an overlapping utility and sewer easement, so preservation would be 0%. Staff supported the waiver, noting the plan provides far more canopy than required (about three times the tree canopy requirement and 69.5% parking-lot canopy against 40% required). TxDOT would not allow trees in its right-of-way, so 23 proposed cedar elms along the frontage were dropped. Approved 9-0.
  • 5812 Eastland Street Duplex Lighting Waiver: a two-story duplex in the Urban Residential district asked to be excused from the pedestrian-scale lighting requirement. Staff asked for a continuance because other waivers may be needed (facade variation, fencing material, urban forestry calculations) after four to five years of review; the commission decided to take up only the lighting waiver. The applicant said no usable sidewalk or light location exists beside a drainage ditch, and the sidewalk waiver had already been granted. Approved 9-0.
  • 5506 Lovell Avenue Floor Height Waiver: four dwelling units in two duplex buildings in the Camp Bowie transition district asked for a first-floor height of 10 feet 8 inches instead of the 15 feet required by the Camp Bowie form-based code. Staff recommended approval subject to resubmitting plans showing compliance with the other standards; a building-code issue with building across platted lot lines remains. The applicant argued the standard applies to commercial-ready space, not residential. The Como neighborhood association president and several residents supported the project, citing a written commitment to at least two affordable units. Approved 9-0.
  • Work session: a status update on the Panther Island Form-Based Code Update (two districts, Core and Edge, replacing nine; moving from a prohibited-use to a permitted-use table; scheduled for City Council adoption on October 13); a preview of the Camp Bowie Form-Based Code Update (use table moved to the zoning ordinance, new sign standards, bars by conditional use permit, fewer vehicle-sales and warehouse uses), with the UDC vote planned for October 22, Zoning Commission November 11 and City Council December 8; and a preview of annual rules-of-procedure changes (an executive secretary replacing the urban design officer, a 9:00 a.m. start, simpler withdrawal rules, and dropping denial with or without prejudice).
  • The chair thanked a departing commissioner and welcomed a new one. The next meeting is October 22.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:11relatively large site. You see here we

00:13have two overlapping easements that

00:15basically run north south through the

00:17property. One of them is an 80ft utility

00:20easement on the right here and then a 25

00:24ft sanitary sewer easement on the left.

00:26They overlap a bit. It's about 86 feet

00:29cutting straight through the property of

00:31easement that they can't develop in and

00:33for urban forestry that area is

00:36considered exempt.

00:38So they're proposing to remove both of

00:40these trees which would leave them

00:42preservation of 0%.

00:45This is their proposed planting plan. Um

00:47it's multif family development, several

00:50exist or several proposed buildings,

00:52detention area down here, and then

00:55obviously all of the associated parking.

00:58Um these numbers are all of their

01:01plantings. It includes 23 proposed cedar

01:04elms. This plan shows these proposed

01:06cedar elms along the frontage for 820. I

01:08spoke with the applicant earlier today.

01:10Tex nixed those. So they weren't

01:13included in the urban forestry numbers

01:14anyways. They were just shown on the

01:16plan here and they were included in the

01:18staff report. As mentioned, they were

01:20being planted. Textile shut that down.

01:22So, those 23 trees are no longer going

01:24to be happening, but it doesn't affect

01:26any of our numbers. Um, we'll jump to

01:30the numbers here. So, like I said, the

01:33growth site area is 695,69

01:37square ft. For multif family

01:39developments, the urban forestry

01:40requirement isn't based on the area of

01:42the property. It's based on the provided

01:45open space. So the provided open space

01:48for the site minus deductible areas

01:51which is basically just that 86t

01:53easement is 201,752

01:57square feet. The existing tree canopy

02:00between those two trees 308 square feet.

02:03So of the net urban forestry area.15%

02:08almost nothing. The required

02:09preservation would be 77 square feet

02:13which is the 25%. The required tree

02:16canopy coverage for the site is 100,000

02:19square or 100,881

02:21square ft. They're proposing no

02:23preservation and they're proposing to

02:25provide 315,400

02:29in square feet which is just over three

02:31times their requirement. And then the

02:34parking lot canopy requirement. So the

02:37area of parking that they provided is

02:40236,687

02:43square feet of parking.

02:45The canopy requirement for that would be

02:4794,675

02:50and they're proposing 164,425

02:54which exceeds by just over or almost

02:5770,000 square feet. Um the parking

03:00canopy requirement is 40% they're at 69

03:03and a half. So

03:06based on the existing conditions

03:09um the difficulty that the easement

03:12because both of the existing trees are

03:14located in the northeast. So with that

03:16easement and preserving one of those

03:18trees could make developing that

03:20northeast portion difficult and the fact

03:23that the only two existing trees are

03:25both 7in trees. Um staff supports this

03:28waiver and we recommend approving the

03:33request to reduce the preservation

03:34requirement from 25% down to zero. And

03:38I'm available if you guys have any

03:40questions.

03:42>> Thank you. Any questions?

03:44>> Caleb, I'm curious. Did Text give a

03:47reason why they nixed those trees? Just

03:50>> I'll let the applicant answer that.

03:51Okay. Just curious.

03:57Are the cedar elms because they're in

03:59the easement not

04:02required to be included? Is is that the

04:04reason or we're not sure?

04:06>> So for urban forestry, these the 23 seed

04:09domes that they were showing, they're

04:10considered offsite.

04:12So they were shown on their plan. They

04:14weren't included in their urban forestry

04:16calculations. So the numbers I went

04:18through, those are still the correct

04:19numbers. They had already omitted those.

04:22The applicant was just electing to

04:24preserve them, I believe, for some

04:25enhanced landscaping credit and text

04:28shut that down.

04:34Good. Any other questions for staff?

04:37Is the applicant here to speak?

04:39>> Yes, Blackwell is here to speak on

04:42behalf of the applicant. If you guys

04:43have any questions,

04:44>> I have any questions for the applicant?

04:46>> If he's got reason from text, I'm just

04:48curious.

04:52doesn't impact my opinion. I just

04:54curious.

04:56>> Welcome. Please state your name, the

04:57city in which you reside.

05:00>> Hi. Yes. I'm Garrett Blackwell and I'm

05:02from Plano, Texas.

05:05>> Um, the reason for Tex Dot not wanting

05:08those trees there when I emailed them

05:09about it that said that they just do not

05:11want any trees in their ride of way.

05:14>> But it's it's the it's the right of way

05:16to the access road. Right.

05:18>> Right. So,

05:19>> I mean, it's essentially the on ramp.

05:21Uh,

05:23>> I guess it is the excess road.

05:25>> Yeah. Right. It's like it's not a major

05:28anyway. I It's not your problem. I'm

05:30just kind of curious because getting

05:31inside their heads was fine.

05:33>> Yeah. No, it's uh No, I wanted some

05:35there too because it was very barren and

05:37generally would look nicer for the

05:39property. But whenever I emailed them,

05:42they said at this time we do not want

05:43any trees on the rideway. I think it's

05:46probably just a maintenance issue on

05:47their end.

05:48But they didn't give me a real reason

05:50other than the fact that they just

05:53>> Right. Thank you.

05:58>> Anyone else here to speak in favor?

06:01Is anyone here to speak uh against an

06:04opposition to this case?

06:06Okay, we'll close the public comment

06:08portion or our discussion.

06:13I make a motion to uh

06:16that the request for the waiver from the

06:18CFW zoning ordinance section 6.302G.4-

06:22general preservation methods of can tree

06:24canopy be granted reducing 25% tree

06:26preservation requirement for this

06:28development to plan to 0%.

06:32>> Commissioner here seconds

06:36and motion to approve has been made and

06:39seconded. Chair Benner, how do you vote?

06:40I.

06:42>> Um, Vice Chair Ramsey, how do you vote?

06:45>> I,

06:47>> Commissioner West, how do you vote?

06:48>> I,

06:50>> Commissioner Carr, how do you vote?

06:52>> I, Mr. Deose, how do you vote?

06:55>> I,

06:56>> Commissioner Harrier, how do you vote?

06:58>> I, Commissioner Hughes, how do you vote?

07:01>> I,

07:03>> Commissioner Holidayiday, how do you

07:04vote? I.

07:06>> And Commissioner Hobsa, how do you vote?

07:09I

07:11>> All right. Motion passes 90.

07:22All right. The applicant's here for the

07:23case that we skipped. So, we can address

07:25that now. Also, just to note on the

07:27record, we've been communicating with

07:29it. There might have been some audio

07:30issue issues during the first case. It

07:33doesn't affect what we're doing. We're

07:34just going to add a note to the

07:35recording. But if you're watching right

07:37now, that's why there was no audio for

07:39the first couple minutes. Just an IT

07:41issue

08:02better set up, I think. I still can't um

08:06So you guys could actually see me this

08:08time.

08:18I don't know if I need to get it closer.

08:19Yeah. All right. So, this is UDC uh case

08:24uh 2026137

08:27um located at Oh, I do I do need to

08:31bring it a little. Okay, now I feel how

08:34you guys feel.

08:36Um, so this is UDC case uh 2026 137

08:41located at 5812 Eastland Street. Um,

08:44good morning commissioners. Um, this UDC

08:46case uh um was seen before in the last

08:50UDC uh u meeting on August in the August

08:55UDC. The applicant resi uh with Hovering

08:58Estate Inc. is requesting a certificate

09:00of appropriateness for a proposed

09:03two-story duplex in the urban

09:05residential UR zoning district. The

09:07request uh before the commissioner today

09:09is a waiver of a uh pedestrian scale

09:13lighting requirement within the street

09:15sides uh street zone furnishing zone. Um

09:18the proposal uh does contain uh two

09:22three bedrooms, two ba two and a half

09:24baths.

09:26Um and the property um is located in an

09:30established UR uh neighborhood. Uh to

09:34the north of the property is zone MU2

09:37and there are FR zone located further

09:40west.

09:43The intent of the UR district, just kind

09:46of a reminder, I'm going to go over just

09:47like the history and like a little bit

09:49of the intent for the urban district,

09:52urban residential district, is to

09:54provide a a transitional between lower

09:57density residential neighborhoods and a

09:59more intense um commercial/mixeduse

10:03areas while promoting a walkable

10:05pedestrian oriented environment.

10:08Um the case just to go over the brief

10:10history of the case. The project

10:12originally entered uh to to the city and

10:16it was through a building permit process

10:18in 2025. The building permit was placed

10:20on hold because of the outstanding UR

10:22design standards requirements and

10:24because the required conceptual review

10:26had not occurred yet occurred. The

10:29applicant previously submitted um UDC

10:3220265

10:34in March of 2026 which was later voided

10:37at the applicant's request. Um the

10:40current UDC case number which is the one

10:42that we're seeing today was uh was

10:45submitted in May of 20 or sorry March of

10:482026. Um since then staff has

10:52coordinated with the applicant through

10:54several meetings discussion regarding

10:55the UR standards and potential design

10:58solutions. The applicant submitted the

11:00revised site plan that we see today in

11:03the updated um staff report and that was

11:06submitted on August uh 31st of 2026. Um

11:11there are still some outstanding things

11:13that staff was seeing on the the those

11:16site plans set. Um so

11:21with that said at this point we can't

11:24really determine if there will be

11:25additional waiverss. Um there are minor

11:28things but at the same time we never say

11:30that there's no waiverss until we can

11:32know that all the waiverss are dealt

11:34with. So with that said we uh we believe

11:37that we could get the applicant to to

11:41get those things done and updated. Um

11:43and so we're requesting a continuous to

11:45allow the applicant add additional time

11:48to be able to address those concerns. Um

11:50the applicant is here today. Um and he

11:53could uh just give you guys a scope of

11:56his project and and give you more

11:58information if needed.

