- First case (site not named in the captions): a multifamily development along a TxDOT access road asked for a waiver of the 25% tree preservation requirement. The only two existing trees (both about 7 inches) sit in an overlapping utility and sewer easement, so preservation would be 0%. Staff supported the waiver, noting the plan provides far more canopy than required (about three times the tree canopy requirement and 69.5% parking-lot canopy against 40% required). TxDOT would not allow trees in its right-of-way, so 23 proposed cedar elms along the frontage were dropped. Approved 9-0.
- 5812 Eastland Street Duplex Lighting Waiver: a two-story duplex in the Urban Residential district asked to be excused from the pedestrian-scale lighting requirement. Staff asked for a continuance because other waivers may be needed (facade variation, fencing material, urban forestry calculations) after four to five years of review; the commission decided to take up only the lighting waiver. The applicant said no usable sidewalk or light location exists beside a drainage ditch, and the sidewalk waiver had already been granted. Approved 9-0.
- 5506 Lovell Avenue Floor Height Waiver: four dwelling units in two duplex buildings in the Camp Bowie transition district asked for a first-floor height of 10 feet 8 inches instead of the 15 feet required by the Camp Bowie form-based code. Staff recommended approval subject to resubmitting plans showing compliance with the other standards; a building-code issue with building across platted lot lines remains. The applicant argued the standard applies to commercial-ready space, not residential. The Como neighborhood association president and several residents supported the project, citing a written commitment to at least two affordable units. Approved 9-0.
- Work session: a status update on the Panther Island Form-Based Code Update (two districts, Core and Edge, replacing nine; moving from a prohibited-use to a permitted-use table; scheduled for City Council adoption on October 13); a preview of the Camp Bowie Form-Based Code Update (use table moved to the zoning ordinance, new sign standards, bars by conditional use permit, fewer vehicle-sales and warehouse uses), with the UDC vote planned for October 22, Zoning Commission November 11 and City Council December 8; and a preview of annual rules-of-procedure changes (an executive secretary replacing the urban design officer, a 9:00 a.m. start, simpler withdrawal rules, and dropping denial with or without prejudice).
- The chair thanked a departing commissioner and welcomed a new one. The next meeting is October 22.
Issues discussed
- 5812 Eastland Street Duplex Lighting Waiver
- 5506 Lovell Avenue Floor Height Waiver
- Panther Island Form-Based Code Update
- Camp Bowie Form-Based Code Update
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:11relatively large site. You see here we
00:13have two overlapping easements that
00:15basically run north south through the
00:17property. One of them is an 80ft utility
00:20easement on the right here and then a 25
00:24ft sanitary sewer easement on the left.
00:26They overlap a bit. It's about 86 feet
00:29cutting straight through the property of
00:31easement that they can't develop in and
00:33for urban forestry that area is
00:36considered exempt.
00:38So they're proposing to remove both of
00:40these trees which would leave them
00:42preservation of 0%.
00:45This is their proposed planting plan. Um
00:47it's multif family development, several
00:50exist or several proposed buildings,
00:52detention area down here, and then
00:55obviously all of the associated parking.
00:58Um these numbers are all of their
01:01plantings. It includes 23 proposed cedar
01:04elms. This plan shows these proposed
01:06cedar elms along the frontage for 820. I
01:08spoke with the applicant earlier today.
01:10Tex nixed those. So they weren't
01:13included in the urban forestry numbers
01:14anyways. They were just shown on the
01:16plan here and they were included in the
01:18staff report. As mentioned, they were
01:20being planted. Textile shut that down.
01:22So, those 23 trees are no longer going
01:24to be happening, but it doesn't affect
01:26any of our numbers. Um, we'll jump to
01:30the numbers here. So, like I said, the
01:33growth site area is 695,69
01:37square ft. For multif family
01:39developments, the urban forestry
01:40requirement isn't based on the area of
01:42the property. It's based on the provided
01:45open space. So the provided open space
01:48for the site minus deductible areas
01:51which is basically just that 86t
01:53easement is 201,752
01:57square feet. The existing tree canopy
02:00between those two trees 308 square feet.
02:03So of the net urban forestry area.15%
02:08almost nothing. The required
02:09preservation would be 77 square feet
02:13which is the 25%. The required tree
02:16canopy coverage for the site is 100,000
02:19square or 100,881
02:21square ft. They're proposing no
02:23preservation and they're proposing to
02:25provide 315,400
02:29in square feet which is just over three
02:31times their requirement. And then the
02:34parking lot canopy requirement. So the
02:37area of parking that they provided is
02:40236,687
02:43square feet of parking.
02:45The canopy requirement for that would be
02:4794,675
02:50and they're proposing 164,425
02:54which exceeds by just over or almost
02:5770,000 square feet. Um the parking
03:00canopy requirement is 40% they're at 69
03:03and a half. So
03:06based on the existing conditions
03:09um the difficulty that the easement
03:12because both of the existing trees are
03:14located in the northeast. So with that
03:16easement and preserving one of those
03:18trees could make developing that
03:20northeast portion difficult and the fact
03:23that the only two existing trees are
03:25both 7in trees. Um staff supports this
03:28waiver and we recommend approving the
03:33request to reduce the preservation
03:34requirement from 25% down to zero. And
03:38I'm available if you guys have any
03:40questions.
03:42>> Thank you. Any questions?
03:44>> Caleb, I'm curious. Did Text give a
03:47reason why they nixed those trees? Just
03:50>> I'll let the applicant answer that.
03:51Okay. Just curious.
03:57Are the cedar elms because they're in
03:59the easement not
04:02required to be included? Is is that the
04:04reason or we're not sure?
04:06>> So for urban forestry, these the 23 seed
04:09domes that they were showing, they're
04:10considered offsite.
04:12So they were shown on their plan. They
04:14weren't included in their urban forestry
04:16calculations. So the numbers I went
04:18through, those are still the correct
04:19numbers. They had already omitted those.
04:22The applicant was just electing to
04:24preserve them, I believe, for some
04:25enhanced landscaping credit and text
04:28shut that down.
04:34Good. Any other questions for staff?
04:37Is the applicant here to speak?
04:39>> Yes, Blackwell is here to speak on
04:42behalf of the applicant. If you guys
04:43have any questions,
04:44>> I have any questions for the applicant?
04:46>> If he's got reason from text, I'm just
04:48curious.
04:52doesn't impact my opinion. I just
04:54curious.
04:56>> Welcome. Please state your name, the
04:57city in which you reside.
05:00>> Hi. Yes. I'm Garrett Blackwell and I'm
05:02from Plano, Texas.
05:05>> Um, the reason for Tex Dot not wanting
05:08those trees there when I emailed them
05:09about it that said that they just do not
05:11want any trees in their ride of way.
05:14>> But it's it's the it's the right of way
05:16to the access road. Right.
05:18>> Right. So,
05:19>> I mean, it's essentially the on ramp.
05:21Uh,
05:23>> I guess it is the excess road.
05:25>> Yeah. Right. It's like it's not a major
05:28anyway. I It's not your problem. I'm
05:30just kind of curious because getting
05:31inside their heads was fine.
05:33>> Yeah. No, it's uh No, I wanted some
05:35there too because it was very barren and
05:37generally would look nicer for the
05:39property. But whenever I emailed them,
05:42they said at this time we do not want
05:43any trees on the rideway. I think it's
05:46probably just a maintenance issue on
05:47their end.
05:48But they didn't give me a real reason
05:50other than the fact that they just
05:53>> Right. Thank you.
05:58>> Anyone else here to speak in favor?
06:01Is anyone here to speak uh against an
06:04opposition to this case?
06:06Okay, we'll close the public comment
06:08portion or our discussion.
06:13I make a motion to uh
06:16that the request for the waiver from the
06:18CFW zoning ordinance section 6.302G.4-
06:22general preservation methods of can tree
06:24canopy be granted reducing 25% tree
06:26preservation requirement for this
06:28development to plan to 0%.
06:32>> Commissioner here seconds
06:36and motion to approve has been made and
06:39seconded. Chair Benner, how do you vote?
06:40I.
06:42>> Um, Vice Chair Ramsey, how do you vote?
06:45>> I,
06:47>> Commissioner West, how do you vote?
06:48>> I,
06:50>> Commissioner Carr, how do you vote?
06:52>> I, Mr. Deose, how do you vote?
06:55>> I,
06:56>> Commissioner Harrier, how do you vote?
06:58>> I, Commissioner Hughes, how do you vote?
07:01>> I,
07:03>> Commissioner Holidayiday, how do you
07:04vote? I.
07:06>> And Commissioner Hobsa, how do you vote?
07:11>> All right. Motion passes 90.
07:22All right. The applicant's here for the
07:23case that we skipped. So, we can address
07:25that now. Also, just to note on the
07:27record, we've been communicating with
07:29it. There might have been some audio
07:30issue issues during the first case. It
07:33doesn't affect what we're doing. We're
07:34just going to add a note to the
07:35recording. But if you're watching right
07:37now, that's why there was no audio for
07:39the first couple minutes. Just an IT
07:41issue
08:02better set up, I think. I still can't um
08:06So you guys could actually see me this
08:08time.
08:18I don't know if I need to get it closer.
08:19Yeah. All right. So, this is UDC uh case
08:24uh 2026137
08:27um located at Oh, I do I do need to
08:31bring it a little. Okay, now I feel how
08:34you guys feel.
08:36Um, so this is UDC case uh 2026 137
08:41located at 5812 Eastland Street. Um,
08:44good morning commissioners. Um, this UDC
08:46case uh um was seen before in the last
08:50UDC uh u meeting on August in the August
08:55UDC. The applicant resi uh with Hovering
08:58Estate Inc. is requesting a certificate
09:00of appropriateness for a proposed
09:03two-story duplex in the urban
09:05residential UR zoning district. The
09:07request uh before the commissioner today
09:09is a waiver of a uh pedestrian scale
09:13lighting requirement within the street
09:15sides uh street zone furnishing zone. Um
09:18the proposal uh does contain uh two
09:22three bedrooms, two ba two and a half
09:24baths.
09:26Um and the property um is located in an
09:30established UR uh neighborhood. Uh to
09:34the north of the property is zone MU2
09:37and there are FR zone located further
09:40west.
09:43The intent of the UR district, just kind
09:46of a reminder, I'm going to go over just
09:47like the history and like a little bit
09:49of the intent for the urban district,
09:52urban residential district, is to
09:54provide a a transitional between lower
09:57density residential neighborhoods and a
09:59more intense um commercial/mixeduse
10:03areas while promoting a walkable
10:05pedestrian oriented environment.
