8th Avenue Bridge Replacement and Floodwalls
At a glance
- What: Replacement of the 8th Avenue Bridge together with floodwalls, estimated at $123,000,000.
- Where it stands: Plans and specifications were adopted on 2026-09-22. The City also posted a public presentation on the bridge on its YouTube channel (title dated 2026-08-26).
- Next: Bidding and construction schedule (not read).
Details
- Presentation video: https://www.youtube.com/watch?v=gjE_t6qcYN4 (before the 2026-09-01 window).
Sources
Log
2026-09-22 - City Council
- Plans and specifications adopted; estimate $123,000,000.