12:03>> And that con

12:04>> Okay. Any questions for staff then?

12:08>> So can you uh the the site plan's a

12:10little difficult to to to see. Can you

12:12pull it up or kind of walk us through

12:14that because I'm trying to

12:15>> I thought it was

12:16>> understand the the ride ofway. So is

12:19there a public sidewalk here?

12:22>> So there there is no public sidewalk

12:24existing.

12:25>> Are we proposing the public sidewalk?

12:27>> So um whenever there's not a public

12:29sidewalk there has to you have to put a

12:32sidewalk a public sidewalk you have to

12:33put the street trees and pedlights. If

12:35there is existing street treep

12:36headlights or or sidewalk for instance,

12:39then um that's when you could utilize

12:43the existing conditions and then kind of

12:45go with it. In this situation, they do

12:47have an existing tree. So, we're using

12:49that and they're going to they are

12:52basically having that within they're

12:54going to include it into the public

12:55rightway so that uh city can maintain it

12:59as a street tree. So, it's a it's kind

13:01of a mature tree and I the picture

13:03before kind of shows that tree right

13:06there. That's the tree that they're

13:09going to consider into a street tree.

13:11So, that's the only thing that's

13:12existing with the conditions right now.

13:15Um,

13:17>> we've got basically a street with no

13:19curbs, a ditch, a tree, and then where

13:24does the sidewalk sit in relation to all

13:26of that? Because I'm not seeing it on

13:28the site plan. All I see is I see a

13:29light

13:30>> on the site plan.

13:33the sidewalk that this one is the older

13:37site plan that they submitted, but on

13:38this on the staff report, you'll see the

13:41updated version of it is kind of to look

13:43at this one. And this is what they

13:45produced um previously. Um but that one

13:49uh shows that they're proposing a

13:51sidewalk that will eventually connect to

13:53the other UR cases. And there are other

13:56UR cases that have been built and and

13:59they have put in sidewalks and street

14:01trees and ped lights and they're

14:03currently being built as we speak.

14:06>> Yeah, understood. And uh but uh what I'm

14:10seeing in this plan looks like the

14:11sidewalk is actually on private property

14:13like on the is it

14:15>> so they're going to dedicate they're

14:17going to put a public access easement so

14:18that way it's to the public.

14:20>> It's not it's not in public it's not in

14:22the rightway. It's on public it's on

14:24private property the sidewalk. They're

14:25going to put an easement and execute an

14:27easement to allow for city to maintain

14:30it and have access to it.

14:32>> But it's it's on the private side of the

14:34property line

14:37>> currently until they put an easement.

14:39Yeah.

14:40>> But it's it's private property.

14:43>> Currently until they put an ement. Yes.

14:45>> So the ride ofway is not large enough to

14:47hold a sidewalk currently.

14:50>> No. Like Well, no. There is a, as you

14:53can see, there is a um elevation and

14:56there's the ditch that you saw there.

14:58So, they're trying to um comply with the

15:01standards and make sure that nothing's

15:03being damaged or anything like that with

15:05the location.

15:07>> Okay.

15:11>> Have any more questions?

15:16>> Okay. Any more questions for staff?

15:20>> I do. Um so staff is recommending a

15:24continuance.

15:25>> Yes.

15:27>> Why?

15:27>> Um there are some outstanding um

15:30waiverss that we are not sure if they

15:32are going to be as of today in

15:35compliance with um so that's why we are

15:38just wanting to the applicant to have

15:40additional time to kind of address those

15:42things. Um and then get back to us and

15:45see if they want to add that to the list

15:47of waiverss.

15:50So there are more waivers coming

15:53>> there. There are potential waiverss that

15:56we I want to make sure that he has

15:58enough time to be able to address them.

16:01So that's why we're asking for a

16:03continuence

16:08>> more than the lighting and the

16:11pedestrian line.

16:12>> That is correct.

16:13>> So if we were to approve deny those

16:16potentially he's coming back in the

16:18future for additional waiverss anyway.

16:19So instead of like going really into it,

16:21we want to just make sure he has enough

16:23time to be able to address those things

16:25before and then we could figure out if

16:27there's additional ones and we'll

16:28properly like obviously place it on the

16:31agenda and stuff like that so that you

16:32guys have a time to

16:35>> to review it.

16:36>> And this has been in the planning since

16:382023.

16:40>> So it came into permitting um status uh

16:44in 2025.

16:45Um, and then it was uh then put on hold.

16:51I want to say

16:54look at my timeline.

17:00>> So it was in

17:02>> one second, sir. We'll be invited up in

17:03just a second. Thank you.

17:04>> So the building permit was uh created in

17:07August of 28, 2025.

17:10Um then it was uh put on hold during the

17:14outstating UR design standards

17:16requirements and the project had not

17:19gone under conceptual review according

17:21to our ordinances prior to permits. Then

17:25um another there was a there was an

17:28older one a UFC case and I think that's

17:31what the applicant saying um in the

17:33background is May 2 of 2023. However,

17:37those plans associated with that case

17:39does not reflect the current

17:40development. Um, and then in um March of

17:4620 2025, they uh undergo this the SIP

17:51program, which is a small scale

17:52infrastructure program to see if that's

17:55something that they would do as a like a

17:57kind of alternative to the pedestrian

17:59light requirement. Um, that application

18:03remains incomplete. Um

18:06the one that we're talking about today

18:09was applied for in March uh 16 of 2026.

18:16>> Thank you.

18:20>> Just one more quick question on my part

18:22just to confirm that the plan that is

18:24currently shown in the documents that we

18:26have here as a 3.3 site plan is the most

18:30current site plan.

18:34Uh the one that you're viewing is the

18:36previous one. The one in the staff

18:37report is the the most recent one.

18:40>> Okay.

18:40>> That's figure three on page six of their

18:43document.

18:44>> I believe so. Yeah, page six. So page

18:48six is the revision from the comments.

18:54>> It's quite blurry. So can what is the

18:56relationship of the that sidewalk to the

18:59building?

19:00>> So with the current

19:03Um with the current plan, there is a

19:08concrete of five feet um right behind

19:13the street tree that you see or the tree

19:15that you see that's highlighted in that

19:17those plans. Um then there is a planter

19:22box that um is in between the porch

19:26concrete pad and the the proposed 5T um

19:31uh sidewalk.

19:33>> And how wide is the Eastland rideway?

19:36>> Um

19:39that is a good question.

19:42Um I don't know off the top of my head.

19:46Give me one moment. Let me see if I can

19:47measure

19:49Yeah, all those plans is tough in in

19:51this condensed PDF.

19:59>> I do know that the building is set back

20:0112 ft from the property line,

20:06but let me measure really quickly.

20:36I have one question. Um,

20:38>> yes ma'am.

20:39>> Is the sidewalk continuous or is it just

20:42going to be on this property? So for

20:44this property there are a couple of

20:46properties that is located um a little

20:50bit

20:52that will eventually connect it will

20:54eventually connect to um and those are

20:57the ones I talked to you about are being

20:58built right as we speak and maybe

21:01there's a way to like share my screen

21:05>> but that sidewalk will connect to the

21:07adjacent properties owner's property

21:10which is will you'll need another access

21:13easement Correct. Like it won't be in a

21:16right of way. It would be

21:17>> they've they've just um fixed it by like

21:20uh leveling out the the land. So they're

21:23putting the sidewalk through that means.

21:25>> But a sidewalk has to sit in an access

21:27easement. So it would have to be on a on

21:29one second property.

21:31>> Do we do we have any outstanding

21:32questions for staff still?

21:34>> Yeah.

21:36>> Okay. Can you please?

21:48>> Okay. If we have no further questions

21:50for staff, um we will Is the applicant

21:54here to speak? Would you like to come up

21:56and speak, sir?

21:57>> Yes. Yes.

22:01>> Welcome.

22:05>> Tends to go that way sometimes.

22:09Yes, that'd be great. Please state your

22:11name and the city in which you reside.

22:14>> My name is uh Resa Safe. Uh I reside in

22:17Mansfield, Texas.

22:21I don't know where to start really. I've

22:23been working on this project for over

22:25four years, almost five years. U when I

22:28started this project, there was none of

22:30those houses, anything around adjacent

22:33street. So, everybody came in and they

22:36got their permit and everybody build

22:38those um duplexes except me.

22:41That's the one right there. Can you hold

22:43on that picture right there if you don't

22:44mind?

22:46Um the the piece of land that that I'm

22:49trying to put a duplex on is uh sitting

22:52right between two houses and the fences

22:56come all the way to that ditch. The

22:58water h the waterway that goes through

23:00and there is no way we can put a

23:03sidewalk in there so the people can

23:05really use it or pedestrian they can use

23:07it. As you can see, they put they build

23:11this new houses and they never did put

23:13any sidewalk on it or pedestrian light.

23:16They could have done that. I mean, there

23:17was a lot of space for them. They

23:18haven't done it. So, mine, if I want to

23:21put, by the way, I did get a waiver for

23:24that sidewalk.

23:26Uh that they said there is, you know,

23:29visible or physible way to can put that

23:31sidewalk could be usable to the public.

23:35So what happened was um u then we came

23:39to the pedestrian light which are

23:41telling me I have to go front of you

23:43folks to explain the situation. So the

23:46reason I say that is if if I want to put

23:48the sidewalk with the pedestrian light,

23:50the people who are walking along that

23:52side of the street, they have to jump

23:54over the ditch, use that about 50 ft of

23:59the sidewalk and then jump back on the

24:01ditch to keep on going on the street,

24:05which which is not visible. It doesn't

24:07make any sense.

24:09But if I do put uh my own little

24:12sidewalk on the front, it's going to

24:13look for the nice for the city, for the

24:16neighborhood. And as you can see, those

24:18fences are all the way down to the

24:20ditches right there.

24:22So right there, you can see it.

24:26And if I want to put the sidewalk in

24:28there, there is a water going through on

24:30that ditch. Uh and it's going to eat up

24:32the clay and all the dirt on that

24:35sidewalk.

24:37Eventually, it's going to collapse.

24:39But now if if you ru if you do things we

24:42have to put a sidewalk. I think the city

24:44got to come in and fill up those ditches

24:47or put some kind of a bridge over them.

24:50So we'll be able to put a a sidewalk all

24:52the way from the new construction that I

24:55showed you to the street all the way

24:57from down there to all the way to down

25:01where we are. So nobody has any

25:04sidewalk,

25:05no pedestrian light. And that new

25:08construction, I don't know how they got

25:10the permit. I mean,

25:14they didn't put no sidewalk and no

25:16pedestrian light. And they've done it. I

25:19mean, and they they build it within four

25:21or five months. And I'm still five years

25:24into this project. And I'm still uh

25:28going back and forth and and I'm I

25:30really appreciate uh Sandy Mitchell.