10:08Um the case just to go over the brief
10:10history of the case. The project
10:12originally entered uh to to the city and
10:16it was through a building permit process
10:18in 2025. The building permit was placed
10:20on hold because of the outstanding UR
10:22design standards requirements and
10:24because the required conceptual review
10:26had not occurred yet occurred. The
10:29applicant previously submitted um UDC
10:3220265
10:34in March of 2026 which was later voided
10:37at the applicant's request. Um the
10:40current UDC case number which is the one
10:42that we're seeing today was uh was
10:45submitted in May of 20 or sorry March of
10:482026. Um since then staff has
10:52coordinated with the applicant through
10:54several meetings discussion regarding
10:55the UR standards and potential design
10:58solutions. The applicant submitted the
11:00revised site plan that we see today in
11:03the updated um staff report and that was
11:06submitted on August uh 31st of 2026. Um
11:11there are still some outstanding things
11:13that staff was seeing on the the those
11:16site plans set. Um so
11:21with that said at this point we can't
11:24really determine if there will be
11:25additional waiverss. Um there are minor
11:28things but at the same time we never say
11:30that there's no waiverss until we can
11:32know that all the waiverss are dealt
11:34with. So with that said we uh we believe
11:37that we could get the applicant to to
11:41get those things done and updated. Um
11:43and so we're requesting a continuous to
11:45allow the applicant add additional time
11:48to be able to address those concerns. Um
11:50the applicant is here today. Um and he
11:53could uh just give you guys a scope of
11:56his project and and give you more
11:58information if needed.
12:03>> And that con
12:04>> Okay. Any questions for staff then?
12:08>> So can you uh the the site plan's a
12:10little difficult to to to see. Can you
12:12pull it up or kind of walk us through
12:14that because I'm trying to
12:15>> I thought it was
12:16>> understand the the ride ofway. So is
12:19there a public sidewalk here?
12:22>> So there there is no public sidewalk
12:24existing.
12:25>> Are we proposing the public sidewalk?
12:27>> So um whenever there's not a public
12:29sidewalk there has to you have to put a
12:32sidewalk a public sidewalk you have to
12:33put the street trees and pedlights. If
12:35there is existing street treep
12:36headlights or or sidewalk for instance,
12:39then um that's when you could utilize
12:43the existing conditions and then kind of
12:45go with it. In this situation, they do
12:47have an existing tree. So, we're using
12:49that and they're going to they are
12:52basically having that within they're
12:54going to include it into the public
12:55rightway so that uh city can maintain it
12:59as a street tree. So, it's a it's kind
13:01of a mature tree and I the picture
13:03before kind of shows that tree right
13:06there. That's the tree that they're
13:09going to consider into a street tree.
13:11So, that's the only thing that's
13:12existing with the conditions right now.
13:15Um,
13:17>> we've got basically a street with no
13:19curbs, a ditch, a tree, and then where
13:24does the sidewalk sit in relation to all
13:26of that? Because I'm not seeing it on
13:28the site plan. All I see is I see a
13:29light
13:30>> on the site plan.
13:33the sidewalk that this one is the older
13:37site plan that they submitted, but on
13:38this on the staff report, you'll see the
13:41updated version of it is kind of to look
13:43at this one. And this is what they
13:45produced um previously. Um but that one
13:49uh shows that they're proposing a
13:51sidewalk that will eventually connect to
13:53the other UR cases. And there are other
13:56UR cases that have been built and and
13:59they have put in sidewalks and street
14:01trees and ped lights and they're
14:03currently being built as we speak.
14:06>> Yeah, understood. And uh but uh what I'm
14:10seeing in this plan looks like the
14:11sidewalk is actually on private property
14:13like on the is it
14:15>> so they're going to dedicate they're
14:17going to put a public access easement so
14:18that way it's to the public.
14:20>> It's not it's not in public it's not in
14:22the rightway. It's on public it's on
14:24private property the sidewalk. They're
14:25going to put an easement and execute an
14:27easement to allow for city to maintain
14:30it and have access to it.
14:32>> But it's it's on the private side of the
14:34property line
14:37>> currently until they put an easement.
14:39Yeah.
14:40>> But it's it's private property.
14:43>> Currently until they put an ement. Yes.
14:45>> So the ride ofway is not large enough to
14:47hold a sidewalk currently.
14:50>> No. Like Well, no. There is a, as you
14:53can see, there is a um elevation and
14:56there's the ditch that you saw there.
14:58So, they're trying to um comply with the
15:01standards and make sure that nothing's
15:03being damaged or anything like that with
15:05the location.
15:07>> Okay.
15:11>> Have any more questions?
15:16>> Okay. Any more questions for staff?
15:20>> I do. Um so staff is recommending a
15:24continuance.
15:25>> Yes.
15:27>> Why?
15:27>> Um there are some outstanding um
15:30waiverss that we are not sure if they
15:32are going to be as of today in
15:35compliance with um so that's why we are
15:38just wanting to the applicant to have
15:40additional time to kind of address those
15:42things. Um and then get back to us and
15:45see if they want to add that to the list
15:47of waiverss.
15:50So there are more waivers coming
15:53>> there. There are potential waiverss that
15:56we I want to make sure that he has
15:58enough time to be able to address them.
16:01So that's why we're asking for a
16:03continuence
16:08>> more than the lighting and the
16:11pedestrian line.
16:12>> That is correct.
16:13>> So if we were to approve deny those
16:16potentially he's coming back in the
16:18future for additional waiverss anyway.
16:19So instead of like going really into it,
16:21we want to just make sure he has enough
16:23time to be able to address those things
16:25before and then we could figure out if
16:27there's additional ones and we'll
16:28properly like obviously place it on the
16:31agenda and stuff like that so that you
16:32guys have a time to
16:35>> to review it.
16:36>> And this has been in the planning since
16:382023.
16:40>> So it came into permitting um status uh
16:44in 2025.
16:45Um, and then it was uh then put on hold.
16:51I want to say
16:54look at my timeline.
17:00>> So it was in
17:02>> one second, sir. We'll be invited up in
17:03just a second. Thank you.
17:04>> So the building permit was uh created in
17:07August of 28, 2025.
17:10Um then it was uh put on hold during the
17:14outstating UR design standards
17:16requirements and the project had not
17:19gone under conceptual review according
17:21to our ordinances prior to permits. Then
17:25um another there was a there was an
17:28older one a UFC case and I think that's
17:31what the applicant saying um in the
17:33background is May 2 of 2023. However,
17:37those plans associated with that case
17:39does not reflect the current
17:40development. Um, and then in um March of
17:4620 2025, they uh undergo this the SIP
17:51program, which is a small scale
17:52infrastructure program to see if that's
17:55something that they would do as a like a
17:57kind of alternative to the pedestrian
17:59light requirement. Um, that application
18:03remains incomplete. Um
18:06the one that we're talking about today
18:09was applied for in March uh 16 of 2026.
18:16>> Thank you.
18:20>> Just one more quick question on my part
18:22just to confirm that the plan that is
18:24currently shown in the documents that we
18:26have here as a 3.3 site plan is the most
18:30current site plan.
18:34Uh the one that you're viewing is the
18:36previous one. The one in the staff
18:37report is the the most recent one.
18:40>> Okay.
18:40>> That's figure three on page six of their
18:43document.
18:44>> I believe so. Yeah, page six. So page
18:48six is the revision from the comments.
18:54>> It's quite blurry. So can what is the
18:56relationship of the that sidewalk to the
18:59building?
19:00>> So with the current
19:03Um with the current plan, there is a
19:08concrete of five feet um right behind
19:13the street tree that you see or the tree
19:15that you see that's highlighted in that
19:17those plans. Um then there is a planter
19:22box that um is in between the porch
19:26concrete pad and the the proposed 5T um
19:31uh sidewalk.
19:33>> And how wide is the Eastland rideway?
19:36>> Um
19:39that is a good question.
19:42Um I don't know off the top of my head.
19:46Give me one moment. Let me see if I can
19:47measure
19:49Yeah, all those plans is tough in in
19:51this condensed PDF.
19:59>> I do know that the building is set back
20:0112 ft from the property line,
20:06but let me measure really quickly.
20:36I have one question. Um,
20:38>> yes ma'am.
20:39>> Is the sidewalk continuous or is it just
20:42going to be on this property? So for
20:44this property there are a couple of
20:46properties that is located um a little
20:50bit
20:52that will eventually connect it will
20:54eventually connect to um and those are
20:57the ones I talked to you about are being
20:58built right as we speak and maybe
21:01there's a way to like share my screen
21:05>> but that sidewalk will connect to the
21:07adjacent properties owner's property
21:10which is will you'll need another access
21:13easement Correct. Like it won't be in a
21:16right of way. It would be
21:17>> they've they've just um fixed it by like
21:20uh leveling out the the land. So they're
21:23putting the sidewalk through that means.
21:25>> But a sidewalk has to sit in an access
21:27easement. So it would have to be on a on
21:29one second property.
21:31>> Do we do we have any outstanding
21:32questions for staff still?
21:34>> Yeah.
21:36>> Okay. Can you please?
21:48>> Okay. If we have no further questions
21:50for staff, um we will Is the applicant
21:54here to speak? Would you like to come up
21:56and speak, sir?
21:57>> Yes. Yes.
22:01>> Welcome.
22:05>> Tends to go that way sometimes.
22:09Yes, that'd be great. Please state your
22:11name and the city in which you reside.
22:14>> My name is uh Resa Safe. Uh I reside in
22:17Mansfield, Texas.
22:21I don't know where to start really. I've
22:23been working on this project for over
22:25four years, almost five years. U when I
22:28started this project, there was none of
22:30those houses, anything around adjacent
22:33street. So, everybody came in and they
22:36got their permit and everybody build
22:38those um duplexes except me.
22:41That's the one right there. Can you hold
22:43on that picture right there if you don't
22:44mind?
22:46Um the the piece of land that that I'm
22:49trying to put a duplex on is uh sitting
22:52right between two houses and the fences
22:56come all the way to that ditch. The
22:58water h the waterway that goes through
23:00and there is no way we can put a
23:03sidewalk in there so the people can
23:05really use it or pedestrian they can use
23:07it. As you can see, they put they build
23:11this new houses and they never did put
23:13any sidewalk on it or pedestrian light.
23:16They could have done that. I mean, there
23:17was a lot of space for them. They
23:18haven't done it. So, mine, if I want to
23:21put, by the way, I did get a waiver for
23:24that sidewalk.
23:26Uh that they said there is, you know,
23:29visible or physible way to can put that
23:31sidewalk could be usable to the public.
23:35So what happened was um u then we came
23:39to the pedestrian light which are
23:41telling me I have to go front of you
23:43folks to explain the situation. So the
23:46reason I say that is if if I want to put
23:48the sidewalk with the pedestrian light,
23:50the people who are walking along that
23:52side of the street, they have to jump
23:54over the ditch, use that about 50 ft of
23:59the sidewalk and then jump back on the
24:01ditch to keep on going on the street,
24:05which which is not visible. It doesn't
24:07make any sense.
24:09But if I do put uh my own little
24:12sidewalk on the front, it's going to
24:13look for the nice for the city, for the
24:16neighborhood. And as you can see, those
24:18fences are all the way down to the
24:20ditches right there.
24:22So right there, you can see it.
24:26And if I want to put the sidewalk in
24:28there, there is a water going through on
24:30that ditch. Uh and it's going to eat up
24:32the clay and all the dirt on that
24:35sidewalk.
24:37Eventually, it's going to collapse.
24:39But now if if you ru if you do things we
24:42have to put a sidewalk. I think the city
24:44got to come in and fill up those ditches
24:47or put some kind of a bridge over them.
