What: Technical Review Committee reviews of the Long Savanna Parkway (45 acres, 5 lots, West Ashley, priority) and Long Savanna Neighborhood 10A Phase 2 (88 single-family lots at 670 Barons Dr) preliminary plats and road construction plans.
Where it stands: Both were on the 2026-09-03 agenda. The Parkway was at its sixth review (first reviewed June 2025); Neighborhood 10A Phase 2 was at its second review. No results have been read.