25:32She's trying to help me out, but things

25:35are getting more complicated the way uh

25:37she was explaining. I was trying to

25:39clarify a little more on the basis of

25:42what we see.

25:47Just to answer your question, is 13 feet

25:49approximately? I'm doing it off of a GIS

25:51map, so it may not be entirely like

25:54meshed out.

25:5813 feet from the right the roadway to

26:02the property line.

26:03>> Yes.

26:04>> And what's the overall ride of way?

26:07>> I don't know.

26:15>> Let me measure. Let me erase this.

26:17>> By the way, those houses are there in

26:19line. And if I do come forward, it's

26:22going to be awkward because the other

26:24houses are lined up this way. And I'm

26:26going to be coming

26:29>> 51 ft

26:36>> approximately of course

26:39>> 45 ft

26:40>> 51

26:41>> 50 ft. Yeah, 50 foot right away be

26:43standard.

26:44>> Um and just a reminder this is just for

26:46a waiver for the pedestrian lights.

26:50So,

26:51>> and the requirement is only for one

26:53pedestrian light because that would be

26:54the only requirement would he would have

26:56to put in one pedestrian light.

26:59>> Where would that pedestrian light go in

27:02in the middle of the

27:03>> This is why he's seeking a waiver.

27:05>> Okay.

27:05>> Yeah.

27:09So, the applicant's preference is to

27:11deal with the pedestrian light now, but

27:13there are still future waiverss

27:16according to staff that we

27:18>> I think we could

27:19>> I don't see really anything else can be

27:21done

27:22>> those things.

27:22>> Sorry.

27:23>> I I think we could work with him on

27:25those things, but we always to make sure

27:28we can't wave those things. So, I think

27:30he just needs time to be able to sort

27:32those things out.

27:33>> Um,

27:34>> what are those things? Oh. Um, I do have

27:37a list of them. Give me one moment.

27:41>> Yes. Yes, sir.

27:44>> I've got maybe about uh five different

27:47site plan or six site plan. I keep going

27:49back and forth to my engineer to to

27:51modify and I have about five different

27:55uh

27:57or or rather six different way of

27:59putting the sidewalk. as we were talking

28:02to Sandy, she was explaining probably

28:04this is the way to do it. But I really

28:07don't see anywhere we can put that uh

28:09pedestrian light. I don't see it

28:11anywhere in the property is isolated

28:14right between the two houses and

28:16nobody's ever going to use that. And

28:17there is a street light on the top of

28:20that if visibility is the issue. And

28:23also on the uh duplex that I'm going to

28:26put, I did modify it to put the two uh

28:30flood lights on each corner. So anyone

28:33who just pass by it, it's going to be

28:35plenty of light.

28:40>> I see this

28:56It's No, it's not. It's the other way.

28:58That's

29:12no sidewalk to be seen. And that's a

29:15small strip of a street. And on the

29:18other side is a business actually as you

29:19can see.

29:26You can't see. There you go.

29:28That's the one he's talking about.

29:30>> There's this to the right up there.

29:34>> Go ahead. Yeah. Did you have your list

29:36of what? Yeah.

29:37>> Um, so we have to kind of contend to the

29:39facade variation requirement. So for

29:42every new building less than 50 uh feet

29:44there is a requirement at least two

29:46elements uh that is either to be like

29:49floor blanding banding columns

29:52foundation or a wall plane variation of

29:55at least 3 ft depth and or projection.

29:58Um and it must be at least two stories

30:01in height. Uh material and color

30:04changes. uh they do have some sort of

30:07difference between the first and the

30:09second floor which is also part of the

30:11requirement. So it's it's it's those

30:12types of things. Um other outstanding

30:16things would be um the fencing material.

30:19They said that there's some existing

30:21one, but we noticed that there's one

30:22fencing that we just need to know like

30:24what material they're planning on using.

30:26Um and that showed up in the newer uh

30:29August 31st submission. So we just need

30:32more clarification on that. There is

30:34also some incorrect information on the

30:36calculations for the urban forestry in

30:39terms of 5% calculation. Um, so we just

30:42again we just need clarification on that

30:44as well. So these are these are

30:46outstanding things but I'll let

30:48Francisco Vega explain a little.

30:51>> Hi everyone, Francisco Vega plant

30:52manager for preservation and design

30:54team. I think part of the confusion

30:56comes to the uh situation of how this

31:00request is on the agenda but because

31:02it's for the approval of the whole

31:05project including the pedestrian lining

31:08that's the reason why staff is

31:10recommending to continue it the case in

31:13the agenda is not only for the light is

31:16for the whole project. So if you approve

31:19the case, you are essentially approving

31:21the whole project and staff will not

31:24have the the opportunity to work with

31:26the applicant on all those standing uh

31:29components of the project that are

31:31pending.

31:33>> I don't I don't think so.

31:35>> Uh yeah, I would agree with that as

31:37well. The the agenda is just is it the

31:39project is a duplex. I think that's

31:41that's clear. It's not it. You're only

31:44granting that specific waiver that is

31:47listed on the agenda, not the entire

31:48project. So,

31:50>> he'll get that waiver. If there are any

31:51additional waiverss that would be

31:53needed, it would come back to the UDC.

31:55It's not just,

31:57>> you know, if there there are ways to

31:58correct staff's oversight in the event

32:01that, hey, we forgot this waiver, we

32:03need to bring it back. It's not as if

32:04the UDC essentially gives a blanket

32:06approval of a project when there may be

32:09necessary waiverss down the line.

32:11For example, the site plan we're looking

32:13at may not be the most recent. We're not

32:14approving the site plan. We're just

32:16specifically addressing the pedestrian

32:18light waiver.

32:18>> That is correct. That is correct.

32:21>> Does the staff are you using guidance

32:24for an overall overlay for this district

32:28and their design? And if you are, is

32:32everyone who's building new being held

32:35to those standards?

32:37>> So, yes, ma'am. Um when we uh typically

32:40get cases like this uh we want to make

32:43sure that the standards are the same for

32:46everyone else. That's why we also had a

32:47pedestrian light waiver for last week

32:49and it's in the not in this specific

32:52area but in this general area. Um we do

32:55want to make sure that everything's

32:56being complied with. We do look at the

32:58overall scope, the future land use, the

33:01current zoning and what's the

33:02surrounding. um a lot of our standards

33:05are tied to that as well in terms of

33:07like um is this going to be is your next

33:10door neighbor is it going to be a one to

33:12two family so then the standards are not

33:14the same and we do evaluate that when we

33:17do our staff reports um in this case

33:19however there the UR and um it's on the

33:23staff report that it shows the UR is

33:25that whole block not just that area of

33:28the project and the uh the property to

33:32the north is MU2 So we do take it as

33:34like a like as soon as the single

33:38families are getting developed and there

33:40we also do have about four more projects

33:42right now in the peritting status on

33:44this street that is coming in UR so we

33:46do look at the overall scope and stuff

33:48like that when we're writing the staff

33:50report um he has been working on this

33:54for some time um we do understand that

33:56there is some drainage issues so we we

33:59we we haven't given our actually

34:01determination because we've requesting a

34:03continuous to deal with the other things

34:05but um given that time we could actually

34:08give you a staff's recommendation um

34:11once we review everything and all the

34:13items that are outstanding

34:15>> seems to me we are just going in cycle

34:19>> everything keep saying it some other

34:22points comes up

34:24>> understandably where you are

34:26>> we're going to focus on the lighting

34:27because that's what on that's what's on

34:29our agenda today and all the other

34:32staff. I'm in my opinion of fellow

34:35commissioners, I think that we just need

34:37to focus on what's on the agenda

34:40>> and hope that the planning and in the in

34:44the city will look at the overall help

34:47them everyone with the drainage,

34:49everyone with the street. We need curbs,

34:52you know, we need you want sidewalks,

34:55you've got to make it conducive. A

34:56>> lot of years a lot of works need to be

34:58done to really to put the sidewalks over

35:00there.

35:00>> Understood. Other things has been an

35:02ongoing

35:03>> that really surprises me is that other

35:05houses about three houses down they put

35:09the new duplexes over there and nobody

35:11ever I don't know they were supervising

35:13and somehow escaped their attention to

35:16putting the sidewalk over there which

35:18was very feasible to do it and put the

35:21uh what do you call uh pedestrian light

35:24and that wasn't happening

35:28>> your case? Yeah, that's that's what I'm

35:31saying. I mean the lighting

35:34appreciate that. Sure. Sure. Yeah,

35:36that's what I'm that's reference to the

35:38siding. I mean the lighting. How come

35:40there wasn't there is no lighting over

35:41there on the other side without other

35:44properties?

35:45>> So on that note, any additional

35:47questions for the applicant related to

35:50the agenda item.

35:53Um is anyone do you have any further

35:55further comments sir before we move on?

35:58Do I have any comment?

36:00>> Any anything else to say while you're up

36:01there?

36:01>> Oh. Oh. This site plan actually is the

36:04ultimate one that with the help of

36:06Sandy, we put that one out. So, it's

36:08kind of like

36:10be able to put a sidewalk which which

36:12really is not going to be usable. But

36:15for the sake of the argue, we're going

36:16to put the sidewalk over there.

36:19Actually, it's going to be a private

36:20sidewalk. And then we have to do the

36:22encroachment and stuff. It's going to

36:23complicate things if we just go straight

36:26with you know what is this the issue at

36:28hand. It should be I've done everything.

36:30Everything is done. I'm only stuck in

36:33this pedestrian light. The sidewalk

36:35waiver has already been issued as well.

36:37>> Okay. Thank you. Um is there anyone else

36:39here to speak in in favor of this case?

36:42>> Yeah.

36:43>> Anyone here to speak in opposition?

36:45>> No.

36:45>> Okay. We will close the public comment

36:47portion or discussion by the commission.

36:50>> Yeah. I I think we need to just really

36:54focus in on what's on the our agenda and

36:56not

36:58they're going to come up with other

37:00things that he's got to have waiverss

37:01for. That's on them and just case by

37:04case.

37:06>> We have to determine whether we want to

37:08continue the case or approve or or

37:11reject the lighting request. So that's

37:13what's

37:14>> agreed. I I don't see any grounds for um

37:17pushing it forward. Yeah. Continuing it.

37:20Um And I don't see where you would put a

37:22pedestrian light in the public realm. So

37:24it would have to any lighting would have

37:26to be on on the building.

37:28>> That's what I'm saying.

37:29>> It's not a pedestrian light. So it's a

37:31that's a roadway light. And then so it's

37:33it's not meeting the UR zoning. So UR

37:37zoning would say that, you know, needs

37:39to be in this public realm and there's

37:41supposed to be sidewalk, there's

37:42supposed to be street trees, there's

37:43supposed to be street lights and or

37:45pedestrian lights. Yeah. And he can't do

37:47that in on this site. But

37:50>> right,

37:51>> so that's why we're

37:53>> why we're here.

37:54>> We're here.

37:56>> Comments.

37:57>> Yeah.

38:00>> Any more comments?

38:01>> I was going to move to approve for

38:03approval of of the waiver

38:05>> waiver for no pedestrian light.

38:09>> This is Commissioner Carl. I'll second

38:11that.