24:50So we'll be able to put a a sidewalk all
24:52the way from the new construction that I
24:55showed you to the street all the way
24:57from down there to all the way to down
25:01where we are. So nobody has any
25:04sidewalk,
25:05no pedestrian light. And that new
25:08construction, I don't know how they got
25:10the permit. I mean,
25:14they didn't put no sidewalk and no
25:16pedestrian light. And they've done it. I
25:19mean, and they they build it within four
25:21or five months. And I'm still five years
25:24into this project. And I'm still uh
25:28going back and forth and and I'm I
25:30really appreciate uh Sandy Mitchell.
25:32She's trying to help me out, but things
25:35are getting more complicated the way uh
25:37she was explaining. I was trying to
25:39clarify a little more on the basis of
25:42what we see.
25:47Just to answer your question, is 13 feet
25:49approximately? I'm doing it off of a GIS
25:51map, so it may not be entirely like
25:54meshed out.
25:5813 feet from the right the roadway to
26:02the property line.
26:03>> Yes.
26:04>> And what's the overall ride of way?
26:07>> I don't know.
26:15>> Let me measure. Let me erase this.
26:17>> By the way, those houses are there in
26:19line. And if I do come forward, it's
26:22going to be awkward because the other
26:24houses are lined up this way. And I'm
26:26going to be coming
26:29>> 51 ft
26:36>> approximately of course
26:39>> 45 ft
26:40>> 51
26:41>> 50 ft. Yeah, 50 foot right away be
26:43standard.
26:44>> Um and just a reminder this is just for
26:46a waiver for the pedestrian lights.
26:50So,
26:51>> and the requirement is only for one
26:53pedestrian light because that would be
26:54the only requirement would he would have
26:56to put in one pedestrian light.
26:59>> Where would that pedestrian light go in
27:02in the middle of the
27:03>> This is why he's seeking a waiver.
27:05>> Okay.
27:05>> Yeah.
27:09So, the applicant's preference is to
27:11deal with the pedestrian light now, but
27:13there are still future waiverss
27:16according to staff that we
27:18>> I think we could
27:19>> I don't see really anything else can be
27:21done
27:22>> those things.
27:22>> Sorry.
27:23>> I I think we could work with him on
27:25those things, but we always to make sure
27:28we can't wave those things. So, I think
27:30he just needs time to be able to sort
27:32those things out.
27:33>> Um,
27:34>> what are those things? Oh. Um, I do have
27:37a list of them. Give me one moment.
27:41>> Yes. Yes, sir.
27:44>> I've got maybe about uh five different
27:47site plan or six site plan. I keep going
27:49back and forth to my engineer to to
27:51modify and I have about five different
27:55uh
27:57or or rather six different way of
27:59putting the sidewalk. as we were talking
28:02to Sandy, she was explaining probably
28:04this is the way to do it. But I really
28:07don't see anywhere we can put that uh
28:09pedestrian light. I don't see it
28:11anywhere in the property is isolated
28:14right between the two houses and
28:16nobody's ever going to use that. And
28:17there is a street light on the top of
28:20that if visibility is the issue. And
28:23also on the uh duplex that I'm going to
28:26put, I did modify it to put the two uh
28:30flood lights on each corner. So anyone
28:33who just pass by it, it's going to be
28:35plenty of light.
28:40>> I see this
28:56It's No, it's not. It's the other way.
28:58That's
29:12no sidewalk to be seen. And that's a
29:15small strip of a street. And on the
29:18other side is a business actually as you
29:19can see.
29:26You can't see. There you go.
29:28That's the one he's talking about.
29:30>> There's this to the right up there.
29:34>> Go ahead. Yeah. Did you have your list
29:36of what? Yeah.
29:37>> Um, so we have to kind of contend to the
29:39facade variation requirement. So for
29:42every new building less than 50 uh feet
29:44there is a requirement at least two
29:46elements uh that is either to be like
29:49floor blanding banding columns
29:52foundation or a wall plane variation of
29:55at least 3 ft depth and or projection.
29:58Um and it must be at least two stories
30:01in height. Uh material and color
30:04changes. uh they do have some sort of
30:07difference between the first and the
30:09second floor which is also part of the
30:11requirement. So it's it's it's those
30:12types of things. Um other outstanding
30:16things would be um the fencing material.
30:19They said that there's some existing
30:21one, but we noticed that there's one
30:22fencing that we just need to know like
30:24what material they're planning on using.
30:26Um and that showed up in the newer uh
30:29August 31st submission. So we just need
30:32more clarification on that. There is
30:34also some incorrect information on the
30:36calculations for the urban forestry in
30:39terms of 5% calculation. Um, so we just
30:42again we just need clarification on that
30:44as well. So these are these are
30:46outstanding things but I'll let
30:48Francisco Vega explain a little.
30:51>> Hi everyone, Francisco Vega plant
30:52manager for preservation and design
30:54team. I think part of the confusion
30:56comes to the uh situation of how this
31:00request is on the agenda but because
31:02it's for the approval of the whole
31:05project including the pedestrian lining
31:08that's the reason why staff is
31:10recommending to continue it the case in
31:13the agenda is not only for the light is
31:16for the whole project. So if you approve
31:19the case, you are essentially approving
31:21the whole project and staff will not
31:24have the the opportunity to work with
31:26the applicant on all those standing uh
31:29components of the project that are
31:31pending.
31:33>> I don't I don't think so.
31:35>> Uh yeah, I would agree with that as
31:37well. The the agenda is just is it the
31:39project is a duplex. I think that's
31:41that's clear. It's not it. You're only
31:44granting that specific waiver that is
31:47listed on the agenda, not the entire
31:48project. So,
31:50>> he'll get that waiver. If there are any
31:51additional waiverss that would be
31:53needed, it would come back to the UDC.
31:55It's not just,
31:57>> you know, if there there are ways to
31:58correct staff's oversight in the event
32:01that, hey, we forgot this waiver, we
32:03need to bring it back. It's not as if
32:04the UDC essentially gives a blanket
32:06approval of a project when there may be
32:09necessary waiverss down the line.
32:11For example, the site plan we're looking
32:13at may not be the most recent. We're not
32:14approving the site plan. We're just
32:16specifically addressing the pedestrian
32:18light waiver.
32:18>> That is correct. That is correct.
32:21>> Does the staff are you using guidance
32:24for an overall overlay for this district
32:28and their design? And if you are, is
32:32everyone who's building new being held
32:35to those standards?
32:37>> So, yes, ma'am. Um when we uh typically
32:40get cases like this uh we want to make
32:43sure that the standards are the same for
32:46everyone else. That's why we also had a
32:47pedestrian light waiver for last week
32:49and it's in the not in this specific
32:52area but in this general area. Um we do
32:55want to make sure that everything's
32:56being complied with. We do look at the
32:58overall scope, the future land use, the
33:01current zoning and what's the
33:02surrounding. um a lot of our standards
33:05are tied to that as well in terms of
33:07like um is this going to be is your next
33:10door neighbor is it going to be a one to
33:12two family so then the standards are not
33:14the same and we do evaluate that when we
33:17do our staff reports um in this case
33:19however there the UR and um it's on the
33:23staff report that it shows the UR is
33:25that whole block not just that area of
33:28the project and the uh the property to
33:32the north is MU2 So we do take it as
33:34like a like as soon as the single
33:38families are getting developed and there
33:40we also do have about four more projects
33:42right now in the peritting status on
33:44this street that is coming in UR so we
33:46do look at the overall scope and stuff
33:48like that when we're writing the staff
33:50report um he has been working on this
33:54for some time um we do understand that
33:56there is some drainage issues so we we
33:59we we haven't given our actually
34:01determination because we've requesting a
34:03continuous to deal with the other things
34:05but um given that time we could actually
34:08give you a staff's recommendation um
34:11once we review everything and all the
34:13items that are outstanding
34:15>> seems to me we are just going in cycle
34:19>> everything keep saying it some other
34:22points comes up
34:24>> understandably where you are
34:26>> we're going to focus on the lighting
34:27because that's what on that's what's on
34:29our agenda today and all the other
34:32staff. I'm in my opinion of fellow
34:35commissioners, I think that we just need
34:37to focus on what's on the agenda
34:40>> and hope that the planning and in the in
34:44the city will look at the overall help
34:47them everyone with the drainage,
34:49everyone with the street. We need curbs,
34:52you know, we need you want sidewalks,
34:55you've got to make it conducive. A
34:56>> lot of years a lot of works need to be
34:58done to really to put the sidewalks over
35:00there.
35:00>> Understood. Other things has been an
35:02ongoing
35:03>> that really surprises me is that other
35:05houses about three houses down they put
35:09the new duplexes over there and nobody
35:11ever I don't know they were supervising
35:13and somehow escaped their attention to
35:16putting the sidewalk over there which
35:18was very feasible to do it and put the
35:21uh what do you call uh pedestrian light
35:24and that wasn't happening
35:28>> your case? Yeah, that's that's what I'm
35:31saying. I mean the lighting
35:34appreciate that. Sure. Sure. Yeah,
35:36that's what I'm that's reference to the
35:38siding. I mean the lighting. How come
35:40there wasn't there is no lighting over
35:41there on the other side without other
35:44properties?
35:45>> So on that note, any additional
35:47questions for the applicant related to
35:50the agenda item.
35:53Um is anyone do you have any further
35:55further comments sir before we move on?
35:58Do I have any comment?
36:00>> Any anything else to say while you're up
36:01there?
36:01>> Oh. Oh. This site plan actually is the
36:04ultimate one that with the help of
36:06Sandy, we put that one out. So, it's
36:08kind of like
36:10be able to put a sidewalk which which
36:12really is not going to be usable. But
36:15for the sake of the argue, we're going
36:16to put the sidewalk over there.
36:19Actually, it's going to be a private
36:20sidewalk. And then we have to do the
36:22encroachment and stuff. It's going to
36:23complicate things if we just go straight
36:26with you know what is this the issue at
36:28hand. It should be I've done everything.
36:30Everything is done. I'm only stuck in
36:33this pedestrian light. The sidewalk
36:35waiver has already been issued as well.
36:37>> Okay. Thank you. Um is there anyone else
36:39here to speak in in favor of this case?
36:42>> Yeah.
36:43>> Anyone here to speak in opposition?
36:45>> No.
36:45>> Okay. We will close the public comment
36:47portion or discussion by the commission.
36:50>> Yeah. I I think we need to just really
36:54focus in on what's on the our agenda and
36:56not
36:58they're going to come up with other
37:00things that he's got to have waiverss
37:01for. That's on them and just case by
37:04case.
37:06>> We have to determine whether we want to
37:08continue the case or approve or or
37:11reject the lighting request. So that's
37:13what's
37:14>> agreed. I I don't see any grounds for um
37:17pushing it forward. Yeah. Continuing it.
37:20Um And I don't see where you would put a
37:22pedestrian light in the public realm. So
37:24it would have to any lighting would have
37:26to be on on the building.
37:28>> That's what I'm saying.
37:29>> It's not a pedestrian light. So it's a
37:31that's a roadway light. And then so it's
37:33it's not meeting the UR zoning. So UR
37:37zoning would say that, you know, needs
37:39to be in this public realm and there's
37:41supposed to be sidewalk, there's
37:42supposed to be street trees, there's
37:43supposed to be street lights and or
37:45pedestrian lights. Yeah. And he can't do
37:47that in on this site. But
37:50>> right,
37:51>> so that's why we're
37:53>> why we're here.
37:54>> We're here.