38:15>> All right. So, we have a motion and a

38:16second to approve the waiver for a

38:18pedestrian scale lighting. Um, Chair

38:22Benner, how do you uh vote?

38:24>> I.

38:25>> Uh, Commissioner Wes, how do you,

38:29>> Commissioner Carr? How do you vote?

38:31>> I.

38:32>> Um, Commissioner Dose, how do you vote?

38:35>> I.

38:35>> Commissioner Harrier, how do you vote?

38:37>> I.

38:38>> Commissioner Hughes, how do you vote?

38:41>> I.

38:42>> Uh, Commissioner Holidayiday, how do you

38:44vote? I

38:45>> Commissioner Ramsey, how do you vote?

38:47>> I.

38:48>> And Commissioner Hamsy, is that correct?

38:50>> Yes.

38:51>> Yeah.

38:51>> I Okay, perfect. Thank you. So, we have

38:54a vote of 90 for the waiver of the

38:56production scale lighting for UDC case

38:59number 2026137

39:02um 5812 Eastland Street. Thank you.

39:06>> Thank you.

39:11>> Thank you folks. I appreciate it. After

39:125 years,

39:14people are making tons and tons of

39:16houses. No issues for me just for one

39:19house. Thank you. Thank you.

39:28All right. Our final case, UDC 2026 205.

39:33And one thing to note, the council

39:35district is actually district 6. about

39:3895% of the campoui form base code is

39:40within district three. So that was my

39:42mistake on on the agenda.

39:47All right. Good morning commissioners.

39:50Morning. Um last case is UDC 2026 205.

39:54Um the address is 5506 Levelville

39:57Avenue. Um the applicant is requesting a

40:00certificate of properness for a

40:02originally designed town home

40:04development for homes in the Kambooi

40:06Boulevard code transition district with

40:09a waiver from the first floor to floor

40:11height standard to allow a floor to

40:14floor height of 10 feet 8 in where a

40:18minimum of 15 feet first floor tofloor

40:21height is required. Um this is the Korea

40:25sunny map of the location. Um

40:29just as a little bit of background this

40:33um let me just

40:37so um the the project that we presenting

40:39today is as I said 556 Love Avenue. Uh

40:43it contains four platted lots but in

40:47overall this project um

40:51uh belongs to a more larger development

40:54which includes um the parcels of the

40:56northern portion as well of this block.

40:59Um

41:02but as of today uh we're just presenting

41:04waivers from the southern portion

41:06because we don't have um final drawing

41:08from the northern part and that's why

41:11we're just presenting the waiver for the

41:13southern um portion of the property the

41:17development. Uh here's the aerial

41:19imagery of the site

41:21and

41:24the as a little bit background as well

41:26about the prop the proposed project.

41:28consist of two Dless residential

41:30building um containing a total of four

41:32dwelling units and this other portion of

41:37the SA is located within the Camboui

41:39transition zone. So as you can see um

41:44even though it's one larger project it

41:47has two different um subunning from

41:50Kambooi the southern portion is

41:52transition and the northern part it's

41:55regally gateway

41:58and

42:01because the updated proposal which is

42:04the one that you're seeing right now um

42:08the what that we got from the applicant

42:10and and the proposed duplex building

42:13extend now across um plotted lot lines.

42:18Um you can see it here

42:20lot lines and it's no longer treated as

42:23a town home because to be treated as a

42:26town hall the building might extend

42:27across internal lot lines and with that

42:31being said um they cannot be treated as

42:33a separate individual lots the units

42:35because you have two units per building

42:38and due to this current design they

42:40could not be longer sell as individual

42:43property lots. So that's why it's not

42:45longer considered as a townhouse with

42:46this current design and the level

42:50development is as I say it's a part of

42:53the larger project and each duplex

42:56building contains two attached building

42:58units. You can see it here on this

43:00elevation facade and our two the two

43:04units are two story in height and

43:07include individual front entrances

43:10from porches attached garage and we

43:13access from the alley and residential

43:17scale architectural detail as you you're

43:19seeing on the elevations.

43:24Um the PU the building are primarily

43:26oriented

43:28uh towards Lobl Avenue and with the

43:30principal facas and the pedestrian

43:33entrances and the front porch address in

43:35the street. Um

43:38the project also includes associated

43:40pedestrian walkways and landscaping

43:42plans that will still working with the

43:46applicant on those kind of components.

43:48The landscape plan

43:56And the Kambooi

43:59co-established development standards

44:00intend to promote compatible building

44:03form appropriate transitions and

44:05pedestrian oriented development pattern

44:06with this district. um

44:12as a presenter today the the the entire

44:15um overall design and that the applicant

44:18still needs a waiver because Kamuico

44:21requires a 15 ft minimum height for the

44:25first floor for

44:28all the districts. And in this case, the

44:31applicant is just proposing a 10 ft 8 in

44:35first floor and staff

44:39believe the the current high design is

44:43appropriate for the residential use and

44:46surrounding neighborhood context. Um as

44:48of right now

44:52the property is um so this is the photo

44:54from the side busy. um the context

44:57around the property it's single home

45:00houses

45:01and

45:03as I believe that the scale that the

45:05applicant is proposing is appropriate

45:08and although the building

45:12size sebox that they're proposing with

45:14this new design um this is just a note

45:17and

45:18um it might have some building code um

45:23issues that the applicant might have to

45:26address once it goes through the general

45:29building permit process

45:31and due to fire and requirements of

45:34minimum segments between buildings.

45:39However, for the waiver that we are

45:41presenting today which is the height um

45:45we believe that it meets the the intent

45:49of the actual neighborhood which is the

45:52scale and

45:56Given the above and the staff recommend

45:58approval of the waiver but but subject

46:00to condition to resume final review plan

46:04showing compliance with the other

46:06standards like landscape plans and

46:10preparational locations and other items

46:13they will still want the applicant to

46:14address but we can work it internally as

46:18a staff. Um, and this comes to staff

46:20report.

46:25>> Thank you. Uh, any questions for staff?

46:29>> Were there any issues with the setback?

46:32>> Um, so when we started working with the

46:35applicant um, in the original proposed

46:38design, he didn't meet the cambooy

46:41sebox. So in order to avoid waiverss

46:44from the camboo of sebas that's why he

46:47presented this kind of new um location

46:49of the building units where are crossing

46:52a platted load lines but for doing that

46:56now he doesn't meet some fire code um

47:00requirements that he might have to

47:02address. uh and the applicant we we

47:06talked to him about this kind of issue

47:08but he's willing to continue that kind

47:11of situation later and we don't know if

47:14has to come back to us but as of right

47:15now he meets the setback stand up for

47:18the camboo we

47:21just I just wanted to give like a note

47:25about the building code issue that he

47:27might will have

47:29once he goes through the general

47:30building permit process Yes.

47:33>> Are these still four individually

47:35platted lots?

47:36>> So, as of right now, um they're

47:38individual plat, but because now the

47:41current design of the building cross um

47:45those plotted lot lines, uh it's no

47:47longer considered as a town hall. And

47:50with that being say, it cannot be sell

47:54as a individual units because it has it

47:57has cross the plat lines and the city

48:00doesn't

48:01>> well he's going to have problems with

48:02building code because you cannot put a

48:04building across a property line and

48:06>> you can property and if you got two he's

48:08going to put a firewall between those

48:09two because you're on a property line.

48:11So

48:11>> So the problem is not that he's crossing

48:13the property line. The problem is the

48:14setbacks that he's

48:16>> he's going to have problems in the

48:17building code because you cannot do

48:18that. Okay.

48:19>> You cannot I can't even put exit doors

48:21across property lines and buildings that

48:23I built.

48:24>> Space in order on your property. So,

48:26he's got some building code issues.

48:28>> Yeah. I think Joe want to

48:29>> Yeah. Commissioner Ramsey in the city of

48:30Fort Worth. The city does allow you to

48:32build across plot lines as long as it's

48:34common ownership.

48:36>> Well, if they're all owned by the same

48:37people.

48:37>> Yes.

48:38>> Yeah. It's the same owner.

48:41>> He just the utility taps have to be se.

48:45But as long as he can de deconlict that

48:47the city will allow him to build.

48:49>> That's fine. I just want to make sure

48:50>> y

48:57>> and I will just add his his waiver

48:59request today is just for the

49:00floortofloor height.

49:02>> Um the applicants looking to get this

49:05project moving. So after discussions

49:07with the applicant, we we agreed to move

49:09forward with just this waiver and that's

49:11why we're asking for the plans just to

49:13be resubmitted so we can continue to

49:14work on the landscape and the public

49:17realm. But the applicants verbally

49:19communicated to staff his willingness to

49:21meet the published standards as is. So

49:24he's just trying to make sure he can

49:26move along as expeditiously as possible.

49:29>> Yeah. Yeah. And also um we believe that

49:32the applicant will might come back for

49:34waiverss for height as well for the

49:36northern part later on. So because it's

49:39the same developer and also just to

49:43point that out the applicant has stated

49:44that he has worked with the KO

49:47neighborhood on the design to have the

49:50neighborhood approval and he has stated

49:52that the neighborhood is feeling

49:55in favor of the height waiver but we

49:58didn't receive any letter of support

50:01from the neighborhood yet so I think

50:03there's some common neighbors here

50:06present today to speak on behalf of the

50:08yet

50:10out of curiosity whether we simply

50:12approve or approve with these condition

50:15with these subject to the conditions of

50:17resubmitting that's the same effect has

50:18the same effect right

50:19>> it's it's the same effect we as staff

50:21just wanted to acknowledge like hey

50:22we're still working through this so like

50:24on the site plan I think you might see

50:25like a pedestrian light like right at

50:27the corner between the two crosswalks we

50:29know IPRC is not going to approve that

50:31so we just need to work on some of that

50:32spacing make sure it's meeting the

50:34intent of the landscape ordinance and

50:36the applicant's been very willing to

50:38work with staff. He's been very

50:39cooperative. So, you know, either way,

50:43it's the same path. We just kind of

50:44wanted to affirm that in our

50:46recommendation for the motion.

50:48>> Understood.

50:49>> Any other questions for staff?

50:53>> I I do. Um so, this is for both of you

50:56guys, Joe and um when we have more

51:00people coming for building in this in

51:03this particular area. So, are we going

51:05to have building codes for the Komo

51:08neighborhood or are we going to follow

51:09the Camp Buouie? Because Camp Buoy

51:12guidelines sounds like it's more

51:13commercial and less residential. So, how

51:17how are you working through all this?

51:19>> So, we're we actually we do have Campo

51:23forbased code update on the agenda later

51:24on. So, we'll address some of that.

51:26Okay.

51:26>> Um this is in the Camp Buouie transition

51:28district. The intent of the district is

51:30to transition that commercial corridor

51:32into the adjacent residential. Campway

51:34formbbased code is the only district we

51:36have that is linear along a sixlane

51:39commercial highway. So it's different

51:41from near southside bar university

51:44stockyards which are all this contiguous

51:46area and you can walk in two directions

51:49in camp where you walk in one direction

51:50and you're outside the district. So the

51:52intented transition is to transition

51:54that commercial into the residential and

51:57that's what this zoning is. Um we are in

52:00communications with the uh KOMO

52:02community and working very closely

52:04handinhand with uh Camp Buouie Inc.