37:56>> Comments.
37:57>> Yeah.
38:00>> Any more comments?
38:01>> I was going to move to approve for
38:03approval of of the waiver
38:05>> waiver for no pedestrian light.
38:09>> This is Commissioner Carl. I'll second
38:11that.
38:15>> All right. So, we have a motion and a
38:16second to approve the waiver for a
38:18pedestrian scale lighting. Um, Chair
38:22Benner, how do you uh vote?
38:24>> I.
38:25>> Uh, Commissioner Wes, how do you,
38:29>> Commissioner Carr? How do you vote?
38:31>> I.
38:32>> Um, Commissioner Dose, how do you vote?
38:35>> I.
38:35>> Commissioner Harrier, how do you vote?
38:37>> I.
38:38>> Commissioner Hughes, how do you vote?
38:41>> I.
38:42>> Uh, Commissioner Holidayiday, how do you
38:44vote? I
38:45>> Commissioner Ramsey, how do you vote?
38:47>> I.
38:48>> And Commissioner Hamsy, is that correct?
38:50>> Yes.
38:51>> Yeah.
38:51>> I Okay, perfect. Thank you. So, we have
38:54a vote of 90 for the waiver of the
38:56production scale lighting for UDC case
38:59number 2026137
39:02um 5812 Eastland Street. Thank you.
39:06>> Thank you.
39:11>> Thank you folks. I appreciate it. After
39:125 years,
39:14people are making tons and tons of
39:16houses. No issues for me just for one
39:19house. Thank you. Thank you.
39:28All right. Our final case, UDC 2026 205.
39:33And one thing to note, the council
39:35district is actually district 6. about
39:3895% of the campoui form base code is
39:40within district three. So that was my
39:42mistake on on the agenda.
39:47All right. Good morning commissioners.
39:50Morning. Um last case is UDC 2026 205.
39:54Um the address is 5506 Levelville
39:57Avenue. Um the applicant is requesting a
40:00certificate of properness for a
40:02originally designed town home
40:04development for homes in the Kambooi
40:06Boulevard code transition district with
40:09a waiver from the first floor to floor
40:11height standard to allow a floor to
40:14floor height of 10 feet 8 in where a
40:18minimum of 15 feet first floor tofloor
40:21height is required. Um this is the Korea
40:25sunny map of the location. Um
40:29just as a little bit of background this
40:33um let me just
40:37so um the the project that we presenting
40:39today is as I said 556 Love Avenue. Uh
40:43it contains four platted lots but in
40:47overall this project um
40:51uh belongs to a more larger development
40:54which includes um the parcels of the
40:56northern portion as well of this block.
40:59Um
41:02but as of today uh we're just presenting
41:04waivers from the southern portion
41:06because we don't have um final drawing
41:08from the northern part and that's why
41:11we're just presenting the waiver for the
41:13southern um portion of the property the
41:17development. Uh here's the aerial
41:19imagery of the site
41:21and
41:24the as a little bit background as well
41:26about the prop the proposed project.
41:28consist of two Dless residential
41:30building um containing a total of four
41:32dwelling units and this other portion of
41:37the SA is located within the Camboui
41:39transition zone. So as you can see um
41:44even though it's one larger project it
41:47has two different um subunning from
41:50Kambooi the southern portion is
41:52transition and the northern part it's
41:55regally gateway
41:58and
42:01because the updated proposal which is
42:04the one that you're seeing right now um
42:08the what that we got from the applicant
42:10and and the proposed duplex building
42:13extend now across um plotted lot lines.
42:18Um you can see it here
42:20lot lines and it's no longer treated as
42:23a town home because to be treated as a
42:26town hall the building might extend
42:27across internal lot lines and with that
42:31being said um they cannot be treated as
42:33a separate individual lots the units
42:35because you have two units per building
42:38and due to this current design they
42:40could not be longer sell as individual
42:43property lots. So that's why it's not
42:45longer considered as a townhouse with
42:46this current design and the level
42:50development is as I say it's a part of
42:53the larger project and each duplex
42:56building contains two attached building
42:58units. You can see it here on this
43:00elevation facade and our two the two
43:04units are two story in height and
43:07include individual front entrances
43:10from porches attached garage and we
43:13access from the alley and residential
43:17scale architectural detail as you you're
43:19seeing on the elevations.
43:24Um the PU the building are primarily
43:26oriented
43:28uh towards Lobl Avenue and with the
43:30principal facas and the pedestrian
43:33entrances and the front porch address in
43:35the street. Um
43:38the project also includes associated
43:40pedestrian walkways and landscaping
43:42plans that will still working with the
43:46applicant on those kind of components.
43:48The landscape plan
43:56And the Kambooi
43:59co-established development standards
44:00intend to promote compatible building
44:03form appropriate transitions and
44:05pedestrian oriented development pattern
44:06with this district. um
44:12as a presenter today the the the entire
44:15um overall design and that the applicant
44:18still needs a waiver because Kamuico
44:21requires a 15 ft minimum height for the
44:25first floor for
44:28all the districts. And in this case, the
44:31applicant is just proposing a 10 ft 8 in
44:35first floor and staff
44:39believe the the current high design is
44:43appropriate for the residential use and
44:46surrounding neighborhood context. Um as
44:48of right now
44:52the property is um so this is the photo
44:54from the side busy. um the context
44:57around the property it's single home
45:00houses
45:01and
45:03as I believe that the scale that the
45:05applicant is proposing is appropriate
45:08and although the building
45:12size sebox that they're proposing with
45:14this new design um this is just a note
45:17and
45:18um it might have some building code um
45:23issues that the applicant might have to
45:26address once it goes through the general
45:29building permit process
45:31and due to fire and requirements of
45:34minimum segments between buildings.
45:39However, for the waiver that we are
45:41presenting today which is the height um
45:45we believe that it meets the the intent
45:49of the actual neighborhood which is the
45:52scale and
45:56Given the above and the staff recommend
45:58approval of the waiver but but subject
46:00to condition to resume final review plan
46:04showing compliance with the other
46:06standards like landscape plans and
46:10preparational locations and other items
46:13they will still want the applicant to
46:14address but we can work it internally as
46:18a staff. Um, and this comes to staff
46:20report.
46:25>> Thank you. Uh, any questions for staff?
46:29>> Were there any issues with the setback?
46:32>> Um, so when we started working with the
46:35applicant um, in the original proposed
46:38design, he didn't meet the cambooy
46:41sebox. So in order to avoid waiverss
46:44from the camboo of sebas that's why he
46:47presented this kind of new um location
46:49of the building units where are crossing
46:52a platted load lines but for doing that
46:56now he doesn't meet some fire code um
47:00requirements that he might have to
47:02address. uh and the applicant we we
47:06talked to him about this kind of issue
47:08but he's willing to continue that kind
47:11of situation later and we don't know if
47:14has to come back to us but as of right
47:15now he meets the setback stand up for
47:18the camboo we
47:21just I just wanted to give like a note
47:25about the building code issue that he
47:27might will have
47:29once he goes through the general
47:30building permit process Yes.
47:33>> Are these still four individually
47:35platted lots?
47:36>> So, as of right now, um they're
47:38individual plat, but because now the
47:41current design of the building cross um
47:45those plotted lot lines, uh it's no
47:47longer considered as a town hall. And
47:50with that being say, it cannot be sell
47:54as a individual units because it has it
47:57has cross the plat lines and the city
48:00doesn't
48:01>> well he's going to have problems with
48:02building code because you cannot put a
48:04building across a property line and
48:06>> you can property and if you got two he's
48:08going to put a firewall between those
48:09two because you're on a property line.
48:11So
48:11>> So the problem is not that he's crossing
48:13the property line. The problem is the
48:14setbacks that he's
48:16>> he's going to have problems in the
48:17building code because you cannot do
48:18that. Okay.
48:19>> You cannot I can't even put exit doors
48:21across property lines and buildings that
48:23I built.
48:24>> Space in order on your property. So,
48:26he's got some building code issues.
48:28>> Yeah. I think Joe want to
48:29>> Yeah. Commissioner Ramsey in the city of
48:30Fort Worth. The city does allow you to
48:32build across plot lines as long as it's
48:34common ownership.
48:36>> Well, if they're all owned by the same
48:37people.
48:37>> Yes.
48:38>> Yeah. It's the same owner.
48:41>> He just the utility taps have to be se.
48:45But as long as he can de deconlict that
48:47the city will allow him to build.
48:49>> That's fine. I just want to make sure
48:50>> y
48:57>> and I will just add his his waiver
48:59request today is just for the
49:00floortofloor height.
49:02>> Um the applicants looking to get this
49:05project moving. So after discussions
49:07with the applicant, we we agreed to move
49:09forward with just this waiver and that's
49:11why we're asking for the plans just to
49:13be resubmitted so we can continue to
49:14work on the landscape and the public
49:17realm. But the applicants verbally
49:19communicated to staff his willingness to
49:21meet the published standards as is. So
49:24he's just trying to make sure he can
49:26move along as expeditiously as possible.
49:29>> Yeah. Yeah. And also um we believe that
49:32the applicant will might come back for
49:34waiverss for height as well for the
49:36northern part later on. So because it's
49:39the same developer and also just to
49:43point that out the applicant has stated
49:44that he has worked with the KO
49:47neighborhood on the design to have the
49:50neighborhood approval and he has stated
49:52that the neighborhood is feeling
49:55in favor of the height waiver but we
49:58didn't receive any letter of support
50:01from the neighborhood yet so I think
50:03there's some common neighbors here
50:06present today to speak on behalf of the
50:08yet
50:10out of curiosity whether we simply
50:12approve or approve with these condition
50:15with these subject to the conditions of
50:17resubmitting that's the same effect has
50:18the same effect right
50:19>> it's it's the same effect we as staff
50:21just wanted to acknowledge like hey
50:22we're still working through this so like
50:24on the site plan I think you might see
50:25like a pedestrian light like right at
50:27the corner between the two crosswalks we
50:29know IPRC is not going to approve that
50:31so we just need to work on some of that
50:32spacing make sure it's meeting the
50:34intent of the landscape ordinance and
50:36the applicant's been very willing to
50:38work with staff. He's been very
50:39cooperative. So, you know, either way,
50:43it's the same path. We just kind of
50:44wanted to affirm that in our
50:46recommendation for the motion.
50:48>> Understood.
50:49>> Any other questions for staff?
50:53>> I I do. Um so, this is for both of you
50:56guys, Joe and um when we have more
51:00people coming for building in this in
51:03this particular area. So, are we going
51:05to have building codes for the Komo
51:08neighborhood or are we going to follow
51:09the Camp Buouie? Because Camp Buoy
51:12guidelines sounds like it's more
51:13commercial and less residential. So, how
51:17how are you working through all this?
51:19>> So, we're we actually we do have Campo
51:23forbased code update on the agenda later
51:24on. So, we'll address some of that.
51:26Okay.
51:26>> Um this is in the Camp Buouie transition
51:28district. The intent of the district is
51:30to transition that commercial corridor
51:32into the adjacent residential. Campway
51:34formbbased code is the only district we
51:36have that is linear along a sixlane
51:39commercial highway. So it's different
51:41from near southside bar university
51:44stockyards which are all this contiguous
51:46area and you can walk in two directions
51:49in camp where you walk in one direction
51:50and you're outside the district. So the
51:52intented transition is to transition
51:54that commercial into the residential and
51:57that's what this zoning is. Um we are in
52:00communications with the uh KOMO
52:02community and working very closely
52:04handinhand with uh Camp Buouie Inc.