52:06about code updates. So we'll actually

52:08address that later on in the work

52:09session.

52:10>> Fair enough. Good. Thank you.

52:11>> Yeah.

52:14And I think one of the just to give a

52:16little bit of background as well, one of

52:18the issues, well not issues, one of the

52:20reason why we don't have the northern

52:22portion um design ready yet is because

52:25it has to meet kind of different

52:26standards because it's actually part of

52:28the Kambooi corridor area on the

52:31northern portion. But this other portion

52:33is the part that's actually facing the

52:34KO community

52:39>> facing KO is in KO the residential side.

52:44Mhm.

52:47>> Okay. Is the applicant here to speak?

52:50Welcome up.

52:50>> Yes.

52:51>> Please state your name in the city in

52:52which you reside.

52:56>> Good morning. Uh my name is Corey

52:57Waldrip. I'm here with Motive Ventures

52:59to speak on behalf of the project. Um

53:01prepared a PowerPoint uh for you guys to

53:03walk you through a couple of things and

53:05just wanted to say thank you. Uh a

53:06couple points of clarity before we get

53:08started. Um, we have been very very uh

53:10graciously accepted to participate in

53:13the community meeting at KOMO and share

53:15about our project as far as having their

53:17support. Um, I hope we do. Um, but we

53:19don't have anything definitive. So,

53:20we'll let them speak as to their um to

53:23their feelings about the project and and

53:25their viewpoint. Um, but anyway, um

53:30u just introduce myself. Uh, my wife and

53:34I uh are Fort Worth residents. I was

53:36born and raised in Fort Worth. Uh Fort

53:37Worth is home. Um and we're grateful for

53:39the opportunity to create something that

53:41will serve this community for years to

53:42come. Uh thank you as well for the Fort

53:45Worth Development Services uh team and

53:47for their collaboration and to the KOMO

53:50community for welcoming us, allowing us

53:52to share the project and helping us

53:54better understand the neighborhood. Um

53:56our uh the project's straightforward. Uh

53:59build quality homes that give families

54:01stability in a place they're proud to

54:03call home.

54:06Uh the location provides important

54:07context uh for the project. Uh the level

54:10property is site sits just south of the

54:13Camp Buouie corridor uh within the Lake

54:15Ko community area and the Camp Buouie

54:17transition district. As Jefferson

54:19pointed out, uh the property front Level

54:22Avenue uh and with a corner frontage on

54:24Borin Street uh both close classified as

54:28local streets uh under the Camp Buouie

54:31framework. Uh the project is part of a

54:33larger initiative that we are planning

54:35for this area including the luck and

54:38actually the Rosedale properties to the

54:39north um as well.

54:46Levelville consists of approximately

54:48four 1,800 square ft four-bedroom

54:50residents and two duplex buildings. Uh,

54:53Miss Jefferson pointed out um

54:56earlier on the site plan, we do

54:58recognize that there are life safety um

55:03codes that we will comply with. I think

55:04that site plan showed an inherent line

55:07to line between the the roof uh fascia

55:10and not inherently the uh building

55:13setback itself. So, we will work with

55:15staff on correcting um and complying

55:17with all life safety um related code. Uh

55:21long-term ownership creates a different

55:23approach to construction. Um well

55:25selected materials, thoughtful layouts,

55:28and durable construction reduce

55:29long-term maintenance while protecting

55:31the value of the property. Uh it's our

55:33belief affordability should not require

55:35sacrificing quality. Uh we are pursuing

55:38opportunities that can assist housing

55:39affordability while also supporting the

55:42investment required for thoughtful

55:43design.

55:46This rendering shows how the project

55:48reflects the Camp Buouie standards

55:50through a residential design. Along the

55:53street, we're providing the sixoot

55:55sidewalks, uh, pedestrian lighting,

55:58landscaping, and front porches that

56:01create a defined and walkable

56:02streetscape, durable materials, and the

56:04design reflect the historic residential

56:07character of the neighborhood. the homes

56:09face uh and engage the street while the

56:12garages and vehicular access remain

56:14secondary and to the rear through the

56:16alley. So while the building is new, the

56:19scale materials in relationship to the

56:21street reflect both the camp standards

56:23um and the residential character of the

56:25neighborhood.

56:28The requested waiver is appropriate for

56:30three simple reasons.

56:33First is use. The code defines these as

56:36residential buildings. It separately

56:38defines commercial ready space

56:41designed for conversion to commercial

56:43use. Tables 5.1 and 5.2 show that

56:47residential use and commercial ready

56:49requirements depend on use and street

56:51frontage. Level is residential and it

56:54fronts a local street. Sections 6.25 and

56:586.85 identify first floor height as part

57:01of the commercial ready standards and

57:03tie standards to Camp Buouie Boulevard

57:06frontage.

57:07levelvel is exclusively residential,

57:10contains no commercial ready space, and

57:13does not have the frontage condition

57:14requiring commercial ready construction.

57:17Therefore,

57:19the 15 ft first floor height is part of

57:21the commercial ready framework and does

57:24not apply to the residential condition

57:25at level.

57:27Second, the proposed first floor to

57:30floor height is approximately 11'2 in.

57:33Jefferson, I know you discussed 10 feet.

57:35Uh I think that's floor to ceiling. Uh

57:37and I might not have been clear on how

57:38we represented that information. But

57:40when we include the floor joist and the

57:42subfloor, that's how we're coming up

57:43with our floor to floor. So just to

57:45clarify um that from an point of view.

57:47Um providing a 10-ft plate plus height

57:50uh in the floor system. Increasing that

57:53dimension to 15t adds almost 4 feet of

57:55vertical space. Um, and why that's

57:58important is the additional height would

58:00lengthen the staircase configuration and

58:03consumes usable uh residential area

58:06within these lots. Accommodating that

58:08additional run would push the building

58:10width beyond the frontage requirements

58:12and plated lot uh the platted lot can

58:14accommodate. Um, more specifically, if

58:17we're going up four feet, then our run's

58:20going to increase by roughly 3' 11 in.

58:22Okay, so if we're doing that for four

58:24duplex units, which just simple math,

58:26four units, four feet, that's 16 feet of

58:28additional building space that we would

58:30need, and it just pushes the project

58:31entirely off our capacity with what the

58:34the platted lots and then we'd be in

58:36here asking for waiverss on frontage.

58:39And so I think that the Camp Buouie uh

58:41code is clear that the frontage

58:42requirements would require a

58:44reasonzoning. And so I think that is a

58:46higher ask uh than what we're here to

58:48discuss with you today.

58:53Uh third's the scale. Uh this is

58:55designed as a traditional two-story

58:57residential building that fits the scale

58:59and character of the surrounding

59:00neighborhood. Um adding additional 4

59:03feet to the vertical would create an

59:04unnecessarily tall first story or at

59:07least in my opinion. Um increase the

59:09building's mass and change those

59:10residential proportions. The waiver

59:12allows the building to maintain the

59:14scale, proportion, and residential

59:15character the KUI standards are intended

59:17to support.

59:22Uh clarity on how the 15 foot standard

59:24applies to exclusively residential

59:26projects would be very valuable for

59:28future development. However, for level,

59:31we are requesting approval of the

59:33proposed residential floor to floor

59:34height through this waiver. I'm thankful

59:37for city staff um and their support of

59:39the request.

59:44And this was just a a video that was

59:47running through the different

59:48elevations. Um there's some additional

59:50information on the back side of this if

59:52you guys have any questions. Uh so

59:54respectfully uh we request the waiver uh

59:56for the floor to floor height and um we

1:00:00believe this is a limited and reasonable

1:00:02request that preserves the neighborhood

1:00:04character of KOMO while maintaining the

1:00:06functional quality and intent of the

1:00:08Camp Buouie code um which allows us to

1:00:10build a beautiful place for families to

1:00:12call home. Thank you for everyone who's

1:00:14been a part of the project and to the

1:00:16commission for your time and

1:00:17consideration. Um, happy to answer any

1:00:19questions you guys might have.

1:00:20>> Thank you very much.

1:00:22>> Staff can provide a little bit of

1:00:24clarity on the the measure. So, there's

1:00:26a weird diagram in the code that

1:00:28suggests the floor tofloor measure is to

1:00:29the top of the ceiling. So, we as staff

1:00:32put in the agenda request to the top of

1:00:35the ceiling. So, he regardless of how

1:00:37you measure what's in the agenda would

1:00:39get him to achieve his plans. So, just

1:00:41note that. That's why we put the 10 feet

1:00:438 inches. It's the more conservative of

1:00:45the of the two options we had dealing

1:00:48through that interpretation and how

1:00:49that's commonly uh applied.

1:00:55Thank you. Any questions for the

1:00:57applicant?

1:01:01>> Okay. Thank you.

1:01:04Uh anyone else here to speak in favor of

1:01:06this case?

1:01:11welcome up.

1:01:16>> Thank you. Please state your name.

1:01:19>> Good day. I'm Sandra Stanley from Como.

1:01:21I'm a stakeholder resident and I'm the

1:01:23current uh Knack president. And so um I

1:01:27wanted to say that this um developer,

1:01:30they have uh really done their due

1:01:32diligence with us. They've met with us

1:01:34three times on site at our NAC meeting.

1:01:37And then some of the people that didn't

1:01:40get to come to the net meeting, we had a

1:01:41third meeting on Zoom. So some of our

1:01:45concerns, initial concerns with the

1:01:48Cambouie and I guess for me being the

1:01:50new president, not knowing that that

1:01:54zoning over there on the veil,

1:01:56especially on the veil is considered

1:01:59Camp Buouie. then knowing that the

1:02:02street the block that backs up to it is

1:02:05considered Camp Buouie. So that's when I

1:02:08started answering asking lots and lots

1:02:11of questions. Okay, that's residential.

1:02:15Those other um zonings aren't going to

1:02:17fit for KOMO. If you look at the new

1:02:22bill across the street from this

1:02:24property, and I don't know if y'all have

1:02:26a picture of that, the new bill across

1:02:28the street from that property. It's a

1:02:30new bill and they didn't come under that

1:02:32under those restrictions and it's very

1:02:35nice. But this project complements this.

1:02:38But what what won us over was most

1:02:42developers when they come to KOMO, they

1:02:44tell us what they're going to do. Of

1:02:46course, it's their property. uh and they

1:02:49never talk about affordable housing.

1:02:51Well, this developer came out the shoot

1:02:53talking about developer uh affordable

1:02:56housing and had a discussion with us

1:02:58about it and we even came back again on

1:03:00that third meeting to say uh some of the

1:03:04um residents said we want that in

1:03:06writing because we have so many

1:03:08developers come and they don't uh honor

1:03:12they get what they need and they forget.

1:03:14So, they did make a ver a written

1:03:16commitment to us to have uh uh at least

1:03:20two of those uh of their properties uh

1:03:25as affordable housing. And they had

1:03:27already the conversation we didn't have

1:03:29to prompt them. We didn't have to ask

1:03:31them. She uh uh Meg had already went and

1:03:34talked to housing and got on schedule

1:03:36and got ideas for that and very open to

1:03:39what we were saying and what we wanted.