52:06about code updates. So we'll actually
52:08address that later on in the work
52:09session.
52:10>> Fair enough. Good. Thank you.
52:11>> Yeah.
52:14And I think one of the just to give a
52:16little bit of background as well, one of
52:18the issues, well not issues, one of the
52:20reason why we don't have the northern
52:22portion um design ready yet is because
52:25it has to meet kind of different
52:26standards because it's actually part of
52:28the Kambooi corridor area on the
52:31northern portion. But this other portion
52:33is the part that's actually facing the
52:34KO community
52:39>> facing KO is in KO the residential side.
52:44Mhm.
52:47>> Okay. Is the applicant here to speak?
52:50Welcome up.
52:50>> Yes.
52:51>> Please state your name in the city in
52:52which you reside.
52:56>> Good morning. Uh my name is Corey
52:57Waldrip. I'm here with Motive Ventures
52:59to speak on behalf of the project. Um
53:01prepared a PowerPoint uh for you guys to
53:03walk you through a couple of things and
53:05just wanted to say thank you. Uh a
53:06couple points of clarity before we get
53:08started. Um, we have been very very uh
53:10graciously accepted to participate in
53:13the community meeting at KOMO and share
53:15about our project as far as having their
53:17support. Um, I hope we do. Um, but we
53:19don't have anything definitive. So,
53:20we'll let them speak as to their um to
53:23their feelings about the project and and
53:25their viewpoint. Um, but anyway, um
53:30u just introduce myself. Uh, my wife and
53:34I uh are Fort Worth residents. I was
53:36born and raised in Fort Worth. Uh Fort
53:37Worth is home. Um and we're grateful for
53:39the opportunity to create something that
53:41will serve this community for years to
53:42come. Uh thank you as well for the Fort
53:45Worth Development Services uh team and
53:47for their collaboration and to the KOMO
53:50community for welcoming us, allowing us
53:52to share the project and helping us
53:54better understand the neighborhood. Um
53:56our uh the project's straightforward. Uh
53:59build quality homes that give families
54:01stability in a place they're proud to
54:03call home.
54:06Uh the location provides important
54:07context uh for the project. Uh the level
54:10property is site sits just south of the
54:13Camp Buouie corridor uh within the Lake
54:15Ko community area and the Camp Buouie
54:17transition district. As Jefferson
54:19pointed out, uh the property front Level
54:22Avenue uh and with a corner frontage on
54:24Borin Street uh both close classified as
54:28local streets uh under the Camp Buouie
54:31framework. Uh the project is part of a
54:33larger initiative that we are planning
54:35for this area including the luck and
54:38actually the Rosedale properties to the
54:39north um as well.
54:46Levelville consists of approximately
54:48four 1,800 square ft four-bedroom
54:50residents and two duplex buildings. Uh,
54:53Miss Jefferson pointed out um
54:56earlier on the site plan, we do
54:58recognize that there are life safety um
55:03codes that we will comply with. I think
55:04that site plan showed an inherent line
55:07to line between the the roof uh fascia
55:10and not inherently the uh building
55:13setback itself. So, we will work with
55:15staff on correcting um and complying
55:17with all life safety um related code. Uh
55:21long-term ownership creates a different
55:23approach to construction. Um well
55:25selected materials, thoughtful layouts,
55:28and durable construction reduce
55:29long-term maintenance while protecting
55:31the value of the property. Uh it's our
55:33belief affordability should not require
55:35sacrificing quality. Uh we are pursuing
55:38opportunities that can assist housing
55:39affordability while also supporting the
55:42investment required for thoughtful
55:43design.
55:46This rendering shows how the project
55:48reflects the Camp Buouie standards
55:50through a residential design. Along the
55:53street, we're providing the sixoot
55:55sidewalks, uh, pedestrian lighting,
55:58landscaping, and front porches that
56:01create a defined and walkable
56:02streetscape, durable materials, and the
56:04design reflect the historic residential
56:07character of the neighborhood. the homes
56:09face uh and engage the street while the
56:12garages and vehicular access remain
56:14secondary and to the rear through the
56:16alley. So while the building is new, the
56:19scale materials in relationship to the
56:21street reflect both the camp standards
56:23um and the residential character of the
56:25neighborhood.
56:28The requested waiver is appropriate for
56:30three simple reasons.
56:33First is use. The code defines these as
56:36residential buildings. It separately
56:38defines commercial ready space
56:41designed for conversion to commercial
56:43use. Tables 5.1 and 5.2 show that
56:47residential use and commercial ready
56:49requirements depend on use and street
56:51frontage. Level is residential and it
56:54fronts a local street. Sections 6.25 and
56:586.85 identify first floor height as part
57:01of the commercial ready standards and
57:03tie standards to Camp Buouie Boulevard
57:06frontage.
57:07levelvel is exclusively residential,
57:10contains no commercial ready space, and
57:13does not have the frontage condition
57:14requiring commercial ready construction.
57:17Therefore,
57:19the 15 ft first floor height is part of
57:21the commercial ready framework and does
57:24not apply to the residential condition
57:25at level.
57:27Second, the proposed first floor to
57:30floor height is approximately 11'2 in.
57:33Jefferson, I know you discussed 10 feet.
57:35Uh I think that's floor to ceiling. Uh
57:37and I might not have been clear on how
57:38we represented that information. But
57:40when we include the floor joist and the
57:42subfloor, that's how we're coming up
57:43with our floor to floor. So just to
57:45clarify um that from an point of view.
57:47Um providing a 10-ft plate plus height
57:50uh in the floor system. Increasing that
57:53dimension to 15t adds almost 4 feet of
57:55vertical space. Um, and why that's
57:58important is the additional height would
58:00lengthen the staircase configuration and
58:03consumes usable uh residential area
58:06within these lots. Accommodating that
58:08additional run would push the building
58:10width beyond the frontage requirements
58:12and plated lot uh the platted lot can
58:14accommodate. Um, more specifically, if
58:17we're going up four feet, then our run's
58:20going to increase by roughly 3' 11 in.
58:22Okay, so if we're doing that for four
58:24duplex units, which just simple math,
58:26four units, four feet, that's 16 feet of
58:28additional building space that we would
58:30need, and it just pushes the project
58:31entirely off our capacity with what the
58:34the platted lots and then we'd be in
58:36here asking for waiverss on frontage.
58:39And so I think that the Camp Buouie uh
58:41code is clear that the frontage
58:42requirements would require a
58:44reasonzoning. And so I think that is a
58:46higher ask uh than what we're here to
58:48discuss with you today.
58:53Uh third's the scale. Uh this is
58:55designed as a traditional two-story
58:57residential building that fits the scale
58:59and character of the surrounding
59:00neighborhood. Um adding additional 4
59:03feet to the vertical would create an
59:04unnecessarily tall first story or at
59:07least in my opinion. Um increase the
59:09building's mass and change those
59:10residential proportions. The waiver
59:12allows the building to maintain the
59:14scale, proportion, and residential
59:15character the KUI standards are intended
59:17to support.
59:22Uh clarity on how the 15 foot standard
59:24applies to exclusively residential
59:26projects would be very valuable for
59:28future development. However, for level,
59:31we are requesting approval of the
59:33proposed residential floor to floor
59:34height through this waiver. I'm thankful
59:37for city staff um and their support of
59:39the request.
59:44And this was just a a video that was
59:47running through the different
59:48elevations. Um there's some additional
59:50information on the back side of this if
59:52you guys have any questions. Uh so
59:54respectfully uh we request the waiver uh
59:56for the floor to floor height and um we
1:00:00believe this is a limited and reasonable
1:00:02request that preserves the neighborhood
1:00:04character of KOMO while maintaining the
1:00:06functional quality and intent of the
1:00:08Camp Buouie code um which allows us to
1:00:10build a beautiful place for families to
1:00:12call home. Thank you for everyone who's
1:00:14been a part of the project and to the
1:00:16commission for your time and
1:00:17consideration. Um, happy to answer any
1:00:19questions you guys might have.
1:00:20>> Thank you very much.
1:00:22>> Staff can provide a little bit of
1:00:24clarity on the the measure. So, there's
1:00:26a weird diagram in the code that
1:00:28suggests the floor tofloor measure is to
1:00:29the top of the ceiling. So, we as staff
1:00:32put in the agenda request to the top of
1:00:35the ceiling. So, he regardless of how
1:00:37you measure what's in the agenda would
1:00:39get him to achieve his plans. So, just
1:00:41note that. That's why we put the 10 feet
1:00:438 inches. It's the more conservative of
1:00:45the of the two options we had dealing
1:00:48through that interpretation and how
1:00:49that's commonly uh applied.
1:00:55Thank you. Any questions for the
1:00:57applicant?
1:01:01>> Okay. Thank you.
1:01:04Uh anyone else here to speak in favor of
1:01:06this case?
1:01:11welcome up.
1:01:16>> Thank you. Please state your name.
1:01:19>> Good day. I'm Sandra Stanley from Como.
1:01:21I'm a stakeholder resident and I'm the
1:01:23current uh Knack president. And so um I
1:01:27wanted to say that this um developer,
1:01:30they have uh really done their due
1:01:32diligence with us. They've met with us
1:01:34three times on site at our NAC meeting.
1:01:37And then some of the people that didn't
1:01:40get to come to the net meeting, we had a
1:01:41third meeting on Zoom. So some of our
1:01:45concerns, initial concerns with the
1:01:48Cambouie and I guess for me being the
1:01:50new president, not knowing that that
1:01:54zoning over there on the veil,
1:01:56especially on the veil is considered
1:01:59Camp Buouie. then knowing that the
1:02:02street the block that backs up to it is
1:02:05considered Camp Buouie. So that's when I
1:02:08started answering asking lots and lots
1:02:11of questions. Okay, that's residential.
1:02:15Those other um zonings aren't going to
1:02:17fit for KOMO. If you look at the new
1:02:22bill across the street from this
1:02:24property, and I don't know if y'all have
1:02:26a picture of that, the new bill across
1:02:28the street from that property. It's a
1:02:30new bill and they didn't come under that
1:02:32under those restrictions and it's very
1:02:35nice. But this project complements this.
1:02:38But what what won us over was most
1:02:42developers when they come to KOMO, they
1:02:44tell us what they're going to do. Of
1:02:46course, it's their property. uh and they
1:02:49never talk about affordable housing.
1:02:51Well, this developer came out the shoot
1:02:53talking about developer uh affordable
1:02:56housing and had a discussion with us
1:02:58about it and we even came back again on
1:03:00that third meeting to say uh some of the
1:03:04um residents said we want that in
1:03:06writing because we have so many
1:03:08developers come and they don't uh honor
1:03:12they get what they need and they forget.
1:03:14So, they did make a ver a written
1:03:16commitment to us to have uh uh at least
1:03:20two of those uh of their properties uh
1:03:25as affordable housing. And they had
1:03:27already the conversation we didn't have
1:03:29to prompt them. We didn't have to ask
1:03:31them. She uh uh Meg had already went and
1:03:34talked to housing and got on schedule
1:03:36and got ideas for that and very open to
1:03:39what we were saying and what we wanted.