1:03:41And um they stayed for our NAG meeting

1:03:43to the end and got to um meet the uh the

1:03:47um community and they were available for

1:03:50questions and no uh questions negative

1:03:53questions came up at the meeting there.

1:03:55If there are some uh questions then uh

1:03:58we don't know about that. But I would I

1:04:01am concerned and I've been talking to

1:04:02the city. We met with Mr. um Mr. uh DJ.

1:04:06We've met with him. I've talked to

1:04:08Joseph has been very helpful in when did

1:04:11Komo become that part of Komo become um

1:04:15uh Cambouie and they're helping us

1:04:18navigate through that and Camboo uh horn

1:04:23you know summer horn yes but not the

1:04:25residential so it doesn't it's apples

1:04:28and oranges for that even when they come

1:04:30back for this second development having

1:04:33the lavel the um the lavell street and

1:04:37then have lock doing something different

1:04:40is going to be weird and it's to me it's

1:04:44going to never be commercial now some

1:04:46kind of way that big storage building is

1:04:48there it's there and we know

1:04:50gentriification well in Ko we can't

1:04:54control people we can't control uh

1:04:57investors a lot of the investors in Ko

1:05:00uh don't live here they're from out of

1:05:02state cuz I stop and ask them where are

1:05:03you from and get that information so Uh

1:05:07uh they live here. That's wonderful.

1:05:09They live We I've asked a lot of

1:05:11questions. They live here in Fort Worth.

1:05:13We like that. And so um we're in

1:05:17majority is in favor of this project. We

1:05:20want it to look like

1:05:23a neighborhood, not commercial. It's not

1:05:26going to ever be commercial right there

1:05:28on those two streets. So when you come

1:05:30back when they come back for their other

1:05:32one, and I know they've had to change

1:05:33the design. I understand the Rosedale

1:05:36part because she shared the whole vision

1:05:39uh and that looks really nice, but um I

1:05:43just don't see how they match up and

1:05:45hopefully we can uh the city will

1:05:47continue to work with us and you guys

1:05:49will work with us to get us on track on

1:05:51what we need and we're working forward

1:05:53on that. Thank you very much.

1:05:55>> Thank you.

1:05:57Anyone else here to speak in favor?

1:06:02Good morning. welcome up.

1:06:06>> Good morning. My name is Wanda Bohannan

1:06:08and I'm a long-term resident of the Lake

1:06:10Homo area. We have met several times

1:06:13with the uh builders. We do appreciate

1:06:17the fact that we want our I hope you

1:06:20appreciate the fact that we want our

1:06:21community to remain a community that

1:06:25looks like a community. We are currently

1:06:28also in progress of working with the

1:06:31conservation to ensure that the inside

1:06:33part of the Lecomo uh community stays

1:06:36the same. As we've looked at these

1:06:39buildings and we as we've talked to the

1:06:41builder too, it sounds like we are um

1:06:46looking forward to them being here. not

1:06:48just because of the affordable um um

1:06:52housing but also because it's going to

1:06:55conform to our neighborhood. What we

1:06:58don't want to do is destroy the concept

1:07:02of family uh s uh residential area. And

1:07:06so as a resident of KO, I can't speak

1:07:10for everyone, but I can speak for what I

1:07:13saw at the meetings, the comments that

1:07:15I've heard. We are in favor of working

1:07:18with this builder. And by the way, they

1:07:20are probably

1:07:22uh one in a long time one of the ones

1:07:27that have actually come to us, worked

1:07:30with us and considered what we as a

1:07:33community would like to have.

1:07:36>> Thank you.

1:07:37>> Thank you.

1:07:39In favor? Yes. Welcome up.

1:07:44>> Good morning. My name is Shavina Miss

1:07:46Peacock Taylor and I am a Lake Ko

1:07:50resident and I am also the program

1:07:53director of keep lake como beautiful. Uh

1:07:56that's a program of proof of life

1:07:58community development corporation. I

1:08:00reviewed the record for UDC 2026205

1:08:04and I want to limit my comment to the

1:08:06decision before the commission today.

1:08:08the four-unit lavel portion and the

1:08:11requested waiver from the 15 foot floor

1:08:15tofloor standard I'm sorry 15 foot first

1:08:20floor floor to floor standard to 10 ft 8

1:08:25in based on the staff's findings that

1:08:28the reduced height is more compatible

1:08:29with the surrounding residential context

1:08:32I support the waiver with the staff

1:08:34recommended conditions requiring final

1:08:36compliance with the remaining Campboy

1:08:38standards and revised enhanced

1:08:40landscaping. I also understand that

1:08:43separate building code and permitting

1:08:45review remains outstanding. Thank you.

1:08:48>> Thank you.

1:08:52Anyone else here to speak in favor?

1:08:55Is anyone here to speak in opposition?

1:08:58Okay, we'll close the public comment

1:08:59portion for discussion by the

1:09:01commission.

1:09:04I think the the developer has done a

1:09:07good job working with the community. I

1:09:09think his design fits in with the

1:09:12character of our neighborhood. Um and so

1:09:15I think they've done an excellent job

1:09:17and I'm recommending approval.

1:09:20>> I have a question just um

1:09:24it blends right with the area and you

1:09:28support the design.

1:09:30Did you through that process do you feel

1:09:33like everyone all the others the you

1:09:37know future people that are coming to

1:09:39purchase the land and come in is this

1:09:41kind of the standard you're wanting the

1:09:44whole neighborhood and KOMO to become?

1:09:46>> I do I'm not encouraging us to have a

1:09:50lot of duplexes throughout our

1:09:51neighborhood. We're having houses. It's

1:09:53mostly it's single family, but this

1:09:57duplex fits in with the other designs of

1:10:01houses that they built. It really

1:10:03doesn't look like a no part a do it

1:10:07looks more like a house. And it

1:10:09>> it's going to expand. You're talking a

1:10:11whole block now behind that public

1:10:12storage. behind that public storage is

1:10:15on lock side and it should looks like a

1:10:19um the neighborhood too because it's not

1:10:23going to be a business corridor on that

1:10:26side. It walks right down into the

1:10:28neighborhood which is houses. So I don't

1:10:32see lock ever becoming a commercial

1:10:36corridor and if you just go to the next

1:10:38block they've built some new houses all

1:10:40along there.

1:10:42>> Thank you.

1:10:45And I think we've seen some of these

1:10:47cases with the 10 foot versus 15 foot.

1:10:49And there are there are commercial

1:10:52spaces with 10ft ceilings. So it doesn't

1:10:56preempt that you can't use this space as

1:10:58like a live work where the downstairs

1:11:01would be um if that was the future

1:11:04growth of the of the neighborhood if it

1:11:06became an area that that was uh feasible

1:11:10or the neighborhood wanted it. Um, but I

1:11:12do think that they have some work to do

1:11:14on the site plan. Uh, specifically you

1:11:16got bedroom windows on property lines uh

1:11:19that need setbacks. So, um, I think we

1:11:23should if we move for approval and we

1:11:26should, uh, have them continue to work

1:11:28with staff.

1:11:32>> So, I would like to make a motion to

1:11:34approve if there are any other comments

1:11:36by

1:11:39um, move for approval.

1:11:41provided subject to a resubmission of

1:11:44final review of the plans showing

1:11:47compliance with all other camp form base

1:11:50code standards.

1:11:53>> Second.

1:11:56>> Okay, we have a motion by Commissioner

1:11:57West and a second by Commissioner Deose.

1:12:00Um, Chair Benner, how do you vote? I

1:12:04>> Vice Chair Ramsey, how do you vote? I

1:12:08>> Commissioner West, how do you vote? Hi,

1:12:11>> Commissioner Carr. How do you vote?

1:12:13>> Hi,

1:12:15>> Commissioner Deose.

1:12:17>> I

1:12:18Commissioner Harrier. How do you vote?

1:12:20>> Hi.

1:12:21>> Commissioner Hughes, how do you vote?

1:12:23>> I

1:12:26Commissioner Holidayiday.

1:12:30>> And Commissioner Hamsy, how do you vote?

1:12:32>> I motion passes 90. Thank you.

1:12:44All right, that concludes our cases

1:12:46today. We're going to this UDC, we

1:12:48decided to try something a little bit

1:12:49different and put work session at the

1:12:51end. Number one, so we can work on

1:12:53getting applicants through the

1:12:55commission process. They're not having

1:12:57to wait um you know, two, three hours

1:12:59for their case to be heard. And then um

1:13:02also just kind of to kind of you know be

1:13:04able to talk about these things a little

1:13:05bit more freely without the pressure of

1:13:07having to rush through them. Um so we

1:13:09have three work session topics today.

1:13:12The first is just a quick status update

1:13:14on the Panther Island formbbased code.

1:13:17So my colleague Francisco has been

1:13:18working on that. So I may um pull him in

1:13:21here on this. Um we presented this code

1:13:24update to you back in June and it's been

1:13:27working through the legislative process

1:13:28for the last few months. Um, so with

1:13:32that, it's getting ready to go to city

1:13:34council. So, we just wanted to remind

1:13:35you about some of the things that you

1:13:36guys may see in the newspaper over the

1:13:39next couple weeks. Um, so here's a

1:13:41quick, it's kind of a long summary of

1:13:43changes. There are some pretty

1:13:44substantial changes, but just to hit

1:13:46some of the high points, we are

1:13:47consolidating the multiple subjects

1:13:50districts into two, Panther Island Core

1:13:52and Panther Island Edge. We're adding

1:13:54some of our some guiding principles and

1:13:57development objectives based off of uh

1:13:59some community engagement and networking

1:14:01and uh visioning for the district. Um

1:14:03we're also updating some of our

1:14:05administrative procedures and regulating

1:14:06plans. We're revising and expanding some

1:14:09of our waterfront and public open space

1:14:11standards to account for updates in the

1:14:14canal work that's being done in Panther

1:14:16Island. Um, we're also modifying some of

1:14:19the district boundaries that relates to

1:14:20the subdist consolidation

1:14:23and making some uh simplification to the

1:14:26maximum height limits given that now

1:14:28we're just moving to two subdists. The

1:14:31the original code had various height

1:14:33limits based off the various subdists.

1:14:36Um, so if you uh paid attention to the

1:14:40last zoning commission hearing, you'll

1:14:41notice you would have noticed that

1:14:42there's actually two zoning cases that

1:14:44we put in front regarding Panther

1:14:46Island. One is to update the code

1:14:48document and the map what's called a map

1:14:51amendment in zoning speak and then the

1:14:53other one is to reszone some of the

1:14:55properties into those two subdists that

1:14:56we're creating.