1:03:41And um they stayed for our NAG meeting
1:03:43to the end and got to um meet the uh the
1:03:47um community and they were available for
1:03:50questions and no uh questions negative
1:03:53questions came up at the meeting there.
1:03:55If there are some uh questions then uh
1:03:58we don't know about that. But I would I
1:04:01am concerned and I've been talking to
1:04:02the city. We met with Mr. um Mr. uh DJ.
1:04:06We've met with him. I've talked to
1:04:08Joseph has been very helpful in when did
1:04:11Komo become that part of Komo become um
1:04:15uh Cambouie and they're helping us
1:04:18navigate through that and Camboo uh horn
1:04:23you know summer horn yes but not the
1:04:25residential so it doesn't it's apples
1:04:28and oranges for that even when they come
1:04:30back for this second development having
1:04:33the lavel the um the lavell street and
1:04:37then have lock doing something different
1:04:40is going to be weird and it's to me it's
1:04:44going to never be commercial now some
1:04:46kind of way that big storage building is
1:04:48there it's there and we know
1:04:50gentriification well in Ko we can't
1:04:54control people we can't control uh
1:04:57investors a lot of the investors in Ko
1:05:00uh don't live here they're from out of
1:05:02state cuz I stop and ask them where are
1:05:03you from and get that information so Uh
1:05:07uh they live here. That's wonderful.
1:05:09They live We I've asked a lot of
1:05:11questions. They live here in Fort Worth.
1:05:13We like that. And so um we're in
1:05:17majority is in favor of this project. We
1:05:20want it to look like
1:05:23a neighborhood, not commercial. It's not
1:05:26going to ever be commercial right there
1:05:28on those two streets. So when you come
1:05:30back when they come back for their other
1:05:32one, and I know they've had to change
1:05:33the design. I understand the Rosedale
1:05:36part because she shared the whole vision
1:05:39uh and that looks really nice, but um I
1:05:43just don't see how they match up and
1:05:45hopefully we can uh the city will
1:05:47continue to work with us and you guys
1:05:49will work with us to get us on track on
1:05:51what we need and we're working forward
1:05:53on that. Thank you very much.
1:05:55>> Thank you.
1:05:57Anyone else here to speak in favor?
1:06:02Good morning. welcome up.
1:06:06>> Good morning. My name is Wanda Bohannan
1:06:08and I'm a long-term resident of the Lake
1:06:10Homo area. We have met several times
1:06:13with the uh builders. We do appreciate
1:06:17the fact that we want our I hope you
1:06:20appreciate the fact that we want our
1:06:21community to remain a community that
1:06:25looks like a community. We are currently
1:06:28also in progress of working with the
1:06:31conservation to ensure that the inside
1:06:33part of the Lecomo uh community stays
1:06:36the same. As we've looked at these
1:06:39buildings and we as we've talked to the
1:06:41builder too, it sounds like we are um
1:06:46looking forward to them being here. not
1:06:48just because of the affordable um um
1:06:52housing but also because it's going to
1:06:55conform to our neighborhood. What we
1:06:58don't want to do is destroy the concept
1:07:02of family uh s uh residential area. And
1:07:06so as a resident of KO, I can't speak
1:07:10for everyone, but I can speak for what I
1:07:13saw at the meetings, the comments that
1:07:15I've heard. We are in favor of working
1:07:18with this builder. And by the way, they
1:07:20are probably
1:07:22uh one in a long time one of the ones
1:07:27that have actually come to us, worked
1:07:30with us and considered what we as a
1:07:33community would like to have.
1:07:36>> Thank you.
1:07:37>> Thank you.
1:07:39In favor? Yes. Welcome up.
1:07:44>> Good morning. My name is Shavina Miss
1:07:46Peacock Taylor and I am a Lake Ko
1:07:50resident and I am also the program
1:07:53director of keep lake como beautiful. Uh
1:07:56that's a program of proof of life
1:07:58community development corporation. I
1:08:00reviewed the record for UDC 2026205
1:08:04and I want to limit my comment to the
1:08:06decision before the commission today.
1:08:08the four-unit lavel portion and the
1:08:11requested waiver from the 15 foot floor
1:08:15tofloor standard I'm sorry 15 foot first
1:08:20floor floor to floor standard to 10 ft 8
1:08:25in based on the staff's findings that
1:08:28the reduced height is more compatible
1:08:29with the surrounding residential context
1:08:32I support the waiver with the staff
1:08:34recommended conditions requiring final
1:08:36compliance with the remaining Campboy
1:08:38standards and revised enhanced
1:08:40landscaping. I also understand that
1:08:43separate building code and permitting
1:08:45review remains outstanding. Thank you.
1:08:48>> Thank you.
1:08:52Anyone else here to speak in favor?
1:08:55Is anyone here to speak in opposition?
1:08:58Okay, we'll close the public comment
1:08:59portion for discussion by the
1:09:01commission.
1:09:04I think the the developer has done a
1:09:07good job working with the community. I
1:09:09think his design fits in with the
1:09:12character of our neighborhood. Um and so
1:09:15I think they've done an excellent job
1:09:17and I'm recommending approval.
1:09:20>> I have a question just um
1:09:24it blends right with the area and you
1:09:28support the design.
1:09:30Did you through that process do you feel
1:09:33like everyone all the others the you
1:09:37know future people that are coming to
1:09:39purchase the land and come in is this
1:09:41kind of the standard you're wanting the
1:09:44whole neighborhood and KOMO to become?
1:09:46>> I do I'm not encouraging us to have a
1:09:50lot of duplexes throughout our
1:09:51neighborhood. We're having houses. It's
1:09:53mostly it's single family, but this
1:09:57duplex fits in with the other designs of
1:10:01houses that they built. It really
1:10:03doesn't look like a no part a do it
1:10:07looks more like a house. And it
1:10:09>> it's going to expand. You're talking a
1:10:11whole block now behind that public
1:10:12storage. behind that public storage is
1:10:15on lock side and it should looks like a
1:10:19um the neighborhood too because it's not
1:10:23going to be a business corridor on that
1:10:26side. It walks right down into the
1:10:28neighborhood which is houses. So I don't
1:10:32see lock ever becoming a commercial
1:10:36corridor and if you just go to the next
1:10:38block they've built some new houses all
1:10:40along there.
1:10:42>> Thank you.
1:10:45And I think we've seen some of these
1:10:47cases with the 10 foot versus 15 foot.
1:10:49And there are there are commercial
1:10:52spaces with 10ft ceilings. So it doesn't
1:10:56preempt that you can't use this space as
1:10:58like a live work where the downstairs
1:11:01would be um if that was the future
1:11:04growth of the of the neighborhood if it
1:11:06became an area that that was uh feasible
1:11:10or the neighborhood wanted it. Um, but I
1:11:12do think that they have some work to do
1:11:14on the site plan. Uh, specifically you
1:11:16got bedroom windows on property lines uh
1:11:19that need setbacks. So, um, I think we
1:11:23should if we move for approval and we
1:11:26should, uh, have them continue to work
1:11:28with staff.
1:11:32>> So, I would like to make a motion to
1:11:34approve if there are any other comments
1:11:36by
1:11:39um, move for approval.
1:11:41provided subject to a resubmission of
1:11:44final review of the plans showing
1:11:47compliance with all other camp form base
1:11:50code standards.
1:11:53>> Second.
1:11:56>> Okay, we have a motion by Commissioner
1:11:57West and a second by Commissioner Deose.
1:12:00Um, Chair Benner, how do you vote? I
1:12:04>> Vice Chair Ramsey, how do you vote? I
1:12:08>> Commissioner West, how do you vote? Hi,
1:12:11>> Commissioner Carr. How do you vote?
1:12:13>> Hi,
1:12:15>> Commissioner Deose.
1:12:17>> I
1:12:18Commissioner Harrier. How do you vote?
1:12:20>> Hi.
1:12:21>> Commissioner Hughes, how do you vote?
1:12:23>> I
1:12:26Commissioner Holidayiday.
1:12:30>> And Commissioner Hamsy, how do you vote?
1:12:32>> I motion passes 90. Thank you.
1:12:44All right, that concludes our cases
1:12:46today. We're going to this UDC, we
1:12:48decided to try something a little bit
1:12:49different and put work session at the
1:12:51end. Number one, so we can work on
1:12:53getting applicants through the
1:12:55commission process. They're not having
1:12:57to wait um you know, two, three hours
1:12:59for their case to be heard. And then um
1:13:02also just kind of to kind of you know be
1:13:04able to talk about these things a little
1:13:05bit more freely without the pressure of
1:13:07having to rush through them. Um so we
1:13:09have three work session topics today.
1:13:12The first is just a quick status update
1:13:14on the Panther Island formbbased code.
1:13:17So my colleague Francisco has been
1:13:18working on that. So I may um pull him in
1:13:21here on this. Um we presented this code
1:13:24update to you back in June and it's been
1:13:27working through the legislative process
1:13:28for the last few months. Um, so with
1:13:32that, it's getting ready to go to city
1:13:34council. So, we just wanted to remind
1:13:35you about some of the things that you
1:13:36guys may see in the newspaper over the
1:13:39next couple weeks. Um, so here's a
1:13:41quick, it's kind of a long summary of
1:13:43changes. There are some pretty
1:13:44substantial changes, but just to hit
1:13:46some of the high points, we are
1:13:47consolidating the multiple subjects
1:13:50districts into two, Panther Island Core
1:13:52and Panther Island Edge. We're adding
1:13:54some of our some guiding principles and
1:13:57development objectives based off of uh
1:13:59some community engagement and networking
1:14:01and uh visioning for the district. Um
1:14:03we're also updating some of our
1:14:05administrative procedures and regulating
1:14:06plans. We're revising and expanding some
1:14:09of our waterfront and public open space
1:14:11standards to account for updates in the
1:14:14canal work that's being done in Panther
1:14:16Island. Um, we're also modifying some of
1:14:19the district boundaries that relates to
1:14:20the subdist consolidation
1:14:23and making some uh simplification to the
1:14:26maximum height limits given that now
1:14:28we're just moving to two subdists. The
1:14:31the original code had various height
1:14:33limits based off the various subdists.
1:14:36Um, so if you uh paid attention to the
1:14:40last zoning commission hearing, you'll
1:14:41notice you would have noticed that
1:14:42there's actually two zoning cases that
1:14:44we put in front regarding Panther
1:14:46Island. One is to update the code
1:14:48document and the map what's called a map
1:14:51amendment in zoning speak and then the
1:14:53other one is to reszone some of the
1:14:55properties into those two subdists that
1:14:56we're creating.