1:14:59So really the genesis of the code update

1:15:01again is to implement the vision 2.0

1:15:04plan that uh TRWD Taran County Regional

1:15:08Water District put together between 2023

1:15:10and 2024. So this is the

1:15:11operationalizing of that making sure the

1:15:13code comes up to speed with it. Um so

1:15:17here's a kind of summary of the district

1:15:19consolidation. On the left you can see

1:15:20the current district map with the nine

1:15:22districts, the various heights and then

1:15:24on the right you can see a couple of

1:15:26things. Number one you can see the

1:15:28consolidation into two subd districts

1:15:30and then additionally a change in the

1:15:32overall boundary. So there are some

1:15:34parcels that are kind of on the opposite

1:15:35sides of the river here and uh once the

1:15:39bypass channels complete there'll be

1:15:41kind of a clear delineation. So, those

1:15:43are going to actually we're working on

1:15:44reszoning those to other things. The the

1:15:47yellow that you hear that you see here

1:15:48by Henderson Street, there's actually an

1:15:50active zoning application for that site

1:15:52already. So, we're kind of adjusting the

1:15:54boundaries of Panther Island, pulling it

1:15:56in, making sure it better aligns with

1:15:57TRWD and public land ownership. Um, and

1:16:02also in the areas that are abudding

1:16:04downtown, uh, in this area, there's some

1:16:06conflicts with the downtown overlay too

1:16:09that make it just a little bit tough to

1:16:11work through. So, we're hoping that this

1:16:13new boundary line will simplify things.

1:16:15Then, as you can see on the right, we're

1:16:17also moving just to the two subd

1:16:19districts. The core, which is the darker

1:16:21pink on that map, and the edge, which is

1:16:23the lighter pink.

1:16:24>> Joe, I have a question. When did it go

1:16:26up to 24? I thought it was at 20 on the

1:16:29max uh height

1:16:31>> on on this one.

1:16:32>> Yeah, the core. I thought I saw

1:16:34something in a public thing. It was 20

1:16:37feet. So, so the north main subdist is

1:16:4020. The N3 subd district, neighborhood

1:16:43three has been 24.

1:16:49I I'd have to go back into the history

1:16:50of Panther to look up exactly when that

1:16:52was. Um, but that's we're kind of just

1:16:56simplifying that across the board. Do

1:16:58you want to hop in on that at all,

1:17:03Francisco Vega, planning manager?

1:17:06No, I I I know that there is an

1:17:09amendment that happened uh probably I

1:17:12don't know five years or something ago

1:17:14where there was a revision to the

1:17:16maximum height. Um in the past 10 years

1:17:18I think that we have been updating this

1:17:20district probably seven times. And so I

1:17:25remember when I was reviewing the uh the

1:17:28background of the district, I saw one of

1:17:30those ordinances to increase the height,

1:17:33but I just can't remember the year.

1:17:36>> Thank you.

1:17:40>> Uh speaking of height, that

1:17:42simplification of the height, we oftent

1:17:44times get questions like, "Oh, you're

1:17:45just going to slap a bunch of big

1:17:47buildings in. Is it going to look out of

1:17:48scale?" So one of the things Vision 2.0

1:17:510 did was they did some broader

1:17:52neighborhood context analysis. Looked at

1:17:54Panther Island and the maximum heights

1:17:56in context to the north side as well as

1:17:58to downtown. And I think the important

1:18:00thing here is to note the change in

1:18:02elevations between those three

1:18:03districts. Downtown obviously we're on a

1:18:06bluff. I mean not this site but you know

1:18:08a few blocks away is on a bluff. So that

1:18:12district where there's already tall

1:18:14buildings will still be downtown and be

1:18:17recognized as such. And then Panther

1:18:19Island actually transitions down due to

1:18:21the lower elevation and that kind of

1:18:23provides a transition between north side

1:18:25and some of the the increase in density

1:18:26that's happening in like the stockyards

1:18:28area.

1:18:31Um again here's a huge list of updates.

1:18:33We've we presented this previously. A

1:18:35lot of this is from the vision 2.0 the

1:18:38work that TRWD has been doing with the

1:18:40Army Corps of Engineers for the bypass

1:18:42channel and the canal work. Um here's

1:18:45some more updates. One thing to note, I

1:18:47do want to call out on this slide. The

1:18:48Panther Island formbbased code is going

1:18:50to be moving from a prohibited use table

1:18:52to a permitted use table, which is the

1:18:54way all the other formbbased codes work,

1:18:56just because sometimes there's new uses

1:18:58that come about, and then unless we

1:19:00update the code in time, that use would

1:19:02be allowed by write. Um, so kind of just

1:19:06going through this. Here's one of the

1:19:08concept drawings that came out of Vision

1:19:102.0. Panther Island's not going to look

1:19:12like this. These concept drawings is

1:19:15really intended to show the maximum

1:19:17building envelopes that could be built

1:19:19if everything was maxed out. Um, so

1:19:23that's kind of some of the intent of

1:19:24this just to kind of give people a

1:19:26vision for what it could be, not

1:19:27necessarily a definitive plan for what

1:19:29it is going to be.

1:19:31So in terms of status update, um, which

1:19:34is really the the purpose of this

1:19:35presentation, uh, we presented to the

1:19:37UDC in June. We went through zoning

1:19:39commission and city plan commission

1:19:40informational briefs as well. And then

1:19:43um uh earlier this month, we went to

1:19:45zoning commission for a vote for

1:19:46recommendation to city council. Um we're

1:19:49going to CPC for a vote for

1:19:50recommendation early next month and then

1:19:52to zoning or to city council for

1:19:54adoption on October 13th. So if you all

1:19:57see it in the news, we've reminded you

1:20:00uh more currently than that. Any

1:20:03questions on this?

1:20:07Cool.

1:20:08All right. We're we're in a code

1:20:10updating frenzy over here on the

1:20:12historic preservation and design side.

1:20:14We've been working on another large code

1:20:16update to the camp buoy formbbased code

1:20:18and Lydia is here from Campoi Inc. She's

1:20:20really our partner like out on the

1:20:22street um for this project.

1:20:26So the the campaign forbased code was

1:20:29adopted in 2012. There has not been

1:20:31significant

1:20:32uh changes to the development standards

1:20:34or the use standards over that time. So,

1:20:37uh, a few years ago, Campo, Inc. started

1:20:39working with city staff to develop a

1:20:41list of proposed changes. This is the

1:20:44first of what we hope was going to be at

1:20:45least two or three other changes to the

1:20:47code that we're making. We talked about

1:20:48working with KOMO and addressing Horn

1:20:50Street. Um, again, this is the first of

1:20:53more things to come. And this code

1:20:54update is really focused in on five

1:20:58things. Uh, number one, removing some of

1:21:00the non-conforming standards that create

1:21:02conflicts with the base zoning

1:21:03ordinance. And as I'll explain in a

1:21:06second, just build a little bit out of

1:21:08date. Second, removing the use table

1:21:10completely from this formbbased code and

1:21:12referring back to the base zoning

1:21:14ordinance. So, currently all formbbased

1:21:16codes have two use tables, which is

1:21:18very, very confusing. There's one in the

1:21:20form-based code document and then one

1:21:22online in the zoning ordinance. And

1:21:25updating both of those has been a

1:21:27challenge for the city to be honest. So

1:21:30transitioning to the point where we only

1:21:32have the use tables in the zoning

1:21:34ordinance should make it a lot easier

1:21:36for developers as well as for staff. Um

1:21:38so this is the first uh code that we're

1:21:40trying to do this with and hopefully

1:21:42we'll eventually spread this to the

1:21:43other codes as well.

1:21:45Um we're going to be uh revising some of

1:21:48our supplemental standards uh

1:21:50particularly for drive-throughs uh sales

1:21:52from kiosks and mobile vendors which is

1:21:54uh Campo is an auto oriented corridor.

1:21:57That's a those are issues that

1:21:58consistently come up. And also

1:22:00clarifying some language around uh parts

1:22:02of the district that are within the NAS

1:22:04JRB uh overlay area, the APZ2,

1:22:08um because that limits some of the uses.

1:22:10So, we're providing more clarity in the

1:22:11use table. So, if someone's purchasing a

1:22:14property within that, they know to be

1:22:16checking that overlay and those overlay

1:22:18standards. Um, we're also took a stab at

1:22:21rewriting and completely updating our

1:22:23signage standards using some of the best

1:22:25practices from downtown. Um, given that

1:22:27Camp Buouie is very autooriented,

1:22:29signage is a big issue along the

1:22:32district. And as you know, probably the

1:22:34majority of cases within the district

1:22:36that come before the urban design

1:22:37commission relate to signage in Camp

1:22:39Buouie. Um, and then lastly, removing

1:22:41some redundant definitions and referring

1:22:43back to chapter 9 of the zoning

1:22:45ordinance for definitions. Again, just

1:22:47trying to simplify and make this code a

1:22:49little bit easier to use both for city

1:22:50staff and applicants looking to uh build

1:22:53and do business in Camp Buouie. So,

1:22:56here's a map of the corridor. As you can

1:22:58see, it starts from I30 and then it

1:23:02moves along Camp Buouie Boulevard

1:23:04southwest and then around Lackland. It

1:23:07kind of pivots and moves along uh Camp

1:23:09Buouie West almost to I30. It stops a

1:23:12little bit short of I30, but you can see

1:23:13the various subdists here. Um you can

1:23:16kind of see a little bit to the north

1:23:18how NASJRB is directly to the north. So

1:23:20that overlay impacts particularly this

1:23:23area right here and some of the uses

1:23:25that can be there.

1:23:29So I mentioned before that we're

1:23:31updating the non-conforming standards.

1:23:33One of the you might call quirks or

1:23:35unique aspects of the campoui form-based

1:23:37code is that some of the

1:23:38non-conformities are tied to uh value of

1:23:41improvements which was set in 2012 and

1:23:44construction costs and renovation costs

1:23:46have changed significantly since 2012.

1:23:48So it's really not achieving the intent

1:23:50that it was supposed to. So what we're

1:23:53doing is we're simplifying the language

1:23:54just to refer to the non-conforming

1:23:56standards that are in the base zoning.

1:23:58So it's similar to other projects within

1:24:01the city. So if you're a developer and

1:24:02you want to do something in Campoi form

1:24:04base code for the first time, you have

1:24:06that context and can refer back to that.

1:24:09For the use table, again, we're removing

1:24:11the use table from the campoui

1:24:12formbbased code, referring back to the

1:24:15use table in the zoning ordinance,

1:24:17sometimes what we call American Legal,

1:24:18which is the hosting website for the uh

1:24:21zoning ordinance. Yeah, I know this is

1:24:22visually not the best. Um yeah, uh just

1:24:26basically this picture is just showing

1:24:28we're crossing out the use table. Um,

1:24:32and we're making some changes to some of

1:24:34the allowable uses to clarify some

1:24:37things, uh, as well as advance some of

1:24:40the economic revitalization efforts the

1:24:42city has, particularly along Camp Buouie

1:24:44West, uh, Camp Buouie formbbased code is

1:24:47actually called the Camp Buouie

1:24:48Boulevard revitalization code. So,

1:24:51there's always been that strong economic

1:24:52development and revitalization focus to

1:24:54the district. So, as mentioned before,

1:24:57we're adding some clarifying language

1:24:59about the APZ overlay um with the with

1:25:02the base. Um we're distinguishing

1:25:04between massage therapy spa and massage

1:25:07parlor. Um the current use table has

1:25:10very broad categories and that's, you

1:25:13know, those are two very different

1:25:15things. Um we're adjusting some of the

1:25:18uses to have bars be by a CUP,

1:25:23conditional use permit. So currently

1:25:25bars are not permitted in a lot of the

1:25:27district. We think there are

1:25:29circumstances where a bar could be a

1:25:31good thing, but that would have to go

1:25:32through the public process for that. So

1:25:35it's giving a little bit more

1:25:36flexibility for that and making sure

1:25:38that for issu for uses such as home

1:25:40improvement stores and liquor stores.