1:14:59So really the genesis of the code update
1:15:01again is to implement the vision 2.0
1:15:04plan that uh TRWD Taran County Regional
1:15:08Water District put together between 2023
1:15:10and 2024. So this is the
1:15:11operationalizing of that making sure the
1:15:13code comes up to speed with it. Um so
1:15:17here's a kind of summary of the district
1:15:19consolidation. On the left you can see
1:15:20the current district map with the nine
1:15:22districts, the various heights and then
1:15:24on the right you can see a couple of
1:15:26things. Number one you can see the
1:15:28consolidation into two subd districts
1:15:30and then additionally a change in the
1:15:32overall boundary. So there are some
1:15:34parcels that are kind of on the opposite
1:15:35sides of the river here and uh once the
1:15:39bypass channels complete there'll be
1:15:41kind of a clear delineation. So, those
1:15:43are going to actually we're working on
1:15:44reszoning those to other things. The the
1:15:47yellow that you hear that you see here
1:15:48by Henderson Street, there's actually an
1:15:50active zoning application for that site
1:15:52already. So, we're kind of adjusting the
1:15:54boundaries of Panther Island, pulling it
1:15:56in, making sure it better aligns with
1:15:57TRWD and public land ownership. Um, and
1:16:02also in the areas that are abudding
1:16:04downtown, uh, in this area, there's some
1:16:06conflicts with the downtown overlay too
1:16:09that make it just a little bit tough to
1:16:11work through. So, we're hoping that this
1:16:13new boundary line will simplify things.
1:16:15Then, as you can see on the right, we're
1:16:17also moving just to the two subd
1:16:19districts. The core, which is the darker
1:16:21pink on that map, and the edge, which is
1:16:23the lighter pink.
1:16:24>> Joe, I have a question. When did it go
1:16:26up to 24? I thought it was at 20 on the
1:16:29max uh height
1:16:31>> on on this one.
1:16:32>> Yeah, the core. I thought I saw
1:16:34something in a public thing. It was 20
1:16:37feet. So, so the north main subdist is
1:16:4020. The N3 subd district, neighborhood
1:16:43three has been 24.
1:16:49I I'd have to go back into the history
1:16:50of Panther to look up exactly when that
1:16:52was. Um, but that's we're kind of just
1:16:56simplifying that across the board. Do
1:16:58you want to hop in on that at all,
1:17:03Francisco Vega, planning manager?
1:17:06No, I I I know that there is an
1:17:09amendment that happened uh probably I
1:17:12don't know five years or something ago
1:17:14where there was a revision to the
1:17:16maximum height. Um in the past 10 years
1:17:18I think that we have been updating this
1:17:20district probably seven times. And so I
1:17:25remember when I was reviewing the uh the
1:17:28background of the district, I saw one of
1:17:30those ordinances to increase the height,
1:17:33but I just can't remember the year.
1:17:36>> Thank you.
1:17:40>> Uh speaking of height, that
1:17:42simplification of the height, we oftent
1:17:44times get questions like, "Oh, you're
1:17:45just going to slap a bunch of big
1:17:47buildings in. Is it going to look out of
1:17:48scale?" So one of the things Vision 2.0
1:17:510 did was they did some broader
1:17:52neighborhood context analysis. Looked at
1:17:54Panther Island and the maximum heights
1:17:56in context to the north side as well as
1:17:58to downtown. And I think the important
1:18:00thing here is to note the change in
1:18:02elevations between those three
1:18:03districts. Downtown obviously we're on a
1:18:06bluff. I mean not this site but you know
1:18:08a few blocks away is on a bluff. So that
1:18:12district where there's already tall
1:18:14buildings will still be downtown and be
1:18:17recognized as such. And then Panther
1:18:19Island actually transitions down due to
1:18:21the lower elevation and that kind of
1:18:23provides a transition between north side
1:18:25and some of the the increase in density
1:18:26that's happening in like the stockyards
1:18:28area.
1:18:31Um again here's a huge list of updates.
1:18:33We've we presented this previously. A
1:18:35lot of this is from the vision 2.0 the
1:18:38work that TRWD has been doing with the
1:18:40Army Corps of Engineers for the bypass
1:18:42channel and the canal work. Um here's
1:18:45some more updates. One thing to note, I
1:18:47do want to call out on this slide. The
1:18:48Panther Island formbbased code is going
1:18:50to be moving from a prohibited use table
1:18:52to a permitted use table, which is the
1:18:54way all the other formbbased codes work,
1:18:56just because sometimes there's new uses
1:18:58that come about, and then unless we
1:19:00update the code in time, that use would
1:19:02be allowed by write. Um, so kind of just
1:19:06going through this. Here's one of the
1:19:08concept drawings that came out of Vision
1:19:102.0. Panther Island's not going to look
1:19:12like this. These concept drawings is
1:19:15really intended to show the maximum
1:19:17building envelopes that could be built
1:19:19if everything was maxed out. Um, so
1:19:23that's kind of some of the intent of
1:19:24this just to kind of give people a
1:19:26vision for what it could be, not
1:19:27necessarily a definitive plan for what
1:19:29it is going to be.
1:19:31So in terms of status update, um, which
1:19:34is really the the purpose of this
1:19:35presentation, uh, we presented to the
1:19:37UDC in June. We went through zoning
1:19:39commission and city plan commission
1:19:40informational briefs as well. And then
1:19:43um uh earlier this month, we went to
1:19:45zoning commission for a vote for
1:19:46recommendation to city council. Um we're
1:19:49going to CPC for a vote for
1:19:50recommendation early next month and then
1:19:52to zoning or to city council for
1:19:54adoption on October 13th. So if you all
1:19:57see it in the news, we've reminded you
1:20:00uh more currently than that. Any
1:20:03questions on this?
1:20:07Cool.
1:20:08All right. We're we're in a code
1:20:10updating frenzy over here on the
1:20:12historic preservation and design side.
1:20:14We've been working on another large code
1:20:16update to the camp buoy formbbased code
1:20:18and Lydia is here from Campoi Inc. She's
1:20:20really our partner like out on the
1:20:22street um for this project.
1:20:26So the the campaign forbased code was
1:20:29adopted in 2012. There has not been
1:20:31significant
1:20:32uh changes to the development standards
1:20:34or the use standards over that time. So,
1:20:37uh, a few years ago, Campo, Inc. started
1:20:39working with city staff to develop a
1:20:41list of proposed changes. This is the
1:20:44first of what we hope was going to be at
1:20:45least two or three other changes to the
1:20:47code that we're making. We talked about
1:20:48working with KOMO and addressing Horn
1:20:50Street. Um, again, this is the first of
1:20:53more things to come. And this code
1:20:54update is really focused in on five
1:20:58things. Uh, number one, removing some of
1:21:00the non-conforming standards that create
1:21:02conflicts with the base zoning
1:21:03ordinance. And as I'll explain in a
1:21:06second, just build a little bit out of
1:21:08date. Second, removing the use table
1:21:10completely from this formbbased code and
1:21:12referring back to the base zoning
1:21:14ordinance. So, currently all formbbased
1:21:16codes have two use tables, which is
1:21:18very, very confusing. There's one in the
1:21:20form-based code document and then one
1:21:22online in the zoning ordinance. And
1:21:25updating both of those has been a
1:21:27challenge for the city to be honest. So
1:21:30transitioning to the point where we only
1:21:32have the use tables in the zoning
1:21:34ordinance should make it a lot easier
1:21:36for developers as well as for staff. Um
1:21:38so this is the first uh code that we're
1:21:40trying to do this with and hopefully
1:21:42we'll eventually spread this to the
1:21:43other codes as well.
1:21:45Um we're going to be uh revising some of
1:21:48our supplemental standards uh
1:21:50particularly for drive-throughs uh sales
1:21:52from kiosks and mobile vendors which is
1:21:54uh Campo is an auto oriented corridor.
1:21:57That's a those are issues that
1:21:58consistently come up. And also
1:22:00clarifying some language around uh parts
1:22:02of the district that are within the NAS
1:22:04JRB uh overlay area, the APZ2,
1:22:08um because that limits some of the uses.
1:22:10So, we're providing more clarity in the
1:22:11use table. So, if someone's purchasing a
1:22:14property within that, they know to be
1:22:16checking that overlay and those overlay
1:22:18standards. Um, we're also took a stab at
1:22:21rewriting and completely updating our
1:22:23signage standards using some of the best
1:22:25practices from downtown. Um, given that
1:22:27Camp Buouie is very autooriented,
1:22:29signage is a big issue along the
1:22:32district. And as you know, probably the
1:22:34majority of cases within the district
1:22:36that come before the urban design
1:22:37commission relate to signage in Camp
1:22:39Buouie. Um, and then lastly, removing
1:22:41some redundant definitions and referring
1:22:43back to chapter 9 of the zoning
1:22:45ordinance for definitions. Again, just
1:22:47trying to simplify and make this code a
1:22:49little bit easier to use both for city
1:22:50staff and applicants looking to uh build
1:22:53and do business in Camp Buouie. So,
1:22:56here's a map of the corridor. As you can
1:22:58see, it starts from I30 and then it
1:23:02moves along Camp Buouie Boulevard
1:23:04southwest and then around Lackland. It
1:23:07kind of pivots and moves along uh Camp
1:23:09Buouie West almost to I30. It stops a
1:23:12little bit short of I30, but you can see
1:23:13the various subdists here. Um you can
1:23:16kind of see a little bit to the north
1:23:18how NASJRB is directly to the north. So
1:23:20that overlay impacts particularly this
1:23:23area right here and some of the uses
1:23:25that can be there.
1:23:29So I mentioned before that we're
1:23:31updating the non-conforming standards.
1:23:33One of the you might call quirks or
1:23:35unique aspects of the campoui form-based
1:23:37code is that some of the
1:23:38non-conformities are tied to uh value of
1:23:41improvements which was set in 2012 and
1:23:44construction costs and renovation costs
1:23:46have changed significantly since 2012.
1:23:48So it's really not achieving the intent
1:23:50that it was supposed to. So what we're
1:23:53doing is we're simplifying the language
1:23:54just to refer to the non-conforming
1:23:56standards that are in the base zoning.
1:23:58So it's similar to other projects within
1:24:01the city. So if you're a developer and
1:24:02you want to do something in Campoi form
1:24:04base code for the first time, you have
1:24:06that context and can refer back to that.
1:24:09For the use table, again, we're removing
1:24:11the use table from the campoui
1:24:12formbbased code, referring back to the
1:24:15use table in the zoning ordinance,
1:24:17sometimes what we call American Legal,
1:24:18which is the hosting website for the uh
1:24:21zoning ordinance. Yeah, I know this is
1:24:22visually not the best. Um yeah, uh just
1:24:26basically this picture is just showing
1:24:28we're crossing out the use table. Um,
1:24:32and we're making some changes to some of
1:24:34the allowable uses to clarify some
1:24:37things, uh, as well as advance some of
1:24:40the economic revitalization efforts the
1:24:42city has, particularly along Camp Buouie
1:24:44West, uh, Camp Buouie formbbased code is
1:24:47actually called the Camp Buouie
1:24:48Boulevard revitalization code. So,
1:24:51there's always been that strong economic
1:24:52development and revitalization focus to
1:24:54the district. So, as mentioned before,
1:24:57we're adding some clarifying language
1:24:59about the APZ overlay um with the with
1:25:02the base. Um we're distinguishing
1:25:04between massage therapy spa and massage
1:25:07parlor. Um the current use table has
1:25:10very broad categories and that's, you
1:25:13know, those are two very different
1:25:15things. Um we're adjusting some of the
1:25:18uses to have bars be by a CUP,
1:25:23conditional use permit. So currently
1:25:25bars are not permitted in a lot of the
1:25:27district. We think there are
1:25:29circumstances where a bar could be a
1:25:31good thing, but that would have to go
1:25:32through the public process for that. So
1:25:35it's giving a little bit more
1:25:36flexibility for that and making sure
1:25:38that for issu for uses such as home
1:25:40improvement stores and liquor stores.