1:25:42There's some controls on where those

1:25:44take place, but while providing a case

1:25:46by case approval for that. We're moving

1:25:49things such as bingo parlors, retail

1:25:51smoke shops, furniture cabinet repair,

1:25:53aluminum manufacturer, and many

1:25:55warehouse uses. So like self- storage.

1:25:57Um, and uh things like retail smoke

1:26:01shops have things or that have been

1:26:03updated in the base zoning ordinance,

1:26:04but then we never updated the formbbased

1:26:06code forum. So we're just trying to come

1:26:08up to speed with that. And then we're

1:26:10removing most vehicle sales and service

1:26:13as well as aviation transportation uses.

1:26:15Um when you read the intent of the

1:26:17campoui formbbased code, it was really

1:26:19to create a robust commercial, retail

1:26:22and economic corridor that could

1:26:24transition into the adjoining

1:26:26neighborhoods. That was the intent

1:26:28behind the initial passage of it. So

1:26:32things like vehicle sales sometimes make

1:26:34that very difficult because they require

1:26:36large lots that are not very pedestrian

1:26:39friendly. So, we're trying to limit that

1:26:41um and prevent that from spreading

1:26:43throughout the the whole district.

1:26:46Um as mentioned before, we're updating

1:26:48some of our supplemental uses. Uh you

1:26:51can see here how we're consolidating

1:26:52some of the supplemental standards for

1:26:53autorelated uses and then um making a

1:26:57note about uh driveway stacking and

1:27:00making sure that it's aligned with the

1:27:01traffic engineering manual as well

1:27:03because it is an auto corridor. That's a

1:27:05consistent issue that we come across. or

1:27:08we've also added I'm not going to read

1:27:09this whole thing. Uh supplemental

1:27:11standards for sales from kiosks and

1:27:13mobile vendors which we see a lot of

1:27:15within the district. Um we are removing

1:27:18the current sign standards and replacing

1:27:21them with new sign standards that mostly

1:27:22come from downtown. Uh here's a list of

1:27:25the new categories of signs that are

1:27:27going to be in the revised code. Um so

1:27:30we're trying to take the best practices

1:27:32from downtown and bring them to Camp

1:27:34Buouie. Um, one thing we brought

1:27:36>> signs on there,

1:27:37>> huh?

1:27:38>> Digital signs.

1:27:39>> Uh, so ECC's

1:27:43>> uh, so electronic changeable copy that

1:27:46would still have to go through board of

1:27:47adjustment.

1:27:49>> Board of adjustment.

1:27:52>> Uh, that might be a broader zoning

1:27:54question.

1:27:57Yeah,

1:28:00>> it's just a pet of mine

1:28:04adjustment

1:28:06and I put scrollers on. I can't put

1:28:08digital signs, but I can put them on my

1:28:09monument sign that's out front.

1:28:13I think everybody uses digital signs on

1:28:15every gas station.

1:28:26It's not a picture. I can't change it

1:28:28from here.

1:28:28>> On on signage, one thing we brought in

1:28:30front of UDC several times is for sites

1:28:34that are on corner lots. So, because the

1:28:37boulevard bisects the street grid,

1:28:39there's a lot of properties on corner

1:28:40lots. The current code only allows one

1:28:42sign per tenant, but we get a lot of

1:28:44requests from tenants to request two

1:28:45signs on those corner lots. So, we're

1:28:48updating some of these sign allocation

1:28:49area standards to uh allow folks to have

1:28:52two signs as long as they stay within

1:28:53the total allocation area.

1:28:57Um, we've we're also removing a bunch of

1:28:59redundant definitions, definitions that

1:29:01exist either verbatim or slightly

1:29:03different in the code and the zoning

1:29:06ordinance. Um, so we're just referring

1:29:09both folks back to the zoning ordinance

1:29:10for those definitions. And then in the

1:29:12current code, all the sign types are

1:29:14separately defined, which is a bit

1:29:17confusing because then you look at the

1:29:18sign standards and you the definition

1:29:20also then defines it. So we're moving

1:29:22those definitions for signage and just

1:29:24having folks refer to the sign standards

1:29:26so it's a little bit more user friendly.

1:29:28And then in terms of schedule of

1:29:29adoption, so this is the first stop on

1:29:31our road tour for the legislative

1:29:32process for this code. Um, we're going

1:29:35to be doingformational briefs to uh

1:29:37zoning commission next month and then

1:29:39we'll do an IR to city council to keep

1:29:42them up to date on this. We've already

1:29:43been speaking with uh council member

1:29:45Crane and we have a meeting next week

1:29:46with uh council member Hall. Um and then

1:29:50we'll bring it back to the urban design

1:29:52commission for a vote on October 22nd

1:29:54followed by zoning commission on uh

1:29:57November 11th and city council we hope

1:29:59on December 8th. Uh we do have a

1:30:02redlinined version of the code that we

1:30:05will send out prior to the October

1:30:07meeting so you can see the how what's

1:30:10changing and how that looks. Um we were

1:30:13also going to probably end up

1:30:14reformatting the code just for ease of

1:30:15use from a landscape version to a

1:30:17portrait version. Um so you you'll see

1:30:20that in the final copy as well, but I

1:30:22think really the red line is what is

1:30:23most important to you so you can

1:30:25understand what is changing in terms of

1:30:26the text and standards. Uh, I'm happy to

1:30:29answer any questions. Francisco's been

1:30:31working on this longer than I have. And

1:30:32we also have Lydia here from Camp

1:30:34Buouie, Inc. who's been our a real

1:30:35partner in this effort.

1:30:37>> I'm curious, when is the public, like

1:30:39the residents and folks in that area

1:30:42going to be informed?

1:30:43>> So, uh, there's a few different methods

1:30:45for that. Um, we've been working with

1:30:47Camp, Inc. on setting up some community

1:30:49meetings in late September, early

1:30:50October to start getting the word out,

1:30:53allow folks opportunities to ask

1:30:55questions. Additionally, before zoning

1:30:57commission, they'll get a mailed public

1:30:59notice.

1:31:01And we've been going through the the

1:31:04district. I was there earlier this week

1:31:05driving around identifying all potential

1:31:07nonconformities. So, we have a list of

1:31:09those folks and can address some of

1:31:11their questions about that. That was a

1:31:12request from the council member and I

1:31:14believe it's also a requirement for the

1:31:15the zoning. Um, it's it's a long

1:31:18corridor and it's a little bit tedious

1:31:21going property by property. Uh, but

1:31:23we're working through that. We've gotten

1:31:24all the way to uh Altameir from the from

1:31:27the west. So, we've done camp uh western

1:31:30business and industrial arts and we're

1:31:32going to keep working our way east on

1:31:33that.

1:31:34>> As you work through that, the Horn

1:31:37Street corridor is still in that.

1:31:39>> Yes, the Horn Street corridor is still

1:31:41in the code. Um that is zone transition.

1:31:44These changes particularly related to

1:31:45use, none of those address the

1:31:47transition district. So, we're keeping

1:31:50that as is. We do have a meeting uh on

1:31:53Monday, I believe, with the Knack

1:31:55leadership to kind of go over that. And

1:31:57one of the things that we want to start

1:31:59talking about with the Knack is we

1:32:01understand that there might be a request

1:32:02for reszoning of Horn or rethinking

1:32:04that. So, we'll we're hoping to start

1:32:06that really in November once we kind of

1:32:07get through this legislative process and

1:32:10then be working on that November,

1:32:11December, and into 2027. I just want to

1:32:14be sure that there are not any surprises

1:32:16come to KOMO that we are not aware of

1:32:19because when they start changing and

1:32:22plopping stuff in, it does affect the

1:32:24neighborhood.

1:32:29>> Will those changes come in our next uh

1:32:32packet? Will we get to see those prior

1:32:34to the 22nd?

1:32:36>> Yes, you're going to get a redline

1:32:38version of the code. It'll I'm hopefully

1:32:40by the end of this month. Uh, but we'll

1:32:42make sure that you have ample time to

1:32:43review that and compare and contrast.

1:32:45>> Awesome. Thanks.

1:32:46>> That was pretty quick, by the way,

1:32:48updating your uh, presentation to show

1:32:50the October 22nd

1:32:51>> wishful thinking. Yeah, considering we

1:32:54just voted on it about an hour.

1:32:58>> Like those Super Bowl teams, they all

1:32:59print them up anyway, then whoever wins

1:33:05>> Thank you, Joe. Yeah. Yeah. Cool. Um,

1:33:09one final work session item and this is

1:33:11really to prepare for next month. So,

1:33:13every year we bring beforeward bring

1:33:15forward our rules of procedure for

1:33:16annual adoption. Um, so we're going to

1:33:19do that in advance of next month. It's

1:33:21largely going to stay the same. We're

1:33:23going to be making some small changes. I

1:33:24just want to go over. So, we're moving

1:33:26away from the term urban design officer

1:33:28to executive secretary, which is what a

1:33:30lot of the other boards and commissions

1:33:32utilize. Um, we're clarifying some of

1:33:35the filing deadlines. Um, also we've

1:33:39moved from 10 a.m. to 9:00 a.m. time.

1:33:41So, that's all getting updated.

1:33:43Simplifying some of the withdrawal

1:33:44language, the current rules of procedure

1:33:47that kind of separate out immediate

1:33:48versus delayed withdrawal. But really,

1:33:50in the end of the day, if someone's

1:33:51requesting a withdrawal of a case, it's

1:33:54just easier for to withdraw it. Um, and

1:33:57then transitioning from filing deadline

1:33:58language to filing requirements language

1:34:01to, you know, we deal with with cases

1:34:03that are as simple as an individual

1:34:05business wall sign. And the largest case

1:34:07we have right now is a 1.4 billion

1:34:0914story hospital tower. So the review

1:34:12timelines for those are drastically

1:34:13different. Um, and really the I think

1:34:16the most important thing is making sure

1:34:18that the case is reviewed by staff and

1:34:21uh really ready to be filed before you,

1:34:25not necessarily, oh, did you meet X or Y

1:34:27deadline? Um, and then we're removing

1:34:30language about denying with or without

1:34:32prejudice um after consulting with legal

1:34:35because design is so contextually based.

1:34:38you know, if you deny with prejudice one

1:34:41application, they can come back slightly

1:34:42tweak it and technically that's a new

1:34:44application because you're taking into

1:34:45consideration the whole context. So,

1:34:48it's really just you're denying it. They

1:34:50can come back and resubmit with an with

1:34:53a change design, but it just kind of

1:34:55clarifies that with the updated legal

1:34:57guidance. So, our hope is to bring this

1:35:01in front of you on October 22nd. Um, and

1:35:04again, this will send out in advance of

1:35:06next UDC, so you have time to review.

1:35:10Very good. Thank you very much. Anything

1:35:12else?

1:35:15That's all we got. Okay. Well, I want to

1:35:18thank Commissioner Hughes for your

1:35:19service

1:35:21and uh, welcome, Commissioner Hamza.

1:35:23And, uh,

1:35:26we will see everybody October 22nd. Have

1:35:28a great rest of your month. Thank you.