1:25:42There's some controls on where those
1:25:44take place, but while providing a case
1:25:46by case approval for that. We're moving
1:25:49things such as bingo parlors, retail
1:25:51smoke shops, furniture cabinet repair,
1:25:53aluminum manufacturer, and many
1:25:55warehouse uses. So like self- storage.
1:25:57Um, and uh things like retail smoke
1:26:01shops have things or that have been
1:26:03updated in the base zoning ordinance,
1:26:04but then we never updated the formbbased
1:26:06code forum. So we're just trying to come
1:26:08up to speed with that. And then we're
1:26:10removing most vehicle sales and service
1:26:13as well as aviation transportation uses.
1:26:15Um when you read the intent of the
1:26:17campoui formbbased code, it was really
1:26:19to create a robust commercial, retail
1:26:22and economic corridor that could
1:26:24transition into the adjoining
1:26:26neighborhoods. That was the intent
1:26:28behind the initial passage of it. So
1:26:32things like vehicle sales sometimes make
1:26:34that very difficult because they require
1:26:36large lots that are not very pedestrian
1:26:39friendly. So, we're trying to limit that
1:26:41um and prevent that from spreading
1:26:43throughout the the whole district.
1:26:46Um as mentioned before, we're updating
1:26:48some of our supplemental uses. Uh you
1:26:51can see here how we're consolidating
1:26:52some of the supplemental standards for
1:26:53autorelated uses and then um making a
1:26:57note about uh driveway stacking and
1:27:00making sure that it's aligned with the
1:27:01traffic engineering manual as well
1:27:03because it is an auto corridor. That's a
1:27:05consistent issue that we come across. or
1:27:08we've also added I'm not going to read
1:27:09this whole thing. Uh supplemental
1:27:11standards for sales from kiosks and
1:27:13mobile vendors which we see a lot of
1:27:15within the district. Um we are removing
1:27:18the current sign standards and replacing
1:27:21them with new sign standards that mostly
1:27:22come from downtown. Uh here's a list of
1:27:25the new categories of signs that are
1:27:27going to be in the revised code. Um so
1:27:30we're trying to take the best practices
1:27:32from downtown and bring them to Camp
1:27:34Buouie. Um, one thing we brought
1:27:36>> signs on there,
1:27:37>> huh?
1:27:38>> Digital signs.
1:27:39>> Uh, so ECC's
1:27:43>> uh, so electronic changeable copy that
1:27:46would still have to go through board of
1:27:47adjustment.
1:27:49>> Board of adjustment.
1:27:52>> Uh, that might be a broader zoning
1:27:54question.
1:27:57Yeah,
1:28:00>> it's just a pet of mine
1:28:04adjustment
1:28:06and I put scrollers on. I can't put
1:28:08digital signs, but I can put them on my
1:28:09monument sign that's out front.
1:28:13I think everybody uses digital signs on
1:28:15every gas station.
1:28:26It's not a picture. I can't change it
1:28:28from here.
1:28:28>> On on signage, one thing we brought in
1:28:30front of UDC several times is for sites
1:28:34that are on corner lots. So, because the
1:28:37boulevard bisects the street grid,
1:28:39there's a lot of properties on corner
1:28:40lots. The current code only allows one
1:28:42sign per tenant, but we get a lot of
1:28:44requests from tenants to request two
1:28:45signs on those corner lots. So, we're
1:28:48updating some of these sign allocation
1:28:49area standards to uh allow folks to have
1:28:52two signs as long as they stay within
1:28:53the total allocation area.
1:28:57Um, we've we're also removing a bunch of
1:28:59redundant definitions, definitions that
1:29:01exist either verbatim or slightly
1:29:03different in the code and the zoning
1:29:06ordinance. Um, so we're just referring
1:29:09both folks back to the zoning ordinance
1:29:10for those definitions. And then in the
1:29:12current code, all the sign types are
1:29:14separately defined, which is a bit
1:29:17confusing because then you look at the
1:29:18sign standards and you the definition
1:29:20also then defines it. So we're moving
1:29:22those definitions for signage and just
1:29:24having folks refer to the sign standards
1:29:26so it's a little bit more user friendly.
1:29:28And then in terms of schedule of
1:29:29adoption, so this is the first stop on
1:29:31our road tour for the legislative
1:29:32process for this code. Um, we're going
1:29:35to be doingformational briefs to uh
1:29:37zoning commission next month and then
1:29:39we'll do an IR to city council to keep
1:29:42them up to date on this. We've already
1:29:43been speaking with uh council member
1:29:45Crane and we have a meeting next week
1:29:46with uh council member Hall. Um and then
1:29:50we'll bring it back to the urban design
1:29:52commission for a vote on October 22nd
1:29:54followed by zoning commission on uh
1:29:57November 11th and city council we hope
1:29:59on December 8th. Uh we do have a
1:30:02redlinined version of the code that we
1:30:05will send out prior to the October
1:30:07meeting so you can see the how what's
1:30:10changing and how that looks. Um we were
1:30:13also going to probably end up
1:30:14reformatting the code just for ease of
1:30:15use from a landscape version to a
1:30:17portrait version. Um so you you'll see
1:30:20that in the final copy as well, but I
1:30:22think really the red line is what is
1:30:23most important to you so you can
1:30:25understand what is changing in terms of
1:30:26the text and standards. Uh, I'm happy to
1:30:29answer any questions. Francisco's been
1:30:31working on this longer than I have. And
1:30:32we also have Lydia here from Camp
1:30:34Buouie, Inc. who's been our a real
1:30:35partner in this effort.
1:30:37>> I'm curious, when is the public, like
1:30:39the residents and folks in that area
1:30:42going to be informed?
1:30:43>> So, uh, there's a few different methods
1:30:45for that. Um, we've been working with
1:30:47Camp, Inc. on setting up some community
1:30:49meetings in late September, early
1:30:50October to start getting the word out,
1:30:53allow folks opportunities to ask
1:30:55questions. Additionally, before zoning
1:30:57commission, they'll get a mailed public
1:30:59notice.
1:31:01And we've been going through the the
1:31:04district. I was there earlier this week
1:31:05driving around identifying all potential
1:31:07nonconformities. So, we have a list of
1:31:09those folks and can address some of
1:31:11their questions about that. That was a
1:31:12request from the council member and I
1:31:14believe it's also a requirement for the
1:31:15the zoning. Um, it's it's a long
1:31:18corridor and it's a little bit tedious
1:31:21going property by property. Uh, but
1:31:23we're working through that. We've gotten
1:31:24all the way to uh Altameir from the from
1:31:27the west. So, we've done camp uh western
1:31:30business and industrial arts and we're
1:31:32going to keep working our way east on
1:31:33that.
1:31:34>> As you work through that, the Horn
1:31:37Street corridor is still in that.
1:31:39>> Yes, the Horn Street corridor is still
1:31:41in the code. Um that is zone transition.
1:31:44These changes particularly related to
1:31:45use, none of those address the
1:31:47transition district. So, we're keeping
1:31:50that as is. We do have a meeting uh on
1:31:53Monday, I believe, with the Knack
1:31:55leadership to kind of go over that. And
1:31:57one of the things that we want to start
1:31:59talking about with the Knack is we
1:32:01understand that there might be a request
1:32:02for reszoning of Horn or rethinking
1:32:04that. So, we'll we're hoping to start
1:32:06that really in November once we kind of
1:32:07get through this legislative process and
1:32:10then be working on that November,
1:32:11December, and into 2027. I just want to
1:32:14be sure that there are not any surprises
1:32:16come to KOMO that we are not aware of
1:32:19because when they start changing and
1:32:22plopping stuff in, it does affect the
1:32:24neighborhood.
1:32:29>> Will those changes come in our next uh
1:32:32packet? Will we get to see those prior
1:32:34to the 22nd?
1:32:36>> Yes, you're going to get a redline
1:32:38version of the code. It'll I'm hopefully
1:32:40by the end of this month. Uh, but we'll
1:32:42make sure that you have ample time to
1:32:43review that and compare and contrast.
1:32:45>> Awesome. Thanks.
1:32:46>> That was pretty quick, by the way,
1:32:48updating your uh, presentation to show
1:32:50the October 22nd
1:32:51>> wishful thinking. Yeah, considering we
1:32:54just voted on it about an hour.
1:32:58>> Like those Super Bowl teams, they all
1:32:59print them up anyway, then whoever wins
1:33:05>> Thank you, Joe. Yeah. Yeah. Cool. Um,
1:33:09one final work session item and this is
1:33:11really to prepare for next month. So,
1:33:13every year we bring beforeward bring
1:33:15forward our rules of procedure for
1:33:16annual adoption. Um, so we're going to
1:33:19do that in advance of next month. It's
1:33:21largely going to stay the same. We're
1:33:23going to be making some small changes. I
1:33:24just want to go over. So, we're moving
1:33:26away from the term urban design officer
1:33:28to executive secretary, which is what a
1:33:30lot of the other boards and commissions
1:33:32utilize. Um, we're clarifying some of
1:33:35the filing deadlines. Um, also we've
1:33:39moved from 10 a.m. to 9:00 a.m. time.
1:33:41So, that's all getting updated.
1:33:43Simplifying some of the withdrawal
1:33:44language, the current rules of procedure
1:33:47that kind of separate out immediate
1:33:48versus delayed withdrawal. But really,
1:33:50in the end of the day, if someone's
1:33:51requesting a withdrawal of a case, it's
1:33:54just easier for to withdraw it. Um, and
1:33:57then transitioning from filing deadline
1:33:58language to filing requirements language
1:34:01to, you know, we deal with with cases
1:34:03that are as simple as an individual
1:34:05business wall sign. And the largest case
1:34:07we have right now is a 1.4 billion
1:34:0914story hospital tower. So the review
1:34:12timelines for those are drastically
1:34:13different. Um, and really the I think
1:34:16the most important thing is making sure
1:34:18that the case is reviewed by staff and
1:34:21uh really ready to be filed before you,
1:34:25not necessarily, oh, did you meet X or Y
1:34:27deadline? Um, and then we're removing
1:34:30language about denying with or without
1:34:32prejudice um after consulting with legal
1:34:35because design is so contextually based.
1:34:38you know, if you deny with prejudice one
1:34:41application, they can come back slightly
1:34:42tweak it and technically that's a new
1:34:44application because you're taking into
1:34:45consideration the whole context. So,
1:34:48it's really just you're denying it. They
1:34:50can come back and resubmit with an with
1:34:53a change design, but it just kind of
1:34:55clarifies that with the updated legal
1:34:57guidance. So, our hope is to bring this
1:35:01in front of you on October 22nd. Um, and
1:35:04again, this will send out in advance of
1:35:06next UDC, so you have time to review.
1:35:10Very good. Thank you very much. Anything
1:35:12else?
1:35:15That's all we got. Okay. Well, I want to
1:35:18thank Commissioner Hughes for your
1:35:19service
1:35:21and uh, welcome, Commissioner Hamza.
1:35:23And, uh,
1:35:26we will see everybody October 22nd. Have